HARGA SATUAN SEWA ALAT

B. HARGA BAHAN

No. Bahan/Material Satuan

A
Alat Potong
1 - Potong Keramik m2
1 - Grinda m2

Scafolding
1 - Frame + Cross set
1 - Uhead m2
1 - Jack base m2
1 - Roda 8" m2
1 - Roda 6" m2

Concrete Pump
1 - uk besar ls
Harga Satuan 230.00

7,451.00 77.17 6,479.20 971.88 7,451.08


7,451.00 77.17 6,479.20 971.88 7,451.08

25,000.00 77.17 6,479.20 971.88 7,451.08


5,000.00 77.17 6,479.20 971.88 7,451.08
5,000.00 77.17 6,479.20 971.88 7,451.08
- 77.17 6,479.20 971.88 7,451.08
- 77.17 6,479.20 971.88 7,451.08

3,250,000.00 77.17 6,479.20 971.88 7,451.08


7,451.00
7,451.00

7,451.00
7,451.00
7,451.00
7,451.00
7,451.00

7,451.00
RESUME BQ
PROYEK : COSTARINA
TYPE : BUTLERS HOUSE

NO ITEM DESCRIPTION UNIT TOTAL

1 PREPARATORY WORK LS 16,972,500.0000

2 STRUCTURE WORK LS 386,764,266.0903

AMOUNT 403,736,766.0903

SERVICE 10% 40,373,676.6090


AMOUNT 444,110,442.6994
HARGA SATUAN UPAH TENAGA KERJA
#REF! : #REF!
#REF! : #REF!
#REF! :
#REF! : #REF!
#REF! :

A. UPAH TENAGA KERJA

No. Uraian Satuan

1 Kepala Tukang Batu Hari - Orang


2 Kepala Tukang Besi Hari - Orang
2 Kepala Tukang Las Hari - Orang
3 Kepala Tukang Cat Hari - Orang
4 Kepala Tukang Kayu Hari - Orang
5 Kepala Tukang Listrik Hari - Orang
6 Mandor Hari - Orang
7 Pekerja / Knek / Pembantu tukang Hari - Orang
8 Tukang Batu Hari - Orang
9 Tukang Besi Hari - Orang
2 Tukang Las Hari - Orang
10 Tukang Cat Hari - Orang
11 Tukang Kayu Hari - Orang
12 Tukang Listrik Hari - Orang
13 Mekanik / montir Hari - Orang
14 Supir Dump Truck Hari - Orang
15 Operator Alat Berat Hari - Orang
TENAGA KERJA

Harga Satuan
(Rp.)

160,000.00
160,000.00
160,000.00
160,000.00
160,000.00
160,000.00
180,000.00
130,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00 3800000
150,000.00
160,000.00 126666.6667
HARGA SATUAN BAHAN BANGUNAN

B. HARGA BAHAN

No. Bahan/Material

A Bahan Pasir, Batu, Semen dan Beton


Pasir
1 - Pasir pasang

Batu
1 Bata Merah kecil
1 Bata Merah Besar
2 Bata Ringan tebal 7 cm
2 Bata Ringan tebal 10 cm
3 - Kerikil / koral beton

Semen
1 - Semen PC 50 kg
2 - Semen PC 50 kg
2 - Semen PC 40 kg
2 - Semen PC 40 kg
3 - Semen warna
4 Mortar Siap pakai
4 Mortar Mix 50 kg (MU-302), 4,35m2 / sak 50kg /10mm

B Bahan Langit-langit
1 Gypsum 9 mm
2 Rangka eka puring
3 Stoping 20 kg
4 Cornice gypsum uk. 7cm x 7cm
5 Plafond PVC Tebal 7 mm
6 Listplank tekstur kayu tebal 8mm
7 Joint tape
8 Cemen Board 9 mm
9 Dinabolt
10 Alumunium 1''x1''
11 Silent
12 Papan listplank GRC tebal 9 mm
13 Seng Partisi
13 Sckup
Seng Gypsum
Partisi

C Bahan Besi
1 C Baja Ringan
2 V baja Ringan
3 Besi hollow 2"x2"x2,3 mm
4 Besi hollow 1"x1"x1,6 mm
5 Besi hollow 1"x1,5"x1,6 mm
6 Pagar BRC 90 x 240
7 Pagar BRC 120 x 240
8 Baja tulangan wiremesh A 8 - 200
9 BSP Ø 2" Bahan Stainlees Steel 304 t. 1.2 mm
10 6mm
C Baja Ringan
11 8mm
V baja Ringan
12 10mm
C Baja Ringan
13 12mm
V baja Ringan
14 16mm
V baja Ringan
15 Kawat
V bajaIkat
Ringan
16 Hollow 1 1/2 x 2mm
17 Hollow 3/4 x 2mm
18 Dinabolt 10mm
19 besi Plat 2mm

D Bahan Paku
1 Paku Kayu 2" - 5"
2 Paku spandek
4 Sekrup 1"
5 Paku ramset hilti
6 scrup rangka baja ringan
7 Sekrup 1"
8 Screw ( Baut )

F Bahan Finishing
1 Pek. Cat dinding Interior (Jotun Premium)
2 Pek. Cat dinding Exterior (Jotun Premium)
1 Pek. Sealer dinding Interior (Jotun Premium)
2 Pek. Sealer dinding Exterior (Jotun Premium)
3 Cat Plafond
4 Minyak bekisting
5 Plamir
Minyak Bekisting
6 Ampelas
Cat meni
7 Kuas/roll
Thiner
8 Cat Dasar ( Sealer )
9 Cat meni kayu
10 Cat minyak
11 Dempul kayu
12 Minyak cat
13 Tiner
13 Varnish Mowilex (Daya seber 6m2 / ltr)

F Anti Bocor
1 Sika Top 107 Bubuk (20 kg)
2 Sika Top 107 Cair (5 kg = 7,2 ltr)

G Bahan Lantai
1 Keramik 60 x 60 cm homogeneus kelas 1
2 Keramik polos 30 x 30 cm
3 Plint keramik 10 x 60 cm
4 Keramik 30 x 60 cm
5 Keramik 30 x 30 cm ( un polish )

G Bahan Dinding
4 Keramik 30 x 60 cm
4 Batu Alam Marmo Putih MCE 10x20

H Bahan Penutup Atap


1 Atap
Plintspandek
keramik polos
10 x 60
0.42
cm setara roman
2 Rabung
Keramikspandek
30 x 30 cm KW-I + step noshing setara roman
7 Atap spandek motif genteng
8 Tunjuk langit

I Bahan Kayu
1 Kayu
Plint Rangka
keramik/10
Kaso
x 60 cm setara roman
2 Triplex
Plint keramik
9mm (1,2x2,4)
10 x 60 cm setara roman

J Bahan Ready mix


1 K-225
Plint keramik 10 x 60 cm setara roman
2 K-250
Keramik 30 x 30 cm KW-I + step noshing setara roman
7 K-275
8 K-300
Tunjuk langit

K Keramik
1 uk.
Plint
60x60
keramik 10 x 60 cm setara roman
1 uk.
Plint
30x30
keramik 10 x 60 cm setara roman
1 uk.
Plint
30x60
keramik 10 x 60 cm setara roman

K Pintu
1 Pintu
PintuPanel
Panel
2 Pintu
PintuDouble
Panel Tripleks
3 Pintu
PintuPVC
Panel
4 Kusen
Plint keramik
Kayu 10 x 60 cm setara roman
5 Kusen
Plint keramik
Aluminium
10 x 60 cm setara roman
10 Engsel
Plint keramik
Pintu 4"10 x 60 cm setara roman
11 Kunci
Plint keramik
Engkol 10 x 60 cm setara roman
12 Kunci
Plint keramik
Bulat 10 x 60 cm setara roman

K Jendela
1 Jendela
Pintu Panel
uk 1.35 x 1.34 (Slide)
2 Jendela
Pintu Panel
uk 1.35 x 1.12 (Slide)
3 Jendela
Pintu Panel
uk 1.35 x 1.02 (Slide)
4 Jendela
Plint keramik
uk 1.3510x x0,58
60 cm
(Slide)
setara roman
5 Jendela
Plint keramik
uk 0,975
10 x 0,50
60 cm(Slide)
setara roman

K Rolling Door
Rolling Door Alumunium uk. 320 x 328 (Tanpa Motor)

K Jendela
ACS KAMAR MANDI
1 Kloset
Pintu Duduk
Panel Merk Toto CW637J
2 Wastfel
Pintu Panel
Toto LW 830 CJ
3 Hand
PintuShower
Panel
4 Floor
Plint Drain
keramik
Plastik
10 x 60 cm setara roman
5 Kran
PlintAir
keramik
PVC 10 x 60 cm setara roman
6 Kitchen Sink Inobe 6045 uk. 60 x 45

K Jendela
Jaringan Air Kotor & Air Bersih
1 PVC
PintuWavin
Panel3/4"
2 Elbow
Pintu 3/4"
Panel
3 Tee
Pintu
3/4"
Panel
4 PVC
PlintWavin
keramik
3" 10 x 60 cm setara roman
5 Elbow
Plint keramik
3" 10 x 60 cm setara roman
6 Tee 3"
7 PVC Wavin 4"
8 Elbow 4"
9 Tee 4"
10 PVC Wavin 6"
10 Lem Pipa
Satuan Harga Satuan 230.00

m3 250,000.00 242,857.14 36,428.57


- - -
- -
bh 600.00 520.00 78.00
bh 2,012.00 1,750.00 262.50
bh 12,500.00 11,000.00 1,650.00
bh 17,250.00 15,000.00 2,250.00
m3 558,571.00 485,714.29 485,714.29 72,857.14
- - -
- -
zak 75,000.00 60,000.00 9,000.00
kg 1,500.00 1,200.00 180.00
zak 56,000.00 49,000.00 7,350.00
kg 1,400.00 1,200.00 180.00
kg 13,000.00 12,500.00 1,875.00
kg 5,000.00 3,750.00 562.50
kg 2,070.00 41.40 90,000.00 13,500.00

- - -
m2 25,000.00 25,000.00 3,750.00
m1 1,800.00 1,800.00 270.00
zak 120,000.00 50,000.00 7,500.00
m' 5,000.00 7,000.00 1,050.00
m2 180,000.00 180,000.00 27,000.00
m' 20,000.00 25,146.00 3,771.90
m1 500.00 300.00 45.00
Lbr 170,000.00 200.00 178,200.00 26,730.00
bh 2,500.00 3,989.70 598.46
m' 9,000.00 9,959.40 1,493.91
botol 60,000.00 43,263.00 6,489.45
m' 20,000.00 18,562.50 2,784.38
m2 30,000.00 31,680.00 4,752.00
pc 500.00 300.00 45.00
- - -
- - -
btg 42,000.00 37,125.00 5,568.75
btg 27,000.00 27,225.00 4,083.75
m' 40,986.00 35,640.00 5,346.00
m' 13,662.00 11,880.00 1,782.00
m' 19,923.00 17,325.00 2,598.75
m' 177,890.00 154,687.50 23,203.13
m' 187,374.00 162,934.20 24,440.13
m2 50,367.00 43,797.60 6,569.64
m' 345,000.00 300,000.00 45,000.00
ton 12,650,000.00 11,000,000.00 1,650,000.00
ton 14,375,000.00 12,500,000.00 1,875,000.00
ton 13,570,000.00 11,800,000.00 1,770,000.00
ton 13,570,000.00 11,800,000.00 1,770,000.00
ton 13,570,000.00 11,800,000.00 1,770,000.00
kg 20,700.00 18,000.00 2,700.00
btg 97,750.00 85,000.00 12,750.00
btg 63,250.00 55,000.00 8,250.00
btg 1,725.00 1,500.00 225.00
m2 212,750.00 185,000.00 27,750.00

- - -
kg 25,000.00 20,000.00 3,000.00
bh 300.00 700.00 105.00
kotak 35,000.00 35,000.00 5,250.00
set 125,000.00 125,000.00 18,750.00
bh 100.00 200.00 30.00
bh 100.00 200.00 30.00
bh 100.00 300.00 45.00
- - -
- - -
kg 50,000.00 100,000.00 15,000.00
kg 65,000.00 72,500.00 157,000.00 23,550.00
kg 29,100.00 100,000.00 15,000.00
kg 30,900.00 72,500.00 157,000.00 23,550.00
kg 15,000.00 100,000.00 15,000.00
Ltr 9,000.00 8,000.00 1,200.00
kg 20,000.00 20,000.00 3,000.00
lbr 3,000.00 3,000.00 450.00
bh 20,000.00 20,000.00 3,000.00
kg 37,500.00 25,000.00 3,750.00
kg 40,000.00 35,000.00 5,250.00
kg 70,000.00 75,000.00 11,250.00
kg 25,000.00 25,000.00 3,750.00
kg 70,000.00 50,000.00 7,500.00
ltr 15,000.00 15,000.00 2,250.00
ltr 86,250.00 75,000.00 11,250.00
- - -
- - -
zak 201,250.00 175,000.00 26,250.00
ltr 27,951.00 72,500.00 24,305.56 3,645.83

- - -
m2 90,000.00 150,000.00 22,500.00
m2 70,000.00 75,000.00 11,250.00
m' 25,000.00 25,000.00 3,750.00
m2 125,000.00 135,000.00 20,250.00
m2 90,000.00 80,000.00 12,000.00
- 50,000.00 - -
- - -
m2 125,000.00 135,000.00 20,250.00
m2 184,000.00 160,000.00 24,000.00

- - -
m2 60,000.00 1.43 70,000.00 10,500.00
m' 40,000.00 57,142.86 41,000.00 6,150.00
m2 150,000.00 106,000.00 15,900.00
bh 900,000.00 900,000.00 135,000.00

- -
ton 3,680,000.00 3,200,000.00 480,000.00
lbr 150,650.00 131,000.00 19,650.00

- - -
m3 1,209,000.00 1.43 930,000.00 279,000.00
m3 1,235,000.00 57,142.86 950,000.00 285,000.00
m3
m3 1,261,000.00 970,000.00 291,000.00

- - -
m3 143,750.00 1.43 125,000.00 18,750.00
m3 69,000.00 1.43 60,000.00 9,000.00
m3 161,000.00 1.43 140,000.00 21,000.00

- - -
unit 920,000.00 1.43 800,000.00 120,000.00
unit - 1.43 - -
set 460,000.00 1.43 400,000.00 60,000.00
unit - 1.43 - -
unit 80,000.00 1.43 80,000.00 12,000.00
set 7,980.00 1.43 7,000.00 980.00
pcs 136,800.00 1.43 120,000.00 18,000.00
pcs 159,600.00 1.43 - -

- - -
unit 1,288,000.00 1.43 1,120,000.00 168,000.00
unit 994,750.00 1.43 865,000.00 129,750.00
set 943,000.00 1.43 820,000.00 123,000.00
unit 575,000.00 1.43 500,000.00 75,000.00
unit 368,000.00 1.43 320,000.00 48,000.00

- - -
unit 977,500.00 850,000.00 127,500.00

- - -
unit 4,370,000.00 1.43 3,800,000.00 570,000.00
unit 2,070,000.00 1.43 1,800,000.00 270,000.00
unit 172,500.00 1.43 150,000.00 22,500.00
pcs 12,000.00 1.43 8,000.00 1,200.00
pcs 35,000.00 1.43 8,000.00 1,200.00
pcs 747,500.00 650,000.00 97,500.00

- - -
m1 8,970.00 1.43 7,800.00 1,170.00
pcs 4,600.00 1.43 4,000.00 600.00
pcs 5,750.00 1.43 5,000.00 750.00
m1 40,537.00 1.43 35,250.00 5,287.50
pcs 11,500.00 1.43 10,000.00 1,500.00
pcs 17,250.00 15,000.00 2,250.00
m1 63,738.00 55,425.00 8,313.75
pcs 17,250.00 15,000.00 2,250.00
pcs 20,700.00 18,000.00 2,700.00
m1 129,432.00 112,550.00 16,882.50
m1 201.00 175.00 26.25

175.00
279,285.71 279,285.00
- -
- -
598.00 598.00
2,012.50 2,012.00
12,650.00 12,650.00
17,250.00 17,250.00
558,571.43 558,571.00
- -
- -
69,000.00 69,000.00
1,380.00 1,380.00
56,350.00 56,350.00
1,380.00 1,380.00
14,375.00 14,375.00
4,312.50 4,312.00
103,500.00 103,500.00

- -
28,750.00 28,750.00
2,070.00 2,070.00 3.6
57,500.00 57,500.00 10000
8,050.00 8,050.00 2777.77777778
207,000.00 207,000.00 11111.1111111
28,917.90 28,917.00
345.00 345.00
204,930.00 204,930.00
4,588.16 4,588.00
11,453.31 11,453.00
49,752.45 49,752.00
21,346.88 21,346.00
36,432.00 36,432.00
345.00 345.00
- -
- -
42,693.75 42,693.00 2800000
31,308.75 31,308.00 80000
40,986.00 40,986.00 9523.80952381
13,662.00 13,662.00
19,923.75 19,923.00
177,890.63 177,890.00
187,374.33 187,374.00
50,367.24 50,367.00
345,000.00 345,000.00
12,650,000.00 12,650,000.00 2800000
14,375,000.00 14,375,000.00 80000
13,570,000.00 13,570,000.00 2800000
13,570,000.00 13,570,000.00 80000
13,570,000.00 13,570,000.00 2285.71428571
20,700.00 20,700.00 65.306122449
97,750.00 97,750.00
63,250.00 63,250.00
1,725.00 1,725.00
212,750.00 212,750.00

- -
23,000.00 23,000.00
805.00 805.00
40,250.00 40,250.00
143,750.00 143,750.00
230.00 230.00
230.00 230.00
345.00 345.00
- -
- -
115,000.00 115,000.00
180,550.00 180,550.00
115,000.00 115,000.00
180,550.00 180,550.00
115,000.00 115,000.00
9,200.00 9,200.00
23,000.00 23,000.00
3,450.00 3,450.00
23,000.00 23,000.00
28,750.00 28,750.00
40,250.00 40,250.00
86,250.00 86,250.00
28,750.00 28,750.00
57,500.00 57,500.00
17,250.00 17,250.00
86,250.00 86,250.00
- -
- -
201,250.00 201,250.00
27,951.39 27,951.00

- -
172,500.00 172,500.00
86,250.00 86,250.00
28,750.00 28,750.00
155,250.00 155,250.00
92,000.00 92,000.00
- -
- -
155,250.00 155,250.00
184,000.00 184,000.00

- -
80,500.00 80,500.00
47,150.00 47,150.00
121,900.00 121,900.00 168750
1,035,000.00 1,035,000.00

- -
3,680,000.00 3,680,000.00
150,650.00 150,650.00

- -
1,209,000.00 1,209,000.00
1,235,000.00 1,235,000.00
168750
1,261,000.00 1,261,000.00

- -
143,750.00 143,750.00
69,000.00 69,000.00
161,000.00 161,000.00

- -
920,000.00 920,000.00
- -
460,000.00 460,000.00
- -
92,000.00 92,000.00
7,980.00 7,980.00
138,000.00 138,000.00
- -

- -
1,288,000.00 1,288,000.00
994,750.00 994,750.00
943,000.00 943,000.00
575,000.00 575,000.00
368,000.00 368,000.00

- -
977,500.00 977,500.00

- -
4,370,000.00 4,370,000.00
2,070,000.00 2,070,000.00
172,500.00 172,500.00
9,200.00 9,200.00
9,200.00 9,200.00
747,500.00 747,500.00

- -
8,970.00 8,970.00
4,600.00 4,600.00
5,750.00 5,750.00
40,537.50 40,537.00
11,500.00 11,500.00
17,250.00 17,250.00
63,738.75 63,738.00
17,250.00 17,250.00
20,700.00 20,700.00
129,432.50 129,432.00
201.25 201.00
BILL OF QUANTITY
Pekerjaan Retaining Wall

No Uraian Pekerjaan Spesifikasi Bahan Volume Unit

a b c d e

A PEKERJAAN PONDASI
1 Bouwplank Kayu Meranti (Kaso & Papan) 135.50 m1
2 Galian Tanah Pondasi Tapak Menerus & Sloof Manual 202.50 m3
3 Urugan Tanah Kembali Bekas Galian - 153.90 m3
4 Urugan Pasir Bawah Pondasi Tapak & Sloof T = 2 cm - 13.55 m3
5 Lantai Kerja Bawah Pondasi Tapak & Sloof T = 3 cm Site Mix 1:3:5 8.13 m3
6 Pondasi Tapak Menerus
a. Beton Ready Mix K-300 81.30 m3
b. Bekisting Papan / Multiplek 68.75 m2
c. Pembesian D 16 mm - 15 cm & D 12 mm - 15 cm 12,701.77 kg
d. Sewa Concrete Pump - ls

B PEKERJAAN DINDING
1 Dinding Beton
a. Beton Ready Mix K-300 203.25 m3
b. Bekisting (3 x Pemakaian) Papan / Multiplek 1,626.00 m2
c. Pembesian D 12 mm - 15 cm 24,322.25 kg
d. Sewa Concrete Pump 3.00 kali
2 Water Proofing Sisi Luar Sikatop 107 Cair & Bubuk 813.00 m2
3 Resapan Air Pipa Wavin 3/4" (4 btg / m2) 813.00 m1
Harga Satuan Jumlah Harga Jumlah Total
Upah Bahan +Alat Bahan + Upah Jumlah Upah Jlh Bahan & Alat Bahan + Upah
Rp Rp Rp Rp Rp Rp
f g h(f+g) i(dxf) j(dxg) k(dxh)

7,633.18 3,921.12 11,554.30 1,034,295.56 531,312.21 1,565,607.77


30,640.00 - 30,640.00 6,204,600.00 - 6,204,600.00 2,000,000.00
25,509.00 - 25,509.00 3,925,835.10 - 3,925,835.10 800,000.00
25,509.00 250,000.00 275,509.00 345,646.95 3,387,500.00 3,733,146.95 400,000.00
270,400.00 717,724.63 988,124.63 2,198,352.00 5,835,101.24 8,033,453.24 3,200,000.00

124,041.45 1,261,000.00 1,385,041.45 10,084,569.95 102,519,300.00 112,603,869.95


15,358.49 67,346.15 82,704.64 1,055,896.23 4,630,047.74 5,685,943.97 202.50
2,500.00 14,070.00 16,570.00 31,754,425.00 178,713,903.90 210,468,328.90
- 3,250,000.00 3,250,000.00 - - - 48.60
JLH 56,603,620.79 295,617,165.09 352,220,785.87

10.00

124,041.45 1,261,000.00 1,385,041.45 25,211,424.87 256,298,250.00 281,509,674.87


6,143.40 65,188.82 71,332.22 9,989,162.26 105,997,028.28 115,986,190.55 202.50
2,500.00 14,070.00 16,570.00 60,805,625.00 342,214,057.50 403,019,682.50
- 3,250,000.00 3,250,000.00 - 9,750,000.00 9,750,000.00 48.60
20,943.40 76,866.13 97,809.52 17,026,981.13 62,492,159.63 79,519,140.76
4,122.31 8,970.00 13,092.31 3,351,441.32 7,292,610.00 10,644,051.32 813.00
JLH 116,384,634.59 784,044,105.41 900,428,740.00
TOTAL 172,988,255.37 1,079,661,270.50 1,252,649,525.87

1,276,666.09 7,967,979.86 9,244,645.95


S1 S2 B1 B2 B3
0.70 0.50 0.70 0.70 0.50 8.45
0.70 0.50 0.70 0.70 0.50 20.4
20.34
6.944
47.68

22.48 8.82
S1 S2

#DIV/0! 1.35 0.90

S1 S2 B1 B2 B3
50.81
16.94
- -
4.07 67.50 S1 S2

203.25
- 203.25
#DIV/0! 1.35 0.90
0.24 1.35 0.90
10.80 74.40
9.60 65.60
8.40 59.20
2.16 21.60
20.16 146.40
7.00 36.60

BETON

- -

BETON

- -
- -
BILL OF QUANTITY
Butlers House Renovation Works Russia 33-36 Coastarina (Structure)
Harga Satuan Jumlah Harga Jumlah Total
No Uraian Pekerjaan Spesifikasi Bahan Volume Unit Upah Bahan +Alat Bahan + Upah Jumlah Upah Jlh Bahan & Alat Bahan + Upah
Rp Rp Rp Rp Rp Rp
a b c d e f g h(f+g) i(dxf) j(dxg) k(dxh)

C PEKERJAAN ARSITEKTUR

LANTAI I, II & III


Pekerjaan Lantai
1 Lantai Corridor (Elv. -0.05), Finish Acian Rabat Beton Tebal 12 cm Finish Acian 1Pc : 3Psr : 5Krl 19.53 m2 55,709.12 116,408.69 172,117.82 1,087,999.17 2,273,461.80 3,361,460.97
Finish Keramik 60x60 (Topgress Double Loading
2 Lantai Ruang Utama 77.17 m2 48,867.92 166,666.67 215,534.59 3,771,137.74 12,861,666.67 16,632,804.40
Polish DL Cream, SY6236
3 Lantai K. Mandi (Elv. -0.05) Finish Keramik 30x30 Asia Tile Murano 6.36 m2 41,886.79 91,916.67 133,803.46 266,400.00 584,590.00 850,990.00
4 Keramik Meja Dapur 2.48 m2 48,867.92 166,666.67 215,534.59 120,948.11 412,500.00 533,448.11
Finish Keramik 60x60 (Topgress Double Loading
5 Lantai Tangga 12.03 m2 48,867.92 166,666.67 215,534.59 587,881.13 2,005,000.00 2,592,881.13
Polish DL Cream, SY6236
6 Keramik Meja Wastafel 0.84 m2 48,867.92 166,666.67 215,534.59 41,049.06 140,000.00 181,049.06
5,875,415.21 18,277,218.47 24,152,633.68

Pekerjaan Dinding
1 Dinding Kisi Kisi Aluminium Corridor 4.57 m2 - 1,500,000.00 1,500,000.00 - 6,851,250.00 6,851,250.00
2 Dinding Bata Ringan Bata Ringan Spesi 1pc : 3ps 325.30 m2 25,000.00 202,836.21 227,836.21 8,132,412.50 65,981,908.18 74,114,320.68
3 Plesteran & Acian Dinding Finishing Acian Mortar 514.16 m2 20,657.89 66,063.83 86,721.72 10,621,494.14 33,967,477.82 44,588,971.96
4 keramik Dinding K.Mandi Keramik 30x60 23.19 m2 55,849.06 179,333.33 235,182.39 1,295,167.55 4,158,829.67 5,453,997.21
5 Camprot Dinding 14.38 m2 20,657.89 22,777.78 43,435.67 297,143.16 327,635.56 624,778.71
6 Tali Air 8.04 m1 13,600.00 7,567.67 21,167.67 109,344.00 60,844.04 170,188.04
7 Cat Dinding Dalam 318.06 m2 19,200.00 19,775.00 38,975.00 6,106,694.40 6,289,577.18 12,396,271.58
8 Cat Dinding Luar 172.91 m2 19,200.00 23,975.00 43,175.00 3,319,948.80 4,145,613.15 7,465,561.95
9 Dinding Batu Alam 11.27 m2 55,849.06 212,261.90 268,110.96 629,477.51 2,392,414.54 3,021,892.05
30,511,682.06 124,175,550.12 154,687,232.18

Pekerjaan Kusen, Daun Pintu, Jendela, Engsel & Kunci

Panel, Finishing Cat, Kusen Aluminium, Casement


1 P1 uk. 80 x 221 3.00 unit 163,858.52 1,160,740.00 1,324,598.52 491,575.56 3,482,220.00 3,973,795.56
Stay Swing, Door lock
Panel, Finishing Cat, Kusen Aluminium, Casement
2 P2 uk. 80 x 221 1.00 unit 163,858.52 1,160,740.00 1,324,598.52 163,858.52 1,160,740.00 1,324,598.52
Stay Swing, Door lock
Panel, Finishing Cat, Kusen Aluminium, Casement
3 P3 uk. 75 x 221 3.00 unit 163,858.52 1,160,740.00 1,324,598.52 491,575.56 3,482,220.00 3,973,795.56
Stay Swing, Door lock
4 P4 uk. 70 x 195 PVC, Door Lock 2.00 unit 54,619.51 460,000.00 514,619.51 109,239.01 920,000.00 1,029,239.01
Kaca Figure Glass T=5mm, Kusen Alumunium 4/10,
5 J1 uk. 134 x 135 1.00 unit 38,169.04 1,288,000.00 1,326,169.04 38,169.04 1,288,000.00 1,326,169.04
Daun Aluminium 3/6, Finish Powder Coating
Kaca Figure Glass T=5mm, Kusen Alumunium 4/10,
6 J2 uk. 112 x 135 1.00 unit 38,169.04 994,750.00 1,032,919.04 38,169.04 994,750.00 1,032,919.04
Daun Aluminium 3/6, Finish Powder Coating
Kaca Figure Glass T=5mm, Kusen Alumunium 4/10,
7 J3 uk. 102 x 135 3.00 unit 38,169.04 943,000.00 981,169.04 114,507.11 2,829,000.00 2,943,507.11
Daun Aluminium 3/6, Finish Powder Coating
Kaca Figure Glass T=5mm, Kusen Alumunium 4/10,
8 J4 uk. 58 x 135 2.00 unit 38,169.04 575,000.00 613,169.04 76,338.08 1,150,000.00 1,226,338.08
Daun Aluminium 3/6, Finish Powder Coating
Kaca Figure Glass T=5mm, Kusen Alumunium 4/10,
9 BV uk. 97,5 x 50 1.00 unit 38,169.04 368,000.00 406,169.04 38,169.04 368,000.00 406,169.04
Daun Aluminium 3/6, Finish Powder Coating
10 RD uk. 320 x 328 Plat Alumunium Tanpa Motor 10.50 unit 120,000.00 977,500.00 1,097,500.00 1,259,520.00 10,259,840.00 11,519,360.00
2,821,120.96 25,934,770.00 28,755,890.96

Pekerjaan Canopy
1 Canopy Teras Sky light Rangka Hollow 100 x 50 mm Penutup Kaca 6+6 18.75 m2 - 2,500,000.00 2,500,000.00 - 46,875,000.00 46,875,000.00
2 Acian Kanopy Beton (Elv. 6.40) 16.67 m2 15,149.12 8,750.00 23,899.12 252,596.47 145,897.50 398,493.97
252,596.47 47,020,897.50 47,273,493.97
252,596.47 47,020,897.50 47,273,493.97
Pekerjaan Railing
1 Railing Tangga Rangka Hollow Finish Cat 7.79 m2 509,260.00 92,026.01 601,286.01 3,964,589.10 716,422.50 4,681,011.60
3,964,589.10 716,422.50 4,681,011.60

Pekerjaan Atap
1 Plafond Plafond Gypsum T=9mm, Rangka Ekafuring, Cat 68.10 m2 54,392.00 57,768.65 112,160.66 3,704,095.51 3,934,045.12 7,638,140.63
1 Waterproofing Dak Atap Sika Top seel 107 (cair + Bubuk) 67.05 m2 20,943.40 76,866.13 97,809.52 1,404,160.47 5,153,527.78 6,557,688.26
1 Atap Kaca Skylight Rangka Hollow 100 x 50 mm Penutup Kaca 6+6 5.94 m2 1,800,000.00 1,800,000.00 - 10,694,700.00 10,694,700.00
5,108,255.98 19,782,272.90 24,890,528.88

Pekerjaan Sanitair
1 Klosed Duduk Merk Toto 2.00 pcs 170,882.49 4,370,000.00 4,540,882.49 341,764.97 8,740,000.00 9,081,764.97
2 Wastafel 2.00 pcs 120,812.81 2,070,000.00 2,190,812.81 241,625.62 4,140,000.00 4,381,625.62
3 Shower 1.00 pcs 47,469.04 172,500.00 219,969.04 47,469.04 172,500.00 219,969.04
4 Floor Drain 2.00 pcs 5,250.00 12,000.00 17,250.00 10,500.00 24,000.00 34,500.00
5 kran air 1.00 pcs 5,250.00 35,000.00 40,250.00 5,250.00 35,000.00 40,250.00
6 Kitchen Sink 1.00 pcs 56,400.00 747,500.00 803,900.00 56,400.00 747,500.00 803,900.00
703,009.63 13,859,000.00 14,562,009.63

49,236,669.41 249,766,131.50 299,002,800.91

D PEKERJAAN MP / UTILITAS
PEKERJAAN JARINGAN PIPA
1 Jaringan Air Bersih PVC 3/4" Wavin, Elbow & Tee (Seri D) 63.60 m1 4,122.31 11,437.77 15,560.08 262,179.17 727,442.00 989,621.17
2 Jaringan Air Kotor & Air Hujan PVC 3" Wavin, Elbow & Tee (Seri D) 67.70 m1 6,870.26 44,995.64 51,865.90 465,116.40 3,046,204.90 3,511,321.30
3 Jaringan Air Kotor Induk PVC 6" Wavin, Elbow & Tee (Seri D) 15.10 m1 10,992.41 61,578.64 72,571.05 165,985.41 929,837.47 1,095,822.88
4 Jaringan Air Tinja PVC 4" Wavin, Elbow & Tee (Seri D) 27.20 m1 6,870.26 68,282.12 75,152.37 186,870.99 1,857,273.60 2,044,144.59
1,080,151.98 6,560,757.97 7,640,909.94
PEKERJAAN BAK KONTROL 70x70x70 (6 unit)
1 Lantai Rabat Tebal 10cm site Mix 0.29 m3 270,400.00 717,724.63 988,124.63 79,497.60 211,011.04 290,508.64
2 Dinding 1/2 Bata site Mix 10.29 m3 35,171.57 60,333.33 95,504.90 361,915.44 620,830.00 982,745.44
3 Plester Papan / Multiplek 20.58 m2 16,526.32 24,444.44 40,970.76 340,111.58 503,066.67 843,178.25
4 Tutup Beton Tebal 8cm D10 - 20CM 1 Lapis
a. Beton 0.24 m3 270,400.00 717,724.63 988,124.63 63,598.08 168,808.83 232,406.91
b. Pembesian 21.07 kg 2,500.00 13,659.35 16,159.35 52,677.97 287,818.79 340,496.76
c. bekisting 4.28 m2 15,358.49 74,501.70 89,860.20 65,795.77 319,165.30 384,961.08
963,596.44 2,110,700.64 3,074,297.08
PEKERJAAN SEPTIKTANK
1 Lantai Kerja Pasir 0.04 m3 - 170,000.00 170,000.00 - 6,732.00 6,732.00
2 Rabat Beton Lantai Rabat Beton 1Pc : 3Psr : 5Krl 0.13 m3 270,400.00 717,724.63 988,124.63 36,017.28 95,600.92 131,618.20
3 Dinding Bata Merah 1/2 bata Bata Merah kecil Spesi 1pc : 3ps 10.95 m2 35,171.57 60,333.33 95,504.90 385,128.68 660,650.00 1,045,778.68
5 Tutup Beton
a. Beton Site Mix 1Pc : 2Psr : 3Krl 0.13 m3 270,400.00 717,724.63 988,124.63 35,422.40 94,021.93 129,444.33
b. Bekisting Papan / Multiplek 1.31 m2 15,358.49 74,501.70 89,860.20 20,119.62 97,597.23 117,716.86
c. Pembesian - 6.81 kg 2,500.00 13,659.35 16,159.35 17,030.00 93,047.52 110,077.52
6 Plesteran 21.90 m2 16,526.32 24,444.44 40,970.76 361,926.32 535,333.33 897,259.65
855,644.29 1,582,982.93 2,438,627.23

2,899,392.71 10,254,441.53 13,153,834.25


Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 PEMBUATAN BOUWPLANK/M1 M1
Upah
Mandor 0.001285 OH 180,000.00 231.31
Kepala Tukang Kayu 0.001285 OH 160,000.00 205.61
Tukang Kayu 0.025701 OH 150,000.00 3,855.14
Pekerja Tak Terampil 0.025701 OH 130,000.00 3,341.12

Jumlah : 7,633.18

Bahan/Material
Kayu 2/2 0.000334 ton 3,680,000.00 1,227.34
Kayu 1/2 0.000727 ton 3,680,000.00 2,675.60
Paku Campuran 2" s/d 3" 0.000727 Kg 25,000.00 18.18
Jumlah : 3,921.12

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 11,554.30

2 PENGALIAN TANAH M3
Upah
Mandor 0.007000 OH 180,000.00 1,260.00
Pekerja Tak Terampil 0.226000 OH 130,000.00 29,380.00
Jumlah : 30,640.00

Bahan/Material

Jumlah : 0.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 30,640.00

3 PENGURUKAN TANAH KEMBALI M3


Upah
Mandor 0.006300 OH 180,000.00 1,134.00
Pekerja Tak Terampil 0.187500 OH 130,000.00 24,375.00
Jumlah : 25,509.00

Bahan/Material

Jumlah : 0.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 25,509.00

4 PENGURUKAN PASIR M3
Upah
Mandor 0.006300 OH 180,000.00 1,134.00
Pekerja Terampil 0.187500 OH 130,000.00 24,375.00
Jumlah : 25,509.00
Bahan/Material
Pasir/Tanah Urug/Tanah 1.000000 m3 250,000.00 250,000.00
Jumlah : 250,000.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 275,509.00

5 PEKERJAAN BETON RABAT (1PC:3PS:5KR) M3


Upah
Mandor 0.080000 OH 180,000.00 14,400.00

Kepala Tukang Batu 0.025000 OH 160,000.00 4,000.00

Tukang Batu 0.250000 OH 150,000.00 37,500.00

Pekerja Tak Terampil 1.650000 OH 130,000.00 214,500.00

Jumlah : 270,400.00

Bahan/Material

Batu Pecah 0.555556 M3 558,571.00 310,317.22

Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07

Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33


Jumlah : 717,724.63

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 988,124.63

6 PEKERJAAN BETON PONDASI TAPAK MENERUS M3


A READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan
Concrete Pump 1.000000 ls 3,250,000.00 3,250,000.00
Jumlah : 3,250,000.00
NILAI HSPK : 4,635,041.45

B BEKISTING M2
Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68

OH
Pekerja Tak Terampil 0.069182 130,000.00 8,993.71

OH
Kepala Tukang Kayu 0.003459 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.023333 ton 3,680,000.00 85,866.67

kg
Paku campuran 0.029040 25,000.00 726.01
Jumlah : 138,901.70

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 154,260.20

C PEMBESIAN TAPAK MENERUS KG


Upah
Pekerja Tak Terampil 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D16 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 4,805,871.65

7 PEKERJAAN PEDESTAL M2
BEKISTING
Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 154,260.20

PEKERJAAN BETON PEDESTAL M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 1,385,041.45

PEMBESIAN PEDESTAL 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,555,871.65

8 PEKERJAAN SLOPE M2
BEKISTING
Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70

Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 154,260.20

PEKERJAAN BETON SLOPE M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 1,385,041.45

PEMBESIAN SLOPE 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,555,871.65

9 PEKERJAAN KOLOM LANTAI 1 M2


BEKISTING
Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.016475 ton 3,680,000.00 60,628.43
kayu 2/3 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 213,996.66

PEKERJAAN BETON KOLOM LANTAI I M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00
Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 1,385,041.45

PEMBESIAN KOLOM LANTAI I 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,615,608.11

10 PEKERJAAN BALOK (ELV. + 4.00) M2


BEKISTING
Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.016475 ton 3,680,000.00 60,628.43
kayu 2/4 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 213,996.66

PEKERJAAN BETON BALOK (ELV. + 4.00) M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 1,385,041.45

PEMBESIAN BALOK (ELV. + 4.00) 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00
Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 14,070.00
TOTAL HSPK (A+B+C) : 1,613,108.11

11 PEKERJAAN BETON PLAT LANTAI I M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 1,385,041.45

PEKERJAAN BEKISTING PLAT LANTAI 1 M2


Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 154,260.20

PEMBESIAN PLAT LANTAI I 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 MM - 20CM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,555,871.65

PEKERJAAN BEKISTING TANGGA M2


Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.016475 ton 3,680,000.00 60,628.43
kayu 2/4 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 213,996.66

PEKERJAAN BETON TANGGA M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 1,385,041.45

PEMBESIAN TANGGA 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 MM - 15 CM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,615,608.11

PEKERJAAN KOLOM LANTAI II M2


BEKISTING
Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.016475 ton 3,680,000.00 60,628.43
kayu 2/3 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 213,996.66

PEKERJAAN BETON KOLOM LANTAI II M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00
Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 1,385,041.45

PEMBESIAN KOLOM LANTAI II 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,615,608.11

PEKERJAAN BALOK (ELV. + 8.00) M2


BEKISTING
Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.016475 ton 3,680,000.00 60,628.43
kayu 2/4 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 213,996.66

PEKERJAAN BETON BALOK (ELV. + 8.00) M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 1,385,041.45

PEMBESIAN BALOK (ELV. + 8.00) 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00
Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,615,608.11

PEKERJAAN BEKISTING PLAT LANTAI II (ELV. + 4.00) M2


Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19

Bahan/Material

Triplex 9mm 0.347222 lbr 150,650.00 52,309.03


kayu 2/3 0.017647 ton 3,680,000.00 64,941.18
kayu 2/4 0.011667 ton 3,680,000.00 42,933.33
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 160,909.55

Sewa Peralatan (Scafolding)


Frame + Cross 1.971429 set 25,000.00 49,285.71
Uhead 1.971429 pcs 5,000.00 9,857.14
Jakc Base 1.971429 pcs 5,000.00 9,857.14
Jumlah : 69,000.00
NILAI HSPK : 248,339.74

PEKERJAAN BETON PLAT LANTAI II (ELV. + 4.00) M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan
Congcrete Pump 1.000000 ls 3,250,000.00 3,250,000.00
Jumlah : 3,250,000.00
NILAI HSPK : 4,635,041.45

PEMBESIAN PLAT (ELV. + 4.00)


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 MM - 20CM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 4,899,951.19

PEKERJAAN BEKISTING PLAT LANTAI ATAP (ELV. + 8.00) M2


Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.017647 ton 3,680,000.00 64,941.18
kayu 2/4 0.011667 ton 3,680,000.00 42,933.33
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 160,909.55

Sewa Peralatan (Scafolding)


Frame + Cross 1.971429 set 25,000.00 49,285.71
Uhead 1.971429 pcs 5,000.00 9,857.14
Jakc Base 1.971429 pcs 5,000.00 9,857.14
Jumlah : 69,000.00
NILAI HSPK : 248,339.74

PEKERJAAN BETON PLAT LANTAI II (ELV. + 8.00) M3


READY MIX K-300
Upah
Tukang Batu 0.186528 OH 150,000.00 27,979.27
Pekerja Tak Terampil 0.559585 OH 130,000.00 72,746.11
Kepala Tukang Batu 0.093264 OH 160,000.00 14,922.28
Mandor 0.046632 OH 180,000.00 8,393.78
Jumlah : 124,041.45
Bahan/Material
Beton Ready Mix K 300, on site Batam - 1.000000 M3 1,261,000.00 1,261,000.00
Jumlah : 1,261,000.00

Sewa Peralatan
Congcrete Pump 1.000000 ls 3,250,000.00 3,250,000.00
Jumlah : 3,250,000.00

PEMBESIAN PLAT LANTAI ATAP


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 MM - 20CM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : #REF!

PEKERJAAN BEKISTING CANOPY (ELV. ) M2


Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.017647 ton 3,680,000.00 64,941.18
kayu 2/4 0.011667 ton 3,680,000.00 42,933.33
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 160,909.55

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 179,339.74

PEKERJAAN BETON CANOPY (ELV.) M3


Upah

Mandor 0.080000 OH 180,000.00 14,400.00

Kepala Tukang Batu 0.025000 OH 160,000.00 4,000.00


Tukang Batu 0.250000 OH 150,000.00 37,500.00

Pekerja Tak Terampil 1.650000 OH 130,000.00 214,500.00

Jumlah : 270,400.00

Bahan/Material
Batu Pecah 0.555556 M3 558,571.00 310,317.22
Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07
Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33
Jumlah : 717,724.63

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 988,124.63

PEMBESIAN CANOPY (ELV. )


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 MM - 20CM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,184,034.37

PEKERJAAN BETON MEJA DAPUR M3


Upah
Mandor 0.080000 OH 180,000.00 14,400.00
Kepala Tukang Batu 0.025000 OH 160,000.00 4,000.00
Tukang Batu 0.250000 OH 150,000.00 37,500.00
Pekerja Tak Terampil 1.650000 OH 130,000.00 214,500.00
Jumlah : 270,400.00

Bahan/Material

Batu Pecah 0.555556 M3 558,571.00 310,317.22

Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07

Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33

Jumlah : 717,724.63

Sewa Peralatan

Jumlah : 0.00

NILAI HSPK : 988,124.63

PEKERJAAN BEKISTING MEJA DAPUR M2


Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70

Sewa Peralatan
Jumlah : 0.00

NILAI HSPK : 154,260.20

PEMBESIAN MEJA DAPUR


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00

NILAI HSPK : 16,570.00


TOTAL HSPK (A+B+C) : 1,158,954.82

PEKERJAAN RING BALOK & BALOK SOPI2 M2


BEKISTING
Upah
Tukang Kayu 0.041509 OH 150,000.00 6,226.42
Pekerja Tak Terampil 0.083019 OH 130,000.00 10,792.45
Kepala Tukang Kayu 0.004151 OH 160,000.00 664.15
Mandor 0.004151 OH 180,000.00 747.17
Jumlah : 18,430.19

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 157,331.89

PEKERJAAN BETON RING BALOK & BALOK SOPI2 M3


Upah
Mandor 0.080000 OH 180,000.00 14,400.00
Kepala Tukang Batu 0.025000 OH 160,000.00 4,000.00
Tukang Batu 0.250000 OH 150,000.00 37,500.00
Pekerja Tak Terampil 1.650000 OH 130,000.00 214,500.00
Jumlah : 270,400.00

Bahan/Material

Batu Pecah 0.555556 M3 558,571.00 310,317.22

Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07

Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33

Jumlah : 717,724.63

Sewa Peralatan

Jumlah : 0.00

NILAI HSPK : 988,124.63

PEMBESIAN RING BALOK & BALOK SOPI2 100/M3


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
Jumlah : 14,070.00

Sewa Peralatan

Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,162,026.52

PEKERJAAN BETON MEJA WASTAFEL M3


Upah
Mandor 0.080000 OH 180,000.00 14,400.00
Kepala Tukang Batu 0.025000 OH 160,000.00 4,000.00
Tukang Batu 0.250000 OH 150,000.00 37,500.00
Pekerja Tak Terampil 1.650000 OH 130,000.00 214,500.00
Jumlah : 270,400.00

Bahan/Material

Batu Pecah 0.555556 M3 558,571.00 310,317.22

Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07

Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33

Jumlah : 717,724.63

Sewa Peralatan

Jumlah : 0.00

NILAI HSPK : 988,124.63

PEKERJAAN BEKISTING MEJA WASTAFEL M2


Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70

Sewa Peralatan

Jumlah : 0.00

NILAI HSPK : 154,260.20

PEMBESIAN MEJA WASTAFEL


Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 & D12 MM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.024155 kg 20,700.00 500.00
14,070.00

Sewa Peralatan

Jumlah : 0.00

NILAI HSPK : 16,570.00


TOTAL HSPK (A+B+C) : 1,158,954.82
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 PEKERJAAN RABAT BETON LANTAI 15 CM M2


Upah

Mandor 0.012000 OH 180,000.00 2,160.00

Kepala Tukang Batu 0.003750 OH 160,000.00 600.00

Tukang Batu 0.037500 OH 150,000.00 5,625.00

Pekerja Tak Terampil 0.247500 OH 130,000.00 32,175.00

Jumlah : 40,560.00

Bahan/Material

Batu Pecah 0.083333 M3 558,571.00 46,547.58

Semen 40 kg (Holcim) 0.868056 zak 56,000.00 48,611.11


Pasir Beton / cor 0.050000 m3 250,000.00 12,500.00
Jumlah : 107,658.69

PEKERJAAN ACIAN M2
Upah
Mandor 0.004825 OH 180,000.00 868.42
Kepala Tukang Batu 0.004825 OH 160,000.00 771.93
Tukang Batu 0.048246 OH 150,000.00 7,236.84
Pekerja Tak Terampil 0.048246 OH 130,000.00 6,271.93

Jumlah : 15,149.12

Bahan/Material

Semen 40kg 0.156250 zak 56,000.00 8,750.00

Jumlah : 8,750.00

NILAI HSPK : 172,117.82

PEKERJAAN PASANG KERAMIK 60 x 60 M2


Upah
Mandor 0.011006 OH 180,000.00 1,981.13
Kepala Tukang Batu 0.011006 OH 160,000.00 1,761.01
Tukang Batu 0.110063 OH 150,000.00 16,509.43

Pekerja Tak Terampil 0.220126 OH 130,000.00 28,616.35

Jumlah : 48,867.92

Bahan/Material

Keramik 60 x 60 1.000000 m2 143,750.00 143,750.00

Semen 40 kg (Holcim) 0.325521 zak 56,000.00 18,229.17

Pasir Beton / cor 0.018750 m3 250,000.00 4,687.50

Jumlah : 166,666.67

NILAI HSPK : 215,534.59

25.03.01.23 PEKERJAAN PASANG KERAMIK 30 x 30 M2


Upah
08.01.01.01.0 Mandor 0.009434 OH 180,000.00 1,698.11
08.01.01.01.0 Kepala Tukang Batu 0.009434 OH 160,000.00 1,509.43
08.01.01.01.0 Tukang Batu 0.094340 OH 150,000.00 14,150.94

08.01.01.01.0 Pekerja Tak Terampil 0.188679 OH 130,000.00 24,528.30

Jumlah : 41,886.79

Bahan/Material
07.01.01.01.0 Keramik 30 x 30 1.000000 m2 69,000.00 69,000.00

07.01.01.01.0 Semen 40 kg (Holcim) 0.325521 zak 56,000.00 18,229.17

07.01.01.01.0 Pasir Beton / cor 0.018750 m3 250,000.00 4,687.50

Jumlah : 91,916.67

NILAI HSPK : 133,803.46


Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 PEKERJAAN DINDING KISI KISI ALUMUNIUM M2


Upah

08.01.01.01.0 Mandor 0.010000 OH 180,000.00 1,800.00

08.01.01.01.0 Kepala Tukang Batu 0.010000 OH 160,000.00 1,600.00

Tukang Batu 0.100000 OH 150,000.00 15,000.00

08.01.01.01.0 Pekerja Tak Terampil 0.300000 OH 130,000.00 39,000.00

Jumlah : 57,400.00

Bahan/Material

07.01.01.01.2 Batu Kisi Kisi 0.083333 pcs 558,571.00 46,547.58

07.01.01.01.2 Semen 40 kg (Holcim) 0.868056 zak 56,000.00 48,611.11


07.01.01.01.3 Pasir Beton / cor 0.050000 m3 250,000.00 12,500.00
Jumlah : 107,658.69
NILAI HSPK : 165,058.69

25.03.01.23 PEKERJAAN PASANG DINDING BATA RINGAN M2


Upah

08.01.01.01.0 Mandor 0.004355 OH 180,000.00 783.97

08.01.01.01.0 Kepala Tukang Batu 0.004355 OH 160,000.00 696.86

08.01.01.01.0 Tukang Batu 0.043554 OH 150,000.00 6,533.10

08.01.01.01.0 Pekerja Tak Terampil 0.130662 OH 130,000.00 16,986.06

Jumlah : 25,000.00

Bahan/Material

07.01.01.01.0 Bata Ringan 60x20x10 9.000000 pcs 17,250.00 155,250.00

07.01.01.01.0 Mortar Mix 50 kg (MU-302), 4,35m2 / sak 50kg /10mm 22.988506 kg 2,070.00 47,586.21
Jumlah : 202,836.21
NILAI HSPK : 227,836.21

25.03.01.23 PEKERJAAN PASANG BATA MERAH KECIL 1/2 BATA M2

Upah

08.01.01.01.0 Mandor 0.006127 OH 180,000.00 1,102.94

08.01.01.01.0 Kepala Tukang Batu 0.006127 OH 160,000.00 980.39

08.01.01.01.0 Tukang Batu 0.061275 OH 150,000.00 9,191.18

08.01.01.01.0 Pekerja Tak Terampil 0.183824 OH 130,000.00 23,897.06

Jumlah : 35,171.57

Bahan/Material

07.01.01.01.0 Bata Merah Kecil 70.000000 pcs 600.00 42,000.00

07.01.01.01.0 Semen 40 kg (Holcim) 0.260417 zak 56,000.00 14,583.33

07.01.01.01.0 Pasir Beton / cor 0.015000 m3 250,000.00 3,750.00


Jumlah : 60,333.33
NILAI HSPK : 95,504.90

25.03.01.23 PEKERJAAN PLESTER ACIAN MORTAR TEBAL 2,5 CM M2


Upah

08.01.01.01.0 Mandor 0.006579 OH 180,000.00 1,184.21

08.01.01.01.0 Kepala Tukang Batu 0.006579 OH 160,000.00 1,052.63

08.01.01.01.0 Tukang Batu 0.065789 OH 150,000.00 9,868.42


08.01.01.01.0 Pekerja Tak Terampil 0.065789 OH 130,000.00 8,552.63

Jumlah : 20,657.89

Bahan/Material

07.01.01.01.0 Mortar Mix 50 kg (MU-302), 2,35m2 / sak 50kg /10mm 31.914894 kg 2,070.00 66,063.83
Jumlah : 66,063.83
NILAI HSPK : 86,721.72

25.03.01.23 PEKERJAAN PASANG KERAMIK 30 x 60 M2


Upah

08.01.01.01.0 Mandor 0.012579 OH 180,000.00 2,264.15

08.01.01.01.0 Kepala Tukang Batu 0.012579 OH 160,000.00 2,012.58

08.01.01.01.0 Tukang Batu 0.125786 OH 150,000.00 18,867.92

08.01.01.01.0 Pekerja Tak Terampil 0.251572 OH 130,000.00 32,704.40

Jumlah : 55,849.06

Bahan/Material

07.01.01.01.0 Keramik 30 x 60 1.000000 m2 161,000.00 161,000.00

07.01.01.01.0 Semen 40 kg (Holcim) 0.260417 zak 56,000.00 14,583.33

07.01.01.01.0 Pasir Beton / cor 0.015000 m3 250,000.00 3,750.00


Jumlah : 179,333.33
NILAI HSPK : 235,182.39

1 PEKERJAAN PLESTERAN KAMPROT M2


Upah

08.01.01.01.0 Mandor 0.006579 OH 180,000.00 1,184.21

08.01.01.01.0 Kepala Tukang Batu 0.006579 OH 160,000.00 1,052.63

Tukang Batu 0.065789 OH 150,000.00 9,868.42

08.01.01.01.0 Pekerja Tak Terampil 0.065789 OH 130,000.00 8,552.63

Jumlah : 20,657.89

Bahan/Material

07.01.01.01.2 Semen 40 kg (Holcim) 0.347222 zak 56,000.00 19,444.44


07.01.01.01.3 Pasir 0.013333 m3 250,000.00 3,333.33
Jumlah : 22,777.78
NILAI HSPK : 43,435.67

25.03.01.23 PEKERJAAN SKONING / PROFILAN / TALI AIR M1


Upah

08.01.01.01.0 Mandor 0.000702 OH 180,000.00 126.32

08.01.01.01.0 Kepala Tukang Batu 0.007018 OH 160,000.00 1,122.81

08.01.01.01.0 Tukang Batu 0.070175 OH 150,000.00 10,526.32

08.01.01.01.0 Pekerja Tak Terampil 0.014035 OH 130,000.00 1,824.56

Jumlah : 13,600.00

Bahan/Material

07.01.01.01.0 Sewa Grinda 1.000000 m1 7,451.00 7,451.00

07.01.01.01.0 Semen 40 kg (Holcim) 0.002083 zak 56,000.00 116.67

07.01.01.01.0 Pasir Beton / cor 0.000000 m3 250,000.00 0.00


Jumlah : 7,567.67
NILAI HSPK : 21,167.67

25.03.01.23 PEKERJAAN CAT DINDING DALAM (DINDING BARU) M2


Upah
08.01.01.01.0 Mandor 0.004000 OH 180,000.00 720.00

08.01.01.01.0 Kepala Tukang Batu 0.008000 OH 160,000.00 1,280.00

08.01.01.01.0 Tukang Cat 0.080000 OH 150,000.00 12,000.00

08.01.01.01.0 Pekerja Tak Terampil 0.040000 OH 130,000.00 5,200.00

Jumlah : 19,200.00

Bahan/Material

07.01.01.01.0 Sealer Jotun Premium 0.250000 ltr 29,100.00 7,275.00

07.01.01.01.0 Cat Jotun Premium 0.250000 ltr 50,000.00 12,500.00


Jumlah : 19,775.00
NILAI HSPK : 38,975.00

25.03.01.23 PEKERJAAN CAT DINDING LUAR (DINDING BARU) M2


Upah

08.01.01.01.0 Mandor 0.004000 OH 180,000.00 720.00

08.01.01.01.0 Kepala Tukang Batu 0.008000 OH 160,000.00 1,280.00

08.01.01.01.0 Tukang Cat 0.080000 OH 150,000.00 12,000.00

08.01.01.01.0 Pekerja Tak Terampil 0.040000 OH 130,000.00 5,200.00

Jumlah : 19,200.00

Bahan/Material

07.01.01.01.0 Sealer Jotun Premium 0.250000 ltr 30,900.00 7,725.00

07.01.01.01.0 Cat Jotun Premium 0.250000 ltr 65,000.00 16,250.00


Jumlah : 23,975.00
NILAI HSPK : 43,175.00

PEKERJAAN PASANG BATU ALAM M2


Upah

Mandor 0.012579 OH 180,000.00 2,264.15

Kepala Tukang Batu 0.012579 OH 160,000.00 2,012.58

Tukang Batu 0.125786 OH 150,000.00 18,867.92

Pekerja Tak Terampil 0.251572 OH 130,000.00 32,704.40

Jumlah : 55,849.06

Bahan/Material

Marmo Putih MCE 10x20 1.000000 m2 184,000.00 184,000.00

Semen 40 kg (Holcim) 0.195313 zak 56,000.00 10,937.50

Pasir Beton / cor 0.011250 m3 250,000.00 2,812.50

Varnish Mowilex (Daya seber 6m2 / ltr) 0.168254 liter 86,250.00 14,511.90
Jumlah : 212,261.90
NILAI HSPK : 268,110.96
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 PEKERJAAN PINTU PANEL + KUNCI ENGKOL UNIT


Upah

08.01.01.01.0 Mandor 0.010718 OH 180,000.00 1,929.26

08.01.01.01.0 Kepala Tukang Kayu 0.064309 OH 160,000.00 10,289.39

Tukang Kayu 0.643087 OH 150,000.00 96,463.02

08.01.01.01.0 Pekerja Tak Terampil 0.214362 OH 130,000.00 27,867.10

Jumlah : 136,548.77

1 PEKERJAAN KUSEN ALUMUNIUM + ENGSEL UNIT

Upah

08.01.01.01.0 Mandor 0.002144 OH 180,000.00 385.85


08.01.01.01.0 Kepala Tukang Kayu 0.012862 OH 160,000.00 2,057.88
Tukang Kayu 0.128617 OH 150,000.00 19,292.60
08.01.01.01.0 Pekerja Tak Terampil 0.042872 OH 130,000.00 5,573.42
Jumlah : 27,309.75
Bahan/Material P1
07.01.01.01.2 Pintu Panel 1.000000 unit 920,000.00 920,000.00
07.01.01.01.2 Kusen Alumunium 1.000000 unit 80,000.00 80,000.00
07.01.01.01.3 Engsel Pintu 4" 3.000000 set 7,980.00 23,940.00
07.01.01.01.3 Handle Pintu Engkol 1.000000 set 136,800.00 136,800.00
Jumlah : 1,160,740.00

Bahan/Material P2
07.01.01.01.2 Pintu Panel 1.000000 unit 920,000.00 920,000.00
07.01.01.01.2 Kusen Alumunium 1.000000 unit 80,000.00 80,000.00
07.01.01.01.3 Engsel Pintu 4" 3.000000 set 7,980.00 23,940.00
07.01.01.01.3 Handle Pintu Engkol 1.000000 set 136,800.00 136,800.00
Jumlah : 1,160,740.00

Bahan/Material P3

07.01.01.01.2 Pintu Panel 1.000000 unit 920,000.00 920,000.00

07.01.01.01.2 Kusen Alumunium 1.000000 unit 80,000.00 80,000.00

07.01.01.01.3 Engsel Pintu 4" 3.000000 set 7,980.00 23,940.00

07.01.01.01.3 Handle Pintu Engkol 1.000000 set 136,800.00 136,800.00

Jumlah : 1,160,740.00

NILAI HSPK : 1,297,288.77

1 PEKERJAAN PINTU KAMAR MANDI P4 UNIT


Upah

08.01.01.01.0 Mandor 0.004287 OH 180,000.00 771.70

08.01.01.01.0 Kepala Tukang Kayu 0.025723 OH 160,000.00 4,115.76

Tukang Kayu 0.257235 OH 150,000.00 38,585.21

08.01.01.01.0 Pekerja Tak Terampil 0.085745 OH 130,000.00 11,146.84

Jumlah : 54,619.51

Bahan/Material P1

07.01.01.01.2 Pintu PVC (set) 1.000000 unit 460,000.00 460,000.00

Jumlah : 460,000.00

1 PEKERJAAN JENDELA ALUMUNIUM UK. 1,5 X 1,5 UNIT


Upah
08.01.01.01.0 Mandor 0.084507 OH 180,000.00 15,211.20
08.01.01.01.0 Kepala Tukang 0.056338 OH 160,000.00 9,014.04
Tukang Batu 0.056338 OH 150,000.00 8,450.67
08.01.01.01.0 Pekerja Tak Terampil 0.042255 OH 130,000.00 5,493.13
Jumlah : 38,169.04

Bahan/Material J1
07.01.01.01.2 Jendela uk 1.35 x 1.34 (Slide) 1.000000 unit 1,288,000.00 1,288,000.00
Jumlah : 1,288,000.00

Bahan/Material J2
07.01.01.01.2 Jendela uk 1.35 x 1.12 (Slide) 1.000000 unit 994,750.00 994,750.00
Jumlah : 994,750.00

Bahan/Material J3
07.01.01.01.2 Jendela uk 1.35 x 1.02 (Slide) 1.000000 unit 943,000.00 943,000.00
Jumlah : 943,000.00

Bahan/Material J4
07.01.01.01.2 Jendela uk 1.35 x 0,58 (Slide) 1.000000 unit 575,000.00 575,000.00
Jumlah : 575,000.00

Bahan/Material BV
07.01.01.01.2 Jendela uk 0,975 x 0,50 (Slide) 1.000000 unit 368,000.00 368,000.00
Jumlah : 368,000.00

NILAI HSPK : 4,206,919.04

1 PEKERJAAN PINTU ROLLING DOOR (TANPA MOTOR) m2

Upah

Mandor 0.019672 OH 180,000.00 3,540.98

Kepala Tukang 0.039344 OH 160,000.00 6,295.08

Tukang 0.393443 OH 150,000.00 59,016.39

Pekerja Tak Terampil 0.393443 OH 130,000.00 51,147.54

Jumlah : 120,000.00

Bahan/Material P1

Rolling Door Alumunium uk. 320 x 328 (Tanpa Motor) 1.000000 m2 977,500.00 977,500.00

Jumlah : 977,500.00
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 PEKERJAAN PLAFOND M2
Upah

08.01.01.01.0 Mandor 0.012250 OH 180,000.00 2,205.08

08.01.01.01.0 Kepala Tukang Kayu 0.012250 OH 160,000.00 1,960.07

Tukang Kayu 0.122505 OH 150,000.00 18,375.68

08.01.01.01.0 Pekerja Tak Terampil 0.245009 OH 130,000.00 31,851.17

Jumlah : 54,392.00

Bahan/Material P1

07.01.01.01.2 Gypsum Board 1200 x 2400 x 9 1.000000 m2 25,000.00 25,000.00

07.01.01.01.2 Ekafuring 7.000000 m1 1,800.00 12,600.00


07.01.01.01.3 Stoping 20kg 0.031250 sak 120,000.00 3,750.00
07.01.01.01.3 join tape 5.000000 m1 500.00 2,500.00
07.01.01.01.3 Skrup Gypsum 25.000000 pcs 500.00 12,500.00
07.01.01.01.3 Cat Nefobox (Daya sebar 8-10 m2 / liter) 0.250000 ltr 5,674.60 1,418.65
Jumlah : 57,768.65

1 PEKERJAAN WATER PROOFING DAK (TEBAL 2MM) M2


Upah

08.01.01.01.0 Mandor 0.004717 OH 180,000.00 849.06

08.01.01.01.0 Kepala Tukang 0.004717 OH 160,000.00 754.72

08.01.01.01.0 Tukang Batu 0.047170 OH 150,000.00 7,075.47

08.01.01.01.0 Pekerja Tak Terampil 0.094340 OH 130,000.00 12,264.15

Jumlah : 20,943.40

Bahan/Material P1

07.01.01.01.2 Sika Top 107 Bubuk (20 kg) 0.312500 zak 201,250.00 62,890.63

07.01.01.01.2 Sika Top 107 Cair (5 kg = 7,2 ltr) 0.500000 ltr 27,951.00 13,975.50
Jumlah : 76,866.13
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 PEKERJAAN KLOSET DUDUK UNIT


Upah

08.01.01.01.0 Mandor 0.057809 OH 180,000.00 10,405.56

08.01.01.01.0 Kepala Tukang Batu 0.000361 OH 160,000.00 57.81

Tukang Batu 0.036130 OH 150,000.00 5,419.56

08.01.01.01.0 Pekerja Tak Terampil 1.192304 OH 130,000.00 154,999.55

Jumlah : 170,882.49

Bahan/Material

07.01.01.01.2 Kloset Duduk Merk Toto CW637J 1.000000 unit 4,370,000.00 4,370,000.00
Jumlah : 4,370,000.00

NILAI HSPK : 4,540,882.49

1 PEKERJAAN WASTAFL UNIT


Upah

08.01.01.01.0 Mandor 0.044335 OH 180,000.00 7,980.30

08.01.01.01.0 Kepala Tukang Batu 0.066502 OH 160,000.00 10,640.39

Tukang Batu 0.642857 OH 150,000.00 96,428.57

08.01.01.01.0 Pekerja Tak Terampil 0.044335 OH 130,000.00 5,763.55

Jumlah : 120,812.81

Bahan/Material

07.01.01.01.2 Wastfel Toto LW 830 CJ 1.000000 unit 2,070,000.00 2,070,000.00


Jumlah : 2,070,000.00

NILAI HSPK : 2,190,812.81

1 PEKERJAAN SHOWER UNIT


Upah

08.01.01.01.0 Mandor 0.079368 OH 180,000.00 14,286.16

08.01.01.01.0 Kepala Tukang Batu 0.000000 OH 160,000.00 0.00

Tukang Batu 0.019842 OH 150,000.00 2,976.28

08.01.01.01.0 Pekerja Tak Terampil 0.232358 OH 130,000.00 30,206.60

Jumlah : 47,469.04

Bahan/Material

07.01.01.01.2 Hand Shower 1.000000 pcs 172,500.00 172,500.00


Jumlah : 172,500.00

NILAI HSPK : 219,969.04

1 PEKERJAAN FLOOR DRAIN UNIT


Upah

08.01.01.01.0 Mandor 0.001396 OH 180,000.00 251.33

08.01.01.01.0 Kepala Tukang Batu 0.002793 OH 160,000.00 446.81


Tukang Batu 0.027926 OH 150,000.00 4,188.83

08.01.01.01.0 Pekerja Tak Terampil 0.002793 OH 130,000.00 363.03

Jumlah : 5,250.00

Bahan/Material

07.01.01.01.2 Floor Drain Plastik 1.000000 pcs 12,000.00 12,000.00


Jumlah : 12,000.00

NILAI HSPK : 17,250.00

1 PEKERJAAN KRAN AIR UNIT


Upah

08.01.01.01.0 Mandor 0.001396 OH 180,000.00 251.33

08.01.01.01.0 Kepala Tukang Batu 0.002793 OH 160,000.00 446.81

Tukang Batu 0.027926 OH 150,000.00 4,188.83

08.01.01.01.0 Pekerja Tak Terampil 0.002793 OH 130,000.00 363.03

Jumlah : 5,250.00

Bahan/Material

07.01.01.01.2 Kran Air PVC 1.000000 pcs 35,000.00 35,000.00


Jumlah : 35,000.00

NILAI HSPK : 40,250.00

1 PEKERJAAN KITCHEN SINK UNIT


Upah

08.01.01.01.0 Mandor 0.015000 OH 180,000.00 2,700.00

08.01.01.01.0 Kepala Tukang Batu 0.030000 OH 160,000.00 4,800.00

Tukang Batu 0.300000 OH 150,000.00 45,000.00

08.01.01.01.0 Pekerja Tak Terampil 0.030000 OH 130,000.00 3,900.00

Jumlah : 56,400.00

Bahan/Material

07.01.01.01.2 Kitchen Sink Inobe 6045 uk. 60 x 45 1.000000 pcs 747,500.00 747,500.00
Jumlah : 747,500.00

NILAI HSPK : 803,900.00


Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 PEKERJAAN RAILING TANGGA M2


Upah

Mandor 0.083000 OH 180,000.00 14,940.00

Kepala Tukang 0.167000 OH 160,000.00 26,720.00

Tukang Las 1.670000 OH 150,000.00 250,500.00

Pekerja Tak Terampil 1.670000 OH 130,000.00 217,100.00

Jumlah : 509,260.00

Bahan/Material

Hollow 1 1/2 x 2mm 0.465476 btg 97,750.00 45,500.30

Hollow 3/4 x 2mm 0.592857 btg 63,250.00 37,498.21


Dinabolt 10mm 4.000000 pcs 1,725.00 6,900.00
besi Plat 2mm 0.010000 m2 212,750.00 2,127.50
Jumlah : 92,026.01

1 PEKERJAAN CANOPY KACA M2


Rangka
Upah

Mandor 0.083000 OH 180,000.00 14,940.00

Kepala Tukang 0.167000 OH 160,000.00 26,720.00

Tukang Las 1.670000 OH 150,000.00 250,500.00

Pekerja Tak Terampil 1.670000 OH 130,000.00 217,100.00

Jumlah : 509,260.00

Kaca Temperet

Upah

Mandor 0.083000 OH 150,000.00 12,450.00


Kepala Tukang 0.167000 OH 130,000.00 21,710.00
Tukang Las 1.670000 OH 110,000.00 183,700.00
Pekerja Tak Terampil 1.670000 OH 90,000.00 150,300.00
Jumlah : 368,160.00
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 JARINGAN PIPA 1/2" M1

Upah

08.01.01.01.0 Mandor 0.000496 OH 180,000.00 89.26

08.01.01.01.0 Kepala Tukang 0.001653 OH 160,000.00 264.46

Tukang Batu 0.016529 OH 150,000.00 2,479.34

08.01.01.01.0 Pekerja Tak Terampil 0.009917 OH 130,000.00 1,289.26

Jumlah : 4,122.31

1 JARINGAN PIPA 1" M1

Upah

08.01.01.01.0 Mandor 0.000496 OH 180,000.00 89.26

08.01.01.01.0 Kepala Tukang 0.001653 OH 160,000.00 264.46

Tukang Batu 0.016529 OH 150,000.00 2,479.34

08.01.01.01.0 Pekerja Tak Terampil 0.009917 OH 130,000.00 1,289.26

Jumlah : 4,122.31

1 JARINGAN PIPA 1 1/2" M1

Upah

08.01.01.01.0 Mandor 0.000496 OH 180,000.00 89.26

08.01.01.01.0 Kepala Tukang 0.001653 OH 160,000.00 264.46

Tukang Batu 0.016529 OH 150,000.00 2,479.34

08.01.01.01.0 Pekerja Tak Terampil 0.009917 OH 130,000.00 1,289.26

Jumlah : 4,122.31

1 JARINGAN PIPA 2" M1

Upah

08.01.01.01.0 Mandor 0.000496 OH 180,000.00 89.26

08.01.01.01.0 Kepala Tukang 0.001653 OH 160,000.00 264.46

Tukang Batu 0.016529 OH 150,000.00 2,479.34

08.01.01.01.0 Pekerja Tak Terampil 0.009917 OH 130,000.00 1,289.26

Jumlah : 4,122.31

1 JARINGAN PIPA 3" M1


Upah
08.01.01.01.0 Mandor 0.000836 OH 180,000.00 150.55
08.01.01.01.0 Kepala Tukang 0.002754 OH 160,000.00 440.64
Tukang Batu 0.027540 OH 150,000.00 4,130.97
08.01.01.01.0 Pekerja Tak Terampil 0.016524 OH 130,000.00 2,148.10

Jumlah : 6,870.26

1 JARINGAN PIPA 4" M1

Upah

08.01.01.01.0 Mandor 0.000836 OH 180,000.00 150.55


08.01.01.01.0 Kepala Tukang 0.002754 OH 160,000.00 440.64
Tukang Las 0.027540 OH 150,000.00 4,130.97
08.01.01.01.0 Pekerja Tak Terampil 0.016524 OH 130,000.00 2,148.10
Jumlah : 6,870.26

1 JARINGAN PIPA 6" M1

Upah
08.01.01.01.0 Mandor 0.001338 OH 180,000.00 240.88
08.01.01.01.0 Kepala Tukang 0.004406 OH 160,000.00 705.02
Tukang Las 0.044064 OH 150,000.00 6,609.55
08.01.01.01.0 Pekerja Tak Terampil 0.026438 OH 130,000.00 3,436.96
Jumlah : 10,992.41

Bahan/Material Jaringan Air Bersih


07.01.01.01.2 PVC Wavin 3/4" 1.000000 m1 8,970.00 8,970.00

07.01.01.01.2 Elbow 3/4" 0.330189 pcs 4,600.00 1,518.87

07.01.01.01.3 Tee 3/4" 0.110063 pcs 5,750.00 632.86

07.01.01.01.3 Lem Pipa 1.572327 gram 201.00 316.04

Jumlah : 11,437.77

Bahan/Material Jaringan Air Kotor & Hujan

07.01.01.01.2 PVC Wavin 3" 1.000000 m1 40,537.00 40,537.00

07.01.01.01.2 Elbow 3" 0.251108 pcs 11,500.00 2,887.74

07.01.01.01.3 Tee 3" 0.073855 pcs 17,250.00 1,274.00


07.01.01.01.3 Lem Pipa 1.477105 gram 201.00 296.90
Jumlah : 44,995.64

Bahan/Material Jaringan Kotor

07.01.01.01.2 PVC Wavin 6" 0.465476 m1 129,432.00 60,247.51


07.01.01.01.3 Lem Pipa 6.622517 gram 201.00 1,331.13
Jumlah : 61,578.64

Bahan/Material Jaringan Tinja


07.01.01.01.2 PVC Wavin 4" 1.000000 m1 63,738.00 63,738.00
07.01.01.01.2 Elbow 4" 0.220588 pcs 17,250.00 3,805.15
07.01.01.01.3 Tee 4" 0.000000 pcs 20,700.00 0.00
07.01.01.01.3 Lem Pipa 3.676471 gram 201.00 738.97
Jumlah : 68,282.12

25.03.01.23 PEKERJAAN BAK KONTROL 70x70x70 M3


1 Lantai
Upah
Mandor 0.080000 OH 180,000.00 14,400.00
Kepala Tukang Batu 0.025000 OH 160,000.00 4,000.00
Tukang Batu 0.250000 OH 150,000.00 37,500.00
Pekerja Tak Terampil 1.650000 OH 130,000.00 214,500.00
Jumlah : 270,400.00

Bahan/Material

Batu Pecah 0.555556 M3 558,571.00 310,317.22

Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07

Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33

Jumlah : 717,724.63

NILAI HSPK : 717,724.63

2 DINDING SBATA MERAH KECIL 1/2 BATA M2


Upah

Mandor 0.006127 OH 180,000.00 1,102.94

Kepala Tukang Batu 0.006127 OH 160,000.00 980.39

Tukang Batu 0.061275 OH 150,000.00 9,191.18

Pekerja Tak Terampil 0.183824 OH 130,000.00 23,897.06

Jumlah : 35,171.57

Bahan/Material

Bata Merah Kecil 70.000000 pcs 600.00 42,000.00

Semen 40 kg (Holcim) 0.260417 zak 56,000.00 14,583.33

Pasir Beton / cor 0.015000 m3 250,000.00 3,750.00


Jumlah : 60,333.33
NILAI HSPK : 95,504.90

PEKERJAAN PLESTERAN M2
Upah

Mandor 0.005263 OH 180,000.00 947.37

Kepala Tukang Batu 0.005263 OH 160,000.00 842.11

Tukang Batu 0.052632 OH 150,000.00 7,894.74

Pekerja Tak Terampil 0.052632 OH 130,000.00 6,842.11

Jumlah : 16,526.32

Bahan/Material

Semen 40 kg (Holcim) 0.347222 zak 56,000.00 19,444.44


Pasir 0.020000 m3 250,000.00 5,000.00
Jumlah : 24,444.44
NILAI HSPK : 40,970.76

3 TUTUP BAK KONTROL TEBAL 8CM

Beton
Upah

Mandor 0.080000 OH 180,000.00 14,400.00

Kepala Tukang Batu 0.025000 OH 160,000.00 4,000.00

Tukang Batu 0.250000 OH 150,000.00 37,500.00

Pekerja Tak Terampil 1.650000 OH 130,000.00 214,500.00

Jumlah : 270,400.00

Bahan/Material

Batu Pecah 0.555556 M3 558,571.00 310,317.22

Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07

Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33


Jumlah : 717,724.63

PEMBESIAN
Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 - 20CM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.004317 kg 20,700.00 89.35
Jumlah : 13,659.35

BEKISTING
Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49

Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 1/2 0.005833 ton 3,680,000.00 21,466.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 74,501.70

25.03.01.23 PEKERJAAN SEPTIKTANK M3

Rabat Lantai Beton


Upah

08.01.01.01.0 Mandor 0.080000 OH 180,000.00 14,400.00

08.01.01.01.0 Kepala Tukang Batu 0.025000 OH 160,000.00 4,000.00

08.01.01.01.0 Tukang Batu 0.250000 OH 150,000.00 37,500.00

08.01.01.01.0 Pekerja Tak Terampil 1.650000 OH 130,000.00 214,500.00

Jumlah : 270,400.00

Bahan/Material

07.01.01.01.0 Batu Pecah 0.555556 M3 558,571.00 310,317.22

07.01.01.01.0 Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07

07.01.01.01.0 Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33


Jumlah : 717,724.63
NILAI HSPK : 988,124.63

25.03.03.07 PEKERJAAN BEKISTING M2


Upah
08.01.01.01.0 Tukang Kayu 0.034591 OH 150,000.00 5,188.68
08.01.01.01.0 Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
08.01.01.01.0 Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
08.01.01.01.0 Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49

Bahan/Material
07.01.01.01.2 Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 1/2 0.005833 ton 3,680,000.00 21,466.67
07.01.01.01.3 Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 74,501.70

3 PEMBESIAN
Upah
08.01.01.01.0 Pekerja 0.008304 OH 130,000.00 1,079.55
08.01.01.01.0 Tukang Besi 0.008304 OH 150,000.00 1,245.63
08.01.01.01.0 Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
08.01.01.01.0 Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
07.01.01.01.1 Besi Tulang D10 - 20CM 1.000000 kg 13,570.00 13,570.00
07.01.01.01.2 Kawat Beton 0.004317 kg 20,700.00 89.35
Jumlah : 13,659.35

1 PEKERJAAN PLESTERAN DINDING SEPTIKTANK M2


Upah

08.01.01.01.0 Mandor 0.005263 OH 180,000.00 947.37

08.01.01.01.0 Kepala Tukang Batu 0.005263 OH 160,000.00 842.11

Tukang Batu 0.052632 OH 150,000.00 7,894.74

08.01.01.01.0 Pekerja Tak Terampil 0.052632 OH 130,000.00 6,842.11

Jumlah : 16,526.32

Bahan/Material

07.01.01.01.2 Semen 40 kg (Holcim) 0.347222 zak 56,000.00 19,444.44


07.01.01.01.3 Pasir 0.020000 m3 250,000.00 5,000.00
Jumlah : 24,444.44
NILAI HSPK : 40,970.76

PEKERJAAN DINDING SEPTIKTANG BATA MERAH KECIL 1/2


25.03.01.23 M2
BATA
Upah

08.01.01.01.0 Mandor 0.006127 OH 180,000.00 1,102.94

08.01.01.01.0 Kepala Tukang Batu 0.006127 OH 160,000.00 980.39

08.01.01.01.0 Tukang Batu 0.061275 OH 150,000.00 9,191.18

08.01.01.01.0 Pekerja Tak Terampil 0.183824 OH 130,000.00 23,897.06

Jumlah : 35,171.57

Bahan/Material

07.01.01.01.0 Bata Merah Kecil 70.000000 pcs 600.00 42,000.00

07.01.01.01.0 Semen 40 kg (Holcim) 0.260417 zak 56,000.00 14,583.33

07.01.01.01.0 Pasir Beton / cor 0.015000 m3 250,000.00 3,750.00


Jumlah : 60,333.33
NILAI HSPK : 95,504.90
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

1 PASANG KABEL M1

Upah

08.01.01.01.0 Mandor 0.000496 OH 180,000.00 89.26

08.01.01.01.0 Kepala Tukang 0.001653 OH 160,000.00 264.46

Tukang Listrik 0.016529 OH 150,000.00 2,479.34

08.01.01.01.0 Pekerja Tak Terampil 0.009917 OH 130,000.00 1,289.26

Jumlah : 4,122.31

1 MCB M1

Upah

08.01.01.01.0 Mandor 0.000000 OH 150,000.00 0.00

08.01.01.01.0 Kepala Tukang 0.035088 OH 130,000.00 4,561.40

Tukang Listrik 0.035088 OH 110,000.00 3,859.65

08.01.01.01.0 Pekerja Tak Terampil 0.350877 OH 90,000.00 31,578.95

Jumlah : 40,000.00

1 STOP KONTAK M1

Upah

08.01.01.01.0 Mandor 0.000000 OH 150,000.00 0.00

08.01.01.01.0 Kepala Tukang 0.035088 OH 130,000.00 4,561.40

Tukang Listrik 0.035088 OH 110,000.00 3,859.65

08.01.01.01.0 Pekerja Tak Terampil 0.350877 OH 90,000.00 31,578.95

Jumlah : 40,000.00

1 SAKLAR HOTEL M1

Upah

08.01.01.01.0 Mandor 0.000000 OH 150,000.00 0.00

08.01.01.01.0 Kepala Tukang 0.035088 OH 130,000.00 4,561.40

Tukang Listrik 0.035088 OH 110,000.00 3,859.65

08.01.01.01.0 Pekerja Tak Terampil 0.350877 OH 90,000.00 31,578.95

Jumlah : 40,000.00

1 SAKLAR TUNGGAL (1 GANG) M1

Upah

08.01.01.01.0 Mandor 0.000000 OH 150,000.00 0.00

08.01.01.01.0 Kepala Tukang 0.035088 OH 130,000.00 4,561.40

Tukang Listrik 0.035088 OH 110,000.00 3,859.65

08.01.01.01.0 Pekerja Tak Terampil 0.350877 OH 90,000.00 31,578.95

Jumlah : 40,000.00

1 SAKLAR TUNGGAL (2 GANG) M1

Upah

08.01.01.01.0 Mandor 0.000000 OH 150,000.00 0.00

08.01.01.01.0 Kepala Tukang 0.035088 OH 130,000.00 4,561.40


Tukang Listrik 0.035088 OH 110,000.00 3,859.65

08.01.01.01.0 Pekerja Tak Terampil 0.350877 OH 90,000.00 31,578.95

Jumlah : 40,000.00

1 PASANG LAMPU DL + FITTING M1


Upah
08.01.01.01.0 Mandor 0.000000 OH 150,000.00 0.00
08.01.01.01.0 Kepala Tukang 0.001293 OH 130,000.00 168.06
Tukang Listrik 0.049054 OH 110,000.00 5,395.95
08.01.01.01.0 Pekerja Tak Terampil 0.049289 OH 90,000.00 4,435.99

Jumlah : 10,000.00

1 PASANG LAMPU PIJAR + FITTING M1


Upah
08.01.01.01.0 Mandor 0.000000 OH 150,000.00 0.00
08.01.01.01.0 Kepala Tukang 0.001293 OH 130,000.00 168.06
Tukang Listrik 0.049054 OH 110,000.00 5,395.95
08.01.01.01.0 Pekerja Tak Terampil 0.049289 OH 90,000.00 4,435.99

Jumlah : 10,000.00

1 PASANG LAMPU TL M1

Upah
08.01.01.01.0 Mandor 0.002509 OH 150,000.00 376.38
08.01.01.01.0 Kepala Tukang 0.008262 OH 130,000.00 1,074.05
Tukang Las 0.082619 OH 110,000.00 9,088.13
08.01.01.01.0 Pekerja Tak Terampil 0.049572 OH 90,000.00 4,461.44
Jumlah : 15,000.00

1 M1

Upah
08.01.01.01.0 Mandor 0.001338 OH 150,000.00 200.73
08.01.01.01.0 Kepala Tukang 0.004406 OH 130,000.00 572.83
Tukang Las 0.044064 OH 110,000.00 4,847.00
08.01.01.01.0 Pekerja Tak Terampil 0.026438 OH 90,000.00 2,379.44
Jumlah : 8,000.00

Bahan/Material Jaringan Air Bersih


07.01.01.01.2 PVC Wavin 1/2" 1.000000 m1 7,800.00 7,800.00

07.01.01.01.2 Elbow 1/2" 0.330189 pcs 4,000.00 1,320.75

07.01.01.01.3 Tee 1/2" 0.110063 pcs 5,000.00 550.31

07.01.01.01.3 Lem Pipa 1.572327 gram 151.25 237.81

Jumlah : 9,908.88

Bahan/Material Jaringan Air Kotor & Hujan

07.01.01.01.2 PVC Wavin 3" 1.000000 m1 35,250.00 35,250.00

07.01.01.01.2 PVC Wavin 2" 1.000000 m1 19,650.00 19,650.00

07.01.01.01.2 Elbow 3" 0.251108 pcs 10,000.00 2,511.08

07.01.01.01.2 Elbow Kepala 2" & 3" 0.014771 pcs 10,000.00 147.71

07.01.01.01.3 Tee 3" 0.073855 pcs 15,000.00 1,107.83


07.01.01.01.3 Lem Pipa 1.477105 gram 151.25 223.41
Jumlah : 58,890.03

Bahan/Material Jaringan Kotor

07.01.01.01.2 PVC Wavin 8" 0.465476 m1 197,900.00 92,117.74


07.01.01.01.3 Lem Pipa 6.622517 gram 151.25 1,001.66
Jumlah : 93,119.39

Bahan/Material Jaringan Tinja


07.01.01.01.2 PVC Wavin 4" 1.000000 m1 55,425.00 55,425.00
07.01.01.01.2 Elbow 4" 0.220588 pcs 15,000.00 3,308.82
07.01.01.01.3 Tee 4" 0.000000 pcs 18,000.00 0.00
07.01.01.01.3 Lem Pipa 3.676471 gram 151.25 556.07
Jumlah : 59,289.89

25.03.01.23 PEKERJAAN BAK KONTROL 70x70x70 M3


Upah
08.01.01.01.0 Mandor 0.080000 OH 150,000.00 12,000.00
08.01.01.01.0 Kepala Tukang Batu 0.025000 OH 130,000.00 3,250.00
08.01.01.01.0 Tukang Batu 0.250000 OH 110,000.00 27,500.00
08.01.01.01.0 Pekerja Tak Terampil 1.650000 OH 90,000.00 148,500.00
Jumlah : 191,250.00

Bahan/Material

07.01.01.01.0 Batu Pecah 0.000000 M3 340,000.00 0.00

07.01.01.01.0 Semen 40 kg (Holcim) 0.000000 zak 49,000.00 0.00

07.01.01.01.0 Pasir Beton / cor 0.000000 m3 170,000.00 0.00

Jumlah : 0.00

NILAI HSPK : 0.00

25.03.03.07 PEKERJAAN BEKISTING BAK KONTROL 70x70x70 M2


Upah
08.01.01.01.0 Tukang Kayu 0.034591 OH 110,000.00 3,805.03
08.01.01.01.0 Pekerja Tak Terampil 0.069182 OH 90,000.00 6,226.42
08.01.01.01.0 Kepala Tukang Kayu 0.003459 OH 130,000.00 449.69
08.01.01.01.0 Mandor 0.003459 OH 150,000.00 518.87
Jumlah : 11,000.00

Bahan/Material
07.01.01.01.2 Triplex 9mm 0.347222 lbr 131,000.00 45,486.11
kayu 2/3 0.011870 ton 3,200,000.00 37,984.00
07.01.01.01.3 Paku campuran 0.029040 kg 15,000.00 435.61
Jumlah : 83,905.72

3 PEMBESIAN BAK KONTROL 70x70x70


Upah
08.01.01.01.0 Pekerja 0.005390 OH 90,000.00 485.08
08.01.01.01.0 Tukang Besi 0.005390 OH 110,000.00 592.88
08.01.01.01.0 Kepala Tukang Besi 0.000454 OH 130,000.00 59.00
08.01.01.01.0 Mandor 0.000227 OH 150,000.00 34.04
Jumlah : 1,171.00
Bahan/Material
07.01.01.01.1 Besi Tulang D10 - 15CM 1.000000 kg 11,800.00 11,800.00
07.01.01.01.2 Kawat Beton 0.004317 kg 18,000.00 77.70
Jumlah : 11,877.70

25.03.01.23 PEKERJAAN BETON RABAT TUTUP SEPTIKTANK (1PC:3PS:5KR) M3


Upah

08.01.01.01.0 Mandor 0.080000 OH 150,000.00 12,000.00

08.01.01.01.0 Kepala Tukang Batu 0.025000 OH 130,000.00 3,250.00

08.01.01.01.0 Tukang Batu 0.250000 OH 110,000.00 27,500.00


08.01.01.01.0 Pekerja Tak Terampil 1.650000 OH 90,000.00 148,500.00

Jumlah : 191,250.00

Bahan/Material

07.01.01.01.0 Batu Pecah 0.000000 M3 340,000.00 0.00

07.01.01.01.0 Semen 40 kg (Holcim) 0.000000 zak 49,000.00 0.00

07.01.01.01.0 Pasir Beton / cor 0.000000 m3 170,000.00 0.00


Jumlah : 0.00
NILAI HSPK : 191,250.00

25.03.03.07 PEKERJAAN BEKISTING M2


Upah
08.01.01.01.0 Tukang Kayu 0.034591 OH 110,000.00 3,805.03
08.01.01.01.0 Pekerja Tak Terampil 0.069182 OH 90,000.00 6,226.42
08.01.01.01.0 Kepala Tukang Kayu 0.003459 OH 130,000.00 449.69
08.01.01.01.0 Mandor 0.003459 OH 150,000.00 518.87
Jumlah : 11,000.00

Bahan/Material
07.01.01.01.2 Triplex 9mm 0.347222 lbr 131,000.00 45,486.11
kayu 2/3 0.011870 ton 3,200,000.00 37,984.00
07.01.01.01.3 Paku campuran 0.029040 kg 15,000.00 435.61
Jumlah : 83,905.72

3 PEMBESIAN
Upah
08.01.01.01.0 Pekerja 0.005390 OH 90,000.00 485.08
08.01.01.01.0 Tukang Besi 0.005390 OH 110,000.00 592.88
08.01.01.01.0 Kepala Tukang Besi 0.000454 OH 130,000.00 59.00
08.01.01.01.0 Mandor 0.000227 OH 150,000.00 34.04
Jumlah : 1,171.00
Bahan/Material
07.01.01.01.1 Besi Tulang D10 - 20CM 1.000000 kg 11,800.00 11,800.00
07.01.01.01.2 Kawat Beton 0.004317 kg 18,000.00 77.70
Jumlah : 11,877.70

1 PEKERJAAN PLESTERAN M2
Upah

08.01.01.01.0 Mandor 0.005263 OH 150,000.00 789.47

08.01.01.01.0 Kepala Tukang Batu 0.005263 OH 130,000.00 684.21

Tukang Batu 0.052632 OH 110,000.00 5,789.47

08.01.01.01.0 Pekerja Tak Terampil 0.052632 OH 90,000.00 4,736.84

Jumlah : 12,000.00

Bahan/Material

07.01.01.01.2 Semen 40 kg (Holcim) 0.000000 zak 49,000.00 0.00


07.01.01.01.3 Pasir 0.000000 m3 170,000.00 0.00
Jumlah : 0.00
NILAI HSPK : 12,000.00
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
D PEKERJAAN DINDING
25.04 DINDING
25.04.01 DINDING DAN PLESTERAN
PEMASANGAN BATU MERAH 1PC:2PS TINGGI
25.04.01.01 S/D 2 M M3
Upah
08.01.01.01.01.001 Mandor 0.160000 OH 180,000 28,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.120000 OH 140,000 16,800.00
08.01.01.01.03.001 Tukang Batu 1.200000 OH 130,000 156,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 3.600000 OH 110,000 396,000.00
Jumlah : 597,600.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.331800 m3 451,000.00 149,641.80
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200.00 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 3.649300 Zak 55,000.00 200,711.50
Jumlah : 2,408,353.30

NILAI HSPK : 3,005,953.30

PEMASANGAN BATU MERAH 1PC:2PS TINGGI


25.04.01.02 S/D 2 M M2
Upah
08.01.01.01.01.001 Mandor 0.016800 OH 180,000 3,024.00
08.01.01.01.01.003 Kepala Tukang Batu 0.012600 OH 140,000 1,764.00
08.01.01.01.03.001 Tukang Batu 0.126000 OH 130,000 16,380.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.378000 OH 110,000 41,580.00
Jumlah : 62,748.00
Bahan/Material
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.04.002 Pasir Pasang / plester 0.034800 m3 451,000 15,694.80
07.01.01.01.02.002 Semen 40 kg 0.383200 Zak 55,000 21,076.00
Jumlah : 255,170.80

NILAI HSPK : 317,918.80

PEMASANGAN BATU MERAH 1PC:2PS TINGGI


25.04.01.03 2 S/D 5 M M3
Upah
08.01.01.01.01.001 Mandor 0.225000 OH 180,000 40,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000 195,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 4.500000 OH 110,000 495,000.00
Jumlah : 751,500.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.331800 m3 451,000 149,641.80
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 3.649300 Zak 55,000 200,711.50
Jumlah : 2,408,353.30

NILAI HSPK : 3,159,853.30

46
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:2PS TINGGI
25.04.01.04 2 S/D 5 M M2
Upah
08.01.01.01.01.001 Mandor 0.023600 OH 180,000 4,248.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015800 OH 140,000 2,212.00
08.01.01.01.03.001 Tukang Batu 0.015800 OH 130,000 2,054.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.472500 OH 110,000 51,975.00
Jumlah : 60,489.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.034800 m3 451,000 15,694.80
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.383200 Zak 55,000 21,076.00
Jumlah : 255,170.80

NILAI HSPK : 315,659.80


PEMASANGAN BATU MERAH 1PC:3PS TINGGI
25.04.01.05 S/D 2 M M3
Upah
08.01.01.01.01.001 Mandor 0.160000 OH 180,000 28,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.120000 OH 140,000 16,800.00
08.01.01.01.03.001 Tukang Batu 1.200000 OH 130,000 156,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 3.600000 OH 110,000 396,000.00
Jumlah : 597,600.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.377000 m3 451,000 170,027.00
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 2.764800 Zak 55,000 152,064.00
Jumlah : 2,380,091.00

NILAI HSPK : 2,977,691.00

PEMASANGAN BATU MERAH 1PC:3PS TINGGI


25.04.01.06 S/D 2 M M2
Upah
08.01.01.01.01.001 Mandor 0.016800 OH 180,000 3,024.00
08.01.01.01.01.003 Kepala Tukang Batu 0.012600 OH 140,000 1,764.00
08.01.01.01.03.001 Tukang Batu 0.126000 OH 130,000 16,380.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.378000 OH 110,000 41,580.00
Jumlah : 62,748.00
Bahan/Material
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.04.002 Pasir Pasang / plester 0.039600 m3 451,000 17,859.60
07.01.01.01.02.002 Semen 40 kg 0.290300 Zak 55,000 15,966.50
Jumlah : 252,226.10

NILAI HSPK : 314,974.10

47
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:3PS TINGGI
25.04.01.07 2 S/D 5 M M3
Upah
08.01.01.01.01.001 Mandor 0.225000 OH 180,000 40,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000 195,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 4.500000 OH 110,000 495,000.00
Jumlah : 751,500.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.377000 m3 451,000 170,027.00
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
Jumlah : 2,979,527.00

NILAI HSPK : 3,731,027.00

PEMASANGAN BATU MERAH 1PC:3PS TINGGI


25.04.01.08 2 S/D 5 M M2
Upah
08.01.01.01.01.001 Mandor 0.023600 OH 180,000 4,248.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015800 OH 140,000 2,212.00
08.01.01.01.03.001 Tukang Batu 0.157500 OH 130,000 20,475.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.472500 OH 110,000 51,975.00
Jumlah : 78,910.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.039600 m3 451,000 17,859.60
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.290300 Zak 55,000 15,966.50
Jumlah : 252,226.10

NILAI HSPK : 331,136.10

PEMASANGAN BATU MERAH 1PC:4PS TINGGI


25.04.01.09 S/D 2 M M3
Upah
08.01.01.01.01.001 Mandor 0.160000 OH 180,000 28,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.120000 OH 140,000 16,800.00
08.01.01.01.03.001 Tukang Batu 1.200000 OH 130,000 156,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 3.600000 OH 110,000 396,000.00
Jumlah : 597,600.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.404600 m3 451,000 182,474.60
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 2.225400 Zak 55,000 122,397.00
Jumlah : 2,362,871.60

NILAI HSPK : 2,960,471.60

48
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:4PS TINGGI
25.04.01.10 S/D 2 M M2
Upah
08.01.01.01.01.001 Mandor 0.016800 OH 180,000 3,024.00
08.01.01.01.01.003 Kepala Tukang Batu 0.012600 OH 140,000 1,764.00
08.01.01.01.03.001 Tukang Batu 0.126000 OH 130,000 16,380.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.378000 OH 110,000 41,580.00
Jumlah : 62,748.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.042500 m3 451,000 19,167.50
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.233700 Zak 55,000 12,853.50
Jumlah : 250,421.00

NILAI HSPK : 313,169.00

PEMASANGAN BATU MERAH 1PC:4PS TINGGI


25.04.01.11 2 S/D 5 M M3
Upah
08.01.01.01.01.001 Mandor 0.225000 OH 180,000 40,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000 195,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 4.500000 OH 110,000 495,000.00
Jumlah : 751,500.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.404600 m3 451,000 182,474.60
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 0.225400 Zak 55,000 12,397.00
Jumlah : 2,252,871.60

NILAI HSPK : 3,004,371.60

PEMASANGAN BATU MERAH 1PC:4PS TINGGI


25.04.01.12 2 S/D 5 M M2
Upah
08.01.01.01.01.001 Mandor 0.023600 OH 180,000 4,248.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015800 OH 140,000 2,212.00
08.01.01.01.03.001 Tukang Batu 0.157500 OH 130,000 20,475.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.472500 OH 110,000 51,975.00
Jumlah : 78,910.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.042500 m3 451,000 19,167.50
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.233700 Zak 55,000 12,853.50
Jumlah : 250,421.00

NILAI HSPK : 329,331.00

49
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:5PS TINGGI
25.04.01.13 S/D 2 M M3
Upah
08.01.01.01.01.001 Mandor 0.160000 OH 180,000 28,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.120000 OH 140,000 16,800.00
08.01.01.01.03.001 Tukang Batu 1.200000 OH 130,000 156,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 3.600000 OH 110,000 396,000.00
Jumlah : 597,600.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.451500 m3 451,000 203,626.50
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 1.862200 Zak 55,000 102,421.00
Jumlah : 2,364,047.50

NILAI HSPK : 2,961,647.50

PEMASANGAN BATU MERAH 1PC:5PS TINGGI


25.04.01.14 S/D 2 M M2
Upah
08.01.01.01.01.001 Mandor 0.016800 OH 180,000 3,024.00
08.01.01.01.01.003 Kepala Tukang Batu 0.012600 OH 140,000 1,764.00
08.01.01.01.03.001 Tukang Batu 0.126000 OH 130,000 16,380.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.378000 OH 110,000 41,580.00
Jumlah : 62,748.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.047400 m3 451,000 21,377.40
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.195500 Zak 55,000 10,752.50
Jumlah : 250,529.90

NILAI HSPK : 313,277.90

PEMASANGAN BATU MERAH 1PC:5PS TINGGI


25.04.01.15 2 S/D 5 M M3
Upah
08.01.01.01.01.001 Mandor 0.225000 OH 180,000 40,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000 195,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 4.500000 OH 110,000 495,000.00
Jumlah : 751,500.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.451500 m3 451,000 203,626.50
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 1.862200 Zak 55,000 102,421.00
Jumlah : 2,364,047.50

NILAI HSPK : 3,115,547.50

50
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:5PS TINGGI
25.04.01.16 2 S/D 5 M M2
Upah
08.01.01.01.01.001 Mandor 0.023600 OH 180,000 4,248.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015800 OH 140,000 2,212.00
08.01.01.01.03.001 Tukang Batu 0.157500 OH 130,000 20,475.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.472500 OH 110,000 51,975.00
Jumlah : 78,910.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.195500 Zak 55,000 10,752.50
07.01.01.01.04.002 Pasir Pasang / plester 0.047400 m3 451,000 21,377.40
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
Jumlah : 250,529.90

NILAI HSPK : 329,439.90

PEMASANGAN BATU MERAH 1PC:3KP:8PS


25.04.01.17 TINGGIS/D 2 M M3
Upah
08.01.01.01.01.001 Mandor 0.160000 OH 180,000 28,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.120000 OH 140,000 16,800.00
08.01.01.01.03.001 Tukang Batu 1.200000 OH 130,000 156,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 3.600000 OH 110,000 396,000.00
Jumlah : 597,600.00
Bahan/Material
07.01.01.02.03.001 Kapur Pasang 0.136000 m3 41,000 5,576.00
07.01.01.01.04.002 Pasir Pasang / plester 0.362700 m3 451,000 163,577.70
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 0.997400 Zak 55,000 54,857.00
Jumlah : 2,282,010.70

NILAI HSPK : 2,879,610.70

PEMASANGAN BATU MERAH 1PC:3KP:8PS


25.04.01.18 TINGGIS/D 2 M M2
Upah
08.01.01.01.01.001 Mandor 0.016800 OH 180,000 3,024.00
08.01.01.01.01.003 Kepala Tukang Batu 0.012600 OH 140,000 1,764.00
08.01.01.01.03.001 Tukang Batu 0.126000 OH 130,000 16,380.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.378000 OH 110,000 41,580.00
Jumlah : 62,748.00
Bahan/Material
07.01.01.02.03.001 Kapur Pasang 0.014300 m3 41,000 586.30
07.01.01.01.04.002 Pasir Pasang / plester 0.038100 m3 451,000 17,183.10
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.104700 Zak 55,000 5,758.50
Jumlah : 241,927.90

NILAI HSPK : 304,675.90

51
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:3KP:8PS
25.04.01.19 TINGGI 2 S/D 5 M M3
Upah
08.01.01.01.01.001 Mandor 0.225000 OH 180,000 40,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000 195,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 4.500000 OH 110,000 495,000.00
Jumlah : 751,500.00
Bahan/Material
07.01.01.02.03.001 Kapur Pasang 0.136000 m3 41,000 5,576.00
07.01.01.01.04.002 Pasir Pasang / plester 0.362700 m3 451,000 163,577.70
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 0.997400 Zak 55,000 54,857.00
Jumlah : 2,282,010.70

NILAI HSPK : 3,033,510.70

PEMASANGAN BATU MERAH 1PC:3KP:8PS TINGGI 2


25.04.01.20 S/D 5 M M2
Upah
08.01.01.01.01.001 Mandor 0.023600 OH 180,000 4,248.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015800 OH 140,000 2,212.00
08.01.01.01.03.001 Tukang Batu 0.157500 OH 130,000 20,475.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.472500 OH 110,000 51,975.00
Jumlah : 78,910.00
Bahan/Material
07.01.01.02.03.001 Kapur Pasang 0.014300 m3 41,000 586.30
07.01.01.01.04.002 Pasir Pasang / plester 0.038100 m3 451,000 17,183.10
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.104700 Zak 55,000 5,758.50
Jumlah : 241,927.90

NILAI HSPK : 320,837.90

25.04.01.21 PEMASANGAN BATU MERAH KOSONGAN M3


Upah
08.01.01.01.01.001 Mandor 0.049500 OH 180,000 8,910.00
08.01.01.01.01.003 Kepala Tukang Batu 0.033000 OH 140,000 4,620.00
08.01.01.01.03.001 Tukang Batu 0.330000 OH 130,000 42,900.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.990000 OH 110,000 108,900.00
Jumlah : 165,330.00
Bahan/Material
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 755.000000 Buah 4,200 3,171,000.00
Jumlah : 3,445,230.00

NILAI HSPK : 3,610,560.00

52
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMBONGKARAN DINDING TEMBOK DENGAN
25.04.01.22 PEMBERSIHAN M3
Upah
08.01.01.01.01.001 Mandor 0.050000 OH 180,000 9,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.000000 OH 110,000 110,000.00
Jumlah : 119,000.00

NILAI HSPK : 119,000.00


PEKERJAAN PLESTERAN 1PC : 1/4KP : 2 PS
25.04.01.23 (T=1 CM) M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.02.025 Pekerja Terampil 0.200000 OH 130,000 26,000.00
Jumlah : 49,400.00
Bahan/Material
07.01.01.02.03.003 Kapur Gamping 0.001300 m3 288,000 374.40
07.01.01.01.04.002 Pasir Pasang / plester 0.010700 m3 451,000 4,825.70
07.01.01.01.02.002 Semen 40 kg 0.117900 Zak 55,000 6,484.50
Jumlah : 11,684.60

NILAI HSPK : 61,084.60


PEKERJAAN PLESTERAN 1PC : 1KP : 2PS (T=1
25.04.01.24 CM) M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.02.025 Pekerja Terampil 0.200000 OH 130,000 26,000.00
Jumlah : 49,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.100400 Zak 55,000 5,522.00
07.01.01.02.03.003 Kapur Gamping 0.004600 m3 288,000 1,324.80
07.01.01.01.04.002 Pasir Pasang / plester 0.009100 m3 451,000 4,104.10
Jumlah : 10,950.90
NILAI HSPK : 60,350.90

25.04.01.25 PLESTERAN HALUS1PC : 2PS (T=1 CM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.125100 Zak 55,000 6,880.50
07.01.01.01.04.002 Pasir Pasang / plester 0.011900 m3 451,000 5,366.90
Jumlah : 12,247.40
NILAI HSPK : 57,647.40

53
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan

25.04.01.26 PLESTERAN HALUS 1PC : 2PS (T=1,5 CM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.170000 Zak 55,000 9,350.00
07.01.01.01.04.002 Pasir Pasang / plester 0.017100 m3 451,000 7,712.10
Jumlah : 17,062.10

NILAI HSPK : 62,462.10

25.04.01.27 PLESTERAN HALUS 1PC : 3PS (T=1 CM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.108000 Zak 55,000 5,940.00
07.01.01.01.04.002 Pasir Pasang / plester 0.013000 m3 451,000 5,863.00
Jumlah : 11,803.00

NILAI HSPK : 57,203.00

25.04.01.28 PLESTERAN HALUS 1PC : 3PS (T=1,5 CM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.163000 Zak 55,000 8,965.00
07.01.01.01.04.002 Pasir Pasang / plester 0.019400 m3 451,000 8,749.40
Jumlah : 17,714.40

NILAI HSPK : 63,114.40

54
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan

25.04.01.29 PLESTERAN HALUS 1PC : 4PS (T=1CM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.076300 Zak 55,000 4,196.50
07.01.01.01.04.002 Pasir Pasang / plester 0.013900 m3 451,000 6,268.90
Jumlah : 10,465.40

NILAI HSPK : 55,865.40

25.04.01.30 PLESTERAN HALUS 1PC : 4PS (T=1,5 CM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.114500 Zak 55,000 6,297.50
07.01.01.01.04.002 Pasir Pasang / plester 0.017000 m3 451,000 7,667.00
Jumlah : 13,964.50

NILAI HSPK : 59,364.50

25.04.01.31 PLESTERAN HALUS 1PC : 3KP : 8PS (T=1 CM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.040000 Zak 55,000 2,200.00
07.01.01.02.03.001 Kapur Pasang 0.003000 m3 41,000 123.00
07.01.01.02.03.003 Kapur Gamping 0.003000 m3 288,000 864.00
07.01.01.01.04.002 Pasir Pasang / plester 0.008000 m3 451,000 3,608.00
Jumlah : 6,795.00

NILAI HSPK : 52,195.00

55
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PLESTERAN HALUS 1PC : 3KP : 8PS (T=1,5
25.04.01.32 CM) M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.040000 Zak 55,000 2,200.00
07.01.01.02.03.001 Kapur Pasang 0.006000 m3 41,000 246.00
07.01.01.01.04.002 Pasir Pasang / plester 0.014000 m3 451,000 6,314.00
Jumlah : 8,760.00

NILAI HSPK : 54,160.00

25.04.01.33 PLESTERAN HALUS 1PC : 3KP : 5PS (T=1 CM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.040000 Zak 55,000 2,200.00
07.01.01.01.04.002 Pasir Pasang / plester 0.010600 m3 451,000 4,780.60
07.01.01.02.03.001 Kapur Pasang 0.006300 m3 41,000 258.30
Jumlah : 7,238.90

NILAI HSPK : 52,638.90


PLESTERAN HALUS 1PC : 3KP : 5PS (T=1,5
25.04.01.34 CM) M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.046400 Zak 55,000 2,552.00
07.01.01.02.03.001 Kapur Pasang 0.009400 m3 41,000 385.40
07.01.01.01.04.002 Pasir Pasang / plester 0.015900 m3 451,000 7,170.90
Jumlah : 10,108.30

NILAI HSPK : 55,508.30

56
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PLESTERAN HALUS 1PC : 3KP : 5PS (T=1 CM)
25.04.01.35 <2M M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.046400 Zak 55,000 2,552.00
07.01.01.02.03.001 Kapur Pasang 0.006300 m3 41,000 258.30
07.01.01.01.04.002 Pasir Pasang / plester 0.010600 m3 451,000 4,780.60
Jumlah : 7,590.90

NILAI HSPK : 52,990.90

PLESTERAN HALUS 1PC : 3KP : 5PS (T=1 CM)


25.04.01.36 LBH TGI DRI 2 M M2
Upah
08.01.01.01.01.001 Mandor 0.030000 OH 180,000 5,400.00
08.01.01.01.01.003 Kepala Tukang Batu 0.020000 OH 140,000 2,800.00
08.01.01.01.03.001 Tukang Batu 0.200000 OH 130,000 26,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000 44,000.00
Jumlah : 78,200.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.046400 Zak 55,000 2,552.00
07.01.01.02.03.001 Kapur Pasang 0.006300 m3 41,000 258.30
07.01.01.01.04.002 Pasir Pasang / plester 0.010600 m3 451,000 4,780.60
Jumlah : 7,590.90

NILAI HSPK : 85,790.90

25.04.01.37 SPESI 1PC : 2PS M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.062600 Zak 55,000 3,443.00
07.01.01.01.04.002 Pasir Pasang / plester 0.006000 m3 451,000 2,706.00
Jumlah : 51,549.00

NILAI HSPK : 96,949.00

57
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.01.38 PASANG BENANGAN M
Upah
08.01.01.01.03.001 Tukang Batu 0.120000 OH 130,000 15,600.00
Jumlah : 15,600.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.003000 Zak 55,000 165.00
07.01.01.01.04.002 Pasir Pasang / plester 0.009000 m3 451,000 4,059.00
Jumlah : 19,824.00

NILAI HSPK : 35,424.00

25.04.01.39 KOL KOLAN M


Upah
08.01.01.01.03.001 Tukang Batu 0.057000 OH 130,000 7,410.00
Jumlah : 7,410.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.010000 Zak 55,000 550.00
07.01.01.01.04.002 Pasir Pasang / plester 0.002000 m3 451,000 902.00
Jumlah : 8,862.00

NILAI HSPK : 16,272.00


25.04.01.40 COCOHAN 1PS : 4PS : 6KR M3
Upah
08.01.01.01.01.001 Mandor 0.300000 OH 180,000 54,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.050000 OH 140,000 7,000.00
08.01.01.01.03.001 Tukang Batu 0.500000 OH 130,000 65,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 5.000000 OH 110,000 550,000.00
Jumlah : 676,000.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 3.383000 Zak 55,000 186,065.00
07.01.01.01.05.001 Batu Kerikil 0.905000 m3 357,000 323,085.00
07.01.01.01.04.001 Pasir Beton / cor 0.603300 m3 499,000 301,046.70
Jumlah : 810,196.70

NILAI HSPK : 1,486,196.70


25.04.01.41 PEMASANGAN BATACO M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.013700 OH 140,000 1,918.00
08.01.01.01.03.001 Tukang Batu 0.130000 OH 130,000 16,900.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.340000 OH 110,000 37,400.00
Jumlah : 59,278.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.280000 Zak 55,000 15,400.00
07.01.01.01.04.002 Pasir Pasang / plester 0.042000 m3 451,000 18,942.00
07.01.01.01.18.005 Bataco Biasa uk. 8 X 13,5 X 36 cm - 12.500000 Buah 2,100 26,250.00
Jumlah : 60,592.00

NILAI HSPK : 119,870.00

58
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan

25.04.01.42 PEMASANGAN BATU MERAH TEBAL 1 BATA, 1PC:2PS M2


Upah
08.01.01.01.03.001 Tukang Batu 0.320000 OH 130,000 41,600.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.500000 OH 110,000 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.032000 OH 140,000 4,480.00
08.01.01.01.01.001 Mandor 0.096000 OH 180,000 17,280.00
Jumlah : 118,360.00
Bahan/Material
07.01.01.01.18.006 Batu Bata Merah 160.000000 Pcs 2,100 336,000.00
07.01.01.01.02.012 Portland Cement 1.064000 zak 60,000 63,840.00
07.01.01.01.04.002 Pasir Pasang / plester 0.085000 m3 451,000 38,335.00
Jumlah : 438,175.00

NILAI HSPK : 556,535.00


PEMASANGAN BATU MERAH TEBAL 1 BATA,
25.04.01.43 1PC:3PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.320000 OH 130,000 41,600.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.500000 OH 110,000 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.032000 OH 140,000 4,480.00
08.01.01.01.01.001 Mandor 0.096000 OH 180,000 17,280.00
Jumlah : 118,360.00
Bahan/Material
07.01.01.01.18.006 Batu Bata Merah 160.000000 Pcs 2,100 336,000.00
07.01.01.01.02.012 Portland Cement 0.880000 zak 60,000 52,800.00
07.01.01.01.04.002 Pasir Pasang / plester 0.096000 m3 451,000 43,296.00
Jumlah : 432,096.00

NILAI HSPK : 550,456.00

PEMASANGAN BATU MERAH TEBAL 1 BATA,


25.04.01.44 1PC:5PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.320000 OH 130,000 41,600.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.500000 OH 110,000 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.032000 OH 140,000 4,480.00
08.01.01.01.01.001 Mandor 0.096000 OH 180,000 17,280.00
Jumlah : 118,360.00
Bahan/Material
07.01.01.01.18.006 Batu Bata Merah 160.000000 Pcs 2,100 336,000.00
07.01.01.01.02.012 Portland Cement 0.544000 zak 60,000 32,640.00
07.01.01.01.04.002 Pasir Pasang / plester 0.112000 m3 451,000 50,512.00
Jumlah : 419,152.00

NILAI HSPK : 537,512.00

59
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH TEBAL 1/2 BATA,
25.04.01.45 1PC:2PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00

Bahan/Material
07.01.01.01.18.006 Batu Bata Merah 80.000000 Pcs 2,100 168,000.00
07.01.01.01.02.012 Portland Cement 0.520000 zak 60,000 31,200.00
07.01.01.01.04.002 Pasir Pasang / plester 0.042000 m3 451,000 18,942.00
Jumlah : 218,142.00

NILAI HSPK : 300,606.00

PEMASANGAN BATU MERAH TEBAL 1/2 BATA,


25.04.01.46 1PC:3PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00
Bahan/Material
07.01.01.01.18.006 Batu Bata Merah 80.000000 Pcs 2,100 168,000.00
07.01.01.01.02.012 Portland Cement 0.400000 zak 60,000 24,000.00
07.01.01.01.04.002 Pasir Pasang / plester 0.047000 m3 451,000 21,197.00
Jumlah : 213,197.00

NILAI HSPK : 265,997.00

PEMASANGAN BATU MERAH TEBAL 1/2 BATA,


25.04.01.47 1PC:5PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00
Bahan/Material
07.01.01.01.18.006 Batu Bata Merah 80.000000 Pcs 2,100 168,000.00
07.01.01.01.02.012 Portland Cement 0.264000 zak 60,000 15,840.00
07.01.01.01.04.002 Pasir Pasang / plester 0.053000 m3 451,000 23,903.00
Jumlah : 207,743.00

NILAI HSPK : 290,207.00

60
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02 FINISHING DINDING
25.04.02.01 PEMASANGAN BATU KLINGKER M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.350000 OH 110,000 38,500.00
Jumlah : 63,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.125100 Zak 55,000 6,880.50
07.01.01.01.05.013 Batu Klingker 52.500000 Buah 5,000 262,500.00
07.01.01.01.04.002 Pasir Pasang / plester 0.011900 m3 451,000 5,366.90
Jumlah : 274,747.40

NILAI HSPK : 337,907.40

25.04.02.02 PEMASANGAN BATU AMPYANG M2


Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.350000 OH 110,000 38,500.00
Jumlah : 63,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.250200 Zak 55,000 13,761.00
07.01.01.01.05.014 Batu Ampyang 1.100000 m2 191,000 210,100.00
07.01.01.01.04.002 Pasir Pasang / plester 0.023800 m3 451,000 10,733.80
Jumlah : 234,594.80

NILAI HSPK : 297,754.80

PEMASANGAN BATU GILANG X JEMBER


25.04.02.03 ( SIMETRIS) M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.02.025 Pekerja Terampil 0.350000 OH 130,000 45,500.00
Jumlah : 70,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.250200 Zak 55,000 13,761.00
07.01.01.01.05.015 Batu Gilang Ex Jember 1.100000 m2 88,000 96,800.00
07.01.01.01.04.002 Pasir Pasang / plester 0.023800 m3 451,000 10,733.80
Jumlah : 121,294.80

NILAI HSPK : 191,454.80

61
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU GILANG X JEMBER (A
25.04.02.04 SIMETRIS) M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.02.025 Pekerja Terampil 0.350000 OH 130,000 45,500.00
Jumlah : 70,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.250200 Zak 55,000 13,761.00
07.01.01.01.05.015 Batu Gilang Ex Jember 1.200000 m2 88,000 105,600.00
07.01.01.01.04.002 Pasir Pasang / plester 0.023800 m3 451,000 10,733.80
Jumlah : 130,094.80

NILAI HSPK : 200,254.80

PEMASANGAN BATU GILANG X CIREBON


25.04.02.05 (SIMETRIS) M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.02.025 Pekerja Terampil 0.350000 OH 130,000 45,500.00
Jumlah : 70,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.250200 Zak 55,000 13,761.00
07.01.01.01.05.016 Batu Gilang Ex Cirebon 1.100000 M2 88,000 96,800.00
07.01.01.01.04.002 Pasir Pasang / plester 0.023800 m3 451,000 10,733.80
Jumlah : 121,294.80

NILAI HSPK : 191,454.80

PEMASANGAN BATU GILANG X CIREBON ( A


25.04.02.06 SIMETRIS) M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.02.025 Pekerja Terampil 0.350000 OH 130,000 45,500.00
Jumlah : 70,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.250200 Zak 55,000 13,761.00
07.01.01.01.05.016 Batu Gilang Ex Cirebon 1.200000 M2 88,000 105,600.00
07.01.01.01.04.002 Pasir Pasang / plester 0.023800 m3 451,000 10,733.80
Jumlah : 130,094.80

NILAI HSPK : 200,254.80

62
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU BOBOS UK( 10 X20 X 1.5
25.04.02.07 CM) M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.350000 OH 110,000 38,500.00
Jumlah : 63,160.00

Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.129600 Zak 55,000 7,128.00
07.01.01.01.04.002 Pasir Pasang / plester 0.023800 m3 451,000 10,733.80
07.01.01.01.05.017 Batu Bobos Uk 1 0 x 20 x 1 5 cm 1.000000 m2 114,000 114,000.00
Jumlah : 131,861.80

NILAI HSPK : 195,021.80

MENGAPUR DINDING TEMBOK BARU SAMPAI


25.04.02.08 BAIK 3 X M2
Upah
08.01.01.01.01.005 Kepala Tukang Cat 0.001000 OH 140,000 140.00
08.01.01.01.03.003 Tukang Cat 0.010000 OH 130,000 1,300.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000 6,600.00
Jumlah : 8,040.00

Bahan/Material
07.01.01.02.03.003 Kapur Gamping 0.000500 m3 288,000 144.00
Jumlah : 106.50

NILAI HSPK : 8,146.50

MENGAPUR DINDING TEMBOK LAMA SAMPAI


25.04.02.09 BAIK 3 X M2
Upah
08.01.01.01.01.005 Kepala Tukang Cat 0.001000 OH 140,000 140.00
08.01.01.01.03.003 Tukang Cat 0.010000 OH 130,000 1,300.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000 6,600.00
Jumlah : 8,040.00

Bahan/Material
07.01.01.02.03.003 Kapur Gamping 0.000500 m3 288,000 144.00
Jumlah : 106.50

NILAI HSPK : 8,146.50

63
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PENGECATAN/PLAMUR TEMBOK DENGAN CAT
25.04.02.10 TEMBOK M2
Upah
08.01.01.01.01.001 Mandor 0.002500 OH 180,000 450.00
08.01.01.01.01.005 Kepala Tukang Cat 0.007500 OH 140,000 1,050.00
08.01.01.01.03.003 Tukang Cat 0.075000 OH 130,000 9,750.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000 5,500.00
Jumlah : 16,750.00

Bahan/Material
07.01.01.01.06.043 Cat Tembok 0.300000 20 Kg 327,000 98,100.00
07.01.01.01.06.077 Plamur Tembok 0.120000 Kg 17,000 2,040.00
07.01.01.01.30.001 Kertas Gosok no 1 50 0.100000 Lembar 4,000 400.00
Jumlah : 100,540.00

NILAI HSPK : 117,290.00

PENGECATAN 3 X SERTA MENGGOSOK


25.04.02.11 ( TANPA MENI) M2
Upah
08.01.01.01.01.001 Mandor 0.007500 OH 180,000 1,350.00
08.01.01.01.01.005 Kepala Tukang Cat 0.022500 OH 140,000 3,150.00
08.01.01.01.03.003 Tukang Cat 0.225000 OH 130,000 29,250.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.150000 OH 110,000 16,500.00
Jumlah : 50,250.00

Bahan/Material
07.01.01.01.06.052 Dempul Tembok 0.080000 5 Kg 59,000 4,720.00
07.01.01.01.06.070 Minyak Cat Mentah 0.057000 Liter 159,000 9,063.00
07.01.01.01.30.001 Kertas Gosok no 1 50 1.000000 Lembar 4,000 4,000.00
07.01.01.01.06.035 Cat Minyak 5000 1 kg 0.425000 Kg 64,000 27,200.00
Jumlah : 44,983.00

NILAI HSPK : 95,233.00

25.04.02.12 PENGECATAN DASAR(MENI) M2


Upah
08.01.01.01.01.001 Mandor 0.005000 OH 180,000 900.00
08.01.01.01.01.005 Kepala Tukang Cat 0.007500 OH 140,000 1,050.00
08.01.01.01.03.003 Tukang Cat 0.075000 OH 130,000 9,750.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.030000 OH 110,000 3,300.00
Jumlah : 15,000.00
Bahan/Material
07.01.01.01.06.069 Minyak Cat / Afduner 0.044000 Liter 32,000 1,408.00
07.01.01.01.06.022 Cat Dasar Meni Besi Kangaroo Line - 0.084000 Liter 29,000 2,436.00
Jumlah : 3,844.00

NILAI HSPK : 18,844.00

64
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.13 PENYAPUTAN AIR PC M2
Upah
08.01.01.01.03.001 Tukang Batu 0.007000 OH 130,000 910.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.007000 OH 110,000 770.00
Jumlah : 1,680.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.029800 Zak 55,000 1,639.00
Jumlah : 1,639.00

NILAI HSPK : 3,319.00

PENGECATAN TEMBOK LAMA Y\TANPA


25.04.02.14 PLAMIR (SEWARNA) M2
Upah
08.01.01.01.01.001 Mandor 0.002500 OH 180,000 450.00
08.01.01.01.01.005 Kepala Tukang Cat 0.007500 OH 140,000 1,050.00
08.01.01.01.03.003 Tukang Cat 0.075000 OH 130,000 9,750.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000 5,500.00
Jumlah : 16,750.00
Bahan/Material
07.01.01.01.06.044 Cat Tembok "Kangaroo" Kartex 10 kg - 0.300000 Kg 41,000 12,300.00
07.01.01.01.30.001 Kertas Gosok no 1 50 0.100000 Lembar 4,000 400.00
Jumlah : 12,700.00

NILAI HSPK : 29,450.00

25.04.02.15 PEMELITURAN 2 X SAMPAI RATA M2


Upah
08.01.01.01.03.003 Tukang Cat 0.880000 OH 130,000 114,400.00
Jumlah : 114,400.00
Bahan/Material
07.01.01.01.06.050 Cerlak 0.034000 Kg 149,000 5,066.00
07.01.01.01.06.079 Spritus 0.660000 Botol 14,000 9,240.00
07.01.01.01.30.001 Kertas Gosok no 1 50 0.500000 Lembar 4,000 2,000.00
Jumlah : 16,306.00

NILAI HSPK : 130,706.00


25.04.02.16 PEKERJAAN TEER KAYU M2
Upah
08.01.01.01.01.001 Mandor 0.002500 OH 180,000 450.00
08.01.01.01.02.025 Pekerja Terampil 0.050000 OH 130,000 6,500.00
Jumlah : 6,950.00
Bahan/Material
07.01.01.01.06.080 Teer / Minyak Hitam 0.175000 18 Liter 242,000 42,350.00
Jumlah : 42,350.00

NILAI HSPK : 49,300.00

65
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.17 PEMASANGAN WALLPAPER M2
Upah
08.01.01.01.01.001 Mandor 0.033000 OH 180,000 5,940.00
08.01.01.01.03.009 Tukang Kayu 0.250000 OH 130,000 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.090000 OH 110,000 9,900.00
Jumlah : 48,340.00
Bahan/Material
Wallpaper (10,05 mx 0,53 m) Collection La Verita No
07.01.01.01.31.035 7811 261 2.000000 Roll 201,000 402,000.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.200000 Kg 39,000 7,800.00
Jumlah : 409,800.00

NILAI HSPK : 458,140.00

PEKERJAAN LAPIS MELAMIN DUCO (2 X


25.04.02.18 LAPIS SAMPAI RATA) M2
Upah
08.01.01.01.01.001 Mandor 0.025000 OH 180,000 4,500.00
08.01.01.01.01.005 Kepala Tukang Cat 0.009000 OH 140,000 1,260.00
08.01.01.01.03.003 Tukang Cat 0.090000 OH 130,000 11,700.00
08.01.01.01.02.025 Pekerja Terampil 0.075000 OH 130,000 9,750.00
Jumlah : 27,210.00
Bahan/Material
07.01.01.01.31.027 Pewarna 0.500000 set 3,000 1,500.00
07.01.01.01.30.001 Kertas Gosok no 1 50 1.000000 Lembar 4,000 4,000.00
07.01.01.01.30.002 Kertas Gosok no 280 1.000000 Lembar 4,000 4,000.00
07.01.01.01.31.029 Shanding 0.500000 Kg 197,000 98,500.00
07.01.01.01.31.003 Clear Doof 0.200000 Kg 156,000 31,200.00
07.01.01.01.06.082 Thinner A 0.837000 4 Liter 120,000 100,440.00
07.01.01.01.31.004 Coumpond 0.200000 kaleng 47,000 9,400.00
07.01.01.01.06.097 Wood Filler 0.200000 Kg 48,000 9,600.00
Jumlah : 258,640.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 500.00
Jumlah : 500.00

NILAI HSPK : 286,350.00


25.04.02.19 PELAPISAN WATERPROOFING M2
Upah
08.01.01.01.01.001 Mandor 1.000000 OH 180,000 180,000.00
08.01.01.01.01.005 Kepala Tukang Cat 0.007500 OH 140,000 1,050.00
08.01.01.01.03.003 Tukang Cat 0.075000 OH 130,000 9,750.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000 5,500.00
Jumlah : 196,300.00
Bahan/Material
07.01.01.01.31.002 Aquaproof 0.350000 5 Kg 78,000 27,300.00
07.01.01.01.31.028 Serat Fiber 1.000000 M3 7,000 7,000.00
Jumlah : 34,300.00

NILAI HSPK : 230,600.00

66
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.20 PENGECATAN GENTENG 2 X M2
Upah
08.01.01.01.01.001 Mandor 0.002500 OH 180,000 450.00
08.01.01.01.01.005 Kepala Tukang Cat 0.007500 OH 140,000 1,050.00
08.01.01.01.03.003 Tukang Cat 0.075000 OH 130,000 9,750.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000 5,500.00
Jumlah : 16,750.00
Bahan/Material
07.01.01.01.06.025 Cat Genteng 0.200000 4 Kg 201,000 40,200.00
Jumlah : 40,200.00

NILAI HSPK : 56,950.00

PEMASANGAN DINDING
25.04.02.21 BATACO,10X19X40CM,1PC:5PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.072000 zak 60,000 4,320.00
07.01.01.01.04.002 Pasir Pasang / plester 0.018000 m3 451,000 8,118.00
07.01.01.01.18.004 Bataco Biasa uk. 10 X 20 X 40 cm - 13.000000 Buah 4,200 54,600.00
Jumlah : 67,038.00

NILAI HSPK : 149,502.00

PEMASANGAN DINDING CELCON,59 X 19 X


25.04.02.22 10CM,1PC:5PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00
Bahan/Material
07.01.01.01.18.013 Celcon Block 59 X 19 t. 7,5 - 9.000000 buah 7,500 67,500.00
07.01.01.01.02.012 Portland Cement 0.072000 zak 60,000 4,320.00
07.01.01.01.04.002 Pasir Pasang / plester 0.018000 m3 451,000 8,118.00
Jumlah : 79,938.00

NILAI HSPK : 162,402.00

67
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN DINDING CELCON,59 X 19 X
25.04.02.23 10CM,1PC:3PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00
Bahan/Material
07.01.01.01.18.012 Celcon Block 59 X 19 t. 10 - 9.000000 Bh 11,000 99,000.00
07.01.01.01.02.012 Portland Cement 0.153600 zak 60,000 9,216.00
07.01.01.01.04.002 Pasir Pasang / plester 0.030000 m3 451,000 13,530.00
Jumlah : 121,746.00

NILAI HSPK : 204,210.00

25.04.02.24 PLESTERAN BIASA,TEBAL 10 MM, 1PC : 3PS M2


Upah
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000 44,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.020000 OH 180,000 3,600.00
Jumlah : 67,324.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.108000 zak 60,000 6,480.00
07.01.01.01.04.002 Pasir Pasang / plester 0.013000 m3 451,000 5,863.00
Jumlah : 12,343.00

NILAI HSPK : 79,667.00

25.04.02.25 PLESTERAN BIASA,TEBAL 10 MM, 1PC : 5PS M2


Upah
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000 44,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.016000 OH 140,000 2,240.00
08.01.01.01.01.001 Mandor 0.020000 OH 180,000 3,600.00
Jumlah : 69,340.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.072000 zak 60,000 4,320.00
07.01.01.01.04.002 Pasir Pasang / plester 0.015000 m3 451,000 6,765.00
Jumlah : 11,085.00

NILAI HSPK : 80,425.00

68
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan

25.04.02.26 PLESTERAN BIASA,TEBAL 15 MM, 1PC : 3PS M2


Upah
08.01.01.01.03.001 Tukang Batu 0.200000 OH 130,000 26,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000 44,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.020000 OH 180,000 3,600.00
Jumlah : 73,824.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.019000 m3 451,000 8,569.00
07.01.01.01.02.012 Portland Cement 0.129600 zak 60,000 7,776.00
Jumlah : 16,345.00

NILAI HSPK : 90,169.00

25.04.02.27 PLESTERAN BIASA,TEBAL 15 MM, 1PC : 5PS M2


Upah
08.01.01.01.03.001 Tukang Batu 0.200000 OH 130,000 26,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000 44,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.002000 OH 180,000 360.00
Jumlah : 70,584.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.086400 zak 60,000 5,184.00
07.01.01.01.04.002 Pasir Pasang / plester 0.022000 m3 451,000 9,922.00
Jumlah : 15,106.00

NILAI HSPK : 85,690.00

25.04.02.28 PLESTERAN BIASA,TEBAL 20 MM, 1PC : 3PS M2


Upah
08.01.01.01.03.001 Tukang Batu 0.200000 OH 130,000 26,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000 44,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.020000 OH 180,000 3,600.00
Jumlah : 73,824.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.216000 zak 60,000 12,960.00
07.01.01.01.04.002 Pasir Pasang / plester 0.026000 m3 451,000 11,726.00
Jumlah : 24,686.00

NILAI HSPK : 98,510.00

69
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan

25.04.02.29 PLESTERAN BIASA,TEBAL 20 MM, 1PC : 5PS M2


Upah
08.01.01.01.03.001 Tukang Batu 0.200000 OH 130,000 26,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000 44,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.020000 OH 180,000 3,600.00
Jumlah : 73,824.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.145600 zak 60,000 8,736.00
07.01.01.01.04.002 Pasir Pasang / plester 0.029000 m3 451,000 13,079.00
Jumlah : 21,815.00

NILAI HSPK : 95,639.00

25.04.02.30 ACIAN M2
Upah
08.01.01.01.03.001 Tukang Batu 0.060000 OH 130,000 7,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000 6,600.00
08.01.01.01.01.003 Kepala Tukang Batu 0.003000 OH 140,000 420.00
08.01.01.01.01.001 Mandor 0.003000 OH 180,000 540.00
Jumlah : 15,360.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.130000 zak 60,000 7,800.00
Jumlah : 7,800.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 2.000,00
Jumlah : 2.000,00

NILAI HSPK : 14,169.00

25.04.02.31 PLESTERAN CIPRAT,TEBAL 10 MM, 1PC : 5PS M2


Upah
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000 44,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.003000 OH 140,000 420.00
08.01.01.01.01.001 Mandor 0.020000 OH 180,000 3,600.00
Jumlah : 67,520.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.072000 zak 60,000 4,320.00
07.01.01.01.04.002 Pasir Pasang / plester 0.016000 m3 451,000 7,216.00
Jumlah : 11,536.00

NILAI HSPK : 79,056.00

70
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
ADUKAN SIAR PASANGAN BATU BELAH 1PC :
25.04.02.32 2PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.070000 OH 130,000 9,100.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.220000 OH 110,000 24,200.00
08.01.01.01.01.003 Kepala Tukang Batu 0.002000 OH 140,000 280.00
08.01.01.01.01.001 Mandor 0.008000 OH 180,000 1,440.00
Jumlah : 35,020.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.142800 zak 60,000 8,568.00
07.01.01.01.04.002 Pasir Pasang / plester 0.011400 m3 451,000 5,141.40
Jumlah : 13,709.40

NILAI HSPK : 48,729.40

25.04.02.33 MENGECAT KAYU, CAT BODELAC M2


Upah
08.01.01.01.03.003 Tukang Cat 0.125000 OH 130,000 16,250.00
08.01.01.01.01.005 Kepala Tukang Cat 0.023000 OH 140,000 3,220.00
08.01.01.01.01.001 Mandor 0.012000 OH 180,000 2,160.00
Jumlah : 21,630.00
Bahan/Material
07.01.01.01.06.043 Cat Tembok 0.200000 Lt 327,000 65,400.00
07.01.01.01.30.001 Kertas Gosok no 1 50 1.000000 Bh 4,000 4,000.00
07.01.01.01.31.018 Kuas 4 inch 0.035000 Buah 26,000 910.00
07.01.01.01.06.023 Cat Dasar Meni Kayu 2.5 Kg - 2.5 Ltr 0.170000 Ltr 67,000 11,390.00
Jumlah : 81,700.00

NILAI HSPK : 103,330.00

25.04.02.34 MENGECAT BESI, CAT CAT SETARA KANGORO M2


Upah
08.01.01.01.03.003 Tukang Cat 0.125000 OH 130,000 16,250.00
08.01.01.01.01.005 Kepala Tukang Cat 0.023000 OH 140,000 3,220.00
08.01.01.01.01.001 Mandor 0.012000 OH 180,000 2,160.00
Jumlah : 21,630.00
Bahan/Material
07.01.01.01.06.022 Cat Dasar Meni Besi Kangaroo Line - 0.100000 Kg 29,000 2,900.00
07.01.01.01.06.049 cat warna 0.200000 kg 120,000 24,000.00
07.01.01.01.31.018 Kuas 4 inch 0.035000 Buah 26,000 910.00
07.01.01.01.30.001 Kertas Gosok no 1 50 0.500000 Bh 4,000 2,000.00
Jumlah : 29,810.00

NILAI HSPK : 51,440.00

71
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.35 MENGECAT TEMBOK, CAT MATEX M2
Upah
08.01.01.01.03.003 Tukang Cat 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.010000 OH 110,000 1,100.00
08.01.01.01.01.001 Mandor 0.001000 OH 180,000 180.00
Jumlah : 20,780.00
Bahan/Material
07.01.01.01.06.043 Cat Tembok 0.350000 5 Kg 327,000 114,450.00
07.01.01.01.31.001 Amplas Kayu Halus 0.100000 Bh 4,000 400.00
07.01.01.01.31.019 Kuas Roll 7" Action 0.010000 Buah 26,000 260.00
07.01.01.01.06.052 Dempul Tembok 0.150000 5 Kg 59,000 8,850.00
Jumlah : 123,960.00

NILAI HSPK : 144,740.00

25.04.02.36 MENGECAT KAYU, CAT SETARABODELAC M2


Upah
08.01.01.01.03.003 Tukang Cat 0.125000 OH 130,000 16,250.00
08.01.01.01.01.005 Kepala Tukang Cat 0.023000 OH 140,000 3,220.00
08.01.01.01.01.001 Mandor 0.012000 OH 180,000 2,160.00
Jumlah : 21,630.00
Bahan/Material
07.01.01.01.06.049 cat warna 0.200000 kg 120,000 24,000.00
07.01.01.01.31.001 Amplas Kayu Halus 1.000000 Bh 4,000 4,000.00
07.01.01.01.31.018 Kuas 4 inch 0.035000 Buah 26,000 910.00
07.01.01.01.06.023 Cat Dasar Meni Kayu 2.5 Kg - 2.5 Ltr 0.170000 klg 67,000 11,390.00
Jumlah : 40,300.00

NILAI HSPK : 61,930.00

25.04.02.37 MENGECAT BESI, CAT SETARA BODELAC M2


Upah
08.01.01.01.03.003 Tukang Cat 0.125000 OH 130,000 16,250.00
08.01.01.01.01.005 Kepala Tukang Cat 0.023000 OH 140,000 3,220.00
08.01.01.01.01.001 Mandor 0.012000 OH 180,000 2,160.00
Jumlah : 21,630.00

Bahan/Material
07.01.01.01.06.069 Minyak Cat / Afduner 0.200000 Liter 32,000 6,400.00
07.01.01.01.06.022 Cat Dasar Meni Besi Kangaroo Line - 0.100000 Kg 29,000 2,900.00
07.01.01.01.06.049 cat warna 0.200000 kg 120,000 24,000.00
07.01.01.01.31.001 Amplas Kayu Halus 0.500000 Bh 4,000 2,000.00
07.01.01.01.31.018 Kuas 4 inch 0.035000 Buah 26,000 910.00
Jumlah : 36,210.00

NILAI HSPK : 57,840.00

72
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
MENGECAT TEMBOK, INTERIOR SETARA NIPPON
25.04.02.38 PAINT M2
Upah
08.01.01.01.03.003 Tukang Cat 0.150000 OH 130,000 19,500.00
08.01.01.01.01.005 Kepala Tukang Cat 0.010000 OH 140,000 1,400.00
08.01.01.01.01.001 Mandor 0.001000 OH 180,000 180.00
Jumlah : 21,080.00
Bahan/Material
07.01.01.01.06.043 Cat Tembok 0.350000 5 Kg 327,000 114,450.00
07.01.01.01.31.001 Amplas Kayu Halus 0.100000 Bh 4,000 400.00
07.01.01.01.31.019 Kuas Roll 7" Action 0.010000 Buah 26,000 260.00
07.01.01.01.06.052 Dempul Tembok 0.150000 5 Kg 59,000 8,850.00
Jumlah : 123,960.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 500.00
Jumlah : 500.00

NILAI HSPK : 145,540.00

MENGECAT TEMBOK, EXTERIOR WEATHER


25.04.02.39 SHILD SETARA NIPPON PAINT M2
Upah
08.01.01.01.03.003 Tukang Cat 0.150000 OH 130,000 19,500.00
08.01.01.01.01.005 Kepala Tukang Cat 0.010000 OH 140,000 1,400.00
08.01.01.01.01.001 Mandor 0.001000 OH 180,000 180.00
Jumlah : 21,080.00
Bahan/Material
07.01.01.01.06.043 Cat Tembok 0.350000 5 Kg 327,000 114,450.00
07.01.01.01.31.001 Amplas Kayu Halus 0.100000 Bh 4,000 400.00
07.01.01.01.31.019 Kuas Roll 7" Action 0.010000 Buah 26,000 260.00
Jumlah : 115,110.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 500.00
Jumlah : 500.00

NILAI HSPK : 136,690.00


25.04.02.40 TEAK OIL M2
Upah
08.01.01.01.03.003 Tukang Cat 0.100000 OH 130,000 13,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.010000 OH 110,000 1,100.00
08.01.01.01.01.001 Mandor 0.001000 OH 180,000 180.00
Jumlah : 14,280.00
Bahan/Material
07.01.01.01.31.033 Teak Oil M 0.150000 M2 11,000 1,650.00
Jumlah : 1,650.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 500.00
Jumlah : 500.00

NILAI HSPK : 16,430.00

73
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.41 POLITURAN M2
Upah
08.01.01.01.03.003 Tukang Cat 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.015000 OH 110,000 1,650.00
08.01.01.01.01.001 Mandor 0.002000 OH 180,000 360.00
Jumlah : 21,510.00
Bahan/Material
07.01.01.01.06.071 Pelitur P-03 UV 0.200000 ltr 103,000 20,600.00
Jumlah : 20,600.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 500.00
Jumlah : 500.00

NILAI HSPK : 42,610.00

74
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
E PEKERJAAN LANTAI
25.05 PEKERJAAN LANTAI
25.05.01 LANTAI
PEMASANGAN TEGEL ABU2 KPL BSH 20X20 CM (1/4 PC :1KP : 2
25.05.01.01 PS M2
Upah

08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00


08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.03.001 Tukang Batu 0.25 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
Jumlah : 95,500.00

Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.02.03.001 Kapur Pasang 0.02 m3 41,000.00 656.00
07.01.01.01.29.030 Keramik Lantai 20 x 20 cm Terpasang 1.05 M2 54,000.00 56,700.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 69,189.80

NILAI HSPK : 164,689.80

25.05.01.02 PEMASANGAN TEGEL KERAMIK 20X20 CM M2


Upah

08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00


08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.03.001 Tukang Batu 0.25 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
Jumlah : 95,500.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.02.03.001 Kapur Pasang 0.02 m3 41,000.00 902.00
07.01.01.01.29.030 Keramik Lantai 20 x 20 cm Terpasang 10.50 M2 54,000.00 567,000.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 579,735.80

NILAI HSPK : 675,235.80

25.05.01.03 PEMASANGAN TEGEL MOZAIK 30X30 CM M2


Upah
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.03.001 Tukang Batu 0.25 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
Jumlah : 95,500.00

75
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.29.046 Keramik 30 x 30 cm 1.05 M2 50,000.00 52,500.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 65,533.80

NILAI HSPK : 161,033.80

25.05.01.04 PEMASANGAN TEGEL KERAMIK 30X30 CM M2


Upah
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.03.001 Tukang Batu 0.25 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
Jumlah : 95,500.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.29.046 Keramik 30 x 30 cm 1.05 M2 50,000.00 52,500.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 65,533.80

NILAI HSPK : 161,033.80

25.05.01.05 PEMASANGAN TEGEL KERAMIK 30X30 CM BERWARNA M2


Upah
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.03.001 Tukang Batu 0.25 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
Jumlah : 95,500.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.29.046 Keramik 30 x 30 cm 1.05 M2 50,000.00 52,500.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 65,533.80

NILAI HSPK : 161,033.80

PEMASANGAN TEGEL KERAMIK 30X30 CM (MOTIF WARNA


25.05.01.06 GELAP) M2
Upah
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.03.001 Tukang Batu 0.25 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
Jumlah : 95,500.00

76
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.11.006 Tegel Keramik 30x30 (motif/warna gelap) 1.05 M2 711,000.00 746,550.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 759,583.80

NILAI HSPK : 855,083.80

PEMASANGAN TEGEL KERAMIK 40X40 CM (MOTIF WARNA


25.05.01.07 GELAP) M2
Upah
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.03.001 Tukang Batu 0.25 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
Jumlah : 95,500.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.29.033 Keramik Lantai 40 x 40 cm Terpasang 1.05 M2 160,000.00 168,000.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 181,033.80

NILAI HSPK : 276,533.80

25.05.01.08 PEMASANGAN TEGEL KERAMIK 20X250 CM (DINDING) M2


Upah
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 5,625.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 4,375.00
08.01.01.01.03.001 Tukang Batu 0.31 OH 130,000.00 40,625.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.63 OH 110,000.00 68,750.00
Jumlah : 119,375.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.09 Zak 55,000.00 5,148.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.29.038 Keramik Dinding 20 x 25 cm Terpasang 1.05 M2 159,000.00 166,950.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 184,031.80

NILAI HSPK : 303,406.80

25.05.01.09 PEMASANGAN TEGEL KERAMIK 11X11 CM (DINDING) M2


Upah
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 5,634.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 4,382.00
08.01.01.01.03.001 Tukang Batu 0.31 OH 130,000.00 40,625.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.63 OH 110,000.00 68,750.00
Jumlah : 119,391.00

77
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.09 Zak 55,000.00 5,148.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.29.026 Porselen Putih 11 x 11 cm 120 kpg 1.05 M2 93,000.00 97,650.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 114,731.80

NILAI HSPK : 234,122.80

25.05.01.10 PEMASANGAN TEGEL KERAMIK DINDING 20X20 CM M2


Upah
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 5,634.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 4,382.00
08.01.01.01.03.001 Tukang Batu 0.31 OH 130,000.00 40,625.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.63 OH 110,000.00 68,750.00
Jumlah : 119,391.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,210.00
07.01.01.01.02.003 Semen Warna 0.01 Kg 6,000.00 82.80
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
07.01.01.01.29.030 Keramik Lantai 20 x 20 cm Terpasang 1.05 M2 54,000.00 56,700.00
Jumlah : 68,726.60
NILAI HSPK : 188,117.60

25.05.01.11 PEMASANGAN TEGEL PLAN ABU2 15X20 CM CAMPUR M


Upah
08.01.01.01.01.001 Mandor 0.00 OH 180,000.00 846.00
08.01.01.01.01.003 Kepala Tukang Batu 0.00 OH 140,000.00 658.00
08.01.01.01.03.001 Tukang Batu 0.05 OH 130,000.00 6,097.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.09 OH 110,000.00 10,318.00
Jumlah : 17,919.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.00 Zak 55,000.00 181.50
07.01.01.01.02.003 Semen Warna 0.00 Kg 6,000.00 12.60
07.01.01.01.11.005 Tegel Abu-abu 15x20 5.25 Buah 3,000.00 15,750.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 26,677.90

NILAI HSPK : 44,596.90

PEMASANGAN TEGEL PLIN DINDING KERAMIK UK


25.05.01.12 7,5X20 CM M
Upah
08.01.01.01.01.001 Mandor 0.00 OH 180,000.00 846.00
08.01.01.01.01.003 Kepala Tukang Batu 0.00 OH 140,000.00 322.00
08.01.01.01.03.001 Tukang Batu 0.02 OH 130,000.00 3,042.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.05 OH 110,000.00 5,159.00
Jumlah : 9,369.00

78
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.00 Zak 55,000.00 93.50
07.01.01.01.02.003 Semen Warna 0.00 Kg 6,000.00 6.00
07.01.01.01.11.004 Tegel Flint Keramik warna/motif 5.25 Buah 7,000.00 36,750.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 47,583.30

NILAI HSPK : 56,952.30

PEMASANGAN LANTAI KERAMIK IKAD, MULIA UK


25.05.01.13 20X20 CM M1
Upah
08.01.01.01.03.001 Tukang Batu 0.03 OH 130,000.00 3,250.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
Jumlah : 66,250.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.07 m3 451,000.00 31,570.00
07.01.01.01.02.001 Semen 50 Kg 0.19 Zak 65,000.00 12,480.00
07.01.01.01.29.030 Keramik Lantai 20 x 20 cm Terpasang 1.10 M2 54,000.00 59,400.00
Jumlah : 103,450.00

NILAI HSPK : 169,700.00

PEMASANGAN LANTAI KERAMIK IKAD, MULIA UK


25.05.01.14 30X30 CM M1
Upah
08.01.01.01.03.001 Tukang Batu 0.03 OH 130,000.00 3,250.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
Jumlah : 66,250.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.07 m3 451,000.00 31,570.00
07.01.01.01.02.001 Semen 50 Kg 0.19 Zak 65,000.00 12,480.00
07.01.01.01.29.032 Keramik Lantai 30 x 30 cm Terpasang 1.10 M2 133,000.00 146,300.00
Jumlah : 190,350.00

NILAI HSPK : 256,600.00

PEMASANGAN LANTAI KERAMIK IKAD, MULIA UK


25.05.01.15 40X40 CM M1
Upah
08.01.01.01.03.001 Tukang Batu 0.03 OH 130,000.00 3,250.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
Jumlah : 66,250.00

79
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.70 m3 451,000.00 315,700.00
07.01.01.01.02.001 Semen 50 Kg 0.92 Zak 65,000.00 59,800.00
07.01.01.01.29.033 Keramik Lantai 40 x 40 cm Terpasang 1.10 M2 160,000.00 176,000.00
Jumlah : 551,500.00

NILAI HSPK : 617,750.00

25.05.01.16 PEMASANGAN LANTAI HOMOGENEUS UK 30X30 CM M1


Upah
08.01.01.01.03.001 Tukang Batu 0.03 OH 130,000.00 3,250.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
Jumlah : 66,250.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.07 m3 451,000.00 31,570.00
07.01.01.01.02.001 Semen 50 Kg 0.19 Zak 65,000.00 12,480.00
07.01.01.01.29.020 Keramik Putih 30 x 30 cm 1.10 m2 106,000.00 116,600.00
Jumlah : 160,650.00

NILAI HSPK : 226,900.00

25.05.01.17 PEMASANGAN LANTAI HOMOGENEUS UK 40X40 CM M1


Upah
08.01.01.01.03.001 Tukang Batu 0.03 OH 130,000.00 3,250.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
Jumlah : 66,250.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.07 m3 451,000.00 31,570.00
07.01.01.01.02.001 Semen 50 Kg 0.19 Zak 65,000.00 12,480.00
07.01.01.01.29.033 Keramik Lantai 40 x 40 cm Terpasang 1.10 M2 160,000.00 176,000.00
Jumlah : 220,050.00

NILAI HSPK : 286,300.00

PEMASANGAN LANTAI HOMOGENEUS POLISH UK


25.05.01.18 30X30 CM M1
Upah
08.01.01.01.03.001 Tukang Batu 0.03 OH 130,000.00 3,250.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.25 OH 140,000.00 35,000.00
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
Jumlah : 97,750.00

80
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.07 m3 451,000.00 31,570.00
07.01.01.01.02.001 Semen 50 Kg 0.19 Zak 65,000.00 12,480.00
07.01.01.01.29.035 Keramik Lantai 30 x 30 cm 1.10 M2 172,000.00 189,200.00
Jumlah : 233,250.00

NILAI HSPK : 331,000.00

PEMASANGAN LANTAI HOMOGENEUS POLISH UK


25.05.01.19 40X40 CM M1
Upah
08.01.01.01.03.001 Tukang Batu 0.03 OH 130,000.00 3,250.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.50 OH 110,000.00 55,000.00
08.01.01.01.01.003 Kepala Tukang Batu 0.03 OH 140,000.00 3,500.00
08.01.01.01.01.001 Mandor 0.03 OH 180,000.00 4,500.00
Jumlah : 66,250.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.07 m3 451,000.00 31,570.00
07.01.01.01.02.001 Semen 50 Kg 0.19 Zak 65,000.00 12,480.00
07.01.01.01.29.033 Keramik Lantai 40 x 40 cm Terpasang 1.10 M2 160,000.00 176,000.00
Jumlah : 220,050.00

NILAI HSPK : 286,300.00

PEMASANGAN LANTAI KERAMIK IKAD, MULIA UK


25.05.01.20 15X30 CM M1
Upah
08.01.01.01.03.001 Tukang Batu 0.06 OH 130,000.00 8,073.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.12 OH 110,000.00 13,651.00
08.01.01.01.01.003 Kepala Tukang Batu 0.01 OH 140,000.00 882.00
08.01.01.01.01.001 Mandor 0.01 OH 180,000.00 1,134.00
Jumlah : 23,740.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.01 m3 451,000.00 5,366.90
07.01.01.01.02.001 Semen 50 Kg 0.03 Zak 65,000.00 2,119.00
07.01.01.01.29.032 Keramik Lantai 30 x 30 cm Terpasang 0.17 M2 133,000.00 22,610.00
Jumlah : 30,095.90

NILAI HSPK : 53,835.90

25.05.01.21 PEMASANGAN LANTAI HOMOGENEUS UK 15X40 CM M1


Upah
08.01.01.01.03.001 Tukang Batu 0.06 OH 130,000.00 8,073.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.12 OH 110,000.00 13,651.00
08.01.01.01.01.003 Kepala Tukang Batu 0.01 OH 140,000.00 882.00
08.01.01.01.01.001 Mandor 0.01 OH 180,000.00 1,134.00
Jumlah : 23,740.00

81
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.00 m3 451,000.00 536.69
07.01.01.01.02.001 Semen 50 Kg 0.03 Zak 65,000.00 2,119.00
07.01.01.01.29.033 Keramik Lantai 40 x 40 cm Terpasang 0.20 M2 160,000.00 32,000.00
Jumlah : 34,655.69

NILAI HSPK : 58,395.69

PEMASANGAN LANTAI KERAMIK IKAD, MULIA UK


25.05.01.22 20X25 CM M2
Upah
08.01.01.01.04.002 Laden Operator 0.04 OH 110,000.00 4,015.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.07 OH 110,000.00 8,030.00
08.01.01.01.01.003 Kepala Tukang Batu 0.04 OH 140,000.00 5,180.00
08.01.01.01.01.001 Mandor 0.04 OH 180,000.00 6,660.00
Jumlah : 23,885.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.07 m3 451,000.00 31,570.00
07.01.01.01.02.001 Semen 50 Kg 0.19 Zak 65,000.00 12,480.00
07.01.01.01.29.031 Keramik Lantai 20 x 25 cm Terpasang 1.10 M2 120,000.00 132,000.00
Jumlah : 176,050.00

NILAI HSPK : 199,935.00

82
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
F PEKERJAAN ATAP
25.06 ATAP
25.06.01 RANGKA ATAP
PEMASANGAN KUDA2 KAYU JATI
25.06.01.01 (BENTANG MAX 7 M) M3
Upah
08.01.01.01.01.001Mandor 0.300000 OH 180,000.00 54,000.00
08.01.01.01.01.011Kepala Tukang Kayu 2.700000 OH 140,000.00 378,000.00
08.01.01.01.03.009Tukang Kayu 18.000000 OH 130,000.00 2,340,000.00
08.01.01.01.04.013Pekerja Tak Terampil 6.000000 OH 110,000.00 660,000.00
Jumlah : 3,432,000.00
Bahan/Material
07.01.01.01.27.022 Kayu Jati (balok 6/1 5) 1.100000 M3 25,240,000.00 27,764,000.00
Jumlah : 27,764,000.00

NILAI HSPK : 31,196,000.00

PEMASANGAN KUDA2 KAYU KAMPER


25.06.01.02 (BENTANG MAX 7 M) M3
Upah
08.01.01.01.01.001Mandor 0.300000 OH 180,000.00 54,000.00
08.01.01.01.01.011Kepala Tukang Kayu 2.700000 OH 140,000.00 378,000.00
08.01.01.01.03.009Tukang Kayu 18.000000 OH 130,000.00 2,340,000.00
08.01.01.01.04.013Pekerja Tak Terampil 6.000000 OH 110,000.00 660,000.00
Jumlah : 3,432,000.00
Bahan/Material
07.01.01.01.27.029Kayu Kamper (Balok 8/12) 1.100000 m3 11,730,000.00 12,903,000.00
Jumlah : 12,903,000.00
NILAI HSPK : 16,335,000.00
PEMASANGAN KUDA2 KAYU MERANTI
25.06.01.03 (BENTANG MAX 7 M) M3
Upah
08.01.01.01.01.001Mandor 0.300000 OH 180,000.00 54,000.00
08.01.01.01.01.011Kepala Tukang Kayu 2.700000 OH 140,000.00 378,000.00
08.01.01.01.03.009Tukang Kayu 18.000000 OH 130,000.00 2,340,000.00
08.01.01.01.04.013Pekerja Tak Terampil 6.000000 OH 110,000.00 660,000.00
Jumlah : 3,432,000.00
Bahan/Material
07.01.01.01.27.042 Kayu Meranti (Balok 6/1 5) 1.100000 M3 2,928,000.00 3,220,800.00
Jumlah : 3,220,800.00

NILAI HSPK : 6,652,800.00


PEMASANGAN RENG KAMPER / USUK
25.06.01.04 KAMPER M2
Upah
08.01.01.01.01.001Mandor 0.100000 OH 180,000.00 18,000.00
08.01.01.01.01.011Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.03.009Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00
Jumlah : 43,400.00

83
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.27.028Kayu Kamper (Balok 6/15) 0.100000 m3 11,850,000.00 1,185,000.00
07.01.01.01.27.035Kayu Kamper Usuk 0.010800 m3 11,730,000.00 126,684.00
07.01.01.01.31.022Paku 0.200000 Kg 25,000.00 5,000.00
Jumlah : 1,316,684.00

NILAI HSPK : 1,360,084.00


PEMASANGAN RENG KAMPER/USUK
25.06.01.05 MERANTI M2
Upah
08.01.01.01.01.001Mandor 0.100000 OH 180,000.00 18,000.00
08.01.01.01.01.011Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.03.009Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00
Jumlah : 43,400.00
Bahan/Material
07.01.01.01.27.028Kayu Kamper (Balok 6/15) 0.003900 m3 11,850,000.00 46,215.00
07.01.01.01.27.047Kayu Meranti (usuk 5/7) 0.010800 m3 2,657,000.00 28,695.60
07.01.01.01.31.022Paku 0.200000 Kg 25,000.00 5,000.00
Jumlah : 79,910.60
NILAI HSPK : 123,310.60

25.06.01.06 PEMASANGAN RENG JATI/USUK KAMPER M2


Upah
08.01.01.01.01.001Mandor 0.100000 OH 180,000.00 18,000.00
08.01.01.01.01.011Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.03.009Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00
Jumlah : 43,400.00
Bahan/Material
07.01.01.01.27.022Kayu Jati (balok 6/1 5) 0.003900 m3 25,240,000.00 98,436.00
07.01.01.01.27.035Kayu Kamper Usuk 0.010800 m3 11,730,000.00 126,684.00
07.01.01.01.31.022Paku 0.200000 Kg 25,000.00 5,000.00
Jumlah : 230,120.00

NILAI HSPK : 273,520.00


25.06.02 PENUTUP ATAP

25.06.02.01 PEMASANGAN GENTENG JAWA (SOKA) M2


Upah
08.01.01.01.01.001Mandor 0.008000 OH 180,000.00 1,440.00
08.01.01.01.01.011Kepala Tukang Kayu 0.008000 OH 140,000.00 1,120.00
08.01.01.01.03.009Tukang Kayu 0.075000 OH 130,000.00 9,750.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 28,810.00
Bahan/Material
07.01.01.01.12.018Genteng Flam Pres Jawa 25.000000 Buah 24,000.00 600,000.00
Jumlah : 600,000.00

NILAI HSPK : 628,810.00

84
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.02.02 PEMASANGAN GENTENG KACA M2
Upah
08.01.01.01.01.001Mandor 0.008000 OH 180,000.00 1,440.00
08.01.01.01.01.011Kepala Tukang Kayu 0.008000 OH 140,000.00 1,120.00
08.01.01.01.03.009Tukang Kayu 0.075000 OH 130,000.00 9,750.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 28,810.00
Bahan/Material
07.01.01.01.12.021Genteng Kaca Besar 25.000000 Buah 21,000.00 525,000.00
Jumlah : 525,000.00

NILAI HSPK : 553,810.00


PEMASANGAN GENTENG KARANG
25.06.02.03 PILANG/ WISMA M2
Upah
08.01.01.01.01.001Mandor 0.008000 OH 180,000.00 1,440.00
08.01.01.01.01.011Kepala Tukang Kayu 0.008000 OH 140,000.00 1,120.00
08.01.01.01.03.009Tukang Kayu 0.075000 OH 130,000.00 9,750.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 28,810.00

Bahan/Material
07.01.01.01.12.022Genteng Karang Pilang / wisma 25.000000 Buah 4,000.00 100,000.00
Jumlah : 100,000.00

NILAI HSPK : 128,810.00

PEMASANGAN ATAP ASBES GELOMBANG


25.06.02.04 BESAR M2
Upah
08.01.01.01.01.001Mandor 0.005000 OH 180,000.00 900.00
08.01.01.01.01.011Kepala Tukang Kayu 0.008000 OH 140,000.00 1,120.00
08.01.01.01.03.009Tukang Kayu 0.080400 OH 130,000.00 10,452.00
08.01.01.01.04.013Pekerja Tak Terampil 0.140000 OH 110,000.00 15,400.00
Jumlah : 27,872.00
Bahan/Material
07.01.01.01.16.002Asbes Gel.Besar EG 80 x 115 x 5 mm 0.374700 Lembar 39,600.00 14,838.12
07.01.01.01.12.046Paku Sekrup 4.000000 Buah 1,000.00 4,000.00
Jumlah : 18,838.12

NILAI HSPK : 46,710.12

PEMASANGAN ATAP ASBES GELOMBANG


25.06.02.05 KECIL M2
Upah
08.01.01.01.01.001Mandor 0.005000 OH 180,000.00 900.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.03.009Tukang Kayu 0.067000 OH 130,000.00 8,710.00
08.01.01.01.04.013Pekerja Tak Terampil 0.140000 OH 110,000.00 15,400.00
Jumlah : 25,990.00

85
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.16.006Asbes Gelombang Kecil 80 cm x 6 ft (4mm) - 0.343500 Lembar 39,600.00 13,602.60
07.01.01.01.12.046Paku Sekrup 4.000000 Buah 1,000.00 4,000.00
Jumlah : 17,602.60

NILAI HSPK : 43,592.60

PEMASANGAN ATAP SIRAP ASBES TEBAL


25.06.02.06 4MM M2
Upah
08.01.01.01.01.001Mandor 0.005000 OH 180,000.00 900.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.03.009Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
Jumlah : 56,380.00
Bahan/Material
07.01.01.01.12.059Sirap Asbes 4 mm 3.300000 Lembar 15,000.00 49,500.00
07.01.01.01.12.046Paku Sekrup 3.000000 Buah 1,000.00 3,000.00
Jumlah : 52,500.00

NILAI HSPK : 108,880.00

25.06.02.07 PEMASANGAN ATAP SENG BJLS 30 M2


Upah
08.01.01.01.01.001Mandor 0.005000 OH 180,000.00 900.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.03.009Tukang Kayu 0.070000 OH 130,000.00 9,100.00
08.01.01.01.04.013Pekerja Tak Terampil 0.006000 OH 110,000.00 660.00
Jumlah : 11,640.00
Bahan/Material
07.01.01.01.07.023Seng Gelombang BJLS 30 (0,8 x 3,00) 1.000000 Lembar 135,000.00 135,000.00
07.01.01.01.12.046Paku Sekrup 4.000000 Buah 1,000.00 4,000.00
Jumlah : 139,000.00

NILAI HSPK : 150,640.00

25.06.02.08 PEMASANGAN ATAP SENG BJLS 40 M2


Upah
08.01.01.01.01.001Mandor 0.005000 OH 180,000.00 900.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.03.009Tukang Kayu 0.070000 OH 130,000.00 9,100.00
08.01.01.01.04.013Pekerja Tak Terampil 0.006000 OH 110,000.00 660.00
Jumlah : 11,640.00
Bahan/Material
07.01.01.01.12.054Seng Gelombang BJLS 40 1.000000 Lembar 168,000.00 168,000.00
07.01.01.01.12.046Paku Sekrup 4.000000 Buah 1,000.00 4,000.00
Jumlah : 172,000.00

NILAI HSPK : 183,640.00

86
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan

25.06.02.09 PEMASANGAN ATAP FIBER CLASS M2


Upah
08.01.01.01.01.001Mandor 0.005000 OH 180,000.00 900.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.03.009Tukang Kayu 0.070000 OH 130,000.00 9,100.00
08.01.01.01.04.013Pekerja Tak Terampil 0.006000 OH 110,000.00 660.00
Jumlah : 11,640.00
Bahan/Material
07.01.05.03.01.001Fiber Glass Bwg 32 1.000000 m2 39,000.00 39,000.00
07.01.01.01.12.046Paku Sekrup 4.000000 Buah 1,000.00 4,000.00
Jumlah : 43,000.00

NILAI HSPK : 54,640.00

PEMASANGAN ATAP GENTENG


25.06.02.10 GALVALUME (M2) M2
Upah
08.01.01.01.01.001Mandor 0.008000 OH 180,000.00 1,440.00
08.01.01.01.01.011Kepala Tukang Kayu 0.008000 OH 140,000.00 1,120.00
08.01.01.01.03.009Tukang Kayu 0.075000 OH 130,000.00 9,750.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 28,810.00
Bahan/Material
07.01.01.01.12.019Genteng Galvalume 2.650000 Buah 7,000.00 18,550.00
07.01.01.01.12.046Paku Sekrup 5.300000 Buah 1,000.00 5,300.00
Jumlah : 23,850.00

NILAI HSPK : 52,660.00

25.06.02.11 PEMASANGAN WUWUNG GENTENG JAWA M1


Upah
08.01.01.01.01.001Mandor 0.020000 OH 180,000.00 3,600.00
08.01.01.01.01.011Kepala Tukang Kayu 0.020000 OH 140,000.00 2,800.00
08.01.01.01.03.009Tukang Kayu 0.200000 OH 130,000.00 26,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.400000 OH 110,000.00 44,000.00
Jumlah : 76,400.00
Bahan/Material
07.01.01.01.02.002Semen 40 kg 0.237000 Zak 55,000.00 13,035.00
07.01.01.01.04.002Pasir Pasang / plester 0.032300 m3 451,000.00 14,567.30
07.01.01.01.12.031Genteng Wuwung Jawa 3.000000 Buah 5,000.00 15,000.00
Jumlah : 42,602.30

NILAI HSPK : 119,002.30

87
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN WUWUNG GENTENG
25.06.02.12 KARANG PILANG M1
Upah
08.01.01.01.01.001Mandor 0.020000 OH 180,000.00 3,600.00
08.01.01.01.01.011Kepala Tukang Kayu 0.020000 OH 140,000.00 2,800.00
08.01.01.01.03.009Tukang Kayu 0.200000 OH 130,000.00 26,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.400000 OH 110,000.00 44,000.00
Jumlah : 76,400.00
Bahan/Material
07.01.01.01.02.002Semen 40 kg 0.237000 Zak 55,000.00 13,035.00
07.01.01.01.12.032Genteng Wuwung Karang Pilang / Wisma 3.000000 Buah 13,000.00 39,000.00
07.01.01.01.04.002Pasir Pasang / plester 0.032300 m3 451,000.00 14,567.30
Jumlah : 66,602.30

NILAI HSPK : 143,002.30

PEMASANGAN WUWUNG GENTENG KARANG PILANG


25.06.02.13 UTK RMH BERTINGKAT M1
Upah
08.01.01.01.01.001Mandor 0.022000 OH 180,000.00 3,960.00
08.01.01.01.01.011Kepala Tukang Kayu 0.022000 OH 140,000.00 3,080.00
08.01.01.01.03.009Tukang Kayu 0.220000 OH 130,000.00 28,600.00
08.01.01.01.04.013Pekerja Tak Terampil 0.440000 OH 110,000.00 48,400.00
Jumlah : 84,040.00
Bahan/Material
07.01.01.01.02.002Semen 40 kg 0.237000 Zak 55,000.00 13,035.00
07.01.01.01.12.032Genteng Wuwung Karang Pilang / Wisma 3.000000 Buah 13,000.00 39,000.00
07.01.01.01.04.002Pasir Pasang / plester 0.032300 m3 451,000.00 14,567.30
Jumlah : 66,602.30

NILAI HSPK : 150,642.30

PEMASANGAN WUWUNG ASBES


25.06.02.14 GELOMBANG BESAR M1
Upah
08.01.01.01.01.001Mandor 0.013000 OH 180,000.00 2,340.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.085000 OH 110,000.00 9,350.00
Jumlah : 29,760.00
Bahan/Material
07.01.01.01.12.003Asbes Wuwung Gelombang Besar Tb.5 mm 1.000000 Lembar 54,000.00 54,000.00
07.01.01.01.12.046Paku Sekrup 2.000000 Buah 1,000.00 2,000.00
Jumlah : 56,000.00

NILAI HSPK : 85,760.00

88
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN WUWUNG ASBES
25.06.02.15 GELOMBANG KECIL M1
Upah
08.01.01.01.01.001Mandor 0.013000 OH 180,000.00 2,340.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.840000 OH 110,000.00 92,400.00
Jumlah : 112,810.00
Bahan/Material
07.01.01.01.12.004Asbes Wuwung Gelombang Kecil Tb.4 mm 1.000000 Lembar 38,000.00 38,000.00
07.01.01.01.12.046Paku Sekrup 2.000000 Buah 1,000.00 2,000.00
Jumlah : 40,000.00

NILAI HSPK : 152,810.00

PEMASANGAN WUWUNG /JURAI SIRAP


25.06.02.16 ASBES TEBAL 4 MM M1
Upah
08.01.01.01.01.001Mandor 0.013000 OH 180,000.00 2,340.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.084000 OH 110,000.00 9,240.00
Jumlah : 29,650.00
Bahan/Material
07.01.01.01.07.019Seng Datar BJLS 40 Lbr. (0 8 x 8) 0.330000 Lembar 195,000.00 64,350.00
07.01.01.01.12.046Paku Sekrup 3.000000 Buah 1,000.00 3,000.00
Jumlah : 67,350.00

NILAI HSPK : 97,000.00

PEMASANGAN WUWUNG JURAI GENTENG


25.06.02.17 GALVALUME TBL 4 MM (M) M1
Upah
08.01.01.01.01.001Mandor 0.013000 OH 180,000.00 2,340.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.084000 OH 110,000.00 9,240.00
Jumlah : 29,650.00
Bahan/Material
07.01.01.01.12.030Genteng Wuwung Galvalume 2.650000 Buah 7,000.00 18,550.00
07.01.01.01.12.046Paku Sekrup 3.000000 Buah 1,000.00 3,000.00
Jumlah : 21,550.00

NILAI HSPK : 51,200.00

89
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN TALANG TRITISAN DARI SENG
25.06.02.18 BJLS 30 (LEBAR 60 CM) M1
Upah
08.01.01.01.01.001Mandor 0.025000 OH 180,000.00 4,500.00
08.01.01.01.01.011Kepala Tukang Kayu 0.080000 OH 140,000.00 11,200.00
08.01.01.01.03.009Tukang Kayu 0.800000 OH 130,000.00 104,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.500000 OH 110,000.00 55,000.00
Jumlah : 174,700.00
Bahan/Material
07.01.01.01.27.044Kayu Meranti (Papan 2/20) 0.008000 m3 4,392,000.00 35,136.00
07.01.01.01.27.047Kayu Meranti (usuk 5/7) 0.005200 m3 2,657,000.00 13,816.40
07.01.01.01.12.056Seng Talang BJLS 30 Lbr 60 1.000000 ml 35,000.00 35,000.00
07.01.01.01.12.047Paku Sumbat 5.000000 Buah 1,000.00 5,000.00
Jumlah : 88,952.40

NILAI HSPK : 263,652.40

PEMASANGAN TALANG TRITISAN DARI SENG


25.06.02.19 BJLS 30 (LEBAR 90 CM) M1
Upah
08.01.01.01.01.001Mandor 0.025000 OH 180,000.00 4,500.00
08.01.01.01.01.011Kepala Tukang Kayu 0.080000 OH 140,000.00 11,200.00
08.01.01.01.03.009Tukang Kayu 0.800000 OH 130,000.00 104,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.500000 OH 110,000.00 55,000.00
Jumlah : 174,700.00
Bahan/Material
07.01.01.01.27.044Kayu Meranti (Papan 2/20) 0.016000 m3 4,392,000.00 70,272.00
07.01.01.01.27.047Kayu Meranti (usuk 5/7) 0.007300 m3 2,657,000.00 19,396.10
07.01.01.01.12.057Seng Talang BJLS 30 Lbr 90 1.000000 ml 41,000.00 41,000.00
07.01.01.01.12.047Paku Sumbat 5.000000 Buah 1,000.00 5,000.00
Jumlah : 135,668.10

NILAI HSPK : 310,368.10


PEMASANGAN TALANG TRITISAN DARI SENG
25.06.02.20 BJLS 40 (LEBAR 60 CM) M1
Upah
08.01.01.01.01.001Mandor 0.025000 OH 180,000.00 4,500.00
08.01.01.01.01.011Kepala Tukang Kayu 0.080000 OH 140,000.00 11,200.00
08.01.01.01.03.009Tukang Kayu 0.800000 OH 130,000.00 104,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.500000 OH 110,000.00 55,000.00
Jumlah : 174,700.00
Bahan/Material
07.01.01.01.27.044Kayu Meranti (Papan 2/20) 0.008000 m3 4,392,000.00 35,136.00
07.01.01.01.27.047Kayu Meranti (usuk 5/7) 0.005200 m3 2,657,000.00 13,816.40
07.01.01.01.12.058Seng Talang BJLS 40 Lbr 60 1.000000 ml 39,000.00 39,000.00
07.01.01.01.12.047Paku Sumbat 5.000000 Buah 1,000.00 5,000.00
Jumlah : 92,952.40

NILAI HSPK : 267,652.40

90
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN TALANG TRITISAN DARI SENG
25.06.02.21 BJLS 40 (LEBAR 90 CM) M1
Upah
08.01.01.01.01.001Mandor 0.016000 OH 180,000.00 2,880.00
08.01.01.01.01.011Kepala Tukang Kayu 0.080000 OH 140,000.00 11,200.00
08.01.01.01.03.009Tukang Kayu 0.800000 OH 130,000.00 104,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.500000 OH 110,000.00 55,000.00
Jumlah : 173,080.00
Bahan/Material
07.01.01.01.27.044Kayu Meranti (Papan 2/20) 0.016000 m3 4,392,000.00 70,272.00
07.01.01.01.27.047Kayu Meranti (usuk 5/7) 0.007300 m3 2,657,000.00 19,396.10
07.01.01.01.07.033Seng Talang BJLS 40 Lbr 90 4 x 8 1.000000 Lbr 218,000.00 218,000.00
07.01.01.01.12.047Paku Sumbat 5.000000 Buah 1,000.00 5,000.00
Jumlah : 312,668.10

NILAI HSPK : 485,748.10

PEMASANGAN TALANG CEROBONG DARI SENG


25.06.02.22 BJLS 40/12 CM M1
Upah
08.01.01.01.01.001Mandor 0.250000 OH 180,000.00 45,000.00
08.01.01.01.01.004Kepala Tukang Besi 0.025000 OH 140,000.00 3,500.00
08.01.01.01.03.002Tukang Besi 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 97,500.00
Bahan/Material
07.01.01.01.07.019Seng Datar BJLS 40 Lbr. (0 8 x 8) 0.414400 Lembar 195,000.00 80,808.00
07.01.01.01.12.047Paku Sumbat 22.500000 Buah 1,000.00 22,500.00
Jumlah : 103,308.00

NILAI HSPK : 200,808.00

PEMASANGAN TALANG POLAKAN LEBAR 60 CM DARI


25.06.02.23 SENG BJLS 40/12 CM M1
Upah
08.01.01.01.01.001Mandor 0.025000 OH 180,000.00 4,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
08.01.01.01.01.004Kepala Tukang Besi 0.025000 OH 140,000.00 3,500.00
08.01.01.01.03.002Tukang Besi 0.250000 OH 130,000.00 32,500.00
Jumlah : 57,000.00
Bahan/Material
07.01.01.01.07.019Seng Datar BJLS 40 Lbr. (0 8 x 8) 1.000000 Lembar 195,000.00 195,000.00
07.01.01.01.12.047Paku Sumbat 35.000000 Buah 1,000.00 35,000.00
Jumlah : 230,000.00

NILAI HSPK : 287,000.00

91
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN TALAN PEMBULUH PIPA PVC 3"
25.06.02.24 TYPE AW M1
Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 3,707.00
Jumlah : 15,182.00
Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.007 Pipa PVC 3 "" Type AW Pj. 6.00 mt 0.166700 Lonjor 490,000.00 81,683.00
Jumlah : 85,683.00

NILAI HSPK : 100,865.00

PEMASANGAN TALAN PEMBULUH PIPA PVC 4"


25.06.02.25 TYPE AW M1
Upah
08.01.01.01.03.011Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 3,707.00
Jumlah : 15,182.00
Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.008Pipa PVC 4 "" Type AW Pj. 6.00 mt 0.166700 Lonjor 713,000.00 118,857.10
Jumlah : 122,857.10

NILAI HSPK : 138,039.10

PEMASANGAN TALAN PEMBULUH PIPA PVC 5"


25.06.02.26 TYPE AW M1
Upah
08.01.01.01.03.011Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 3,707.00
Jumlah : 15,182.00

Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.009 Pipa PVC 5 "" Type AW Pj. 6.00 mt 0.166700 Lonjor 1,115,000.00 185,870.50
Jumlah : 189,870.50

NILAI HSPK : 205,052.50


PEMASANGAN TALAN PEMBULUH PIPA
25.06.02.27 PVC 3" M1
Upah
08.01.01.01.03.011Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 1,179.50
Jumlah : 12,654.50
Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 1,250.00
07.01.05.04.01.004Pipa PVC 3 "" Pj. 4.00 mt 0.250000 Lonjor 329,000.00 36,825.00
Jumlah : 38,075.00

NILAI HSPK : 50,729.50

92
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN TALAN PEMBULUH PIPA
25.06.02.28 PVC 4" M1
Upah
08.01.01.01.03.011Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 1,179.50
Jumlah : 12,654.50

Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.005Pipa PVC 4 "" Pj. 4.00 mt 0.250000 Lonjor 475,000.00 118,750.00
Jumlah : 122,750.00

NILAI HSPK : 135,404.50

PEMASANGAN TALAN PEMBULUH PIPA


25.06.02.29 PVC 5" M1
Upah
08.01.01.01.03.011Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 1,179.50
Jumlah : 12,654.50
Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.006 Pipa PVC 5"" Pj. 4.00 mt 0.250000 Lonjor 744,000.00 186,000.00
Jumlah : 190,000.00

NILAI HSPK : 202,654.50

PEMASANGAN LISTPLANK KAYU JATI 2/20


25.06.02.30 CM M1
Upah
08.01.01.01.01.001Mandor 0.009300 OH 180,000.00 1,674.00
08.01.01.01.01.011Kepala Tukang Kayu 0.053300 OH 140,000.00 7,462.00
08.01.01.01.03.009Tukang Kayu 0.533300 OH 130,000.00 69,329.00
08.01.01.01.04.013Pekerja Tak Terampil 0.186700 OH 110,000.00 20,537.00
Jumlah : 99,002.00
Bahan/Material
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
07.01.01.01.27.067Papan Klas II 0.004800 m3 19,740,000.00 94,752.00
Jumlah : 96,002.00

NILAI HSPK : 195,004.00

PEMASANGAN LISTPLANK KAYU KAMPER


25.06.02.31 2/20 CM M1
Upah
08.01.01.01.01.001Mandor 0.009300 OH 180,000.00 1,674.00
08.01.01.01.01.011Kepala Tukang Kayu 0.025000 OH 140,000.00 3,500.00
08.01.01.01.03.009Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 54,174.00

93
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.27.033Kayu Kamper Papan 2/20 0.004800 m3 15,790,000.00 75,792.00
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
Jumlah : 77,042.00
NILAI HSPK : 131,216.00
PEMASANGAN LISTPLANK KAYU JATI 3/30
25.06.02.32 CM M1
Upah
08.01.01.01.01.001Mandor 0.005300 OH 180,000.00 954.00
08.01.01.01.01.011Kepala Tukang Kayu 0.053300 OH 140,000.00 7,462.00
08.01.01.01.03.009Tukang Kayu 0.533300 OH 130,000.00 69,329.00
08.01.01.01.04.013Pekerja Tak Terampil 0.186700 OH 110,000.00 20,537.00
Jumlah : 98,282.00
Bahan/Material
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
07.01.01.01.27.067Papan Klas II 0.010800 m3 19,740,000.00 213,192.00
Jumlah : 214,442.00

NILAI HSPK : 312,724.00

PEMASANGAN LISTPLANK KAYU KAMPER


25.06.02.33 3/30 CM M1
Upah
08.01.01.01.01.001Mandor 0.005000 OH 180,000.00 900.00
08.01.01.01.01.011Kepala Tukang Kayu 0.022000 OH 140,000.00 3,080.00
08.01.01.01.03.009Tukang Kayu 0.220000 OH 130,000.00 28,600.00
08.01.01.01.04.013Pekerja Tak Terampil 0.110000 OH 110,000.00 12,100.00
Jumlah : 44,680.00

Bahan/Material
07.01.01.01.27.030Kayu Kamper (papan 3/30) 0.010800 m3 15,640,000.00 168,912.00
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
Jumlah : 170,162.00

NILAI HSPK : 214,842.00

25.06.02.34 PEMASANGAN PIPA PVC DIA 12 M1


Upah
08.01.01.01.03.011Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 3,707.00
Jumlah : 15,182.00
Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.025 Pipa PVC Class AW dia. 12" 0.116700 Lonjor 815,000.00 95,110.50
Jumlah : 99,110.50

NILAI HSPK : 114,292.50

94
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.02.35 PENUTUP GENTENG KODOK M2
Upah
08.01.01.01.03.001Tukang Batu 0.075000 OH 130,000.00 9,750.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
08.01.01.01.01.003Kepala Tukang Batu 0.008000 OH 140,000.00 1,120.00
08.01.01.01.01.001Mandor 0.008000 OH 180,000.00 1,440.00
Jumlah : 28,810.00

Bahan/Material
07.01.01.01.12.025Genteng Plentong ex. Jawa - 25.000000 Bh 14,000.00 350,000.00
Jumlah : 350,000.00

NILAI HSPK : 378,810.00

25.06.02.36 PENUTUP GENTENG BETON M2


Upah
08.01.01.01.03.001Tukang Batu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
08.01.01.01.01.003Kepala Tukang Batu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001Mandor 0.010000 OH 180,000.00 1,800.00
Jumlah : 38,200.00

Bahan/Material
07.01.01.01.12.014Genteng Beton 34 cm x 42 cm - 10.000000 Buah 15,000.00 150,000.00
07.01.01.01.31.022Paku 0.030000 Kg 25,000.00 750.00
Jumlah : 36,240.00

NILAI HSPK : 74,440.00

25.06.02.37 BUBUNG PADA GENTENG KODOK M


Upah
08.01.01.01.03.001Tukang Batu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
08.01.01.01.01.003Kepala Tukang Batu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001Mandor 0.010000 OH 180,000.00 1,800.00
Jumlah : 38,200.00

Bahan/Material
07.01.01.01.12.023Genteng Kodok - 5.000000 Buah 4,000.00 20,000.00
07.01.01.01.02.001Semen 50 Kg 0.216000 zak 65,000.00 14,040.00
07.01.01.01.04.002Pasir Pasang / plester 0.032000 m3 451,000.00 14,432.00
Jumlah : 48,472.00

NILAI HSPK : 86,672.00

95
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.02.38 BUBUNG PADA GENTENG BETON M
Upah
08.01.01.01.03.001Tukang Batu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
08.01.01.01.01.003Kepala Tukang Batu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001Mandor 0.010000 OH 180,000.00 1,800.00
Jumlah : 38,200.00
Bahan/Material
07.01.01.01.12.036Nok Genteng Beton Metra, warna - 3.500000 Buah 14,000.00 49,000.00
07.01.01.01.02.001 Semen 50 Kg 0.216000 zak 65,000.00 14,040.00
07.01.01.01.04.002Pasir Pasang / plester 0.032000 m3 451,000.00 14,432.00
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
Jumlah : 78,722.00

NILAI HSPK : 116,922.00

PENUTUP ATAP FIBER GLASS GELOMBANG


25.06.02.39 180 X 90 CM M1
Upah
08.01.01.01.03.009Tukang Kayu 0.067000 OH 130,000.00 8,710.00
08.01.01.01.04.013Pekerja Tak Terampil 0.140000 OH 110,000.00 15,400.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.01.001Mandor 0.007000 OH 180,000.00 1,260.00
Jumlah : 26,350.00
Bahan/Material
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Atap - Asbes Semen Gelombang 180 cm x 105
07.01.01.01.16.009 cm/M 0.760000 Lembar 52,600.00 39,976.00
Jumlah : 52,476.00

NILAI HSPK : 78,826.00

PENUTUP ATAP ASBES SEMEN GELOMBANG 240 X


25.06.02.40 105 CM M2
Upah
08.01.01.01.03.009Tukang Kayu 0.067000 OH 130,000.00 8,710.00
08.01.01.01.04.013Pekerja Tak Terampil 0.140000 OH 110,000.00 15,400.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.01.001Mandor 0.007000 OH 180,000.00 1,260.00
Jumlah : 26,350.00
Bahan/Material
Penutup Atap - Asbes Semen Gelombang 240
07.01.01.01.16.025 cm x 105 cm/M 0.440000 M2 66,600.00 29,304.00
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Jumlah : 41,804.00

NILAI HSPK : 68,154.00

96
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PENUTUP ATAP ASBES SEMEN GELOMBANG 210 X
25.06.02.41 105 CM M2
Upah
08.01.01.01.03.009Tukang Kayu 0.067000 OH 130,000.00 8,710.00
08.01.01.01.04.013Pekerja Tak Terampil 0.140000 OH 110,000.00 15,400.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.01.001Mandor 0.007000 OH 180,000.00 1,260.00
Jumlah : 26,350.00
Bahan/Material
Atap - Asbes Semen Gelombang 210 cm x 105
07.01.01.01.16.010 cm/M 0.500000 Lembar 66,600.00 33,300.00
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Jumlah : 45,800.00

NILAI HSPK : 72,150.00

25.06.02.42 PENUTUP ATAP ASBES SEMEN GELOMBANG 180 X 105 CM M2


Upah
08.01.01.01.03.009Tukang Kayu 0.067000 OH 130,000.00 8,710.00
08.01.01.01.04.013Pekerja Tak Terampil 0.140000 OH 110,000.00 15,400.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.01.001Mandor 0.007000 OH 180,000.00 1,260.00
Jumlah : 26,350.00
Bahan/Material
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Atap - Asbes Semen Gelombang 180 cm x 105
07.01.01.01.16.009 cm/M 0.600000 Lembar 52,600.00 31,560.00
Jumlah : 44,060.00

NILAI HSPK : 70,410.00

PENUTUP SEMEN GELOMBANG


25.06.02.43 (P=6",T=3MM,LEFT=55CM) M2
Upah
08.01.01.01.03.009Tukang Kayu 0.060000 OH 130,000.00 7,800.00
08.01.01.01.04.013Pekerja Tak Terampil 0.120000 OH 110,000.00 13,200.00
08.01.01.01.01.011Kepala Tukang Kayu 0.006000 OH 140,000.00 840.00
08.01.01.01.01.001Mandor 0.006000 OH 180,000.00 1,080.00
Jumlah : 22,920.00
Bahan/Material
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
07.01.01.01.12.055Seng Gelombang BWG 28.8 ft (3mm) 1.010000 Lbr 74,000.00 74,740.00
Jumlah : 87,240.00

NILAI HSPK : 110,160.00

97
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
BUBUNG PADA ATAP ASBES SEMEN GELOMBANG
25.06.02.44 (NOK STEL ),105 MM M
Upah
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.084000 OH 110,000.00 9,240.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.01.001Mandor 0.004000 OH 180,000.00 720.00
Jumlah : 28,030.00

Bahan/Material
Bumbungan Atap Asbes Semen Gelombang
07.01.01.01.16.019 (Nokstel), 105 1.050000 M 107,100.00 112,455.00
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Jumlah : 124,955.00

NILAI HSPK : 152,985.00

BUBUNG PADA ATAP ASBES SEMEN GELOMBANG


25.06.02.45 (NOK PATEN ),105 MM M1
Upah
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.084000 OH 110,000.00 9,240.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.01.001Mandor 0.004000 OH 180,000.00 720.00
Jumlah : 28,030.00
Bahan/Material
Bumbungan Atap Asbes Semen Gelombang
07.01.01.01.16.019 (Nokstel), 105 1.050000 M 107,100.00 112,455.00
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Jumlah : 124,955.00

NILAI HSPK : 152,985.00

25.06.02.46 BUBUNG ATAP SENG GELOMBANG M1


Upah
08.01.01.01.03.009Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.125000 OH 110,000.00 13,750.00
08.01.01.01.01.011Kepala Tukang Kayu 0.025000 OH 140,000.00 3,500.00
08.01.01.01.01.001Mandor 0.006000 OH 180,000.00 1,080.00
Jumlah : 50,830.00
Bahan/Material
07.01.01.01.07.032Seng Plat 4 x 8 x 3 mm 0.200000 Lbr 2,636,000.00 527,200.00
07.01.01.01.31.022Paku 0.060000 Kg 25,000.00 1,500.00
07.01.01.01.27.041Kayu Meranti 0.007000 Ton 4,478,000.00 31,346.00
Jumlah : 560,046.00

NILAI HSPK : 610,876.00

98
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan

25.06.02.47 PENUTUP ATAP SIRAP 7 CM X 50 CM M2


Upah
08.01.01.01.03.009Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.166000 OH 110,000.00 18,260.00
08.01.01.01.01.011Kepala Tukang Kayu 0.025000 OH 140,000.00 3,500.00
08.01.01.01.01.001Mandor 0.008000 OH 180,000.00 1,440.00
Jumlah : 55,700.00

Bahan/Material
07.01.01.01.31.022Paku 0.200000 Kg 25,000.00 5,000.00
07.01.01.01.12.005Atap Sirap ex Kalimantan (7 cm x 50 cm) 1.100000 M2 84,000.00 92,400.00
Jumlah : 97,400.00

NILAI HSPK : 153,100.00

25.06.02.48 BUBUNG PADA ATAP SIRAP M


Upah
08.01.01.01.03.009Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.125000 OH 110,000.00 13,750.00
08.01.01.01.01.011Kepala Tukang Kayu 0.025000 OH 140,000.00 3,500.00
08.01.01.01.01.001Mandor 0.006000 OH 180,000.00 1,080.00
Jumlah : 50,830.00

Bahan/Material
07.01.01.01.07.032Seng Plat 4 x 8 x 3 mm 0.400000 Lbr 2,636,000.00 1,054,400.00
07.01.01.01.31.022Paku 0.060000 Kg 25,000.00 1,500.00
07.01.01.01.27.041Kayu Meranti 0.007000 Ton 4,478,000.00 31,346.00
Jumlah : 1,087,246.00

NILAI HSPK : 1,138,076.00

25.06.02.49 PENUTUP GENTENG METAL MULTY ROOF M2


Upah
08.01.01.01.03.001Tukang Batu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
08.01.01.01.01.003Kepala Tukang Batu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001Mandor 0.010000 OH 180,000.00 1,800.00
Jumlah : 38,200.00

Bahan/Material
07.01.01.01.31.022Paku 0.030000 Kg 25,000.00 750.00
07.01.01.01.12.024Genteng Metal Multi roof 1.000000 M2 86,000.00 86,000.00
Jumlah : 86,750.00

NILAI HSPK : 124,950.00

99
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
BUBUNG PADA GENTENG METAL MULTI
25.06.02.50 ROOF M
Upah
08.01.01.01.03.001Tukang Batu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
08.01.01.01.01.011Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001Mandor 0.010000 OH 180,000.00 1,800.00
Jumlah : 38,200.00

Bahan/Material
07.01.01.01.02.001 Semen 50 Kg 0.216000 zak 65,000.00 14,040.00
07.01.01.01.04.002Pasir Pasang / plester 0.032000 m3 451,000.00 14,432.00
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
07.01.01.01.12.038Nok Genteng Tanah - 1.200000 Bh 9,000.00 10,800.00
Jumlah : 40,522.00

NILAI HSPK : 78,722.00

25.06.02.51 PENUTUP ATAP SPANDEK M2


Upah
08.01.01.01.03.009Tukang Kayu 0.067000 OH 130,000.00 8,710.00
08.01.01.01.04.013Pekerja Tak Terampil 0.140000 OH 110,000.00 15,400.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.01.001Mandor 0.007000 OH 180,000.00 1,260.00
Jumlah : 26,350.00
Bahan/Material
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
07.01.01.01.32.020Atap Spandek Lebar eff = 745mm 1.400000 M2 108,000.00 151,200.00
Jumlah : 163,700.00

NILAI HSPK : 190,050.00

25.06.02.52 BUBUNG ATAP SPANDEK M


Upah
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.084000 OH 110,000.00 9,240.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.01.001Mandor 0.004000 OH 180,000.00 720.00
Jumlah : 28,030.00
Bahan/Material
07.01.01.01.12.006Bumbungan Atap Spandek /M 1.050000 M 64,000.00 67,200.00
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Jumlah : 79,700.00

NILAI HSPK : 107,730.00

100
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.03 PLAFON
PEMASANGAN PLAFON ASBES DATAR RANGKA
25.06.03.01 KAYU KAMPER M2
Upah
08.01.01.01.01.001Mandor 0.005800 OH 180,000.00 1,044.00
08.01.01.01.01.011Kepala Tukang Kayu 0.034600 OH 140,000.00 4,844.00
08.01.01.01.03.009Tukang Kayu 0.346500 OH 130,000.00 45,045.00
08.01.01.01.04.013Pekerja Tak Terampil 0.117000 OH 110,000.00 12,870.00
Jumlah : 63,803.00
Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.011600 m3 11,960,000.00 138,736.00
07.01.01.01.12.045Paku Asbes 0.032400 Kg 17,000.00 550.80
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
07.01.01.01.12.002Asbes Datar Tebal 4 mm 1.050000 m2 15,000.00 15,750.00
Jumlah : 155,806.80

NILAI HSPK : 219,609.80

PEMASANGAN PLAFON ETERNIT RANGKA KAYU


25.06.03.02 KAMPER M2
Upah
08.01.01.01.01.001Mandor 0.005800 OH 180,000.00 1,044.00
08.01.01.01.01.011Kepala Tukang Kayu 0.034600 OH 140,000.00 4,844.00
08.01.01.01.03.009Tukang Kayu 0.346500 OH 130,000.00 45,045.00
08.01.01.01.04.013Pekerja Tak Terampil 0.117000 OH 110,000.00 12,870.00
Jumlah : 63,803.00
Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.011600 m3 11,960,000.00 138,736.00
07.01.01.01.12.048Paku Triplek/Eternit 0.032400 Kg 25,000.00 810.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
07.01.01.01.12.007Eternit Gresik 1.050000 M2 21,000.00 22,050.00
Jumlah : 162,366.00

NILAI HSPK : 226,169.00

PEMASANGAN PLAFON ETERNIT GRESIK RANGKA


25.06.03.03 KAYU LAMA M2
Upah
08.01.01.01.01.001Mandor 0.001900 OH 180,000.00 342.00
08.01.01.01.01.011Kepala Tukang Kayu 0.011500 OH 140,000.00 1,610.00
08.01.01.01.03.009Tukang Kayu 0.115500 OH 130,000.00 15,015.00
08.01.01.01.04.013Pekerja Tak Terampil 0.039000 OH 110,000.00 4,290.00
Jumlah : 21,257.00
Bahan/Material
07.01.01.01.12.007Eternit Gresik 1.050000 M2 21,000.00 22,050.00
07.01.01.01.12.048Paku Triplek/Eternit 0.032400 Kg 25,000.00 810.00
Jumlah : 22,860.00

NILAI HSPK : 44,117.00

101
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN PLAFON ETERNIT RANGKA KAYU
25.06.03.04 MERANTI M2
Upah
08.01.01.01.01.001Mandor 0.005800 OH 180,000.00 1,044.00
08.01.01.01.01.011Kepala Tukang Kayu 0.034600 OH 140,000.00 4,844.00
08.01.01.01.03.009Tukang Kayu 0.346500 OH 130,000.00 45,045.00
08.01.01.01.04.013Pekerja Tak Terampil 0.117000 OH 110,000.00 12,870.00
Jumlah : 63,803.00

Bahan/Material
07.01.01.01.12.007Eternit Gresik 1.050000 M2 21,000.00 22,050.00
07.01.01.01.12.048Paku Triplek/Eternit 0.032400 Kg 25,000.00 810.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
07.01.01.01.27.042Kayu Meranti (Balok 6/1 5) 0.011600 m3 2,928,000.00 33,964.80
Jumlah : 57,594.80

NILAI HSPK : 121,397.80

PEMASANGAN PLAFON ETERNIT RANGKA KAYU


25.06.03.05 MERANTI M2
Upah
08.01.01.01.01.001Mandor 0.005800 OH 180,000.00 1,044.00
08.01.01.01.01.011Kepala Tukang Kayu 0.034600 OH 140,000.00 4,844.00
08.01.01.01.03.009Tukang Kayu 0.346500 OH 130,000.00 45,045.00
08.01.01.01.04.013Pekerja Tak Terampil 0.117000 OH 110,000.00 12,870.00
Jumlah : 63,803.00
Bahan/Material
07.01.01.01.12.048Paku Triplek/Eternit 0.032400 Kg 25,000.00 810.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
07.01.01.01.27.042Kayu Meranti (Balok 6/1 5) 0.011600 m3 2,928,000.00 33,964.80
07.01.01.04.02.070 Triplek 4 mm 0.381900 Lembar 78,000.00 29,788.20
Jumlah : 65,333.00

NILAI HSPK : 129,136.00

PEMASANGAN LIST PLAFOND KAYU


25.06.03.06 KAMPER UK 1/5 M1
Upah
08.01.01.01.01.001Mandor 0.001000 OH 180,000.00 180.00
08.01.01.01.01.011Kepala Tukang Kayu 0.002000 OH 140,000.00 280.00
08.01.01.01.03.009Tukang Kayu 0.021000 OH 130,000.00 2,730.00
08.01.01.01.04.013Pekerja Tak Terampil 0.021000 OH 110,000.00 2,310.00
Jumlah : 5,500.00
Bahan/Material
07.01.01.01.27.032Kayu Kamper 1/5 0.000500 m3 11,730,000.00 5,865.00
07.01.01.01.12.048Paku Triplek/Eternit 0.020000 Kg 25,000.00 500.00
Jumlah : 6,365.00

NILAI HSPK : 11,865.00

102
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN RANGKA PLAFOND KAYU
25.06.03.07 KAMPER M2
Upah
08.01.01.01.01.001Mandor 0.003900 OH 180,000.00 702.00
08.01.01.01.01.011Kepala Tukang Kayu 0.023100 OH 140,000.00 3,234.00
08.01.01.01.03.009Tukang Kayu 0.231000 OH 130,000.00 30,030.00
08.01.01.01.04.013Pekerja Tak Terampil 0.078000 OH 110,000.00 8,580.00
Jumlah : 42,546.00

Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.011600 m3 11,960,000.00 138,736.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
Jumlah : 139,506.00

NILAI HSPK : 182,052.00

PEMASANGAN RANGKA PLAFOND KAYU


25.06.03.08 MERANTI M2
Upah
08.01.01.01.01.001Mandor 0.003900 OH 180,000.00 702.00
08.01.01.01.01.011Kepala Tukang Kayu 0.023100 OH 140,000.00 3,234.00
08.01.01.01.03.009Tukang Kayu 0.231000 OH 130,000.00 30,030.00
08.01.01.01.04.013Pekerja Tak Terampil 0.078000 OH 110,000.00 8,580.00
Jumlah : 42,546.00

Bahan/Material
07.01.01.01.27.042Kayu Meranti (Balok 6/1 5) 0.011600 m3 2,928,000.00 33,964.80
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
Jumlah : 34,734.80

NILAI HSPK : 77,280.80

PEMASANGAN PLAFOND GYPSUM 9MM (TANPA


25.06.03.09 RANGKA) M2
Upah
08.01.01.01.01.001Mandor 0.002400 OH 180,000.00 432.00
08.01.01.01.01.011Kepala Tukang Kayu 0.014400 OH 140,000.00 2,016.00
08.01.01.01.03.009Tukang Kayu 0.144400 OH 130,000.00 18,772.00
08.01.01.01.04.013Pekerja Tak Terampil 0.048800 OH 110,000.00 5,368.00
Jumlah : 26,588.00

Bahan/Material
07.01.01.01.23.002Plywood Uk 9 mm 0.381900 Lembar 200,000.00 76,380.00
07.01.01.01.31.022Paku 0.048600 Kg 25,000.00 1,215.00
Jumlah : 77,595.00

NILAI HSPK : 104,183.00

103
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.03.10 RANGKA PLAFON HANGER M3
Upah
08.01.01.01.01.001Mandor 0.006000 OH 180,000.00 1,080.00
08.01.01.01.01.011Kepala Tukang Kayu 0.012000 OH 140,000.00 1,680.00
08.01.01.01.03.009Tukang Kayu 0.120000 OH 130,000.00 15,600.00
08.01.01.01.02.025Pekerja Terampil 0.120000 OH 130,000.00 15,600.00
Jumlah : 33,960.00
Bahan/Material
07.01.01.01.27.043Kayu Meranti (Balok 6/12) 1.100000 m3 2,632,000.00 2,895,200.00
07.01.01.01.31.022Paku 2.000000 Kg 25,000.00 50,000.00
Jumlah : 2,945,200.00

NILAI HSPK : 2,979,160.00

25.06.03.11 RANGKA PLAFOND LUAR M2


Upah
08.01.01.01.01.001Mandor 0.003900 OH 180,000.00 702.00
08.01.01.01.01.011Kepala Tukang Kayu 0.023100 OH 140,000.00 3,234.00
08.01.01.01.03.009Tukang Kayu 0.231000 OH 130,000.00 30,030.00
08.01.01.01.02.025Pekerja Terampil 0.078000 OH 130,000.00 10,140.00
Jumlah : 44,106.00
Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.011600 m3 11,960,000.00 138,736.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
Jumlah : 139,506.00

NILAI HSPK : 183,612.00

PEMASANGAN PLAFON LUAR KISI2 (2X2/3


25.06.03.12 CM) M2
Upah
08.01.01.01.01.001Mandor 0.014000 OH 180,000.00 2,520.00
08.01.01.01.01.011Kepala Tukang Kayu 0.080000 OH 140,000.00 11,200.00
08.01.01.01.03.009Tukang Kayu 0.800000 OH 130,000.00 104,000.00
08.01.01.01.02.025Pekerja Terampil 0.280000 OH 130,000.00 36,400.00
Jumlah : 154,120.00

Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.012000 m3 11,960,000.00 143,520.00
07.01.01.01.31.022Paku 0.140000 Kg 25,000.00 3,500.00
Jumlah : 147,020.00

NILAI HSPK : 301,140.00

104
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN RANGKA PLAFON KAYU
25.06.03.13 JATI M2
Upah
08.01.01.01.01.001Mandor 0.003900 OH 180,000.00 702.00
08.01.01.01.01.011Kepala Tukang Kayu 0.023100 OH 140,000.00 3,234.00
08.01.01.01.03.009Tukang Kayu 0.231000 OH 130,000.00 30,030.00
08.01.01.01.04.013Pekerja Tak Terampil 0.078000 OH 110,000.00 8,580.00
Jumlah : 42,546.00

Bahan/Material
07.01.01.01.27.020Kayu Jati (Balok 5/7) 0.011600 m3 25,240,000.00 292,784.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
Jumlah : 293,554.00

NILAI HSPK : 336,100.00

PEMASANGAN LISTPLANK ASBES DATAR ( KAYU


25.06.03.14 KAMPER) M2
Upah
08.01.01.01.01.001Mandor 0.007800 OH 180,000.00 1,404.00
08.01.01.01.01.011Kepala Tukang Kayu 0.046200 OH 140,000.00 6,468.00
08.01.01.01.03.009Tukang Kayu 0.462000 OH 130,000.00 60,060.00
08.01.01.01.04.013Pekerja Tak Terampil 0.156000 OH 110,000.00 17,160.00
Jumlah : 85,092.00
Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.022000 m3 11,960,000.00 263,120.00
07.01.01.01.12.002Asbes Datar Tebal 4 mm 1.000000 m2 15,000.00 15,000.00
07.01.01.01.31.022Paku 0.100000 Kg 25,000.00 800.00
Jumlah : 278,920.00

NILAI HSPK : 364,012.00

PEMASANGAN LISTPLANK ASBES DATAR ( KAYU


25.06.03.15 MERNTI) M2
Upah
08.01.01.01.01.001Mandor 0.007800 OH 180,000.00 1,404.00
08.01.01.01.01.011Kepala Tukang Kayu 0.046200 OH 140,000.00 6,468.00
08.01.01.01.03.009Tukang Kayu 0.462000 OH 130,000.00 60,060.00
08.01.01.01.04.013Pekerja Tak Terampil 0.156000 OH 110,000.00 17,160.00
Jumlah : 85,092.00
Bahan/Material
07.01.01.01.12.002Asbes Datar Tebal 4 mm 1.000000 m2 15,000.00 15,000.00
07.01.01.01.31.022Paku 0.100000 Kg 25,000.00 2,500.00
07.01.01.01.27.042Kayu Meranti (Balok 6/1 5) 0.022000 m3 2,928,000.00 64,416.00
Jumlah : 81,916.00

NILAI HSPK : 167,008.00

105
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.03.16 RANGKA PLAFON ALUMUNIUM M2
Upah
08.01.01.01.01.001Mandor 0.075000 OH 180,000.00 13,500.00
08.01.01.01.01.011Kepala Tukang Kayu 0.025000 OH 140,000.00 3,500.00
08.01.01.01.03.009Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 66,000.00
Bahan/Material
07.01.01.01.12.001Aluminium Profil 4" Coklat 2.750000 ml 30,000.00 82,500.00
07.01.01.01.12.046Paku Sekrup 4.000000 Buah 1,000.00 4,000.00
Jumlah : 86,500.00

NILAI HSPK : 152,500.00

106
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga

G PEKERJAAN FINISHING
25.07 FINISHING
25.07.01 KUSEN,PINTU DAN JENDELA
25.07.01.01 KUSEN PINTU/JENDELA KAYU JATI M3
Upah
08.01.01.01.01.001 Mandor 0.300000 OH 180,000.00 54,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 2.000000 OH 140,000.00 280,000.00
08.01.01.01.03.009 Tukang Kayu 20.000000 OH 130,000.00 2,600,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 6.000000 OH 110,000.00 660,000.00
Jumlah : 3,594,000.00
Bahan/Material
07.01.01.01.27.022 Kayu Jati (balok 6/1 5) 1.100000 m3 25,240,000.00 27,764,000.00
Jumlah : 27,764,000.00

NILAI HSPK : 31,358,000.00

25.07.01.02 KUSEN PINTU/JENDELA KAYU KAMPER M3


Upah
08.01.01.01.01.001 Mandor 0.300000 OH 180,000.00 54,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 2.000000 OH 140,000.00 280,000.00
08.01.01.01.03.009 Tukang Kayu 20.000000 OH 130,000.00 2,600,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 6.000000 OH 110,000.00 660,000.00
Jumlah : 3,594,000.00
Bahan/Material
07.01.01.01.27.028 Kayu Kamper (Balok 6/15) 1.100000 m3 11,850,000.00 13,035,000.00
Jumlah : 13,035,000.00

NILAI HSPK : 16,629,000.00

25.07.01.03 KUSEN PINTU/JENDELA KAYU MERANTI M3


Upah
08.01.01.01.01.001 Mandor 0.300000 OH 180,000.00 54,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 2.000000 OH 140,000.00 280,000.00
08.01.01.01.03.009 Tukang Kayu 20.000000 OH 130,000.00 2,600,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 6.000000 OH 110,000.00 660,000.00
Jumlah : 3,594,000.00
Bahan/Material
07.01.01.01.27.042 Kayu Meranti (Balok 6/1 5) 1.100000 m3 2,928,000.00 3,220,800.00
Jumlah : 3,220,800.00

NILAI HSPK : 6,814,800.00

107
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

25.07.01.04 DAUN PINTU TEAKWOOD M2


Upah
08.01.01.01.01.001 Mandor 0.030000 OH 180,000.00 5,400.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.200000 OH 140,000.00 28,000.00
08.01.01.01.03.009 Tukang Kayu 2.000000 OH 130,000.00 260,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.600000 OH 110,000.00 66,000.00
07.01.01.04.02.057 Teakwood Uk 110 x 210 x 4 mm 1.000000 Lembar 49,000.00 49,000.00
Jumlah : 408,400.00
Bahan/Material
07.01.01.01.27.034 Kayu Kamper Slimar 0.019600 m3 11,850,000.00 232,260.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.300000 Kg 39,000.00 11,700.00
07.01.01.01.31.022 Paku 0.300000 Kg 25,000.00 7,500.00
Jumlah : 251,460.00

NILAI HSPK : 659,860.00

25.07.01.05 DAUN PINTU TRIPLEK M2


Upah
08.01.01.01.01.001 Mandor 0.030000 OH 180,000.00 5,400.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.200000 OH 140,000.00 28,000.00
08.01.01.01.03.009 Tukang Kayu 2.000000 OH 130,000.00 260,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.600000 OH 110,000.00 66,000.00
Jumlah : 359,400.00
Bahan/Material
07.01.01.01.27.034 Kayu Kamper Slimar 0.019600 m3 11,850,000.00 232,260.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.300000 Kg 39,000.00 11,700.00
07.01.01.04.02.057 Teakwood Uk 110 x 210 x 4 mm 1.000000 Lembar 49,000.00 49,000.00
Jumlah : 292,960.00

NILAI HSPK : 652,360.00

25.07.01.06 DAUN PINTU KLAM(KAYU JATI KLAS II) M2


Upah
08.01.01.01.01.001 Mandor 0.030000 OH 180,000.00 5,400.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.200000 OH 140,000.00 28,000.00
08.01.01.01.03.009 Tukang Kayu 2.000000 OH 130,000.00 260,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.600000 OH 110,000.00 66,000.00
Jumlah : 359,400.00
Bahan/Material
07.01.01.01.12.046 Paku Sekrup 25.000000 Buah 1,000.00 12,500.00
07.01.01.01.27.023 Kayu Jati (papan 2/20) 0.036000 m3 26,060,000.00 408,599.98
Jumlah : 421,099.98

NILAI HSPK : 780,499.98

108
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

25.07.01.07 DAUN PINTU KLAM(KAYU KAMPER)


Upah
08.01.01.01.01.001 Mandor 0.030000 OH 180,000.00 5,400.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.200000 OH 140,000.00 28,000.00
08.01.01.01.03.009 Tukang Kayu 2.000000 OH 130,000.00 260,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.600000 OH 110,000.00 66,000.00
Jumlah : 359,400.00
Bahan/Material
07.01.01.01.27.033 Kayu Kamper Papan 2/20 0.036000 m3 15,790,000.00 568,440.00
07.01.01.01.12.046 Paku Sekrup 25.000000 Buah 1,000.00 25,000.00
Jumlah : 593,440.00

NILAI HSPK : 952,840.00

25.07.01.08 DAUN PINTU PANIT (KAYU JATI KLAS II) M2


Upah
08.01.01.01.01.001 Mandor 0.050000 OH 180,000.00 9,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.250000 OH 140,000.00 35,000.00
08.01.01.01.03.009 Tukang Kayu 2.500000 OH 130,000.00 325,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.000000 OH 110,000.00 110,000.00
Jumlah : 479,000.00
Bahan/Material
07.01.01.01.12.046 Paku Sekrup 25.000000 Buah 1,000.00 25,000.00
07.01.01.01.27.023 Kayu Jati (papan 2/20) 0.044000 m3 26,060,000.00 1,146,640.00
Jumlah : 1,171,640.00

NILAI HSPK : 1,650,640.00

25.07.01.09 DAUN PINTU PANIT (KAYU KAMPER) M2


Upah
08.01.01.01.01.001 Mandor 0.050000 OH 180,000.00 9,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.250000 OH 140,000.00 35,000.00
08.01.01.01.03.009 Tukang Kayu 2.500000 OH 130,000.00 325,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.000000 OH 110,000.00 110,000.00
Jumlah : 479,000.00
Bahan/Material
07.01.01.01.27.033 Kayu Kamper Papan 2/20 0.044000 m3 15,790,000.00 694,760.00
07.01.01.01.12.046 Paku Sekrup 25.000000 Buah 1,000.00 25,000.00
Jumlah : 719,760.00

NILAI HSPK : 1,198,760.00

25.07.01.10 PINTU/JENDELA KACA PAPAN KAYU JATI M2


Upah
08.01.01.01.01.001 Mandor 0.040000 OH 180,000.00 7,200.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.200000 OH 140,000.00 28,000.00
08.01.01.01.03.009 Tukang Kayu 2.000000 OH 130,000.00 260,000.00

109
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

08.01.01.01.04.013 Pekerja Tak Terampil 0.800000 OH 110,000.00 88,000.00


Jumlah : 383,200.00
Bahan/Material
07.01.01.04.02.024 Kaca Polos Tebal 5 mm 1.000000 M2 52,000.00 50,000.00
07.01.01.01.31.022 Paku 0.100000 Kg 25,000.00 800.00
07.01.01.01.27.023 Kayu Jati (papan 2/20) 0.035000 m3 26,060,000.00 397,250.00
Jumlah : 448,050.00

NILAI HSPK : 831,250.00

25.07.01.11 PINTU/JENDELA KACA PAPAN KAYU KAMPER M2


Upah
08.01.01.01.01.001 Mandor 0.040000 OH 180,000.00 7,200.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.200000 OH 140,000.00 28,000.00
08.01.01.01.03.009 Tukang Kayu 2.000000 OH 130,000.00 260,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.800000 OH 110,000.00 88,000.00
Jumlah : 383,200.00
Bahan/Material
07.01.01.01.27.033 Kayu Kamper Papan 2/20 0.035000 m3 15,790,000.00 552,650.00
07.01.01.04.02.024 Kaca Polos Tebal 5 mm 0.800000 M2 52,000.00 41,600.00
07.01.01.01.31.022 Paku 0.100000 Kg 25,000.00 2,500.00
Jumlah : 596,750.00

NILAI HSPK : 979,950.00

25.07.01.12 PASANG KACA NACO TEBAL 5 MM M2


Upah
08.01.01.01.01.001 Mandor 0.005000 OH 180,000.00 900.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.005000 OH 140,000.00 700.00
08.01.01.01.03.009 Tukang Kayu 0.200000 OH 130,000.00 26,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
Jumlah : 49,600.00
Bahan/Material
07.01.01.04.02.034 Krepyak Nako 8" 10.000000 daun 57,000.00 570,000.00
07.01.01.04.02.024 Kaca Polos Tebal 5 mm 1.600000 M2 52,000.00 83,200.00
07.01.01.01.12.046 Paku Sekrup 10.000000 Buah 1,000.00 10,000.00
Jumlah : 663,200.00

NILAI HSPK : 712,800.00

25.07.01.13 PASANG KACA MATI TEBAL 5MM M2


Upah
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000.00 5,500.00
08.01.01.01.03.009 Tukang Kayu 0.150000 OH 130,000.00 19,500.00
Jumlah : 25,000.00
Bahan/Material
07.01.01.01.27.031 Kayu Kamper 1/3 0.002000 m3 11,730,000.00 23,460.00

110
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

07.01.01.04.02.024 Kaca Polos Tebal 5 mm 1.000000 M2 52,000.00 52,000.00


07.01.01.01.31.022 Paku 0.002000 Kg 25,000.00 50.00
Jumlah : 75,510.00

NILAI HSPK : 100,510.00

25.07.01.14 PEMASANGAN KACA MATI RAYBEN(M2)TEBAL 5MM M2


Upah
08.01.01.01.03.009 Tukang Kayu 0.150000 OH 130,000.00 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000.00 5,500.00
Jumlah : 25,000.00
Bahan/Material
07.01.01.01.27.031 Kayu Kamper 1/3 0.002000 m3 11,730,000.00 23,460.00
07.01.01.01.31.022 Paku 0.100000 Kg 25,000.00 2,500.00
07.01.01.01.03.010 KACA RAYBEN Tebal 5 mm 1.000000 M2 75,000.00 75,000.00
Jumlah : 100,960.00

NILAI HSPK : 125,960.00

25.07.01.15 PEMASANGAN DINDING SKETSEL(DOUBLE) M2


Upah
08.01.01.01.01.001 Mandor 0.750000 OH 180,000.00 135,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.045000 OH 140,000.00 6,300.00
08.01.01.01.03.009 Tukang Kayu 0.450000 OH 130,000.00 58,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 216,300.00
Bahan/Material
07.01.01.04.02.057 Teakwood Uk 110 x 210 x 4 mm 1.000000 Lembar 49,000.00 49,000.00
07.01.01.01.27.035 Kayu Kamper Usuk 0.015400 m3 11,730,000.00 180,642.00
07.01.01.01.31.022 Paku 0.100000 Kg 25,000.00 2,500.00
Jumlah : 232,142.00

NILAI HSPK : 448,442.00

25.07.01.16 PEMASANGAN DINDING TEAKWOOD (1 LAPIS) TANPA RANGKA M2


Upah
08.01.01.01.01.001 Mandor 0.001300 OH 180,000.00 234.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.007500 OH 140,000.00 1,050.00
08.01.01.01.03.009 Tukang Kayu 0.075000 OH 130,000.00 9,750.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.025000 OH 110,000.00 2,750.00
Jumlah : 13,784.00

Bahan/Material
07.01.01.04.02.057 Teakwood Uk 110 x 210 x 4 mm 0.500000 Lembar 49,000.00 24,500.00
07.01.01.01.31.022 Paku 0.050000 Kg 25,000.00 1,250.00

111
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Jumlah : 23,400.00

NILAI HSPK : 37,184.00

25.07.01.17 PEMASANGAN PARTISI DOUBLE GYPSUM 12MM RANGKA KAYU KAMPER M2


Upah
08.01.01.01.01.001 Mandor 0.075000 OH 180,000.00 13,500.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.045000 OH 140,000.00 6,300.00
08.01.01.01.03.009 Tukang Kayu 0.450000 OH 130,000.00 58,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 94,800.00
Bahan/Material
07.01.01.01.27.035 Kayu Kamper Usuk 0.015400 m3 11,730,000.00 180,642.00
07.01.01.04.02.022 Gypsum Plat tebal 12 mm 2.000000 Lembar 53,000.00 106,000.00
07.01.01.01.12.046 Paku Sekrup 28.000000 Buah 1,000.00 28,000.00
Jumlah : 314,642.00

NILAI HSPK : 409,442.00

25.07.01.18 PEMASANGAN KUNCI TANAM KECIL BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.360000 OH 130,000.00 46,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 63,300.00
Bahan/Material
07.01.01.01.19.038 Kunci Tanam Royal 1 x putar 1.000000 Buah 107,100.00 107,100.00
Jumlah : 39,500.00

NILAI HSPK : 102,800.00

25.07.01.19 PEMASANGAN KUNCI TANAM BESAR 2X PUTAR KUNINGAN BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.360000 OH 130,000.00 46,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 63,300.00
Bahan/Material
07.01.01.01.19.038 Kunci Tanam Royal 1 x putar 1.000000 Buah 107,100.00 107,100.00
Jumlah : 107,100.00

NILAI HSPK : 170,400.00

25.07.01.20 PEMASANGAN ENGSEL H(STEEL) STEL


Upah
08.01.01.01.03.009 Tukang Kayu 0.140000 OH 130,000.00 18,200.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.080000 OH 110,000.00 8,800.00

112
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Jumlah : 27,000.00
Bahan/Material
07.01.01.01.19.001 Engsel H 1.000000 Buah 14,500.00 14,500.00
Jumlah : 14,500.00

NILAI HSPK : 41,500.00

25.07.01.21 PEMASANGAN ENGSEL KUNINGAN UNTUK JENDELA STEL


Upah
08.01.01.01.03.009 Tukang Kayu 0.140000 OH 130,000.00 18,200.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.080000 OH 110,000.00 8,800.00
Jumlah : 27,000.00
Bahan/Material
07.01.01.01.19.004 Engsel Kuningan Jendela 3" 1.000000 Buah 16,700.00 16,700.00
Jumlah : 16,700.00

NILAI HSPK : 43,700.00

25.07.01.22 PEMASANGAN ENGSEL KUNINGAN UNTUK PINTU STEL


Upah
08.01.01.01.03.009 Tukang Kayu 0.140000 OH 130,000.00 18,200.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.080000 OH 110,000.00 8,800.00
Jumlah : 27,000.00
Bahan/Material
07.01.01.01.19.005 Engsel kuningan Pintu 4" 1.000000 Buah 17,500.00 17,500.00
Jumlah : 17,500.00

NILAI HSPK : 44,500.00

25.07.01.23 PEMASANGAN GRENDEL BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.120000 OH 130,000.00 15,600.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000.00 6,600.00
Jumlah : 22,200.00
Bahan/Material
07.01.01.01.22.003 Grendel Panjang 1.000000 Buah 4,000.00 4,000.00
Jumlah : 4,000.00

NILAI HSPK : 26,200.00

25.07.01.24 PEMASANGAN GRENDEL BIASA (KECIL) BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.120000 OH 130,000.00 15,600.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000.00 6,600.00
Jumlah : 22,200.00

113
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Bahan/Material
07.01.01.01.22.002 Grendel Biasa (kecil) 1.000000 Buah 11,000.00 11,000.00
Jumlah : 11,000.00

NILAI HSPK : 33,200.00

25.07.01.25 PEMASANGAN GRENDEL BIASA (BESAR) BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.120000 OH 130,000.00 15,600.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000.00 6,600.00
Jumlah : 22,200.00
Bahan/Material
07.01.01.01.22.001 Grendel Biasa (besar) 1.000000 Buah 22,000.00 22,000.00
Jumlah : 22,000.00

NILAI HSPK : 44,200.00

25.07.01.26 PEMASANGAN GRENDEL TANAM BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.140000 OH 130,000.00 18,200.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.080000 OH 110,000.00 8,800.00
Jumlah : 27,000.00
Bahan/Material
07.01.01.01.22.004 Grendel Tanam 6" & 8" 1.000000 Buah 34,000.00 34,000.00
Jumlah : 34,000.00

NILAI HSPK : 61,000.00

25.07.01.27 PEMASANGAN RENDEL KUNINGAN/CROUM(KECIL) BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.120000 OH 130,000.00 15,600.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000.00 6,600.00
Jumlah : 22,200.00
Bahan/Material
07.01.01.01.22.004 Grendel Tanam 6" & 8" 1.000000 Buah 34,000.00 34,000.00
Jumlah : 34,000.00

NILAI HSPK : 56,200.00

25.07.01.28 PEMASANGAN RENDEL ESPANYOLET BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.140000 OH 130,000.00 18,200.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.080000 OH 110,000.00 8,800.00
Jumlah : 27,000.00
Bahan/Material

114
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

07.01.01.01.25.001 Espanyolet 1.000000 Buah 5,000.00 5,000.00


Jumlah : 5,000.00

NILAI HSPK : 32,000.00

25.07.01.29 PEMASANGAN HAK ANGIN(SIKUTAN) STEL


Upah
08.01.01.01.03.009 Tukang Kayu 0.140000 OH 130,000.00 18,200.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.080000 OH 110,000.00 8,800.00
Jumlah : 27,000.00
Bahan/Material
07.01.01.01.24.001 Hak Angin (Sikutan Biasa) 1.000000 Buah 7,000.00 7,000.00
Jumlah : 7,000.00

NILAI HSPK : 34,000.00

25.07.01.30 PEMASANGAN HAK ANGIN SIKUTAN(KUNINGAN) BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.012000 OH 130,000.00 1,560.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000.00 6,600.00
Jumlah : 8,160.00
Bahan/Material
07.01.01.01.24.003 Hak Angin kuningan Lurus Maju/Mundur Lubang 1.000000 Buah 48,000.00 48,000.00
Jumlah : 48,000.00

NILAI HSPK : 56,160.00

25.07.01.31 PEMASANGAN HAK ANGIN 4MM (LURUS) STEL


Upah
08.01.01.01.03.009 Tukang Kayu 0.140000 OH 130,000.00 18,200.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.080000 OH 110,000.00 8,800.00
Jumlah : 27,000.00
Bahan/Material
07.01.01.01.24.002 Hak Angin 4 mm (Lurus Biasa) 1.000000 Buah 19,000.00 19,000.00
Jumlah : 19,000.00

NILAI HSPK : 46,000.00

25.07.01.32 PEMASANGAN HAK ANGIN LURUS BUAH


Upah
08.01.01.01.03.009 Tukang Kayu 0.120000 OH 130,000.00 15,600.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000.00 6,600.00
Jumlah : 22,200.00
Bahan/Material
07.01.01.01.24.004 Hak Angin Lurus Kuningan (Bisa Disetel Maju/Mun 1.000000 Buah 29,000.00 29,000.00

115
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Jumlah : 29,000.00

NILAI HSPK : 51,200.00

25.07.01.33 PEMASANGAN FITRASE M2


Upah
08.01.01.01.01.001 Mandor 0.040000 OH 180,000.00 7,200.00
08.01.01.01.03.009 Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.130000 OH 110,000.00 14,300.00
Jumlah : 54,000.00
Bahan/Material
07.01.01.01.25.002 Fitrase 2.000000 M2 17,000.00 34,000.00
Jumlah : 34,000.00

NILAI HSPK : 88,000.00

25.07.01.34 PEMASANGAN VERTICAL BLIND M2


Upah
08.01.01.01.01.001 Mandor 0.040000 OH 180,000.00 7,200.00
08.01.01.01.03.009 Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.130000 OH 110,000.00 14,300.00
Jumlah : 54,000.00
Bahan/Material
07.01.01.04.02.079 Vertical Blind 1.000000 M2 99,000.00 99,000.00
Jumlah : 99,000.00

NILAI HSPK : 153,000.00

25.07.01.35 PEMASANGAN LAPISAN FOAM UNTUK KARPET M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000.00 1,800.00
08.01.01.01.03.009 Tukang Kayu 0.050000 OH 130,000.00 6,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.030000 OH 110,000.00 3,300.00
Jumlah : 11,600.00
Bahan/Material
07.01.01.01.37.001 Foam Lapisan Karpet 1.000000 M2 82,000.00 82,000.00
07.01.01.04.02.036 Lem 0.375000 Kg 35,000.00 13,125.00
Jumlah : 52,375.00

NILAI HSPK : 63,975.00


25.07.01.36 PEMASANGAN KARPET WOOL M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000.00 1,800.00
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000.00 5,500.00
Jumlah : 20,300.00
Bahan/Material
07.01.01.01.37.002 Karpet 0.550000 M2 445,000.00 244,750.00

116
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

07.01.01.04.02.036 Lem 0.550000 Kg 35,000.00 19,250.00


Jumlah : 264,000.00

NILAI HSPK : 284,300.00

25.07.01.37 PEMASANGAN KAWAT NYAMUK (KASAA ALUMUNIUM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000.00 1,800.00
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
Jumlah : 14,800.00
Bahan/Material
07.01.01.01.26.005 Kawat Nyamuk Kasa Aluminium 1.100000 M2 17,000.00 18,700.00
Jumlah : 18,700.00

NILAI HSPK : 33,500.00

25.07.01.38 PEMASANGAN KAWAT NYAMUK (KASAA ALUMUNIUM) M2


Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000.00 1,800.00
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
Jumlah : 14,800.00
Bahan/Material
07.01.01.01.26.005 Kawat Nyamuk Kasa Aluminium 1.100000 M2 17,000.00 18,700.00
Jumlah : 18,700.00

NILAI HSPK : 33,500.00


25.07.01.39 PEMASANGAN KAWAT HARMONIKA M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000.00 1,800.00
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
Jumlah : 14,800.00
Bahan/Material
07.01.01.01.26.002 Kawat Harmonika 1.100000 M2 30,000.00 33,000.00
Jumlah : 33,000.00

NILAI HSPK : 47,800.00

25.07.01.40 PEMBONGKARAN KAYU M2


Upah
08.01.01.01.01.001 Mandor 0.200000 OH 180,000.00 36,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.400000 OH 140,000.00 56,000.00
08.01.01.01.03.009 Tukang Kayu 4.000000 OH 130,000.00 520,000.00
08.01.01.01.02.025 Pekerja Terampil 2.670000 OH 130,000.00 347,100.00
Jumlah : 959,100.00

NILAI HSPK : 959,100.00

117
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

25.07.01.41 LANTAI JEMBATAN DARI PAPAN/BALOK KAYU KAMPER PER M2 M2


Upah
08.01.01.01.01.001 Mandor 0.006700 OH 180,000.00 1,206.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.033300 OH 140,000.00 4,662.00
08.01.01.01.03.009 Tukang Kayu 0.033300 OH 130,000.00 4,329.00
08.01.01.01.02.025 Pekerja Terampil 0.133300 OH 130,000.00 17,329.00
Jumlah : 27,526.00
Bahan/Material
07.01.01.01.27.029 Kayu Kamper (Balok 8/12) 0.014100 m3 11,730,000.00 165,393.00
07.01.01.01.27.030 Kayu Kamper (papan 3/30) 0.033000 m3 15,640,000.00 516,120.00
07.01.01.01.31.022 Paku 0.750000 Kg 25,000.00 18,750.00
Jumlah : 700,263.00

NILAI HSPK : 727,789.00

25.07.01.42 LANTAI JEMBATAN DARI PAPAN/BALOK KAYU BESI PER M2 M2


Upah
08.01.01.01.01.001 Mandor 0.006200 OH 180,000.00 1,116.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.033300 OH 140,000.00 4,662.00
08.01.01.01.03.009 Tukang Kayu 0.333300 OH 130,000.00 43,329.00
08.01.01.01.02.025 Pekerja Terampil 0.133300 OH 130,000.00 17,329.00
Jumlah : 66,436.00
Bahan/Material
07.01.01.01.27.011 Kayu Besi (Balok) Untuk Lantai Jembatan 0.014100 m3 36,840,000.00 519,444.00
07.01.01.01.27.012 Kayu Besi (Papan ) Untuk Lantai Jembatan 0.033000 m3 51,810,000.00 1,709,730.00
07.01.01.01.31.022 Paku 0.750000 Kg 25,000.00 18,750.00
Jumlah : 2,247,924.00

NILAI HSPK : 2,314,360.00

25.07.01.43 LANTAI JEMBATAN DARI PAPAN/BALOK KAYU JATI PER M2 M2


Upah
08.01.01.01.01.001 Mandor 0.006700 OH 180,000.00 1,206.00
08.01.01.01.03.009 Tukang Kayu 0.033300 OH 130,000.00 4,329.00
08.01.01.01.03.009 Tukang Kayu 0.333300 OH 130,000.00 43,329.00
08.01.01.01.02.025 Pekerja Terampil 0.133300 OH 130,000.00 17,329.00
Jumlah : 66,193.00
Bahan/Material
07.01.01.01.31.022 Paku 0.750000 Kg 25,000.00 18,750.00
07.01.01.01.27.012 Kayu Besi (Papan ) Untuk Lantai Jembatan 0.033000 m3 51,810,000.00 1,709,730.00
07.01.01.01.27.011 Kayu Besi (Balok) Untuk Lantai Jembatan 0.014100 m3 36,840,000.00 519,444.00
Jumlah : 2,247,924.00

NILAI HSPK : 2,314,117.00

118
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

25.07.01.44 PEMASANGAN KUSEN ALUMUNIUM PROFIL 4" M1


Upah
08.01.01.01.01.001 Mandor 0.004400 OH 180,000.00 792.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.022000 OH 140,000.00 3,080.00
08.01.01.01.03.009 Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.02.025 Pekerja Terampil 0.150000 OH 130,000.00 19,500.00
Jumlah : 55,872.00
Bahan/Material
07.01.01.04.02.001 Aluminium Profil 4" Putih 1.050000 ml 23,000.00 24,150.00
07.01.01.01.12.046 Paku Sekrup 5.000000 Buah 1,000.00 5,000.00
Jumlah : 29,150.00

NILAI HSPK : 85,022.00

25.07.01.45 PEMASANGAN SLIMAR ALUMUNIUM PROFIL 3/B" M1


Upah
08.01.01.01.01.001 Mandor 0.015000 OH 180,000.00 2,700.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.035000 OH 140,000.00 4,900.00
08.01.01.01.03.009 Tukang Kayu 0.400000 OH 130,000.00 52,000.00
08.01.01.01.02.025 Pekerja Terampil 0.200000 OH 130,000.00 26,000.00
Jumlah : 85,600.00
Bahan/Material
07.01.01.04.02.050 Slimar Aluminium 3/8" 1.050000 ml 19,000.00 19,950.00
07.01.01.01.12.046 Paku Sekrup 5.000000 Buah 1,000.00 5,000.00
07.01.01.04.02.028 Karet 0.033000 M3 11,600,000.00 382,800.00
Jumlah : 407,750.00

NILAI HSPK : 493,350.00

25.07.01.46 KUSEN,PINTU,JENDELA, BHN KAYU KAPUR M3


Upah
08.01.01.01.03.009 Tukang Kayu 24.000000 OH 130,000.00 3,120,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 7.200000 OH 110,000.00 792,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 2.400000 OH 140,000.00 336,000.00
08.01.01.01.01.001 Mandor 0.360000 OH 180,000.00 64,800.00
Jumlah : 4,312,800.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 1.600000 Ton 15,940,000.00 25,504,000.00
07.01.01.01.31.022 Paku 3.000000 Kg 25,000.00 75,000.00
07.01.01.04.02.002 Angker Baut Untuk Kayu 56.000000 Bh 17,000.00 952,000.00
Jumlah : 26,531,000.00

NILAI HSPK : 30,843,800.00

119
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

25.07.01.47 PINTU, JENDELA KLAM,BHN KAYU KAPUR M2


Upah
08.01.01.01.03.009 Tukang Kayu 1.000000 OH 130,000.00 130,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.350000 OH 110,000.00 38,500.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.100000 OH 140,000.00 14,000.00
08.01.01.01.01.001 Mandor 0.018000 OH 180,000.00 3,240.00
Jumlah : 185,740.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 0.052000 Ton 15,940,000.00 828,880.00
07.01.01.01.31.022 Paku 0.100000 Kg 25,000.00 2,500.00
Jumlah : 831,380.00

NILAI HSPK : 1,017,120.00

25.07.01.48 PINTU, JENDELA PANEL, BHN KAYU KAPUR M2


Upah
08.01.01.01.03.009 Tukang Kayu 2.000000 OH 130,000.00 260,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.000000 OH 110,000.00 110,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.200000 OH 140,000.00 28,000.00
08.01.01.01.01.001 Mandor 0.005000 OH 180,000.00 900.00
Jumlah : 398,900.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 0.059000 Ton 15,940,000.00 940,460.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.100000 Kg 39,000.00 3,900.00
Jumlah : 944,360.00

NILAI HSPK : 1,343,260.00

25.07.01.49 RANGKA PINTU JENDELA,KACA KAYU KAPUR M2


Upah
08.01.01.01.03.009 Tukang Kayu 2.000000 OH 130,000.00 260,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.800000 OH 110,000.00 88,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.200000 OH 140,000.00 28,000.00
08.01.01.01.01.001 Mandor 0.040000 OH 180,000.00 7,200.00
Jumlah : 383,200.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 0.040000 Ton 15,940,000.00 637,600.00
07.01.01.01.31.022 Paku 0.050000 Kg 25,000.00 1,250.00
Jumlah : 638,850.00

NILAI HSPK : 1,022,050.00

25.07.01.50 PINTU JENDELA JALUSI, KAYU KAPUR M2


Upah

120
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

08.01.01.01.03.009 Tukang Kayu 3.000000 OH 130,000.00 390,000.00


08.01.01.01.04.013 Pekerja Tak Terampil 1.000000 OH 110,000.00 110,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.300000 OH 140,000.00 42,000.00
08.01.01.01.01.001 Mandor 0.050000 OH 180,000.00 9,000.00
Jumlah : 551,000.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 0.056000 Ton 15,940,000.00 892,640.00
07.01.01.01.31.022 Paku 0.200000 Kg 25,000.00 5,000.00
Jumlah : 897,640.00

NILAI HSPK : 1,448,640.00

25.07.01.51 JALUSI MATI PADA KUSEN BHN KAYU KAPUR M2


Upah
08.01.01.01.03.009 Tukang Kayu 1.600000 OH 130,000.00 208,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000.00 44,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.160000 OH 140,000.00 22,400.00
08.01.01.01.01.001 Mandor 0.020000 OH 180,000.00 3,600.00
Jumlah : 278,000.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 0.071000 Ton 15,940,000.00 1,131,740.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.200000 Kg 39,000.00 7,800.00
Jumlah : 1,139,540.00

NILAI HSPK : 1,417,540.00

25.07.01.52 PINTU PLYWOOD RANGKAP, RANGKA KAYU KAPUR M2


Upah
08.01.01.01.03.009 Tukang Kayu 1.600000 OH 130,000.00 208,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000.00 52,800.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.160000 OH 140,000.00 22,400.00
08.01.01.01.01.001 Mandor 0.024000 OH 180,000.00 4,320.00
Jumlah : 287,520.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 0.053000 Ton 15,940,000.00 844,820.00
07.01.01.01.31.022 Paku 0.030000 Kg 25,000.00 750.00
07.01.01.01.23.001 Plywood Uk. 4 mm 1.000000 Lembar 20,000.00 20,000.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.300000 Kg 39,000.00 11,700.00
Jumlah : 877,270.00

NILAI HSPK : 1,164,790.00

25.07.01.53 PINTU PLYWOOD DAN FORMIKA, RANGKA KAYU KAPUR M2


Upah
08.01.01.01.03.009 Tukang Kayu 1.800000 OH 130,000.00 234,000.00

121
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

08.01.01.01.04.013 Pekerja Tak Terampil 0.540000 OH 110,000.00 59,400.00


08.01.01.01.01.011 Kepala Tukang Kayu 0.180000 OH 140,000.00 25,200.00
08.01.01.01.01.001 Mandor 0.027000 OH 180,000.00 4,860.00
Jumlah : 323,460.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 0.053000 Ton 15,940,000.00 844,820.00
07.01.01.01.31.022 Paku 0.030000 Kg 25,000.00 750.00
07.01.01.01.23.001 Plywood Uk. 4 mm 0.500000 Lembar 20,000.00 10,000.00
07.01.01.04.02.015 formika 1,2 m x 2,4m t=3 mm 0.500000 Lbr 21,000.00 10,500.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.300000 Kg 39,000.00 8,400.00
Jumlah : 874,470.00

NILAI HSPK : 1,197,930.00

25.07.01.54 PINTU FORMIKA RANGKAP,RANGKA KAYU KAPUR M2


Upah
08.01.01.01.03.009 Tukang Kayu 2.250000 OH 130,000.00 292,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.675000 OH 110,000.00 74,250.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.225000 OH 140,000.00 31,500.00
08.01.01.01.01.001 Mandor 0.034000 OH 180,000.00 6,120.00
Jumlah : 404,370.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 0.053000 Ton 15,940,000.00 844,820.00
07.01.01.01.31.022 Paku 0.030000 Kg 25,000.00 750.00
07.01.01.04.02.015 formika 1,2 m x 2,4m t=3 mm 1.000000 Lbr 21,000.00 21,000.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 1.200000 Kg 39,000.00 46,800.00
Jumlah : 913,370.00

NILAI HSPK : 1,317,740.00

25.07.01.55 KUDA2 BENTANG S/D 6 M, KAYU KAPUR M3


Upah
08.01.01.01.03.009 Tukang Kayu 15.000000 OH 130,000.00 1,950,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 5.000000 OH 110,000.00 550,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 1.500000 OH 140,000.00 210,000.00
08.01.01.01.01.001 Mandor 0.250000 OH 180,000.00 45,000.00
Jumlah : 2,755,000.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 1.457000 Ton 15,940,000.00 23,224,580.00
07.01.01.01.31.022 Paku 3.000000 Kg 25,000.00 75,000.00
07.01.01.01.10.016 Besi Strip, untuk Kayu - 15.000000 Batang 20,000.00 300,000.00
Jumlah : 23,599,580.00

NILAI HSPK : 26,354,580.00

25.07.01.56 KUDA2 BENTANG S/D 6 - 9 M, KAYU KAPUR M3


Upah

122
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

08.01.01.01.03.009 Tukang Kayu 20.000000 OH 130,000.00 2,600,000.00


08.01.01.01.04.013 Pekerja Tak Terampil 6.700000 OH 110,000.00 737,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 2.000000 OH 140,000.00 280,000.00
08.01.01.01.01.001 Mandor 0.340000 OH 180,000.00 61,200.00
Jumlah : 3,678,200.00
Bahan/Material
07.01.01.01.27.036 Kayu kapur - 1.467000 Ton 15,940,000.00 23,383,980.00
07.01.01.01.31.022 Paku 3.000000 Kg 25,000.00 75,000.00
07.01.01.01.10.016 Besi Strip, untuk Kayu - 15.000000 Batang 20,000.00 300,000.00
Jumlah : 23,758,980.00

NILAI HSPK : 27,437,180.00

25.07.01.57 PASANG GORDING, BAN KAYU MERANTI M3


Upah
08.01.01.01.03.009 Tukang Kayu 5.800000 OH 130,000.00 754,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.940000 OH 110,000.00 213,400.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.580000 OH 140,000.00 81,200.00
08.01.01.01.01.001 Mandor 0.097000 OH 180,000.00 17,460.00
Jumlah : 1,066,060.00
Bahan/Material
07.01.01.01.31.022 Paku 2.200000 Kg 25,000.00 55,000.00
07.01.01.01.27.050 Kayu Meranti Batu 2.037000 Ton 2,704,000.00 5,508,048.00
Jumlah : 5,563,048.00

NILAI HSPK : 6,629,108.00

RANGKA ATAP KASO2 5/7 & RENG 2/3 UTK


25.07.01.58 GENTENG,BHN KAYU MERANTI M2
Upah
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001 Mandor 0.005000 OH 180,000.00 900.00
Jumlah : 26,300.00
Bahan/Material
07.01.01.01.31.022 Paku 0.150000 Kg 25,000.00 3,750.00
07.01.01.01.27.050 Kayu Meranti Batu 0.028000 Ton 2,704,000.00 75,712.00
Jumlah : 79,462.00

NILAI HSPK : 105,762.00

25.07.01.59 RANGKA ATAP KASO2 5/7 & RENG 2/3 UTK GENTENG BETON, BHN M2
Upah
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00

123
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

08.01.01.01.01.011 Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00


08.01.01.01.01.001 Mandor 0.005000 OH 180,000.00 900.00
Jumlah : 26,300.00
Bahan/Material
07.01.01.01.31.022 Paku 0.150000 Kg 25,000.00 3,750.00
07.01.01.01.27.050 Kayu Meranti Batu 0.032000 Ton 2,704,000.00 86,528.00
Jumlah : 90,278.00

NILAI HSPK : 116,578.00

25.07.01.60 RANGKA ATAP KASO2 5/7 & RENG 2/3 UTK GENTENG SIRAP, BHN M2
Upah
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001 Mandor 0.005000 OH 180,000.00 900.00
Jumlah : 26,300.00
Bahan/Material
07.01.01.01.31.022 Paku 0.250000 Kg 25,000.00 6,250.00
07.01.01.01.27.050 Kayu Meranti Batu 0.044000 Ton 2,704,000.00 118,976.00
Jumlah : 125,226.00

NILAI HSPK : 151,526.00

LANGIT2 GRID 60 CM X 120 CM, TRIPLEK 4 MM BHN


25.07.01.61 KAYU MERANTI BATU M2
Upah
08.01.01.01.03.009 Tukang Kayu 0.350000 OH 130,000.00 45,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.210000 OH 110,000.00 23,100.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.035000 OH 140,000.00 4,900.00
08.01.01.01.01.001 Mandor 0.011000 OH 180,000.00 1,980.00
Jumlah : 75,480.00
Bahan/Material
07.01.01.01.31.022 Paku 0.180000 Kg 25,000.00 4,500.00
07.01.01.04.02.071 Triplek 4 x 8 Ft 0.450800 Lbr 78,000.00 35,162.40
07.01.01.01.27.050 Kayu Meranti Batu 0.041500 Ton 2,704,000.00 112,216.00
Jumlah : 151,878.40

NILAI HSPK : 227,358.40

LANGIT2 GRID 60 CM X 60 CM, TRIPLEK 4 MM BHN


25.07.01.62 KAYU MERANTI BATU M2
Upah
08.01.01.01.03.009 Tukang Kayu 0.500000 OH 130,000.00 65,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.350000 OH 110,000.00 38,500.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.050000 OH 140,000.00 7,000.00

124
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

08.01.01.01.01.001 Mandor 0.018000 OH 180,000.00 3,240.00


Jumlah : 113,740.00
Bahan/Material
07.01.01.01.31.022 Paku 0.230000 Kg 25,000.00 5,750.00
07.01.01.04.02.071 Triplek 4 x 8 Ft 0.450000 Lbr 78,000.00 35,100.00
07.01.01.01.27.050 Kayu Meranti Batu 0.052300 Ton 2,704,000.00 141,419.20
Jumlah : 182,269.20

NILAI HSPK : 296,009.20

25.07.01.63 RANGKA LANGIT2GRID 30 CM X 30 CM, BHN KAYU MERANTI M2


Upah
08.01.01.01.03.009 Tukang Kayu 0.600000 OH 130,000.00 78,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 43.000000 OH 110,000.00 4,730,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.060000 OH 140,000.00 8,400.00
08.01.01.01.01.001 Mandor 0.022000 OH 180,000.00 3,960.00
Jumlah : 4,820,360.00
Bahan/Material
07.01.01.01.31.022 Paku 0.280000 Kg 25,000.00 7,000.00
07.01.01.04.02.071 Triplek 4 x 8 Ft 0.450800 Lbr 78,000.00 35,162.40
07.01.01.01.27.050 Kayu Meranti Batu 0.058500 Ton 2,704,000.00 158,184.00
Jumlah : 200,346.40

NILAI HSPK : 5,020,706.40

25.07.01.64 DINDING PARTISI GYPSUM (9MM)DI CAT RANGKA ALM 2 1/4" X 1" M2
Upah
08.01.01.01.04.013 Pekerja Tak Terampil 0.695000 OH 110,000.00 76,450.00
08.01.01.01.03.019 Tukang 0.560000 Jam 110,001.00 61,600.56
Jumlah : 138,050.56
Bahan/Material
07.01.01.04.02.012 Dinding Partisi Gypsum 2.200000 M2 82,000.00 171,600.00
07.01.01.04.02.010 Cat Partisi Gypsum 1.000000 Kg 62,000.00 60,000.00
07.01.01.04.02.048 Rangka Alumunium + Accesories 2.500000 m1 168,000.00 400,000.00
Jumlah : 631,600.00

NILAI HSPK : 769,650.56

DINDING PARTISI GYPSUM (9MM)LAP WALLPAPER


25.07.01.65 RANGKA ALM 2 1/4" X 1" M3
Upah
08.01.01.01.04.013 Pekerja Tak Terampil 0.804000 OH 110,000.00 88,440.00
08.01.01.01.03.019 Tukang 0.560000 Jam 110,001.00 61,600.56
Jumlah : 150,040.56
Bahan/Material

125
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

07.01.01.04.02.012 Dinding Partisi Gypsum 2.200000 M2 82,000.00 171,600.00


07.01.01.01.31.035 Wallpaper (10,05 mx 0,53 m) Collection La Verita 1.000000 Roll 201,000.00 150,000.00
07.01.01.04.02.036 Lem 0.950000 Kg 35,000.00 31,350.00
07.01.01.04.02.048 Rangka Alumunium + Accesories 2.500000 m1 168,000.00 400,000.00
Jumlah : 752,950.00

NILAI HSPK : 902,990.56

25.07.01.66 LISPLANG 3 X 20 CM,BHN KAYU KAPUR M


Upah
08.01.01.01.03.009 Tukang Kayu 0.200000 OH 130,000.00 26,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.020000 OH 140,000.00 2,800.00
08.01.01.01.01.001 Mandor 0.005000 OH 180,000.00 900.00
Jumlah : 40,700.00
Bahan/Material
07.01.01.01.31.022 Paku 0.050000 Kg 25,000.00 1,250.00
07.01.01.04.02.030 Kayu Kapur Papan 0.009000 Ton 13,520,000.00 121,680.00
Jumlah : 54,400.00

NILAI HSPK : 95,100.00

25.07.01.67 LISPLANG 3 X 30 CM,BHN KAYU MERANTI M


Upah
08.01.01.01.03.009 Tukang Kayu 0.285000 OH 130,000.00 37,050.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.143000 OH 110,000.00 15,730.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.029000 OH 140,000.00 4,060.00
08.01.01.01.01.001 Mandor 0.007000 OH 180,000.00 1,260.00
Jumlah : 58,100.00
Bahan/Material
07.01.01.01.31.022 Paku 0.050000 Kg 25,000.00 1,250.00
07.01.01.01.27.050 Kayu Meranti Batu 0.013000 Ton 2,704,000.00 35,152.00
Jumlah : 36,402.00

NILAI HSPK : 94,502.00

25.07.01.68 DINDING PEMISAH KAYU KAPUR M2


Upah
08.01.01.01.03.009 Tukang Kayu 1.250000 OH 130,000.00 162,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.400000 OH 110,000.00 44,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.125000 OH 140,000.00 17,500.00
08.01.01.01.01.001 Mandor 0.002000 OH 180,000.00 360.00
Jumlah : 224,360.00
Bahan/Material
07.01.01.01.31.022 Paku 0.250000 Kg 25,000.00 6,250.00

126
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

07.01.01.01.27.050 Kayu Meranti Batu 0.024000 Ton 2,704,000.00 64,896.00


Jumlah : 71,146.00

NILAI HSPK : 295,506.00

25.07.01.69 DINDING PEMISAH TRIPLEK RANGKAP RANGKA KAYU MERANTI M2


Upah
08.01.01.01.03.009 Tukang Kayu 0.600000 OH 130,000.00 78,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.060000 OH 140,000.00 8,400.00
08.01.01.01.01.001 Mandor 0.010000 OH 180,000.00 1,800.00
Jumlah : 110,200.00
Bahan/Material
07.01.01.04.02.071 Triplek 4 x 8 Ft 0.850000 Lbr 78,000.00 66,300.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.300000 Kg 39,000.00 11,700.00
07.01.01.01.31.022 Paku 0.100000 Kg 25,000.00 2,500.00
07.01.01.01.27.050 Kayu Meranti Batu 0.029200 Ton 2,704,000.00 78,956.80
Jumlah : 159,456.80

NILAI HSPK : 269,656.80

25.07.02 INSTALASI LISTRIK


25.07.02.01 PEMASANGAN TITIK STOP KONTAK GEDUNG TITIK
Upah
08.01.01.01.01.007 Kepala Tukang Listrik 0.050000 OH 170,000.00 8,500.00
08.01.01.01.03.010 Tukang Listrik 0.200000 OH 160,000.00 32,000.00
08.01.01.01.02.025 Pekerja Terampil 0.001000 OH 130,000.00 130.00
Jumlah : 40,630.00
Bahan/Material
07.01.04.02.14.006 Stop Kontak Broko 3 phase (in bow) 1.000000 Buah 156,000.00 15,000.00
07.01.04.02.01.006 Kabel NYA 2 x 1.5 mm² 0.012000 M1 9,000.00 60.00
07.01.01.04.02.045 Pipa Paralon 5/8 1.000000 Ljr 7,000.00 6,100.00
07.01.05.01.03.012 T Doos PVC 0.750000 Buah 4,000.00 1,875.00
Jumlah : 23,035.00

NILAI HSPK : 63,665.00

25.07.02.02 PEMASANGAN TITIK LAMPU GEDUNG TITIK


Upah
08.01.01.01.01.007 Kepala Tukang Listrik 0.050000 OH 170,000.00 8,500.00
08.01.01.01.03.010 Tukang Listrik 1.000000 OH 160,000.00 160,000.00
08.01.01.01.02.025 Pekerja Terampil 1.000000 OH 130,000.00 130,000.00
Jumlah : 298,500.00
Bahan/Material
07.01.01.04.02.035 Las Doof 6.000000 Buah 1,000.00 4,200.00
07.01.04.02.01.006 Kabel NYA 2 x 1.5 mm² 30.000000 Meter 9,000.00 270,000.00

127
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

07.01.05.01.03.012 T Doos PVC 2.000000 Buah 4,000.00 5,000.00


07.01.01.04.02.045 Pipa Paralon 5/8 1.000000 Ljr 7,000.00 6,100.00
07.01.01.04.02.014 Fitting Plafon 1.000000 Buah 11,000.00 10,140.00
07.01.04.02.29.013 Isolator 15.000000 Buah 3,000.00 10,500.00
Jumlah : 305,940.00

NILAI HSPK : 604,440.00

25.07.02.03 PEMASANGAN SAKLAR TUNGGAL TITIK


Upah
08.01.01.01.01.007 Kepala Tukang Listrik 0.050000 OH 170,000.00 8,500.00
08.01.01.01.03.010 Tukang Listrik 0.200000 OH 160,000.00 32,000.00
08.01.01.01.02.025 Pekerja Terampil 0.001000 OH 130,000.00 130.00
Jumlah : 40,630.00
Bahan/Material
07.01.04.02.15.001 Saklar 1 G 1.000000 Buah 37,000.00 37,000.00
07.01.04.02.01.006 Kabel NYA 2 x 1.5 mm² 0.012000 M1 9,000.00 108.00
07.01.01.04.02.045 Pipa Paralon 5/8 1.000000 Ljr 7,000.00 7,000.00
07.01.05.01.03.012 T Doos PVC 0.750000 Buah 4,000.00 3,000.00
Jumlah : 47,108.00

NILAI HSPK : 87,738.00

25.07.02.04 PEMASANGAN SAKLAR GANDA TITIK


Upah
08.01.01.01.01.007 Kepala Tukang Listrik 0.050000 OH 170,000.00 8,500.00
08.01.01.01.03.010 Tukang Listrik 0.200000 OH 160,000.00 32,000.00
08.01.01.01.02.025 Pekerja Terampil 0.001000 OH 130,000.00 130.00
Jumlah : 40,630.00
Bahan/Material
07.01.04.02.15.007 Saklar Seri 1.000000 Buah 50,000.00 50,000.00
07.01.04.02.01.006 Kabel NYA 2 x 1.5 mm² 0.012000 M1 9,000.00 108.00
07.01.01.04.02.045 Pipa Paralon 5/8 1.000000 Ljr 7,000.00 7,000.00
07.01.05.01.03.012 T Doos PVC 0.750000 Buah 4,000.00 3,000.00
Jumlah : 60,108.00

NILAI HSPK : 100,738.00

25.07.03 SANITAIR
25.07.03.01 PEMASANGAN DASAR SALURAN R 25 SEGMEN M
Upah
08.01.01.01.01.001 Mandor 0.023800 OH 180,000.00 4,284.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.475000 OH 110,000.00 52,250.00
Jumlah : 56,534.00
Bahan/Material
07.01.01.01.21.028 Got Talang R 15 1.000000 Buah 11,000.00 11,000.00

128
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Jumlah : 20,000.00

NILAI HSPK : 76,534.00

25.07.03.02 PEMASANGAN DASAR SALURAN R 15 SEGMEN


Upah
08.01.01.01.01.001 Mandor 0.019000 OH 180,000.00 3,420.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.380000 OH 110,000.00 41,800.00
Jumlah : 45,220.00
Bahan/Material
07.01.01.01.21.028 Got Talang R 15 1.000000 Buah 11,000.00 11,000.00
Jumlah : 11,000.00

NILAI HSPK : 56,220.00

25.07.03.03 PEMASANGAN DASAR SALURAN R 10 SEGMEN


Upah
08.01.01.01.01.001 Mandor 0.015200 OH 180,000.00 2,736.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.304000 OH 110,000.00 33,440.00
Jumlah : 36,176.00
Bahan/Material
07.01.01.01.21.029 Got Talang R 10 1.000000 Buah 10,000.00 10,000.00
Jumlah : 10,000.00

NILAI HSPK : 46,176.00


25.07.03.04 PEMASANGAN DASAR SALURAN R 25 (1/2 LINGKARAN) M
Upah
08.01.01.01.01.001 Mandor 0.023800 OH 180,000.00 4,284.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.475000 OH 110,000.00 52,250.00
Jumlah : 56,534.00
Bahan/Material
07.01.01.01.21.027 Got Talang R 25 1.000000 Buah 20,000.00 20,000.00
Jumlah : 20,000.00

NILAI HSPK : 76,534.00

25.07.03.05 PEMASANGAN DASAR SALURAN R 15 (1/2 LINGKARAN) M


Upah
08.01.01.01.01.001 Mandor 0.019000 OH 180,000.00 3,420.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.380000 OH 110,000.00 41,800.00
Jumlah : 45,220.00
Bahan/Material
07.01.01.01.21.028 Got Talang R 15 1.000000 Buah 11,000.00 11,000.00
Jumlah : 11,000.00

NILAI HSPK : 56,220.00

129
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

25.07.03.06 PEMASANGAN DASAR SALURAN R 10 (1/2 LINGKARAN)


Upah
08.01.01.01.01.001 Mandor 0.015200 OH 180,000.00 2,736.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.304000 OH 110,000.00 33,440.00
Jumlah : 36,176.00
Bahan/Material
07.01.01.01.21.029 Got Talang R 10 1.000000 Buah 10,000.00 10,000.00
Jumlah : 10,000.00

NILAI HSPK : 46,176.00

25.07.03.07 PEKERJAAN COR BETON TUTUP URUNG2 1PC:2PS:3KR M3


Upah
25.03.01.06 Pekerjaan Beton Struktur K-225 1.000000 M3 1,200,806.40 1,200,806.40
25.03.01.05 Pekerjaan Pembesian 160.000000 Kg 36,231.00 5,796,960.00
25.03.01.02 Acuan untuk Beton Struktur ( Bekisting ) 0.250000 M3 2,059,962.15 514,990.54
25.03.01.08 Pembongkaran Cetakan dan Penyiraman Beton 0.250000 M3 330,000.00 82,500.00
Jumlah : 7,595,256.94

NILAI HSPK : 7,595,256.94

25.07.03.08 PEKERJAAN PLAT TUTUP BETON (1PC:2PS:3KR) M3


Upah
25.03.01.06 Pekerjaan Beton Struktur K-225 1.000000 M3 1,200,806.40 1,200,806.40
25.03.01.05 Pekerjaan Pembesian 100.000000 Kg 36,231.00 3,623,100.00
25.03.01.02 Acuan untuk Beton Struktur ( Bekisting ) 0.250000 M3 2,059,962.15 514,990.54
25.03.01.08 Pembongkaran Cetakan dan Penyiraman Beton 0.250000 M3 330,000.00 82,500.00
Jumlah : 5,421,396.94

NILAI HSPK : 5,421,396.94

25.07.03.09 PEMASANGAN PIPA AIR BERSIH DIA 1/2" M


Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.01.03.004 Lem PVC 0.100000 Buah 25,000.00 2,500.00
07.01.05.04.01.012 Pipa PVC Class AW dia. 1/2" 1.100000 M 16,000.00 17,600.00
Jumlah : 20,100.00

NILAI HSPK : 139,670.00

130
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

25.07.03.10 PEMASANGAN PIPA AIR BERSIH DIA 3/4" M


Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.04.01.013 Pipa PVC Class AW dia. 3/4" 1.100000 M 25,000.00 27,500.00
07.01.05.01.03.004 Lem PVC 0.100000 Buah 25,000.00 2,500.00
Jumlah : 30,000.00

NILAI HSPK : 149,570.00

25.07.03.11 PEMASANGAN PIPA AIR BERSIH DIA 1" M


Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.04.01.014 Pipa PVC Class AW dia. 1" 1.100000 M 33,000.00 36,300.00
07.01.05.01.03.004 Lem PVC 0.100000 Buah 25,000.00 2,500.00
Jumlah : 38,800.00

NILAI HSPK : 158,370.00


25.07.03.12 PEMASANGAN PIPA AIR BERSIH DIA 11/2" M
Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.01.03.004 Lem PVC 0.150000 Buah 25,000.00 3,750.00
07.01.05.04.01.016 Pipa PVC Class AW dia. 1 1/2" 1.100000 Lonjor 52,000.00 57,200.00
Jumlah : 60,950.00

NILAI HSPK : 180,520.00

25.07.03.13 PEMASANGAN PIPA AIR KOTOR DIA 1.1/2" M


Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.01.03.004 Lem PVC 0.200000 Buah 25,000.00 5,000.00
07.01.05.04.01.030 Pipa PVC Class C dia. 1 1/2" 1.100000 Lonjor 21,000.00 23,100.00
Jumlah : 28,100.00

NILAI HSPK : 147,670.00

25.07.03.14 PEMASANGAN PIPA AIR KOTOR DIA 2" M

131
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.01.03.004 Lem PVC 0.260000 Buah 25,000.00 6,500.00
07.01.05.04.01.031 Pipa PVC Class C dia. 2" 1.100000 Lonjor 25,000.00 27,500.00
Jumlah : 17,174.30

NILAI HSPK : 136,744.30

25.07.03.15 PEMASANGAN PIPA AIR KOTOR DIA 3" M


Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.04.01.033 Pipa PVC Class C dia. 3" 1.100000 Lonjor 37,000.00 40,700.00
07.01.05.01.03.004 Lem PVC 0.400000 Buah 25,000.00 10,000.00
Jumlah : 50,700.00

NILAI HSPK : 170,270.00


25.07.03.16 PEMASANGAN PIPA AIR KOTOR DIA 4" M
Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.04.01.034 Pipa PVC Class C dia. 4" 1.100000 Lonjor 52,000.00 57,200.00
07.01.05.01.03.004 Lem PVC 0.500000 Buah 25,000.00 12,500.00
Jumlah : 69,700.00

NILAI HSPK : 189,270.00

25.07.03.17 PEMASANGAN PIPA AIR KOTOR DIA 5" M


Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.04.01.035 Pipa PVC Class C dia. 5" 1.100000 Lonjor 57,000.00 62,700.00
07.01.05.01.03.004 Lem PVC 0.650000 Buah 25,000.00 16,250.00
Jumlah : 78,950.00

NILAI HSPK : 198,520.00

25.07.03.18 PEMASANGAN PIPA AIR KOTOR DIA 6" M

132
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.04.01.036 Pipa PVC Class C dia. 6" 1.100000 Lonjor 62,000.00 68,200.00
07.01.05.01.03.004 Lem PVC 0.800000 Buah 25,000.00 20,000.00
Jumlah : 88,200.00

NILAI HSPK : 207,770.00

25.07.03.19 PEMASANGAN CRAN AIR EX IMPORT BUAH


Upah
08.01.01.01.01.008 Kepala Tukang Pipa 0.030000 OH 140,000.00 4,200.00
08.01.01.01.03.011 Tukang Pasang Pipa 0.150000 OH 170,000.00 25,500.00
Jumlah : 29,700.00
Bahan/Material
07.01.01.01.31.013 Kran Air 3/4 dim 1.000000 Buah 94,000.00 94,000.00
07.01.05.01.03.010 Rol TBA 1.000000 Roll 18,000.00 18,000.00
Jumlah : 112,000.00

NILAI HSPK : 141,700.00


25.07.03.20 PEMASANGAN CRAN AIR LOKAL BUAH
Upah
08.01.01.01.01.008 Kepala Tukang Pipa 0.030000 OH 140,000.00 4,200.00
08.01.01.01.03.011 Tukang Pasang Pipa 0.150000 OH 170,000.00 25,500.00
Jumlah : 29,700.00
Bahan/Material
07.01.01.01.31.013 Kran Air 3/4 dim 1.000000 Buah 94,000.00 94,000.00
07.01.05.01.03.010 Rol TBA 1.000000 Roll 18,000.00 18,000.00
Jumlah : 112,000.00

NILAI HSPK : 141,700.00

25.07.03.21 KLOSET JONGKOK PORSELEN BUAH


Upah
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000.00 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000.00 195,000.00
Jumlah : 216,000.00

Bahan/Material
07.01.01.01.46.003 Kloset Jongkok Porselen 1.000000 Buah 392,000.00 392,000.00
Jumlah : 100,000.00

NILAI HSPK : 316,000.00

25.07.03.22 KLOSET DUDUK PORSELEN BUAH

133
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Upah
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000.00 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000.00 195,000.00
Jumlah : 216,000.00
Bahan/Material
07.01.01.01.46.001 Kloset Jongkok 1.000000 Buah 300,000.00 300,000.00
Jumlah : 300,000.00

NILAI HSPK : 516,000.00

25.07.03.23 PEMASANAN WASTAFEL BESAR WARNA BUAH


Upah
08.01.01.01.01.001 Mandor 0.100000 OH 180,000.00 18,000.00
08.01.01.01.01.008 Kepala Tukang Pipa 0.150000 OH 140,000.00 21,000.00
08.01.01.01.03.011 Tukang Pasang Pipa 1.450000 OH 170,000.00 246,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.200000 OH 110,000.00 132,000.00
Jumlah : 417,500.00
Bahan/Material
07.01.01.01.46.005 Wastafel Besar Warna 1.000000 Buah 185,000.00 185,000.00
07.01.01.01.31.013 Kran Air 3/4 dim 1.000000 Buah 94,000.00 94,000.00
07.01.01.01.46.006 Pipa/Slang Spiral 1.000000 Fit 19,000.00 19,000.00
07.01.01.01.28.003 Keni 1D 1.000000 Buah 5,000.00 5,000.00
07.01.01.01.46.007 Sifon Wasel 1.000000 Set 141,000.00 141,000.00
07.01.05.01.03.010 Rol TBA 1.000000 Roll 18,000.00 18,000.00
07.01.01.01.46.008 Wafermor 1.000000 Buah 16,000.00 16,000.00
Jumlah : 478,000.00

NILAI HSPK : 895,500.00

25.07.03.24 PEMASANGAN LUBANG DRAINASE BUAH


Upah
08.01.01.01.01.001 Mandor 0.002500 OH 180,000.00 450.00
08.01.01.01.01.003 Kepala Tukang Batu 0.003000 OH 140,000.00 420.00
08.01.01.01.03.001 Tukang Batu 0.030000 OH 130,000.00 3,900.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000.00 6,600.00
Jumlah : 11,370.00
Bahan/Material
07.01.01.01.20.001 ljuk 0.050000 Kg 15,000.00 750.00
07.01.05.04.01.031 Pipa PVC Class C dia. 2" 0.500000 Lonjor 25,000.00 12,500.00
Jumlah : 13,250.00

NILAI HSPK : 24,620.00

25.07.03.25 PEMBERSIHAN LUBANG KEDALAMAN S/D 1M M2


Upah

134
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

08.01.01.01.01.001 Mandor 0.008000 OH 180,000.00 1,440.00


08.01.01.01.02.025 Pekerja Terampil 0.050000 OH 130,000.00 6,500.00
Jumlah : 7,940.00

NILAI HSPK : 7,940.00

25.07.03.26 ANGKUTAN PEMBERSIHAN SALURAN M3


Upah
08.01.01.01.01.001 Mandor 0.008000 OH 180,000.00 1,440.00
08.01.01.01.02.025 Pekerja Terampil 0.830000 OH 130,000.00 107,900.00
Jumlah : 109,340.00
Sewa Peralatan
08.01.04.03.01.041 Dump Truk 3-4 ton 0.020000 jam 200,000.00 4,000.00
Jumlah : 4,000.00

NILAI HSPK : 113,340.00

25.07.03.27 PENGERUKAN LUMPUR(GORONG2) M3


Upah
08.01.01.01.01.001 Mandor 0.050000 OH 180,000.00 9,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.500000 OH 110,000.00 165,000.00
Jumlah : 174,000.00

NILAI HSPK : 174,000.00

25.07.03.28 GALIAN DRAINASE M3


Upah
08.01.01.01.01.001 Mandor 0.025000 OH 180,000.00 4,500.00
08.01.01.01.02.025 Pekerja Terampil 0.750000 OH 130,000.00 97,500.00
Jumlah : 102,000.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500.00 500.00
Jumlah : 500.00

NILAI HSPK : 102,500.00

25.07.03.29 DRAINASE POROUS M3


Upah
08.01.01.01.01.001 Mandor 0.012500 OH 180,000.00 2,250.00
08.01.01.01.02.025 Pekerja Terampil 0.375000 OH 130,000.00 48,750.00
Jumlah : 51,000.00
Bahan/Material
07.01.01.01.04.008 Tasirtu/sirtu 1.200000 m3 89,000.00 106,800.00

135
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Jumlah : 106,800.00

NILAI HSPK : 157,800.00

25.07.03.30 PEMASANGAN INSTALASI AIR BERSIH M


Upah
08.01.01.01.02.025 Pekerja Terampil 1.000000 OH 130,000.00 130,000.00
08.01.01.01.03.011 Tukang Pasang Pipa 0.100000 OH 170,000.00 17,000.00
Jumlah : 147,000.00
Bahan/Material
07.01.01.01.46.006 Pipa/Slang Spiral 1.000000 40 m 19,000.00 19,000.00
07.01.05.04.01.050 Pipa PVC" Dia.3/4 " Class AW 1.000000 Lonjor 29,000.00 29,000.00
Jumlah : 48,000.00

NILAI HSPK : 195,000.00

25.07.03.31 PEMASANGAN INSTALASI AIR KOTOR M


Upah
08.01.01.01.02.025 Pekerja Terampil 1.000000 OH 130,000.00 130,000.00
08.01.01.01.03.011 Tukang Pasang Pipa 0.100000 OH 170,000.00 17,000.00
Jumlah : 147,000.00
Bahan/Material
07.01.05.04.01.047 Pipa PVC dia. 4" 0.250000 Lonjor 268,000.00 67,000.00
Jumlah : 67,000.00

NILAI HSPK : 214,000.00

25.07.03.32 PEMASANGAN SEPTI TANK BIOFILTER UNIT


Upah
08.01.01.01.01.011 Kepala Tukang Kayu 0.013700 OH 140,000.00 1,918.00
08.01.01.01.01.001 Mandor 0.042000 OH 180,000.00 7,560.00
08.01.01.01.02.025 Pekerja Terampil 0.340000 OH 130,000.00 44,200.00
08.01.01.01.03.001 Tukang Batu 0.130000 OH 130,000.00 16,900.00
08.01.01.01.03.011 Tukang Pasang Pipa 0.100000 OH 170,000.00 17,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.750000 OH 110,000.00 82,500.00
Jumlah : 170,078.00
Bahan/Material
07.01.01.01.02.002 Semen 40 Kg 0.280000 Zak 55,000.00 15,400.00
07.01.01.01.07.018 Seng Datar BJLS 0,17 Uk (0 90 x 1 1 1) 1.000000 Lembar 36,000.00 36,000.00
07.01.01.01.46.013 Septic Tank Biofil BF-08 kapasitas 8-12 orang 1.000000 Unit 14,960,000.00 14,960,000.00
07.01.01.01.04.002 Pasir Pasang / plester 0.042000 m3 451,000.00 18,942.00
07.01.05.04.01.047 Pipa PVC dia. 4" 0.250000 Lonjor 268,000.00 67,000.00
Jumlah : 15,097,342.00

136
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

NILAI HSPK : 15,267,420.00

25.07.04 PAGAR
25.07.04.01 PEMASANGAN PAGAR MODEL BRC/PMG A M2
Upah
08.01.01.01.03.002 Tukang Besi 1.050000 OH 130,000.00 136,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.050000 OH 110,000.00 115,500.00
Jumlah : 252,000.00
Bahan/Material
Pagar BRC diameter 6 mm, panjang 240 cm,
07.01.01.01.40.002 tinggi 90 cm 0.364000 Batang 129,000.00 46,956.00
Jumlah : 46,956.00

NILAI HSPK : 298,956.00

25.07.04.02 PEMASANGAN PAGAR MODEL PMG 2" TINGGI 1.5M BTG


Upah
08.01.01.01.03.002 Tukang Besi 0.500000 OH 130,000.00 65,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.500000 OH 110,000.00 55,000.00
Jumlah : 120,000.00
Bahan/Material
Pagar BRC diameter 6 mm, panjang 240 cm,
07.01.01.01.40.003 tinggi 120 cm 0.291000 M2 280,000.00 81,480.00
Jumlah : 81,480.00

NILAI HSPK : 201,480.00

25.07.04.03 PEMASANGAN PINTU SWING GANDA TYPE BRC/PMG UK (I,2 X3) M UNIT
Upah
08.01.01.01.03.002 Tukang Besi 1.050000 OH 130,000.00 136,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.050000 OH 110,000.00 115,500.00
Jumlah : 252,000.00
Bahan/Material
07.01.01.01.46.009 Pintu Swing Ganda BRC/PMG Uk! 1 2x3 00 m2 0.291600 Unit 1,962,000.00 572,119.20
Jumlah : 572,119.20

NILAI HSPK : 824,119.20

PEMASANGAN PINTU DORONG TYPE BRC/PMG UK ( 1,2


25.07.04.04 X3)M UNIT
Upah
08.01.01.01.03.002 Tukang Besi 0.017000 OH 130,000.00 2,210.00
08.01.01.01.03.001 Tukang Batu 1.050000 OH 130,000.00 136,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.050000 OH 110,000.00 115,500.00
Jumlah : 254,210.00
Bahan/Material
07.01.01.01.46.009 Pintu Swing Ganda BRC/PMG Uk! 1 2x3 00 m2 0.291600 Unit 1,962,000.00 572,119.20

137
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Jumlah : 572,119.20

NILAI HSPK : 826,329.20

25.07.05 PIPA
PEMASANGAN PIPA GALVANISH
25.07.05.01 TERMASUK ELEKTRODE M
Upah
08.01.01.01.01.001 Mandor 0.002000 OH 180,000.00 360.00
08.01.01.01.03.002 Tukang Besi 0.060000 OH 130,000.00 7,800.00
08.01.01.01.02.025 Pekerja Terampil 0.028000 OH 130,000.00 3,640.00
Jumlah : 11,800.00
Bahan/Material
07.01.01.01.17.002 Elektroda Baja 0.006000 Kg 15,500.00 93.00
Jumlah : 93.00
Sewa Peralatan
08.01.04.03.01.069 Welding Set 0.021000 jam 100,000.00 2,100.00
Jumlah : 2,100.00

NILAI HSPK : 13,993.00


25.07.05.02 PEKERJAAN BESI PIPA GALVANISH 1/2" (MEDIUM) M
Upah
25.07.05.11 Ongkos Pemasangan Pipa 1.962500 M 11,800.00 13,168.37
Jumlah : 13,168.37
Bahan/Material
07.01.05.01.01.001 Besi Pipa Galvanish Medium Diameter 1/2" 1.000000 M1 57,000.00 57,000.00
Jumlah : 57,000.00

NILAI HSPK : 70,168.37

25.07.05.03 PEKERJAAN BESI PIPA GALVANISH 3/4" (MEDIUM) M


Upah
25.07.05.11 Ongkos Pemasangan Pipa 1.000000 M 11,800.00 11,800.00
Jumlah : 11,800.00
Bahan/Material
07.01.05.01.01.002 Besi Pipa Galvanish Medium Diameter 3/4" 1.000000 M1 71,000.00 71,000.00
Jumlah : 71,000.00

NILAI HSPK : 39,710.00

25.07.05.04 PEKERJAAN BESI PIPA GALVANISH 1" (MEDIUM) M


Upah
25.07.05.11 Ongkos Pemasangan Pipa 1.471900 M 11,800.00 17,368.42
Jumlah : 17,368.42
Bahan/Material
07.01.05.01.01.003 Besi Pipa Galvanish Medium Diameter 1" 1.000000 M1 80,000.00 80,000.00

138
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Jumlah : 80,000.00

NILAI HSPK : 46,876.45

25.07.05.05 PEKERJAAN BESI PIPA GALVANISH 2" (MEDIUM) M


Upah
25.07.05.11 Ongkos Pemasangan Pipa 2.943800 M 11,800.00 34,736.84
Jumlah : 34,736.84
Bahan/Material
07.01.05.01.01.006 Besi Pipa Galvanish Medium Diameter 2" 1.000000 M1 122,000.00 122,000.00
Jumlah : 122,000.00

NILAI HSPK : 88,752.90

25.07.05.06 PEKERJAAN BESI PIPA GALVANISH 2 1/2" (MEDIUM) M


Upah
25.07.05.11 Ongkos Pemasangan Pipa 3.140000 M 11,800.00 37,052.00
Jumlah : 37,052.00
Bahan/Material
07.01.05.01.01.007 Besi Pipa Galvanish Medium Diameter 2 1/2" 1.000000 M1 148,000.00 148,000.00
Jumlah : 148,000.00

NILAI HSPK : 91,069.40

25.07.05.07 PEKERJAAN BESI PIPA GALVANISH 3" (MEDIUM) M


Upah
25.07.05.11 Ongkos Pemasangan Pipa 3.270800 M 11,800.00 38,595.44
Jumlah : 38,595.44
Bahan/Material
07.01.05.01.01.008 Besi Pipa Galvanish Medium Diameter 3" 1.000000 M1 206,000.00 95,000.00
Jumlah : 95,000.00

NILAI HSPK : 116,947.07

25.07.05.08 PEKERJAAN BESI PIPA GALVANISH 4" (MEDIUM) M


Upah
25.07.05.11 Ongkos Pemasangan Pipa M 11,800.00 39,505.80
Jumlah : 39,505.80
Bahan/Material
07.01.05.01.01.009 Besi Pipa Galvanish Medium Diameter 4" 1.000000 M1 298,000.00 298,000.00
Jumlah : 170,000.00

NILAI HSPK : 209,505.80

25.07.05.09 PEKERJAAN BESI PIPA GALVANISH 5" (MEDIUM) M

139
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)

Upah
25.07.05.11 Ongkos Pemasangan Pipa 6.280000 M 11,800.00 42,138.80
Jumlah : 42,138.80
Bahan/Material
07.01.05.01.01.010 Besi Pipa Galvanish Medium Diameter 5" 1.000000 M1 371,000.00 371,000.00
Jumlah : 371,000.00

NILAI HSPK : 42,138.80

25.07.05.10 PEKERJAAN BESI PIPA GALVANISH 1 1/4" (MEDIUM) M


Upah
25.07.05.11 Ongkos Pemasangan Pipa 3.140000 M 11,800.00 37,052.00
Jumlah : 37,052.00
Bahan/Material
07.01.05.01.01.004 Besi Pipa Galvanish Medium Diameter 1 1/4" 1.000000 M1 87,000.00 87,000.00
Jumlah : 87,000.00

NILAI HSPK : 124,052.00

25.07.05.11 OGNKOS PEMASANGAN PIPA M

Upah

08.01.01.01.01.001 Mandor 0.002000 OH 180,000.00 360.00

08.01.01.01.03.002 Tukang Besi 0.060000 OH 130,000.00 7,800.00

08.01.01.01.02.025 Pekerja Terampil 0.028000 OH 130,000.00 3,640.00

Jumlah : 11,800.00

NILAI HSPK 11,800.00

140