Professional Documents
Culture Documents
2 Peg 5 Nr
5 Head pan 15 Nr
6 Shovel 15 Nr
7 Digger 5 Nr
8 Binding wire 4 Nr
8 Binding wire 3 Nr
16 Bamboo 200 Nr
3 Granite 5 trips
8 Binding wire 6 Nr
LABOUR SUMMARY
SETTING-OUT 50,000.00
FOUNDATION TO D P C 3,500,000.00
TOTAL
LABOUR 7,550,000.00
Contractors representatives.
Client's representatives;
Name;
Signature;
Date;
Name;
Signature;
Date;
Name;
Signature;
Date;
Name;
Signature;
Date;