No. Particular Unit Quantity Rate Per Amount
Printing coat.
Bitumen at 20 lbs.per % Sft. Tons. 6.4 Tons.
Main carpet.
1/2" to 3/4" stone 3400 Cft. Cft. 5100 Cft.
3/8" to 1/2" stone 1700 Cft.
Bitumen at 4 lbs.per Cft. Tons. 10.29 Tons.
Sand at 5% of stone Cft. 255 Cft.
Bitumen for sand at 0.25 lbs.per Cft. Tons. 0.03 Tons.
Wearing Course.
1/4" to 1/2" chips at 3 Cft.per 100 Sft. Cft. 1900 Cft.
1/8" to 1/4" Chips
Bitumen at 35 lbs.per % Sft. Tons. 11.19 Tons.
Sand for final coat at 2 Cft.per % Sft. Cft. 1300 Cft.
Railway freight for bitumen Tons. 27.91 Tons.
Carriage to site Tons. 27.91 Tons.
Wood fire Cft. 804 Cft.
Labour for spreading, spraying, etc. no. 500 no.
Road roller charges M. Coat Day. 16 Day.
Road roller charges W. Coat Day. 4 Day.
Hire for boiler, etc. Day. 16 Day.
Wire and bristle brushes L-s L-s
Miscellaneous, tools & plant, camber board L-s L-s
Main carpet.
1" to 1-1/4" stone 7670 Cft. Cft. 11500 Cft.
1/4" to 3/4" stone 3830 Cft.
Bitumen at 3 lbs.per Cft. Tons. 20.31 Tons.
Sand at 5% of stone Cft. 575 Cft.
Bitumen for sand at 0.25 lbs.per Cft. Tons. 0.07 Tons.
Topping course.
1/2" to 3/4" chipping at 4.5 Cft.per 100 Sft. Cft. 3200
1/4" to 1/2" chipping bitumen at 4lb.per Cft. Tons. 6.45
Wearing Course.
1/4" to 1/2" chips at 4.5Cft.per 100 Sft. Cft. 2900 Cft.
1/8" to 1/4" Chips
Bitumen at 25 lbs.per % Sft. Tons. 8 Tons.
Sand for final coat at 2 Cft.per % Sft. Cft. 1300 Cft.
Railway freight for bitumen Tons. 34.83 Tons.
Carriage to site Tons. 34.83 Tons.
Wood fire Cft. 1065 Cft.
Labour for spreading, spraying, etc. no. 1000 no.
Road roller charges M. Coat Day. 25 Day.
Road roller charges W. Coat Day. 4 Day.
Hire for boiler, etc. Day. 25 Day.
Wire and bristle brushes L-s L-s
Miscellaneous, tools & plant, camber board L-s L-s
Bitumen for liquid seal coat at 1/4 Gal.per Tons. 9.25 Tons.
Sq. yard at 215 gallons a tons.1760 gallons
and wastage.
Freight on bitumen Tons. 9.25 Tons.
Carriage on bitumen Tons. 9.25 Tons.
Wood fuel for heating bitumen Cft. 267 Cft.
Labour for spraying no. 90 no.
3/8" grit or coarse sand for binding Cft. 1800 Cft.
Labour for spreading sand no. 40 no.
Steam road roller charges Day. 10 Day.
hire for boiler for heating bitumen Day. 6 Day.
Incidental charges such as L-s L-s
brushes,pouring can, oil , etc.
Remark
Task=140 Cft.
for 1 Digger.
Task=100 Cft.
for 1 Digger.
plain section
only ( outter in
hill section =
70 Cft. )
wood fuel req-
uired for a ste-
am roller for 1
day work is1/6
fathom or 36
Cft.=10Cwt.
1120 lb. If coal
is used 5Cwt.
or 560 lb. Is
necessary.
13%Wastage
13%Wastage
13%Wastage
13%Wastage
13%Wastage
13%Wastage
13%Wastage
13%Wastage
13%Wastage
13%Wastage