ITEM DESCRIPTION QTY UNIT AMOUNT
SETTING - OUT

1 2" X 3" wood 60 Nr

2 Peg 5 Nr

3 3" Nail 1 bags

4 2" Nail 1 bags

5 Head pan 15 Nr

6 Shovel 15 Nr

7 Digger 5 Nr

SETTING-OUT CARRIED TO SUMMARY


ITEM DESCRIPTION QTY UNIT
FOUNDATION TO D P C

1 Cement 600 bags

2 Sharp Sand 30 trips

3 Granite @30 tones 7 trips

4 9" Block 3000 Nr

5 16mm diameter reinforment bar 200 Nr

6 12mm diameter reinforment bar 250 Nr

7 8mm diameter reinforment bar 150 Nr

8 Binding wire 4 Nr

9 1" X 12" wood 200 Nr

10 1" X 6" wood 50 Nr

11 1" X 1" wood 250 Nr

12 3" Nail 4 bags

13 2" Nail 5 bags

14 Laterite soil 60 trips

ITEM DESCRIPTION QTY UNIT


D P C TO GALLARY DECKING
PROPOSED CHURCH BUILDING

1 Cement 600 bags

2 Sharp Sand 30 trips

3 Granite @30 tones 7 trips

4 9" Block 3500 Nr

5 16mm diameter reinforment bar 500 Nr

6 12mm diameter reinforment bar 450 Nr

7 8mm diameter reinforment bar 150 Nr

8 Binding wire 3 Nr

9 1" X 12" wood 450 Nr

10 1" X 9" wood 100 Nr

11 1" X 6" wood 100 Nr

12 2" X 3" wood 300 Nr

13 1" X 1" wood 450 Nr

14 3" Nail 3 bags

15 2" Nail 1 bags

16 Bamboo 200 Nr

ITEM DESCRIPTION QTY UNIT


GALLARY DECKING TO PARAPET

1 Cement 550 bags

2 Sharp Sand 20 trips

3 Granite 5 trips

4 9" Block 3000 Nr

5 16mm diameter reinforment bar 220 Nr

6 12mm diameter reinforment bar 450 Nr

7 10mm diameter reinforment bar 150 Nr

8 8mm diameter reinforment bar 120 Nr

8 Binding wire 6 Nr

10 1" X 12" wood 400 Nr


PROPOSED CHURCH BUILDING

11 1" X 9" wood 100 Nr

12 1" X 6" wood 80 Nr

13 2" X 3" wood 250 Nr

14 3" Nail 3 bags

15 2" Nail 1 bags

ITEM DESCRIPTION QTY UNIT


ROOFING

ITEM DESCRIPTION QTY UNIT


ELECTRICAL AND MECHANICAL

ITEM DESCRIPTION QTY UNIT

LABOUR SUMMARY

SETTING-OUT 50,000.00

FOUNDATION TO D P C 3,500,000.00

D P C TO GALLARY DECKING 2,000,000.00

GALLARY DECKING TO PARAPET 2,000,000.00

TOTAL
LABOUR 7,550,000.00

Felix Adinnu A/C 3034635664 Firstbank.

Contractors representatives.

Name; Adinnu George .C.


Signature;
Date;

Name; Adinnu Felix


Signature;
Date;
PROPOSED CHURCH BUILDING

Client's representatives;

Name;
Signature;
Date;

Name;
Signature;
Date;

Name;
Signature;
Date;

Name;
Signature;
Date;

You might also like