ANALYSIS OF RATES ( Roofing )

8/9/2020 19:58
No. Particular Unit Quantity Rate Per Amount

1 Danyingon ( mangalore pattern ) clay tile


roofing with 2"x 1" battens and 4"x 2"
common rafters. Sft. 100

Mangalore pattern clay tiles no. 156 no.


2"x 1"Battens at 13" centres Cft. 1.76 Cft.
4"x 2"Common rafters 2' centers Cft. 3.42 Cft.
Wire nails & spikes lbs. 2 lbs.
Binding wire L-s L-s

Carpenters no. 2 no.


Workers no. 2 no.

2 Danyingon ( mangalore pattern ) clay tile


roofing with 2"x 1" close battens and 4"x 2"
common rafters. Sft. 100

Manglore or marseilles tiles no. 156 no.


2"x 1"Close battens Cft. 9.58 Cft.
1-1/2"x 1"Ordinary batterns above Cft. 1.32 Cft.
close above
4"x 2"Common rafters 2'centers Cft. 3.42 Cft.
Wire nails & spikes lbs. 5 lbs.

Carpenters no. 3 no.


Workers no. 3 no.

3 Danyingon ( mangalore pattern ) clay tile


roofing with 2"x 1" battens but without frame Sft. 100
Mangalore pattern clay tiles no. 156 no.
2"x 1"Battens at 13" centres Cft. 1.76 Cft.
Wire nails & spikes lbs. 1.5 lbs.
Binding wire lbs. 0.5 lbs.

Carpenters no. 1.5 no.


Workers no. 2 no.

4 Danyingon ( mangalore pattern ) clay tile


roofing without frames. Sft. 100

Mangalore pattern clay tiles no. 156 no.


Wire nails & spikes lbs. 1.5 lbs.
Binding wire lbs. 0.5 lbs.

Carpenters no. 1.25 no.


Workers no. 1.5 no.

5 Galvd. C.I.roofing 24 or 30 B.W.G 7'x10/3 Sft. 100

Galvd.C.I.sheet 7'x 10/3 no. 7 no.


G.I.roofing nails lbs. 1.5 lbs.

Carpenters no. 1 no.


Workers no. 1 no.

6 Galvd.C.I.roofing laind on 1" planking Sft. 100

Galvd.C.I.sheet 7'x 10/3 no. 7 no.


G.I.roofing nails lbs. 1.5 lbs.
1"Thick planks Cft. 9.58 Cft.
Nails lbs. 2 lbs.

Carpenters no. 3 no.


Workers no. 1 no.
7 Roofing of 32 G. C.G.I sheets supplied and
fixed. Sft. 100

32 G. C.G.I sheets no. 9 no.


G.I roofing nails lbs. 1.5 lbs.

Carpenters no. 1.5 no.


Workers no. 1 no.

8 Wind ties for corrugated iron roofing Sft. 100

Flat iron 1-1/2"x 1/4"with nessary bolts hole lbs. 128 lbs.
3/8"Hook bolts 12" long with heads & nuts no. 25 no.

Carpenters no. 1 no.


Smith no. 3 no.
Workers no. 1 no.

9 Teak shingle roofing with 2"x 1" battens and


3"x 2" common rafters at 2' centers. Sft. 100

Teak shingles 15"x 15" no. 600 no.


2"x 1"Battens at 5"centers Cft. 4 Cft.
3"x 2"Common rafters 2' centers Cft. 2.52 Cft.
Nails & spikes lbs. 5 lbs.
Earth oil Gal. 4 Gal.
Fuel L-s L-s

Carpenters no. 2.5 no.


Workers no. 4 no.

10 Teak shingle roofing with 2"x1"close batten Sft. 100

Teak shingles 15"x 15" no. 600 no.


2"x 1"Battens at 5"centers Cft. 9.58 Cft.
Nails & spikes lbs. 9 lbs.
Earth oil Gal. 4 Gal.
Fuel L-s L-s

Carpenters no. 3 no.


Workers no. 4 no.

11 Thatch roofing with bamboo rafters & purlins Sft. 100

Bamboo rafters 9"centers 10' long no. 14 no.


Bamboo purlins 18"centers 10' long no. 7 no.
Bamboo small size for lattice work 10' long no. 20 no.
Thatch ( 6 no.to 1' ) no. 120 no.
Cane ties L-s L-s

Thatch layers no. 1 no.


Workers no. 1 no.

12 Wagat roofing with bamboo rafters & purlins Sft. 100

Bamboo rafters 2'centers 10' long no. 6 no.


Bamboo purlins 18"centers 10' long no. 7 no.
Bamboo small size for lattice work 10' long no. 20 no.
Wagat ( 6 no.to 1' ) no. 120 no.
Cane ties L-s L-s
Earth oil Gal. 1 Gal.
Fuel L-s L-s

Wagat layers no. 1 no.


Workers no. 1.25 no.

13 Wagat roofing with bamboo common rafters


1' centers and whole wind ties complete. Sft. 100

1-1/2" to 2" Ø Bamboo no. 20 no.


Hnee ( fine bamboo ) Viss. 1 Viss.
Wagat ( 6 no. to 1' ) no. 120 no.
Binding wire lbs. 0.25 lbs.
Earth oil Gal. 1 Gal.
Fuel L-s L-s

Wagat layer no. 1 no.


Workers no. 1.25 no.

14 Wagat roofing with 2"x 1" rafters 1' centers


and bamboo wind ties fixed at 2' centers
complete including earth oiling 2 coats to
timber & impregnating wagat with earth oil Sft. 100

2"x 1"Common rafters Cft. 1.75 Cft.


1-1/2" to 1"Ø Bamboo no. 8 no.
Wagat ( 6 no. to 1' ) no. 120 no.
Nails lbs. 1 lbs.
Binding wire lbs. 1 lbs.
Earth oil Gal. 1.333 Gal.
Fuel L-s L-s

Wagat layer no. 1 no.


Carpenters no. 0.333 no.
Workers no. 1.25 no.

15 Dhani, Thetke or Thatch roofing laid 6 byits


to 1' with 6" side laps and including 1-1/2"Ø
bamboo common rafters at 12" centers and
including a covering of bamboo lattice frame
and 1-1/2"Ø wind ties at 4' centers Sft. 160

1-1/2"Ø Bamboo rafters at 12" centers no. 11 no.


1-1/2"Ø Bamboo for lattice and wind ties no. 15 no.
Dhani, Thetke or Thatch ( 6 no.to 1' ) no. 120 no.
Hnee Viss. 1 Viss.
G.I binding wire lbs. 0.5 lbs.
Dhani or Thetke layers no. 1 no.
Workers no. 1 no.

16 Corrugated A.C sheet roofing with 1/4"Ø


hook bolts and washers. Sft. 100

Corrugated A.C sheet 7' long no. 5 no.


Hook bolts and washers lbs. 5 lbs.

Carpenters no. 2 no.


Workers no. 1 no.

17 Galvd iron ridge and hip covers with 6" lap. Rft. 100

Galvd iron ridge with G.I screws Rft. 8 Rft.

Carpenters no. 0.25 no.

18 Ridging of G.I plain sheet 2'-6" girth with 9"


end laps fixed complete. Rft. 100

G.I plain sheet Rft. 112 Rft.


G.I roofing nails & washers lbs. 1.5 lbs.

Carpenters no. 3.333 no.

19 Ridging of G.I plain sheet 24" girth with 9"


end laps fixed complete. Rft. 100

7' G.I plain sheet 24 G. Rft. 112 Rft.


G.I roofing nails with washers lbs. 1.5 lbs.

Carpenters no. 3.333 no.

20 Danyingon ( mangalore pattern ) clay ties


ridge and hip covering set in cement
mortar 1:2 Rft. 100

Mangalore or marseilles ridge tiles no. 90 no.


Cement mortar Cft. 2 Cft.

Masons no. 2 no.


Workers no. 2 no.

21 Wooden ridge and hip covers. Rft. 100

Ridge roll 1x 10'x 4"x 3" Cft. 0.92 Cft.


Boards 2x 10'x 9"x 1" Cft. 1.44 Cft.
Nails lbs. 0.75 lbs.

Carpenters no. 0.5 no.

22 20 B.W.G. 8'x 3' Zinc valley guttering 3'


wide laid on 12" x 1" planks & 2"x 1"fillets. Rft. 22

20.B.W.G 8'x 3' zinc sheet 9" lap Sht. 3 Sht.


Planks 2x 25'x 2"x 1" Cft. 4.79 Cft.
Fillets 2x 23'x 2"x 1" Cft. 0.73 Cft.
Nails lbs. 0.5 lbs.

Carpenters no. 1.5 no.

23 G.I valley guttering 3' wide without planks. Rft. 22.5

G.I plain sheets Sft. 72 Sft.


Nails lbs. 0.25 lbs.

Carpenters no. 1 no.

24 Valley gutter with G.I plain sheet 36" girth


with 9" end laps, supported on 1" valley
boards and 2"x 1" fillets including earth
oiling 2 coats. Rft. 22.5

G.I plain sheet Rft. 24 Rft.


Planks 6"x 1" Cft. 6.47 Cft.
Fillets 2"x 1" Cft. 0.73 Cft.
Earth oil Gal. 0.5 Gal.
Nails lbs. 0.75 lbs.

Carpenters no. 1.75 no.


Workers no. 0.25 no.

25 Valley gutter of 32 G. G.I plain sheet 24"


girth with 9" end laps supporeted on 1/2"
thick valley boards fixed complete with 2"x
1" fillets including earth oiling 2 coats. Rft. 100

G.I plain sheet Rft. 112 Rft.


Planka 6"x 1/2" Cft. 9.58 Cft.
Fillets 2"x 1" Cft. 3.19 Cft.
Nails lbs. 2.5 lbs.
Earth oil Gal. 5 Gal.

Carpenters no. 1.5 no.


Workers no. 1.5 no.

26 5 lbs.per set flashing 18" wide for 150 set. Rft. 100

7' x 3' Lead sheet 5 lbs./Sft. Sht. 9 Sht.


Composite motar Cft. 2.5 Cft.

Masons no. 2 no.


Smiths no. 2 no.
Workers no. 4 no.

27 Lead flashing 18" wide. Rft. 100


Lead sheet ( 7' x 3' ) Sht. 9 Sht.
Cement motar ( 1:3 ) Cft. 2.5 Cft.

Masons no. 2 no.


Tin smiths no. 2 no.
Workers no. 4 no.

28 5 lbs.per.Sft. Lead flashing 20" wide for


( 167 Sft. ) Rft. 100

5 lbs./Sft. Lead sheet Sft. 189 Sft.


Cement motar ( 1: 3 ) Cft. 2.5 Cft.

Masons no. 2 no.


Smiths no. 2 no.
Workers no. 4 no.

29 G.I plain sheet flashing 18" witdh. Rft. 100

G.I Plain sheet 7' x 3' Sht. 8 Sht.


Cement lbs. 75 lbs.
Sand Cft. 2.5 Cft.

Masons no. 2 no.


Smiths no. 2 no.
Workers no. 4 no.

30 Zinc flashing 18" wide with 6" lap. Rft. 13.5

Zinc sheet 7' x 3' no. 1 no.


Nails & screws lbs. 1 lbs.

Carpenters no. 1 no.

31 G.I / C.I Ring water pipe. Rft. 100


G.I / C.I Pipe Rft. 100 Rft.
Offsets and bends L-s L-s

Plumbers no. 3 no.


Mate no. 3 no.

32 Corrugated A.C or Trafford ridging with 1/4"


hook bolts and nuts and washers. Sft. 100

A.C Ridging tile no. 66 no.


1/4"Ø Bolts & nuts and washers lbs. 22 lbs.

Carpenters no. 3.33 no.


Workers no. 1 no.

33 Diamond shape cement tile roofing with 2"x


1" battens but without rafters. Sft, 100

Diamond shape tile no. 220 no.


2"x 1"Battens at 6" centers Cft. 3.52 Cft.
Wire nails lbs. 3 lbs.

Carpenters no. 2 no.


Workers no. 2 no.

34 Cement tile ridging for diamond shape


cement tile roofing, set in cement motar 1:2 Rft. 100

Cement tile ridge piece no. 74 no.


Cement motar Cft. 2 Cft.

Masons no. 2 no.


Eorkers no. 2 no.
Remark

20%Wastage
15%Wastage
10%Wastage

20%Wastage
15%Wastage
15%Wastage

10%Wastage
20%Wastage
15%Wastage

20%Wastage

15%Wastage
15%Wastage
10%Wastage

10%Wastage
Wind ties at
2-1/2' centers
Tilex 10-1/2no.
(30"x5') burdex
15 no. 22"x 5'

When G.I ridg-


ing & hip cove-
ring isto be
used for A-C
sheet roofing
allow 1 more
carpentes for
every 7-1/2'.
10%Wastage
15%Wastage

15%Wastage
15%Wastage
15%Wastage
15%Wastage

15%Wastage