B. HARGA BAHAN
A
Alat Potong
1 - Potong Keramik m2
1 - Grinda m2
Scafolding
1 - Frame + Cross set
1 - Uhead m2
1 - Jack base m2
1 - Roda 8" m2
1 - Roda 6" m2
Concrete Pump
1 - uk besar ls
Harga Satuan 230.00
7,451.00
7,451.00
7,451.00
7,451.00
7,451.00
7,451.00
RESUME BQ
PROYEK : COSTARINA
TYPE : BUTLERS HOUSE
AMOUNT 403,736,766.0903
Harga Satuan
(Rp.)
160,000.00
160,000.00
160,000.00
160,000.00
160,000.00
160,000.00
180,000.00
130,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00 3800000
150,000.00
160,000.00 126666.6667
HARGA SATUAN BAHAN BANGUNAN
B. HARGA BAHAN
No. Bahan/Material
Batu
1 Bata Merah kecil
1 Bata Merah Besar
2 Bata Ringan tebal 7 cm
2 Bata Ringan tebal 10 cm
3 - Kerikil / koral beton
Semen
1 - Semen PC 50 kg
2 - Semen PC 50 kg
2 - Semen PC 40 kg
2 - Semen PC 40 kg
3 - Semen warna
4 Mortar Siap pakai
4 Mortar Mix 50 kg (MU-302), 4,35m2 / sak 50kg /10mm
B Bahan Langit-langit
1 Gypsum 9 mm
2 Rangka eka puring
3 Stoping 20 kg
4 Cornice gypsum uk. 7cm x 7cm
5 Plafond PVC Tebal 7 mm
6 Listplank tekstur kayu tebal 8mm
7 Joint tape
8 Cemen Board 9 mm
9 Dinabolt
10 Alumunium 1''x1''
11 Silent
12 Papan listplank GRC tebal 9 mm
13 Seng Partisi
13 Sckup
Seng Gypsum
Partisi
C Bahan Besi
1 C Baja Ringan
2 V baja Ringan
3 Besi hollow 2"x2"x2,3 mm
4 Besi hollow 1"x1"x1,6 mm
5 Besi hollow 1"x1,5"x1,6 mm
6 Pagar BRC 90 x 240
7 Pagar BRC 120 x 240
8 Baja tulangan wiremesh A 8 - 200
9 BSP Ø 2" Bahan Stainlees Steel 304 t. 1.2 mm
10 6mm
C Baja Ringan
11 8mm
V baja Ringan
12 10mm
C Baja Ringan
13 12mm
V baja Ringan
14 16mm
V baja Ringan
15 Kawat
V bajaIkat
Ringan
16 Hollow 1 1/2 x 2mm
17 Hollow 3/4 x 2mm
18 Dinabolt 10mm
19 besi Plat 2mm
D Bahan Paku
1 Paku Kayu 2" - 5"
2 Paku spandek
4 Sekrup 1"
5 Paku ramset hilti
6 scrup rangka baja ringan
7 Sekrup 1"
8 Screw ( Baut )
F Bahan Finishing
1 Pek. Cat dinding Interior (Jotun Premium)
2 Pek. Cat dinding Exterior (Jotun Premium)
1 Pek. Sealer dinding Interior (Jotun Premium)
2 Pek. Sealer dinding Exterior (Jotun Premium)
3 Cat Plafond
4 Minyak bekisting
5 Plamir
Minyak Bekisting
6 Ampelas
Cat meni
7 Kuas/roll
Thiner
8 Cat Dasar ( Sealer )
9 Cat meni kayu
10 Cat minyak
11 Dempul kayu
12 Minyak cat
13 Tiner
13 Varnish Mowilex (Daya seber 6m2 / ltr)
F Anti Bocor
1 Sika Top 107 Bubuk (20 kg)
2 Sika Top 107 Cair (5 kg = 7,2 ltr)
G Bahan Lantai
1 Keramik 60 x 60 cm homogeneus kelas 1
2 Keramik polos 30 x 30 cm
3 Plint keramik 10 x 60 cm
4 Keramik 30 x 60 cm
5 Keramik 30 x 30 cm ( un polish )
G Bahan Dinding
4 Keramik 30 x 60 cm
4 Batu Alam Marmo Putih MCE 10x20
I Bahan Kayu
1 Kayu
Plint Rangka
keramik/10
Kaso
x 60 cm setara roman
2 Triplex
Plint keramik
9mm (1,2x2,4)
10 x 60 cm setara roman
K Keramik
1 uk.
Plint
60x60
keramik 10 x 60 cm setara roman
1 uk.
Plint
30x30
keramik 10 x 60 cm setara roman
1 uk.
Plint
30x60
keramik 10 x 60 cm setara roman
K Pintu
1 Pintu
PintuPanel
Panel
2 Pintu
PintuDouble
Panel Tripleks
3 Pintu
PintuPVC
Panel
4 Kusen
Plint keramik
Kayu 10 x 60 cm setara roman
5 Kusen
Plint keramik
Aluminium
10 x 60 cm setara roman
10 Engsel
Plint keramik
Pintu 4"10 x 60 cm setara roman
11 Kunci
Plint keramik
Engkol 10 x 60 cm setara roman
12 Kunci
Plint keramik
Bulat 10 x 60 cm setara roman
K Jendela
1 Jendela
Pintu Panel
uk 1.35 x 1.34 (Slide)
2 Jendela
Pintu Panel
uk 1.35 x 1.12 (Slide)
3 Jendela
Pintu Panel
uk 1.35 x 1.02 (Slide)
4 Jendela
Plint keramik
uk 1.3510x x0,58
60 cm
(Slide)
setara roman
5 Jendela
Plint keramik
uk 0,975
10 x 0,50
60 cm(Slide)
setara roman
K Rolling Door
Rolling Door Alumunium uk. 320 x 328 (Tanpa Motor)
K Jendela
ACS KAMAR MANDI
1 Kloset
Pintu Duduk
Panel Merk Toto CW637J
2 Wastfel
Pintu Panel
Toto LW 830 CJ
3 Hand
PintuShower
Panel
4 Floor
Plint Drain
keramik
Plastik
10 x 60 cm setara roman
5 Kran
PlintAir
keramik
PVC 10 x 60 cm setara roman
6 Kitchen Sink Inobe 6045 uk. 60 x 45
K Jendela
Jaringan Air Kotor & Air Bersih
1 PVC
PintuWavin
Panel3/4"
2 Elbow
Pintu 3/4"
Panel
3 Tee
Pintu
3/4"
Panel
4 PVC
PlintWavin
keramik
3" 10 x 60 cm setara roman
5 Elbow
Plint keramik
3" 10 x 60 cm setara roman
6 Tee 3"
7 PVC Wavin 4"
8 Elbow 4"
9 Tee 4"
10 PVC Wavin 6"
10 Lem Pipa
Satuan Harga Satuan 230.00
- - -
m2 25,000.00 25,000.00 3,750.00
m1 1,800.00 1,800.00 270.00
zak 120,000.00 50,000.00 7,500.00
m' 5,000.00 7,000.00 1,050.00
m2 180,000.00 180,000.00 27,000.00
m' 20,000.00 25,146.00 3,771.90
m1 500.00 300.00 45.00
Lbr 170,000.00 200.00 178,200.00 26,730.00
bh 2,500.00 3,989.70 598.46
m' 9,000.00 9,959.40 1,493.91
botol 60,000.00 43,263.00 6,489.45
m' 20,000.00 18,562.50 2,784.38
m2 30,000.00 31,680.00 4,752.00
pc 500.00 300.00 45.00
- - -
- - -
btg 42,000.00 37,125.00 5,568.75
btg 27,000.00 27,225.00 4,083.75
m' 40,986.00 35,640.00 5,346.00
m' 13,662.00 11,880.00 1,782.00
m' 19,923.00 17,325.00 2,598.75
m' 177,890.00 154,687.50 23,203.13
m' 187,374.00 162,934.20 24,440.13
m2 50,367.00 43,797.60 6,569.64
m' 345,000.00 300,000.00 45,000.00
ton 12,650,000.00 11,000,000.00 1,650,000.00
ton 14,375,000.00 12,500,000.00 1,875,000.00
ton 13,570,000.00 11,800,000.00 1,770,000.00
ton 13,570,000.00 11,800,000.00 1,770,000.00
ton 13,570,000.00 11,800,000.00 1,770,000.00
kg 20,700.00 18,000.00 2,700.00
btg 97,750.00 85,000.00 12,750.00
btg 63,250.00 55,000.00 8,250.00
btg 1,725.00 1,500.00 225.00
m2 212,750.00 185,000.00 27,750.00
- - -
kg 25,000.00 20,000.00 3,000.00
bh 300.00 700.00 105.00
kotak 35,000.00 35,000.00 5,250.00
set 125,000.00 125,000.00 18,750.00
bh 100.00 200.00 30.00
bh 100.00 200.00 30.00
bh 100.00 300.00 45.00
- - -
- - -
kg 50,000.00 100,000.00 15,000.00
kg 65,000.00 72,500.00 157,000.00 23,550.00
kg 29,100.00 100,000.00 15,000.00
kg 30,900.00 72,500.00 157,000.00 23,550.00
kg 15,000.00 100,000.00 15,000.00
Ltr 9,000.00 8,000.00 1,200.00
kg 20,000.00 20,000.00 3,000.00
lbr 3,000.00 3,000.00 450.00
bh 20,000.00 20,000.00 3,000.00
kg 37,500.00 25,000.00 3,750.00
kg 40,000.00 35,000.00 5,250.00
kg 70,000.00 75,000.00 11,250.00
kg 25,000.00 25,000.00 3,750.00
kg 70,000.00 50,000.00 7,500.00
ltr 15,000.00 15,000.00 2,250.00
ltr 86,250.00 75,000.00 11,250.00
- - -
- - -
zak 201,250.00 175,000.00 26,250.00
ltr 27,951.00 72,500.00 24,305.56 3,645.83
- - -
m2 90,000.00 150,000.00 22,500.00
m2 70,000.00 75,000.00 11,250.00
m' 25,000.00 25,000.00 3,750.00
m2 125,000.00 135,000.00 20,250.00
m2 90,000.00 80,000.00 12,000.00
- 50,000.00 - -
- - -
m2 125,000.00 135,000.00 20,250.00
m2 184,000.00 160,000.00 24,000.00
- - -
m2 60,000.00 1.43 70,000.00 10,500.00
m' 40,000.00 57,142.86 41,000.00 6,150.00
m2 150,000.00 106,000.00 15,900.00
bh 900,000.00 900,000.00 135,000.00
- -
ton 3,680,000.00 3,200,000.00 480,000.00
lbr 150,650.00 131,000.00 19,650.00
- - -
m3 1,209,000.00 1.43 930,000.00 279,000.00
m3 1,235,000.00 57,142.86 950,000.00 285,000.00
m3
m3 1,261,000.00 970,000.00 291,000.00
- - -
m3 143,750.00 1.43 125,000.00 18,750.00
m3 69,000.00 1.43 60,000.00 9,000.00
m3 161,000.00 1.43 140,000.00 21,000.00
- - -
unit 920,000.00 1.43 800,000.00 120,000.00
unit - 1.43 - -
set 460,000.00 1.43 400,000.00 60,000.00
unit - 1.43 - -
unit 80,000.00 1.43 80,000.00 12,000.00
set 7,980.00 1.43 7,000.00 980.00
pcs 136,800.00 1.43 120,000.00 18,000.00
pcs 159,600.00 1.43 - -
- - -
unit 1,288,000.00 1.43 1,120,000.00 168,000.00
unit 994,750.00 1.43 865,000.00 129,750.00
set 943,000.00 1.43 820,000.00 123,000.00
unit 575,000.00 1.43 500,000.00 75,000.00
unit 368,000.00 1.43 320,000.00 48,000.00
- - -
unit 977,500.00 850,000.00 127,500.00
- - -
unit 4,370,000.00 1.43 3,800,000.00 570,000.00
unit 2,070,000.00 1.43 1,800,000.00 270,000.00
unit 172,500.00 1.43 150,000.00 22,500.00
pcs 12,000.00 1.43 8,000.00 1,200.00
pcs 35,000.00 1.43 8,000.00 1,200.00
pcs 747,500.00 650,000.00 97,500.00
- - -
m1 8,970.00 1.43 7,800.00 1,170.00
pcs 4,600.00 1.43 4,000.00 600.00
pcs 5,750.00 1.43 5,000.00 750.00
m1 40,537.00 1.43 35,250.00 5,287.50
pcs 11,500.00 1.43 10,000.00 1,500.00
pcs 17,250.00 15,000.00 2,250.00
m1 63,738.00 55,425.00 8,313.75
pcs 17,250.00 15,000.00 2,250.00
pcs 20,700.00 18,000.00 2,700.00
m1 129,432.00 112,550.00 16,882.50
m1 201.00 175.00 26.25
175.00
279,285.71 279,285.00
- -
- -
598.00 598.00
2,012.50 2,012.00
12,650.00 12,650.00
17,250.00 17,250.00
558,571.43 558,571.00
- -
- -
69,000.00 69,000.00
1,380.00 1,380.00
56,350.00 56,350.00
1,380.00 1,380.00
14,375.00 14,375.00
4,312.50 4,312.00
103,500.00 103,500.00
- -
28,750.00 28,750.00
2,070.00 2,070.00 3.6
57,500.00 57,500.00 10000
8,050.00 8,050.00 2777.77777778
207,000.00 207,000.00 11111.1111111
28,917.90 28,917.00
345.00 345.00
204,930.00 204,930.00
4,588.16 4,588.00
11,453.31 11,453.00
49,752.45 49,752.00
21,346.88 21,346.00
36,432.00 36,432.00
345.00 345.00
- -
- -
42,693.75 42,693.00 2800000
31,308.75 31,308.00 80000
40,986.00 40,986.00 9523.80952381
13,662.00 13,662.00
19,923.75 19,923.00
177,890.63 177,890.00
187,374.33 187,374.00
50,367.24 50,367.00
345,000.00 345,000.00
12,650,000.00 12,650,000.00 2800000
14,375,000.00 14,375,000.00 80000
13,570,000.00 13,570,000.00 2800000
13,570,000.00 13,570,000.00 80000
13,570,000.00 13,570,000.00 2285.71428571
20,700.00 20,700.00 65.306122449
97,750.00 97,750.00
63,250.00 63,250.00
1,725.00 1,725.00
212,750.00 212,750.00
- -
23,000.00 23,000.00
805.00 805.00
40,250.00 40,250.00
143,750.00 143,750.00
230.00 230.00
230.00 230.00
345.00 345.00
- -
- -
115,000.00 115,000.00
180,550.00 180,550.00
115,000.00 115,000.00
180,550.00 180,550.00
115,000.00 115,000.00
9,200.00 9,200.00
23,000.00 23,000.00
3,450.00 3,450.00
23,000.00 23,000.00
28,750.00 28,750.00
40,250.00 40,250.00
86,250.00 86,250.00
28,750.00 28,750.00
57,500.00 57,500.00
17,250.00 17,250.00
86,250.00 86,250.00
- -
- -
201,250.00 201,250.00
27,951.39 27,951.00
- -
172,500.00 172,500.00
86,250.00 86,250.00
28,750.00 28,750.00
155,250.00 155,250.00
92,000.00 92,000.00
- -
- -
155,250.00 155,250.00
184,000.00 184,000.00
- -
80,500.00 80,500.00
47,150.00 47,150.00
121,900.00 121,900.00 168750
1,035,000.00 1,035,000.00
- -
3,680,000.00 3,680,000.00
150,650.00 150,650.00
- -
1,209,000.00 1,209,000.00
1,235,000.00 1,235,000.00
168750
1,261,000.00 1,261,000.00
- -
143,750.00 143,750.00
69,000.00 69,000.00
161,000.00 161,000.00
- -
920,000.00 920,000.00
- -
460,000.00 460,000.00
- -
92,000.00 92,000.00
7,980.00 7,980.00
138,000.00 138,000.00
- -
- -
1,288,000.00 1,288,000.00
994,750.00 994,750.00
943,000.00 943,000.00
575,000.00 575,000.00
368,000.00 368,000.00
- -
977,500.00 977,500.00
- -
4,370,000.00 4,370,000.00
2,070,000.00 2,070,000.00
172,500.00 172,500.00
9,200.00 9,200.00
9,200.00 9,200.00
747,500.00 747,500.00
- -
8,970.00 8,970.00
4,600.00 4,600.00
5,750.00 5,750.00
40,537.50 40,537.00
11,500.00 11,500.00
17,250.00 17,250.00
63,738.75 63,738.00
17,250.00 17,250.00
20,700.00 20,700.00
129,432.50 129,432.00
201.25 201.00
BILL OF QUANTITY
Pekerjaan Retaining Wall
a b c d e
A PEKERJAAN PONDASI
1 Bouwplank Kayu Meranti (Kaso & Papan) 135.50 m1
2 Galian Tanah Pondasi Tapak Menerus & Sloof Manual 202.50 m3
3 Urugan Tanah Kembali Bekas Galian - 153.90 m3
4 Urugan Pasir Bawah Pondasi Tapak & Sloof T = 2 cm - 13.55 m3
5 Lantai Kerja Bawah Pondasi Tapak & Sloof T = 3 cm Site Mix 1:3:5 8.13 m3
6 Pondasi Tapak Menerus
a. Beton Ready Mix K-300 81.30 m3
b. Bekisting Papan / Multiplek 68.75 m2
c. Pembesian D 16 mm - 15 cm & D 12 mm - 15 cm 12,701.77 kg
d. Sewa Concrete Pump - ls
B PEKERJAAN DINDING
1 Dinding Beton
a. Beton Ready Mix K-300 203.25 m3
b. Bekisting (3 x Pemakaian) Papan / Multiplek 1,626.00 m2
c. Pembesian D 12 mm - 15 cm 24,322.25 kg
d. Sewa Concrete Pump 3.00 kali
2 Water Proofing Sisi Luar Sikatop 107 Cair & Bubuk 813.00 m2
3 Resapan Air Pipa Wavin 3/4" (4 btg / m2) 813.00 m1
Harga Satuan Jumlah Harga Jumlah Total
Upah Bahan +Alat Bahan + Upah Jumlah Upah Jlh Bahan & Alat Bahan + Upah
Rp Rp Rp Rp Rp Rp
f g h(f+g) i(dxf) j(dxg) k(dxh)
10.00
22.48 8.82
S1 S2
S1 S2 B1 B2 B3
50.81
16.94
- -
4.07 67.50 S1 S2
203.25
- 203.25
#DIV/0! 1.35 0.90
0.24 1.35 0.90
10.80 74.40
9.60 65.60
8.40 59.20
2.16 21.60
20.16 146.40
7.00 36.60
BETON
- -
BETON
- -
- -
BILL OF QUANTITY
Butlers House Renovation Works Russia 33-36 Coastarina (Structure)
Harga Satuan Jumlah Harga Jumlah Total
No Uraian Pekerjaan Spesifikasi Bahan Volume Unit Upah Bahan +Alat Bahan + Upah Jumlah Upah Jlh Bahan & Alat Bahan + Upah
Rp Rp Rp Rp Rp Rp
a b c d e f g h(f+g) i(dxf) j(dxg) k(dxh)
C PEKERJAAN ARSITEKTUR
Pekerjaan Dinding
1 Dinding Kisi Kisi Aluminium Corridor 4.57 m2 - 1,500,000.00 1,500,000.00 - 6,851,250.00 6,851,250.00
2 Dinding Bata Ringan Bata Ringan Spesi 1pc : 3ps 325.30 m2 25,000.00 202,836.21 227,836.21 8,132,412.50 65,981,908.18 74,114,320.68
3 Plesteran & Acian Dinding Finishing Acian Mortar 514.16 m2 20,657.89 66,063.83 86,721.72 10,621,494.14 33,967,477.82 44,588,971.96
4 keramik Dinding K.Mandi Keramik 30x60 23.19 m2 55,849.06 179,333.33 235,182.39 1,295,167.55 4,158,829.67 5,453,997.21
5 Camprot Dinding 14.38 m2 20,657.89 22,777.78 43,435.67 297,143.16 327,635.56 624,778.71
6 Tali Air 8.04 m1 13,600.00 7,567.67 21,167.67 109,344.00 60,844.04 170,188.04
7 Cat Dinding Dalam 318.06 m2 19,200.00 19,775.00 38,975.00 6,106,694.40 6,289,577.18 12,396,271.58
8 Cat Dinding Luar 172.91 m2 19,200.00 23,975.00 43,175.00 3,319,948.80 4,145,613.15 7,465,561.95
9 Dinding Batu Alam 11.27 m2 55,849.06 212,261.90 268,110.96 629,477.51 2,392,414.54 3,021,892.05
30,511,682.06 124,175,550.12 154,687,232.18
Pekerjaan Canopy
1 Canopy Teras Sky light Rangka Hollow 100 x 50 mm Penutup Kaca 6+6 18.75 m2 - 2,500,000.00 2,500,000.00 - 46,875,000.00 46,875,000.00
2 Acian Kanopy Beton (Elv. 6.40) 16.67 m2 15,149.12 8,750.00 23,899.12 252,596.47 145,897.50 398,493.97
252,596.47 47,020,897.50 47,273,493.97
252,596.47 47,020,897.50 47,273,493.97
Pekerjaan Railing
1 Railing Tangga Rangka Hollow Finish Cat 7.79 m2 509,260.00 92,026.01 601,286.01 3,964,589.10 716,422.50 4,681,011.60
3,964,589.10 716,422.50 4,681,011.60
Pekerjaan Atap
1 Plafond Plafond Gypsum T=9mm, Rangka Ekafuring, Cat 68.10 m2 54,392.00 57,768.65 112,160.66 3,704,095.51 3,934,045.12 7,638,140.63
1 Waterproofing Dak Atap Sika Top seel 107 (cair + Bubuk) 67.05 m2 20,943.40 76,866.13 97,809.52 1,404,160.47 5,153,527.78 6,557,688.26
1 Atap Kaca Skylight Rangka Hollow 100 x 50 mm Penutup Kaca 6+6 5.94 m2 1,800,000.00 1,800,000.00 - 10,694,700.00 10,694,700.00
5,108,255.98 19,782,272.90 24,890,528.88
Pekerjaan Sanitair
1 Klosed Duduk Merk Toto 2.00 pcs 170,882.49 4,370,000.00 4,540,882.49 341,764.97 8,740,000.00 9,081,764.97
2 Wastafel 2.00 pcs 120,812.81 2,070,000.00 2,190,812.81 241,625.62 4,140,000.00 4,381,625.62
3 Shower 1.00 pcs 47,469.04 172,500.00 219,969.04 47,469.04 172,500.00 219,969.04
4 Floor Drain 2.00 pcs 5,250.00 12,000.00 17,250.00 10,500.00 24,000.00 34,500.00
5 kran air 1.00 pcs 5,250.00 35,000.00 40,250.00 5,250.00 35,000.00 40,250.00
6 Kitchen Sink 1.00 pcs 56,400.00 747,500.00 803,900.00 56,400.00 747,500.00 803,900.00
703,009.63 13,859,000.00 14,562,009.63
D PEKERJAAN MP / UTILITAS
PEKERJAAN JARINGAN PIPA
1 Jaringan Air Bersih PVC 3/4" Wavin, Elbow & Tee (Seri D) 63.60 m1 4,122.31 11,437.77 15,560.08 262,179.17 727,442.00 989,621.17
2 Jaringan Air Kotor & Air Hujan PVC 3" Wavin, Elbow & Tee (Seri D) 67.70 m1 6,870.26 44,995.64 51,865.90 465,116.40 3,046,204.90 3,511,321.30
3 Jaringan Air Kotor Induk PVC 6" Wavin, Elbow & Tee (Seri D) 15.10 m1 10,992.41 61,578.64 72,571.05 165,985.41 929,837.47 1,095,822.88
4 Jaringan Air Tinja PVC 4" Wavin, Elbow & Tee (Seri D) 27.20 m1 6,870.26 68,282.12 75,152.37 186,870.99 1,857,273.60 2,044,144.59
1,080,151.98 6,560,757.97 7,640,909.94
PEKERJAAN BAK KONTROL 70x70x70 (6 unit)
1 Lantai Rabat Tebal 10cm site Mix 0.29 m3 270,400.00 717,724.63 988,124.63 79,497.60 211,011.04 290,508.64
2 Dinding 1/2 Bata site Mix 10.29 m3 35,171.57 60,333.33 95,504.90 361,915.44 620,830.00 982,745.44
3 Plester Papan / Multiplek 20.58 m2 16,526.32 24,444.44 40,970.76 340,111.58 503,066.67 843,178.25
4 Tutup Beton Tebal 8cm D10 - 20CM 1 Lapis
a. Beton 0.24 m3 270,400.00 717,724.63 988,124.63 63,598.08 168,808.83 232,406.91
b. Pembesian 21.07 kg 2,500.00 13,659.35 16,159.35 52,677.97 287,818.79 340,496.76
c. bekisting 4.28 m2 15,358.49 74,501.70 89,860.20 65,795.77 319,165.30 384,961.08
963,596.44 2,110,700.64 3,074,297.08
PEKERJAAN SEPTIKTANK
1 Lantai Kerja Pasir 0.04 m3 - 170,000.00 170,000.00 - 6,732.00 6,732.00
2 Rabat Beton Lantai Rabat Beton 1Pc : 3Psr : 5Krl 0.13 m3 270,400.00 717,724.63 988,124.63 36,017.28 95,600.92 131,618.20
3 Dinding Bata Merah 1/2 bata Bata Merah kecil Spesi 1pc : 3ps 10.95 m2 35,171.57 60,333.33 95,504.90 385,128.68 660,650.00 1,045,778.68
5 Tutup Beton
a. Beton Site Mix 1Pc : 2Psr : 3Krl 0.13 m3 270,400.00 717,724.63 988,124.63 35,422.40 94,021.93 129,444.33
b. Bekisting Papan / Multiplek 1.31 m2 15,358.49 74,501.70 89,860.20 20,119.62 97,597.23 117,716.86
c. Pembesian - 6.81 kg 2,500.00 13,659.35 16,159.35 17,030.00 93,047.52 110,077.52
6 Plesteran 21.90 m2 16,526.32 24,444.44 40,970.76 361,926.32 535,333.33 897,259.65
855,644.29 1,582,982.93 2,438,627.23
1 PEMBUATAN BOUWPLANK/M1 M1
Upah
Mandor 0.001285 OH 180,000.00 231.31
Kepala Tukang Kayu 0.001285 OH 160,000.00 205.61
Tukang Kayu 0.025701 OH 150,000.00 3,855.14
Pekerja Tak Terampil 0.025701 OH 130,000.00 3,341.12
Jumlah : 7,633.18
Bahan/Material
Kayu 2/2 0.000334 ton 3,680,000.00 1,227.34
Kayu 1/2 0.000727 ton 3,680,000.00 2,675.60
Paku Campuran 2" s/d 3" 0.000727 Kg 25,000.00 18.18
Jumlah : 3,921.12
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 11,554.30
2 PENGALIAN TANAH M3
Upah
Mandor 0.007000 OH 180,000.00 1,260.00
Pekerja Tak Terampil 0.226000 OH 130,000.00 29,380.00
Jumlah : 30,640.00
Bahan/Material
Jumlah : 0.00
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 30,640.00
Bahan/Material
Jumlah : 0.00
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 25,509.00
4 PENGURUKAN PASIR M3
Upah
Mandor 0.006300 OH 180,000.00 1,134.00
Pekerja Terampil 0.187500 OH 130,000.00 24,375.00
Jumlah : 25,509.00
Bahan/Material
Pasir/Tanah Urug/Tanah 1.000000 m3 250,000.00 250,000.00
Jumlah : 250,000.00
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 275,509.00
Jumlah : 270,400.00
Bahan/Material
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 988,124.63
Sewa Peralatan
Concrete Pump 1.000000 ls 3,250,000.00 3,250,000.00
Jumlah : 3,250,000.00
NILAI HSPK : 4,635,041.45
B BEKISTING M2
Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
OH
Pekerja Tak Terampil 0.069182 130,000.00 8,993.71
OH
Kepala Tukang Kayu 0.003459 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.023333 ton 3,680,000.00 85,866.67
kg
Paku campuran 0.029040 25,000.00 726.01
Jumlah : 138,901.70
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 154,260.20
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 4,805,871.65
7 PEKERJAAN PEDESTAL M2
BEKISTING
Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 154,260.20
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 1,385,041.45
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,555,871.65
8 PEKERJAAN SLOPE M2
BEKISTING
Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 154,260.20
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 1,385,041.45
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,555,871.65
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.016475 ton 3,680,000.00 60,628.43
kayu 2/3 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 213,996.66
Jumlah : 0.00
NILAI HSPK : 1,385,041.45
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,615,608.11
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.016475 ton 3,680,000.00 60,628.43
kayu 2/4 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 213,996.66
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 1,385,041.45
Jumlah : 0.00
NILAI HSPK : 14,070.00
TOTAL HSPK (A+B+C) : 1,613,108.11
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 1,385,041.45
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 154,260.20
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,555,871.65
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.016475 ton 3,680,000.00 60,628.43
kayu 2/4 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 213,996.66
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 1,385,041.45
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,615,608.11
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/2 0.016475 ton 3,680,000.00 60,628.43
kayu 2/3 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 213,996.66
Jumlah : 0.00
NILAI HSPK : 1,385,041.45
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,615,608.11
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.016475 ton 3,680,000.00 60,628.43
kayu 2/4 0.022256 ton 3,680,000.00 81,903.00
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 195,566.47
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 213,996.66
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 1,385,041.45
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,615,608.11
Bahan/Material
Sewa Peralatan
Congcrete Pump 1.000000 ls 3,250,000.00 3,250,000.00
Jumlah : 3,250,000.00
NILAI HSPK : 4,635,041.45
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 4,899,951.19
Sewa Peralatan
Congcrete Pump 1.000000 ls 3,250,000.00 3,250,000.00
Jumlah : 3,250,000.00
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : #REF!
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.017647 ton 3,680,000.00 64,941.18
kayu 2/4 0.011667 ton 3,680,000.00 42,933.33
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 160,909.55
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 179,339.74
Jumlah : 270,400.00
Bahan/Material
Batu Pecah 0.555556 M3 558,571.00 310,317.22
Semen 40 kg (Holcim) 5.787037 zak 56,000.00 324,074.07
Pasir Beton / cor 0.333333 m3 250,000.00 83,333.33
Jumlah : 717,724.63
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 988,124.63
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,184,034.37
Bahan/Material
Jumlah : 717,724.63
Sewa Peralatan
Jumlah : 0.00
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70
Sewa Peralatan
Jumlah : 0.00
Sewa Peralatan
Jumlah : 0.00
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 157,331.89
Bahan/Material
Jumlah : 717,724.63
Sewa Peralatan
Jumlah : 0.00
Sewa Peralatan
Jumlah : 0.00
NILAI HSPK : 16,570.00
TOTAL HSPK (A+B+C) : 1,162,026.52
Bahan/Material
Jumlah : 717,724.63
Sewa Peralatan
Jumlah : 0.00
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 2/3 0.023333 ton 3,680,000.00 85,866.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 138,901.70
Sewa Peralatan
Jumlah : 0.00
Sewa Peralatan
Jumlah : 0.00
Jumlah : 40,560.00
Bahan/Material
PEKERJAAN ACIAN M2
Upah
Mandor 0.004825 OH 180,000.00 868.42
Kepala Tukang Batu 0.004825 OH 160,000.00 771.93
Tukang Batu 0.048246 OH 150,000.00 7,236.84
Pekerja Tak Terampil 0.048246 OH 130,000.00 6,271.93
Jumlah : 15,149.12
Bahan/Material
Jumlah : 8,750.00
Jumlah : 48,867.92
Bahan/Material
Jumlah : 166,666.67
Jumlah : 41,886.79
Bahan/Material
07.01.01.01.0 Keramik 30 x 30 1.000000 m2 69,000.00 69,000.00
Jumlah : 91,916.67
Jumlah : 57,400.00
Bahan/Material
Jumlah : 25,000.00
Bahan/Material
07.01.01.01.0 Mortar Mix 50 kg (MU-302), 4,35m2 / sak 50kg /10mm 22.988506 kg 2,070.00 47,586.21
Jumlah : 202,836.21
NILAI HSPK : 227,836.21
Upah
Jumlah : 35,171.57
Bahan/Material
Jumlah : 20,657.89
Bahan/Material
07.01.01.01.0 Mortar Mix 50 kg (MU-302), 2,35m2 / sak 50kg /10mm 31.914894 kg 2,070.00 66,063.83
Jumlah : 66,063.83
NILAI HSPK : 86,721.72
Jumlah : 55,849.06
Bahan/Material
Jumlah : 20,657.89
Bahan/Material
Jumlah : 13,600.00
Bahan/Material
Jumlah : 19,200.00
Bahan/Material
Jumlah : 19,200.00
Bahan/Material
Jumlah : 55,849.06
Bahan/Material
Varnish Mowilex (Daya seber 6m2 / ltr) 0.168254 liter 86,250.00 14,511.90
Jumlah : 212,261.90
NILAI HSPK : 268,110.96
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga
Jumlah : 136,548.77
Upah
Bahan/Material P2
07.01.01.01.2 Pintu Panel 1.000000 unit 920,000.00 920,000.00
07.01.01.01.2 Kusen Alumunium 1.000000 unit 80,000.00 80,000.00
07.01.01.01.3 Engsel Pintu 4" 3.000000 set 7,980.00 23,940.00
07.01.01.01.3 Handle Pintu Engkol 1.000000 set 136,800.00 136,800.00
Jumlah : 1,160,740.00
Bahan/Material P3
Jumlah : 1,160,740.00
Jumlah : 54,619.51
Bahan/Material P1
Jumlah : 460,000.00
Bahan/Material J1
07.01.01.01.2 Jendela uk 1.35 x 1.34 (Slide) 1.000000 unit 1,288,000.00 1,288,000.00
Jumlah : 1,288,000.00
Bahan/Material J2
07.01.01.01.2 Jendela uk 1.35 x 1.12 (Slide) 1.000000 unit 994,750.00 994,750.00
Jumlah : 994,750.00
Bahan/Material J3
07.01.01.01.2 Jendela uk 1.35 x 1.02 (Slide) 1.000000 unit 943,000.00 943,000.00
Jumlah : 943,000.00
Bahan/Material J4
07.01.01.01.2 Jendela uk 1.35 x 0,58 (Slide) 1.000000 unit 575,000.00 575,000.00
Jumlah : 575,000.00
Bahan/Material BV
07.01.01.01.2 Jendela uk 0,975 x 0,50 (Slide) 1.000000 unit 368,000.00 368,000.00
Jumlah : 368,000.00
Upah
Jumlah : 120,000.00
Bahan/Material P1
Rolling Door Alumunium uk. 320 x 328 (Tanpa Motor) 1.000000 m2 977,500.00 977,500.00
Jumlah : 977,500.00
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga
1 PEKERJAAN PLAFOND M2
Upah
Jumlah : 54,392.00
Bahan/Material P1
Jumlah : 20,943.40
Bahan/Material P1
07.01.01.01.2 Sika Top 107 Bubuk (20 kg) 0.312500 zak 201,250.00 62,890.63
07.01.01.01.2 Sika Top 107 Cair (5 kg = 7,2 ltr) 0.500000 ltr 27,951.00 13,975.50
Jumlah : 76,866.13
Nomor Uraian Kegiatan Koef Satuan Harga Satuan Harga
Jumlah : 170,882.49
Bahan/Material
07.01.01.01.2 Kloset Duduk Merk Toto CW637J 1.000000 unit 4,370,000.00 4,370,000.00
Jumlah : 4,370,000.00
Jumlah : 120,812.81
Bahan/Material
Jumlah : 47,469.04
Bahan/Material
Jumlah : 5,250.00
Bahan/Material
Jumlah : 5,250.00
Bahan/Material
Jumlah : 56,400.00
Bahan/Material
07.01.01.01.2 Kitchen Sink Inobe 6045 uk. 60 x 45 1.000000 pcs 747,500.00 747,500.00
Jumlah : 747,500.00
Jumlah : 509,260.00
Bahan/Material
Jumlah : 509,260.00
Kaca Temperet
Upah
Upah
Jumlah : 4,122.31
Upah
Jumlah : 4,122.31
Upah
Jumlah : 4,122.31
Upah
Jumlah : 4,122.31
Jumlah : 6,870.26
Upah
Upah
08.01.01.01.0 Mandor 0.001338 OH 180,000.00 240.88
08.01.01.01.0 Kepala Tukang 0.004406 OH 160,000.00 705.02
Tukang Las 0.044064 OH 150,000.00 6,609.55
08.01.01.01.0 Pekerja Tak Terampil 0.026438 OH 130,000.00 3,436.96
Jumlah : 10,992.41
Jumlah : 11,437.77
Bahan/Material
Jumlah : 717,724.63
Jumlah : 35,171.57
Bahan/Material
PEKERJAAN PLESTERAN M2
Upah
Jumlah : 16,526.32
Bahan/Material
Beton
Upah
Jumlah : 270,400.00
Bahan/Material
PEMBESIAN
Upah
Pekerja 0.008304 OH 130,000.00 1,079.55
Tukang Besi 0.008304 OH 150,000.00 1,245.63
Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
Besi Tulang D10 - 20CM 1.000000 kg 13,570.00 13,570.00
Kawat Beton 0.004317 kg 20,700.00 89.35
Jumlah : 13,659.35
BEKISTING
Upah
Tukang Kayu 0.034591 OH 150,000.00 5,188.68
Pekerja Tak Terampil 0.069182 OH 130,000.00 8,993.71
Kepala Tukang Kayu 0.003459 OH 160,000.00 553.46
Mandor 0.003459 OH 180,000.00 622.64
Jumlah : 15,358.49
Bahan/Material
Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 1/2 0.005833 ton 3,680,000.00 21,466.67
Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 74,501.70
Jumlah : 270,400.00
Bahan/Material
Bahan/Material
07.01.01.01.2 Triplex 9mm 0.347222 lbr 150,650.00 52,309.03
kayu 1/2 0.005833 ton 3,680,000.00 21,466.67
07.01.01.01.3 Paku campuran 0.029040 kg 25,000.00 726.01
Jumlah : 74,501.70
3 PEMBESIAN
Upah
08.01.01.01.0 Pekerja 0.008304 OH 130,000.00 1,079.55
08.01.01.01.0 Tukang Besi 0.008304 OH 150,000.00 1,245.63
08.01.01.01.0 Kepala Tukang Besi 0.000699 OH 160,000.00 111.89
08.01.01.01.0 Mandor 0.000350 OH 180,000.00 62.94
Jumlah : 2,500.00
Bahan/Material
07.01.01.01.1 Besi Tulang D10 - 20CM 1.000000 kg 13,570.00 13,570.00
07.01.01.01.2 Kawat Beton 0.004317 kg 20,700.00 89.35
Jumlah : 13,659.35
Jumlah : 16,526.32
Bahan/Material
Jumlah : 35,171.57
Bahan/Material
1 PASANG KABEL M1
Upah
Jumlah : 4,122.31
1 MCB M1
Upah
Jumlah : 40,000.00
1 STOP KONTAK M1
Upah
Jumlah : 40,000.00
1 SAKLAR HOTEL M1
Upah
Jumlah : 40,000.00
Upah
Jumlah : 40,000.00
Upah
Jumlah : 40,000.00
Jumlah : 10,000.00
Jumlah : 10,000.00
1 PASANG LAMPU TL M1
Upah
08.01.01.01.0 Mandor 0.002509 OH 150,000.00 376.38
08.01.01.01.0 Kepala Tukang 0.008262 OH 130,000.00 1,074.05
Tukang Las 0.082619 OH 110,000.00 9,088.13
08.01.01.01.0 Pekerja Tak Terampil 0.049572 OH 90,000.00 4,461.44
Jumlah : 15,000.00
1 M1
Upah
08.01.01.01.0 Mandor 0.001338 OH 150,000.00 200.73
08.01.01.01.0 Kepala Tukang 0.004406 OH 130,000.00 572.83
Tukang Las 0.044064 OH 110,000.00 4,847.00
08.01.01.01.0 Pekerja Tak Terampil 0.026438 OH 90,000.00 2,379.44
Jumlah : 8,000.00
Jumlah : 9,908.88
07.01.01.01.2 Elbow Kepala 2" & 3" 0.014771 pcs 10,000.00 147.71
Bahan/Material
Jumlah : 0.00
Bahan/Material
07.01.01.01.2 Triplex 9mm 0.347222 lbr 131,000.00 45,486.11
kayu 2/3 0.011870 ton 3,200,000.00 37,984.00
07.01.01.01.3 Paku campuran 0.029040 kg 15,000.00 435.61
Jumlah : 83,905.72
Jumlah : 191,250.00
Bahan/Material
Bahan/Material
07.01.01.01.2 Triplex 9mm 0.347222 lbr 131,000.00 45,486.11
kayu 2/3 0.011870 ton 3,200,000.00 37,984.00
07.01.01.01.3 Paku campuran 0.029040 kg 15,000.00 435.61
Jumlah : 83,905.72
3 PEMBESIAN
Upah
08.01.01.01.0 Pekerja 0.005390 OH 90,000.00 485.08
08.01.01.01.0 Tukang Besi 0.005390 OH 110,000.00 592.88
08.01.01.01.0 Kepala Tukang Besi 0.000454 OH 130,000.00 59.00
08.01.01.01.0 Mandor 0.000227 OH 150,000.00 34.04
Jumlah : 1,171.00
Bahan/Material
07.01.01.01.1 Besi Tulang D10 - 20CM 1.000000 kg 11,800.00 11,800.00
07.01.01.01.2 Kawat Beton 0.004317 kg 18,000.00 77.70
Jumlah : 11,877.70
1 PEKERJAAN PLESTERAN M2
Upah
Jumlah : 12,000.00
Bahan/Material
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
D PEKERJAAN DINDING
25.04 DINDING
25.04.01 DINDING DAN PLESTERAN
PEMASANGAN BATU MERAH 1PC:2PS TINGGI
25.04.01.01 S/D 2 M M3
Upah
08.01.01.01.01.001 Mandor 0.160000 OH 180,000 28,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.120000 OH 140,000 16,800.00
08.01.01.01.03.001 Tukang Batu 1.200000 OH 130,000 156,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 3.600000 OH 110,000 396,000.00
Jumlah : 597,600.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.331800 m3 451,000.00 149,641.80
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200.00 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 3.649300 Zak 55,000.00 200,711.50
Jumlah : 2,408,353.30
46
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:2PS TINGGI
25.04.01.04 2 S/D 5 M M2
Upah
08.01.01.01.01.001 Mandor 0.023600 OH 180,000 4,248.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015800 OH 140,000 2,212.00
08.01.01.01.03.001 Tukang Batu 0.015800 OH 130,000 2,054.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.472500 OH 110,000 51,975.00
Jumlah : 60,489.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.034800 m3 451,000 15,694.80
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.383200 Zak 55,000 21,076.00
Jumlah : 255,170.80
47
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:3PS TINGGI
25.04.01.07 2 S/D 5 M M3
Upah
08.01.01.01.01.001 Mandor 0.225000 OH 180,000 40,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000 195,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 4.500000 OH 110,000 495,000.00
Jumlah : 751,500.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.377000 m3 451,000 170,027.00
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
Jumlah : 2,979,527.00
48
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:4PS TINGGI
25.04.01.10 S/D 2 M M2
Upah
08.01.01.01.01.001 Mandor 0.016800 OH 180,000 3,024.00
08.01.01.01.01.003 Kepala Tukang Batu 0.012600 OH 140,000 1,764.00
08.01.01.01.03.001 Tukang Batu 0.126000 OH 130,000 16,380.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.378000 OH 110,000 41,580.00
Jumlah : 62,748.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.042500 m3 451,000 19,167.50
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
07.01.01.01.02.002 Semen 40 kg 0.233700 Zak 55,000 12,853.50
Jumlah : 250,421.00
49
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:5PS TINGGI
25.04.01.13 S/D 2 M M3
Upah
08.01.01.01.01.001 Mandor 0.160000 OH 180,000 28,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.120000 OH 140,000 16,800.00
08.01.01.01.03.001 Tukang Batu 1.200000 OH 130,000 156,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 3.600000 OH 110,000 396,000.00
Jumlah : 597,600.00
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.451500 m3 451,000 203,626.50
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 1.862200 Zak 55,000 102,421.00
Jumlah : 2,364,047.50
50
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:5PS TINGGI
25.04.01.16 2 S/D 5 M M2
Upah
08.01.01.01.01.001 Mandor 0.023600 OH 180,000 4,248.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015800 OH 140,000 2,212.00
08.01.01.01.03.001 Tukang Batu 0.157500 OH 130,000 20,475.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.472500 OH 110,000 51,975.00
Jumlah : 78,910.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.195500 Zak 55,000 10,752.50
07.01.01.01.04.002 Pasir Pasang / plester 0.047400 m3 451,000 21,377.40
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 52.000000 Buah 4,200 218,400.00
Jumlah : 250,529.90
51
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH 1PC:3KP:8PS
25.04.01.19 TINGGI 2 S/D 5 M M3
Upah
08.01.01.01.01.001 Mandor 0.225000 OH 180,000 40,500.00
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000 195,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 4.500000 OH 110,000 495,000.00
Jumlah : 751,500.00
Bahan/Material
07.01.01.02.03.001 Kapur Pasang 0.136000 m3 41,000 5,576.00
07.01.01.01.04.002 Pasir Pasang / plester 0.362700 m3 451,000 163,577.70
07.01.01.01.18.009 Batu Bata Merah Press Kelas 2 490.000000 Buah 4,200 2,058,000.00
07.01.01.01.02.002 Semen 40 kg 0.997400 Zak 55,000 54,857.00
Jumlah : 2,282,010.70
52
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMBONGKARAN DINDING TEMBOK DENGAN
25.04.01.22 PEMBERSIHAN M3
Upah
08.01.01.01.01.001 Mandor 0.050000 OH 180,000 9,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.000000 OH 110,000 110,000.00
Jumlah : 119,000.00
53
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
54
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
55
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PLESTERAN HALUS 1PC : 3KP : 8PS (T=1,5
25.04.01.32 CM) M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.040000 Zak 55,000 2,200.00
07.01.01.02.03.001 Kapur Pasang 0.006000 m3 41,000 246.00
07.01.01.01.04.002 Pasir Pasang / plester 0.014000 m3 451,000 6,314.00
Jumlah : 8,760.00
56
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PLESTERAN HALUS 1PC : 3KP : 5PS (T=1 CM)
25.04.01.35 <2M M2
Upah
08.01.01.01.01.001 Mandor 0.010000 OH 180,000 1,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.200000 OH 110,000 22,000.00
Jumlah : 45,400.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.046400 Zak 55,000 2,552.00
07.01.01.02.03.001 Kapur Pasang 0.006300 m3 41,000 258.30
07.01.01.01.04.002 Pasir Pasang / plester 0.010600 m3 451,000 4,780.60
Jumlah : 7,590.90
57
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.01.38 PASANG BENANGAN M
Upah
08.01.01.01.03.001 Tukang Batu 0.120000 OH 130,000 15,600.00
Jumlah : 15,600.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.003000 Zak 55,000 165.00
07.01.01.01.04.002 Pasir Pasang / plester 0.009000 m3 451,000 4,059.00
Jumlah : 19,824.00
58
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
59
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU MERAH TEBAL 1/2 BATA,
25.04.01.45 1PC:2PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00
Bahan/Material
07.01.01.01.18.006 Batu Bata Merah 80.000000 Pcs 2,100 168,000.00
07.01.01.01.02.012 Portland Cement 0.520000 zak 60,000 31,200.00
07.01.01.01.04.002 Pasir Pasang / plester 0.042000 m3 451,000 18,942.00
Jumlah : 218,142.00
60
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02 FINISHING DINDING
25.04.02.01 PEMASANGAN BATU KLINGKER M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.350000 OH 110,000 38,500.00
Jumlah : 63,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.125100 Zak 55,000 6,880.50
07.01.01.01.05.013 Batu Klingker 52.500000 Buah 5,000 262,500.00
07.01.01.01.04.002 Pasir Pasang / plester 0.011900 m3 451,000 5,366.90
Jumlah : 274,747.40
61
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU GILANG X JEMBER (A
25.04.02.04 SIMETRIS) M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.02.025 Pekerja Terampil 0.350000 OH 130,000 45,500.00
Jumlah : 70,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.250200 Zak 55,000 13,761.00
07.01.01.01.05.015 Batu Gilang Ex Jember 1.200000 m2 88,000 105,600.00
07.01.01.01.04.002 Pasir Pasang / plester 0.023800 m3 451,000 10,733.80
Jumlah : 130,094.80
62
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN BATU BOBOS UK( 10 X20 X 1.5
25.04.02.07 CM) M2
Upah
08.01.01.01.01.001 Mandor 0.017000 OH 180,000 3,060.00
08.01.01.01.01.003 Kepala Tukang Batu 0.015000 OH 140,000 2,100.00
08.01.01.01.03.001 Tukang Batu 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.350000 OH 110,000 38,500.00
Jumlah : 63,160.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.129600 Zak 55,000 7,128.00
07.01.01.01.04.002 Pasir Pasang / plester 0.023800 m3 451,000 10,733.80
07.01.01.01.05.017 Batu Bobos Uk 1 0 x 20 x 1 5 cm 1.000000 m2 114,000 114,000.00
Jumlah : 131,861.80
Bahan/Material
07.01.01.02.03.003 Kapur Gamping 0.000500 m3 288,000 144.00
Jumlah : 106.50
Bahan/Material
07.01.01.02.03.003 Kapur Gamping 0.000500 m3 288,000 144.00
Jumlah : 106.50
63
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PENGECATAN/PLAMUR TEMBOK DENGAN CAT
25.04.02.10 TEMBOK M2
Upah
08.01.01.01.01.001 Mandor 0.002500 OH 180,000 450.00
08.01.01.01.01.005 Kepala Tukang Cat 0.007500 OH 140,000 1,050.00
08.01.01.01.03.003 Tukang Cat 0.075000 OH 130,000 9,750.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000 5,500.00
Jumlah : 16,750.00
Bahan/Material
07.01.01.01.06.043 Cat Tembok 0.300000 20 Kg 327,000 98,100.00
07.01.01.01.06.077 Plamur Tembok 0.120000 Kg 17,000 2,040.00
07.01.01.01.30.001 Kertas Gosok no 1 50 0.100000 Lembar 4,000 400.00
Jumlah : 100,540.00
Bahan/Material
07.01.01.01.06.052 Dempul Tembok 0.080000 5 Kg 59,000 4,720.00
07.01.01.01.06.070 Minyak Cat Mentah 0.057000 Liter 159,000 9,063.00
07.01.01.01.30.001 Kertas Gosok no 1 50 1.000000 Lembar 4,000 4,000.00
07.01.01.01.06.035 Cat Minyak 5000 1 kg 0.425000 Kg 64,000 27,200.00
Jumlah : 44,983.00
64
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.13 PENYAPUTAN AIR PC M2
Upah
08.01.01.01.03.001 Tukang Batu 0.007000 OH 130,000 910.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.007000 OH 110,000 770.00
Jumlah : 1,680.00
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.029800 Zak 55,000 1,639.00
Jumlah : 1,639.00
65
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.17 PEMASANGAN WALLPAPER M2
Upah
08.01.01.01.01.001 Mandor 0.033000 OH 180,000 5,940.00
08.01.01.01.03.009 Tukang Kayu 0.250000 OH 130,000 32,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.090000 OH 110,000 9,900.00
Jumlah : 48,340.00
Bahan/Material
Wallpaper (10,05 mx 0,53 m) Collection La Verita No
07.01.01.01.31.035 7811 261 2.000000 Roll 201,000 402,000.00
07.01.01.01.31.020 Lem Kayu 1/2 Kg 0.200000 Kg 39,000 7,800.00
Jumlah : 409,800.00
66
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.20 PENGECATAN GENTENG 2 X M2
Upah
08.01.01.01.01.001 Mandor 0.002500 OH 180,000 450.00
08.01.01.01.01.005 Kepala Tukang Cat 0.007500 OH 140,000 1,050.00
08.01.01.01.03.003 Tukang Cat 0.075000 OH 130,000 9,750.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.050000 OH 110,000 5,500.00
Jumlah : 16,750.00
Bahan/Material
07.01.01.01.06.025 Cat Genteng 0.200000 4 Kg 201,000 40,200.00
Jumlah : 40,200.00
PEMASANGAN DINDING
25.04.02.21 BATACO,10X19X40CM,1PC:5PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.072000 zak 60,000 4,320.00
07.01.01.01.04.002 Pasir Pasang / plester 0.018000 m3 451,000 8,118.00
07.01.01.01.18.004 Bataco Biasa uk. 10 X 20 X 40 cm - 13.000000 Buah 4,200 54,600.00
Jumlah : 67,038.00
67
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN DINDING CELCON,59 X 19 X
25.04.02.23 10CM,1PC:3PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.160000 OH 130,000 20,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.480000 OH 110,000 52,800.00
08.01.01.01.01.003 Kepala Tukang Batu 0.001600 OH 140,000 224.00
08.01.01.01.01.001 Mandor 0.048000 OH 180,000 8,640.00
Jumlah : 82,464.00
Bahan/Material
07.01.01.01.18.012 Celcon Block 59 X 19 t. 10 - 9.000000 Bh 11,000 99,000.00
07.01.01.01.02.012 Portland Cement 0.153600 zak 60,000 9,216.00
07.01.01.01.04.002 Pasir Pasang / plester 0.030000 m3 451,000 13,530.00
Jumlah : 121,746.00
68
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
69
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.30 ACIAN M2
Upah
08.01.01.01.03.001 Tukang Batu 0.060000 OH 130,000 7,800.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.060000 OH 110,000 6,600.00
08.01.01.01.01.003 Kepala Tukang Batu 0.003000 OH 140,000 420.00
08.01.01.01.01.001 Mandor 0.003000 OH 180,000 540.00
Jumlah : 15,360.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.130000 zak 60,000 7,800.00
Jumlah : 7,800.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 2.000,00
Jumlah : 2.000,00
70
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
ADUKAN SIAR PASANGAN BATU BELAH 1PC :
25.04.02.32 2PS M2
Upah
08.01.01.01.03.001 Tukang Batu 0.070000 OH 130,000 9,100.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.220000 OH 110,000 24,200.00
08.01.01.01.01.003 Kepala Tukang Batu 0.002000 OH 140,000 280.00
08.01.01.01.01.001 Mandor 0.008000 OH 180,000 1,440.00
Jumlah : 35,020.00
Bahan/Material
07.01.01.01.02.012 Portland Cement 0.142800 zak 60,000 8,568.00
07.01.01.01.04.002 Pasir Pasang / plester 0.011400 m3 451,000 5,141.40
Jumlah : 13,709.40
71
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.35 MENGECAT TEMBOK, CAT MATEX M2
Upah
08.01.01.01.03.003 Tukang Cat 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.010000 OH 110,000 1,100.00
08.01.01.01.01.001 Mandor 0.001000 OH 180,000 180.00
Jumlah : 20,780.00
Bahan/Material
07.01.01.01.06.043 Cat Tembok 0.350000 5 Kg 327,000 114,450.00
07.01.01.01.31.001 Amplas Kayu Halus 0.100000 Bh 4,000 400.00
07.01.01.01.31.019 Kuas Roll 7" Action 0.010000 Buah 26,000 260.00
07.01.01.01.06.052 Dempul Tembok 0.150000 5 Kg 59,000 8,850.00
Jumlah : 123,960.00
Bahan/Material
07.01.01.01.06.069 Minyak Cat / Afduner 0.200000 Liter 32,000 6,400.00
07.01.01.01.06.022 Cat Dasar Meni Besi Kangaroo Line - 0.100000 Kg 29,000 2,900.00
07.01.01.01.06.049 cat warna 0.200000 kg 120,000 24,000.00
07.01.01.01.31.001 Amplas Kayu Halus 0.500000 Bh 4,000 2,000.00
07.01.01.01.31.018 Kuas 4 inch 0.035000 Buah 26,000 910.00
Jumlah : 36,210.00
72
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
MENGECAT TEMBOK, INTERIOR SETARA NIPPON
25.04.02.38 PAINT M2
Upah
08.01.01.01.03.003 Tukang Cat 0.150000 OH 130,000 19,500.00
08.01.01.01.01.005 Kepala Tukang Cat 0.010000 OH 140,000 1,400.00
08.01.01.01.01.001 Mandor 0.001000 OH 180,000 180.00
Jumlah : 21,080.00
Bahan/Material
07.01.01.01.06.043 Cat Tembok 0.350000 5 Kg 327,000 114,450.00
07.01.01.01.31.001 Amplas Kayu Halus 0.100000 Bh 4,000 400.00
07.01.01.01.31.019 Kuas Roll 7" Action 0.010000 Buah 26,000 260.00
07.01.01.01.06.052 Dempul Tembok 0.150000 5 Kg 59,000 8,850.00
Jumlah : 123,960.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 500.00
Jumlah : 500.00
73
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.04.02.41 POLITURAN M2
Upah
08.01.01.01.03.003 Tukang Cat 0.150000 OH 130,000 19,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.015000 OH 110,000 1,650.00
08.01.01.01.01.001 Mandor 0.002000 OH 180,000 360.00
Jumlah : 21,510.00
Bahan/Material
07.01.01.01.06.071 Pelitur P-03 UV 0.200000 ltr 103,000 20,600.00
Jumlah : 20,600.00
Sewa Peralatan
08.01.04.03.01.074 Sewa Alat Bantu 1.000000 Ls 500 500.00
Jumlah : 500.00
74
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
E PEKERJAAN LANTAI
25.05 PEKERJAAN LANTAI
25.05.01 LANTAI
PEMASANGAN TEGEL ABU2 KPL BSH 20X20 CM (1/4 PC :1KP : 2
25.05.01.01 PS M2
Upah
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.02.03.001 Kapur Pasang 0.02 m3 41,000.00 656.00
07.01.01.01.29.030 Keramik Lantai 20 x 20 cm Terpasang 1.05 M2 54,000.00 56,700.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 69,189.80
75
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.29.046 Keramik 30 x 30 cm 1.05 M2 50,000.00 52,500.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 65,533.80
76
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.02 Zak 55,000.00 1,100.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.11.006 Tegel Keramik 30x30 (motif/warna gelap) 1.05 M2 711,000.00 746,550.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 759,583.80
77
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.09 Zak 55,000.00 5,148.00
07.01.01.01.02.003 Semen Warna 0.20 Kg 6,000.00 1,200.00
07.01.01.01.29.026 Porselen Putih 11 x 11 cm 120 kpg 1.05 M2 93,000.00 97,650.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 114,731.80
78
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.02.002 Semen 40 kg 0.00 Zak 55,000.00 93.50
07.01.01.01.02.003 Semen Warna 0.00 Kg 6,000.00 6.00
07.01.01.01.11.004 Tegel Flint Keramik warna/motif 5.25 Buah 7,000.00 36,750.00
07.01.01.01.04.002 Pasir Pasang / plester 0.02 m3 451,000.00 10,733.80
Jumlah : 47,583.30
79
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.70 m3 451,000.00 315,700.00
07.01.01.01.02.001 Semen 50 Kg 0.92 Zak 65,000.00 59,800.00
07.01.01.01.29.033 Keramik Lantai 40 x 40 cm Terpasang 1.10 M2 160,000.00 176,000.00
Jumlah : 551,500.00
80
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.07 m3 451,000.00 31,570.00
07.01.01.01.02.001 Semen 50 Kg 0.19 Zak 65,000.00 12,480.00
07.01.01.01.29.035 Keramik Lantai 30 x 30 cm 1.10 M2 172,000.00 189,200.00
Jumlah : 233,250.00
81
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.04.002 Pasir Pasang / plester 0.00 m3 451,000.00 536.69
07.01.01.01.02.001 Semen 50 Kg 0.03 Zak 65,000.00 2,119.00
07.01.01.01.29.033 Keramik Lantai 40 x 40 cm Terpasang 0.20 M2 160,000.00 32,000.00
Jumlah : 34,655.69
82
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
F PEKERJAAN ATAP
25.06 ATAP
25.06.01 RANGKA ATAP
PEMASANGAN KUDA2 KAYU JATI
25.06.01.01 (BENTANG MAX 7 M) M3
Upah
08.01.01.01.01.001Mandor 0.300000 OH 180,000.00 54,000.00
08.01.01.01.01.011Kepala Tukang Kayu 2.700000 OH 140,000.00 378,000.00
08.01.01.01.03.009Tukang Kayu 18.000000 OH 130,000.00 2,340,000.00
08.01.01.01.04.013Pekerja Tak Terampil 6.000000 OH 110,000.00 660,000.00
Jumlah : 3,432,000.00
Bahan/Material
07.01.01.01.27.022 Kayu Jati (balok 6/1 5) 1.100000 M3 25,240,000.00 27,764,000.00
Jumlah : 27,764,000.00
83
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.27.028Kayu Kamper (Balok 6/15) 0.100000 m3 11,850,000.00 1,185,000.00
07.01.01.01.27.035Kayu Kamper Usuk 0.010800 m3 11,730,000.00 126,684.00
07.01.01.01.31.022Paku 0.200000 Kg 25,000.00 5,000.00
Jumlah : 1,316,684.00
84
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.02.02 PEMASANGAN GENTENG KACA M2
Upah
08.01.01.01.01.001Mandor 0.008000 OH 180,000.00 1,440.00
08.01.01.01.01.011Kepala Tukang Kayu 0.008000 OH 140,000.00 1,120.00
08.01.01.01.03.009Tukang Kayu 0.075000 OH 130,000.00 9,750.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 28,810.00
Bahan/Material
07.01.01.01.12.021Genteng Kaca Besar 25.000000 Buah 21,000.00 525,000.00
Jumlah : 525,000.00
Bahan/Material
07.01.01.01.12.022Genteng Karang Pilang / wisma 25.000000 Buah 4,000.00 100,000.00
Jumlah : 100,000.00
85
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.16.006Asbes Gelombang Kecil 80 cm x 6 ft (4mm) - 0.343500 Lembar 39,600.00 13,602.60
07.01.01.01.12.046Paku Sekrup 4.000000 Buah 1,000.00 4,000.00
Jumlah : 17,602.60
86
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
87
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN WUWUNG GENTENG
25.06.02.12 KARANG PILANG M1
Upah
08.01.01.01.01.001Mandor 0.020000 OH 180,000.00 3,600.00
08.01.01.01.01.011Kepala Tukang Kayu 0.020000 OH 140,000.00 2,800.00
08.01.01.01.03.009Tukang Kayu 0.200000 OH 130,000.00 26,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.400000 OH 110,000.00 44,000.00
Jumlah : 76,400.00
Bahan/Material
07.01.01.01.02.002Semen 40 kg 0.237000 Zak 55,000.00 13,035.00
07.01.01.01.12.032Genteng Wuwung Karang Pilang / Wisma 3.000000 Buah 13,000.00 39,000.00
07.01.01.01.04.002Pasir Pasang / plester 0.032300 m3 451,000.00 14,567.30
Jumlah : 66,602.30
88
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN WUWUNG ASBES
25.06.02.15 GELOMBANG KECIL M1
Upah
08.01.01.01.01.001Mandor 0.013000 OH 180,000.00 2,340.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.840000 OH 110,000.00 92,400.00
Jumlah : 112,810.00
Bahan/Material
07.01.01.01.12.004Asbes Wuwung Gelombang Kecil Tb.4 mm 1.000000 Lembar 38,000.00 38,000.00
07.01.01.01.12.046Paku Sekrup 2.000000 Buah 1,000.00 2,000.00
Jumlah : 40,000.00
89
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN TALANG TRITISAN DARI SENG
25.06.02.18 BJLS 30 (LEBAR 60 CM) M1
Upah
08.01.01.01.01.001Mandor 0.025000 OH 180,000.00 4,500.00
08.01.01.01.01.011Kepala Tukang Kayu 0.080000 OH 140,000.00 11,200.00
08.01.01.01.03.009Tukang Kayu 0.800000 OH 130,000.00 104,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.500000 OH 110,000.00 55,000.00
Jumlah : 174,700.00
Bahan/Material
07.01.01.01.27.044Kayu Meranti (Papan 2/20) 0.008000 m3 4,392,000.00 35,136.00
07.01.01.01.27.047Kayu Meranti (usuk 5/7) 0.005200 m3 2,657,000.00 13,816.40
07.01.01.01.12.056Seng Talang BJLS 30 Lbr 60 1.000000 ml 35,000.00 35,000.00
07.01.01.01.12.047Paku Sumbat 5.000000 Buah 1,000.00 5,000.00
Jumlah : 88,952.40
90
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN TALANG TRITISAN DARI SENG
25.06.02.21 BJLS 40 (LEBAR 90 CM) M1
Upah
08.01.01.01.01.001Mandor 0.016000 OH 180,000.00 2,880.00
08.01.01.01.01.011Kepala Tukang Kayu 0.080000 OH 140,000.00 11,200.00
08.01.01.01.03.009Tukang Kayu 0.800000 OH 130,000.00 104,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.500000 OH 110,000.00 55,000.00
Jumlah : 173,080.00
Bahan/Material
07.01.01.01.27.044Kayu Meranti (Papan 2/20) 0.016000 m3 4,392,000.00 70,272.00
07.01.01.01.27.047Kayu Meranti (usuk 5/7) 0.007300 m3 2,657,000.00 19,396.10
07.01.01.01.07.033Seng Talang BJLS 40 Lbr 90 4 x 8 1.000000 Lbr 218,000.00 218,000.00
07.01.01.01.12.047Paku Sumbat 5.000000 Buah 1,000.00 5,000.00
Jumlah : 312,668.10
91
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN TALAN PEMBULUH PIPA PVC 3"
25.06.02.24 TYPE AW M1
Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 3,707.00
Jumlah : 15,182.00
Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.007 Pipa PVC 3 "" Type AW Pj. 6.00 mt 0.166700 Lonjor 490,000.00 81,683.00
Jumlah : 85,683.00
Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.009 Pipa PVC 5 "" Type AW Pj. 6.00 mt 0.166700 Lonjor 1,115,000.00 185,870.50
Jumlah : 189,870.50
92
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN TALAN PEMBULUH PIPA
25.06.02.28 PVC 4" M1
Upah
08.01.01.01.03.011Tukang Pasang Pipa 0.067500 OH 170,000.00 11,475.00
08.01.01.01.04.013Pekerja Tak Terampil 0.033700 OH 110,000.00 1,179.50
Jumlah : 12,654.50
Bahan/Material
07.01.05.01.03.002Klem PVC 1.000000 Buah 4,000.00 4,000.00
07.01.05.04.01.005Pipa PVC 4 "" Pj. 4.00 mt 0.250000 Lonjor 475,000.00 118,750.00
Jumlah : 122,750.00
93
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.27.033Kayu Kamper Papan 2/20 0.004800 m3 15,790,000.00 75,792.00
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
Jumlah : 77,042.00
NILAI HSPK : 131,216.00
PEMASANGAN LISTPLANK KAYU JATI 3/30
25.06.02.32 CM M1
Upah
08.01.01.01.01.001Mandor 0.005300 OH 180,000.00 954.00
08.01.01.01.01.011Kepala Tukang Kayu 0.053300 OH 140,000.00 7,462.00
08.01.01.01.03.009Tukang Kayu 0.533300 OH 130,000.00 69,329.00
08.01.01.01.04.013Pekerja Tak Terampil 0.186700 OH 110,000.00 20,537.00
Jumlah : 98,282.00
Bahan/Material
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
07.01.01.01.27.067Papan Klas II 0.010800 m3 19,740,000.00 213,192.00
Jumlah : 214,442.00
Bahan/Material
07.01.01.01.27.030Kayu Kamper (papan 3/30) 0.010800 m3 15,640,000.00 168,912.00
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
Jumlah : 170,162.00
94
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.02.35 PENUTUP GENTENG KODOK M2
Upah
08.01.01.01.03.001Tukang Batu 0.075000 OH 130,000.00 9,750.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
08.01.01.01.01.003Kepala Tukang Batu 0.008000 OH 140,000.00 1,120.00
08.01.01.01.01.001Mandor 0.008000 OH 180,000.00 1,440.00
Jumlah : 28,810.00
Bahan/Material
07.01.01.01.12.025Genteng Plentong ex. Jawa - 25.000000 Bh 14,000.00 350,000.00
Jumlah : 350,000.00
Bahan/Material
07.01.01.01.12.014Genteng Beton 34 cm x 42 cm - 10.000000 Buah 15,000.00 150,000.00
07.01.01.01.31.022Paku 0.030000 Kg 25,000.00 750.00
Jumlah : 36,240.00
Bahan/Material
07.01.01.01.12.023Genteng Kodok - 5.000000 Buah 4,000.00 20,000.00
07.01.01.01.02.001Semen 50 Kg 0.216000 zak 65,000.00 14,040.00
07.01.01.01.04.002Pasir Pasang / plester 0.032000 m3 451,000.00 14,432.00
Jumlah : 48,472.00
95
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.02.38 BUBUNG PADA GENTENG BETON M
Upah
08.01.01.01.03.001Tukang Batu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
08.01.01.01.01.003Kepala Tukang Batu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001Mandor 0.010000 OH 180,000.00 1,800.00
Jumlah : 38,200.00
Bahan/Material
07.01.01.01.12.036Nok Genteng Beton Metra, warna - 3.500000 Buah 14,000.00 49,000.00
07.01.01.01.02.001 Semen 50 Kg 0.216000 zak 65,000.00 14,040.00
07.01.01.01.04.002Pasir Pasang / plester 0.032000 m3 451,000.00 14,432.00
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
Jumlah : 78,722.00
96
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PENUTUP ATAP ASBES SEMEN GELOMBANG 210 X
25.06.02.41 105 CM M2
Upah
08.01.01.01.03.009Tukang Kayu 0.067000 OH 130,000.00 8,710.00
08.01.01.01.04.013Pekerja Tak Terampil 0.140000 OH 110,000.00 15,400.00
08.01.01.01.01.011Kepala Tukang Kayu 0.007000 OH 140,000.00 980.00
08.01.01.01.01.001Mandor 0.007000 OH 180,000.00 1,260.00
Jumlah : 26,350.00
Bahan/Material
Atap - Asbes Semen Gelombang 210 cm x 105
07.01.01.01.16.010 cm/M 0.500000 Lembar 66,600.00 33,300.00
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Jumlah : 45,800.00
97
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
BUBUNG PADA ATAP ASBES SEMEN GELOMBANG
25.06.02.44 (NOK STEL ),105 MM M
Upah
08.01.01.01.03.009Tukang Kayu 0.125000 OH 130,000.00 16,250.00
08.01.01.01.04.013Pekerja Tak Terampil 0.084000 OH 110,000.00 9,240.00
08.01.01.01.01.011Kepala Tukang Kayu 0.013000 OH 140,000.00 1,820.00
08.01.01.01.01.001Mandor 0.004000 OH 180,000.00 720.00
Jumlah : 28,030.00
Bahan/Material
Bumbungan Atap Asbes Semen Gelombang
07.01.01.01.16.019 (Nokstel), 105 1.050000 M 107,100.00 112,455.00
07.01.01.01.31.022Paku 0.500000 Kg 25,000.00 12,500.00
Jumlah : 124,955.00
98
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
Bahan/Material
07.01.01.01.31.022Paku 0.200000 Kg 25,000.00 5,000.00
07.01.01.01.12.005Atap Sirap ex Kalimantan (7 cm x 50 cm) 1.100000 M2 84,000.00 92,400.00
Jumlah : 97,400.00
Bahan/Material
07.01.01.01.07.032Seng Plat 4 x 8 x 3 mm 0.400000 Lbr 2,636,000.00 1,054,400.00
07.01.01.01.31.022Paku 0.060000 Kg 25,000.00 1,500.00
07.01.01.01.27.041Kayu Meranti 0.007000 Ton 4,478,000.00 31,346.00
Jumlah : 1,087,246.00
Bahan/Material
07.01.01.01.31.022Paku 0.030000 Kg 25,000.00 750.00
07.01.01.01.12.024Genteng Metal Multi roof 1.000000 M2 86,000.00 86,000.00
Jumlah : 86,750.00
99
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
BUBUNG PADA GENTENG METAL MULTI
25.06.02.50 ROOF M
Upah
08.01.01.01.03.001Tukang Batu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013Pekerja Tak Terampil 0.200000 OH 110,000.00 22,000.00
08.01.01.01.01.011Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001Mandor 0.010000 OH 180,000.00 1,800.00
Jumlah : 38,200.00
Bahan/Material
07.01.01.01.02.001 Semen 50 Kg 0.216000 zak 65,000.00 14,040.00
07.01.01.01.04.002Pasir Pasang / plester 0.032000 m3 451,000.00 14,432.00
07.01.01.01.31.022Paku 0.050000 Kg 25,000.00 1,250.00
07.01.01.01.12.038Nok Genteng Tanah - 1.200000 Bh 9,000.00 10,800.00
Jumlah : 40,522.00
100
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.03 PLAFON
PEMASANGAN PLAFON ASBES DATAR RANGKA
25.06.03.01 KAYU KAMPER M2
Upah
08.01.01.01.01.001Mandor 0.005800 OH 180,000.00 1,044.00
08.01.01.01.01.011Kepala Tukang Kayu 0.034600 OH 140,000.00 4,844.00
08.01.01.01.03.009Tukang Kayu 0.346500 OH 130,000.00 45,045.00
08.01.01.01.04.013Pekerja Tak Terampil 0.117000 OH 110,000.00 12,870.00
Jumlah : 63,803.00
Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.011600 m3 11,960,000.00 138,736.00
07.01.01.01.12.045Paku Asbes 0.032400 Kg 17,000.00 550.80
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
07.01.01.01.12.002Asbes Datar Tebal 4 mm 1.050000 m2 15,000.00 15,750.00
Jumlah : 155,806.80
101
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN PLAFON ETERNIT RANGKA KAYU
25.06.03.04 MERANTI M2
Upah
08.01.01.01.01.001Mandor 0.005800 OH 180,000.00 1,044.00
08.01.01.01.01.011Kepala Tukang Kayu 0.034600 OH 140,000.00 4,844.00
08.01.01.01.03.009Tukang Kayu 0.346500 OH 130,000.00 45,045.00
08.01.01.01.04.013Pekerja Tak Terampil 0.117000 OH 110,000.00 12,870.00
Jumlah : 63,803.00
Bahan/Material
07.01.01.01.12.007Eternit Gresik 1.050000 M2 21,000.00 22,050.00
07.01.01.01.12.048Paku Triplek/Eternit 0.032400 Kg 25,000.00 810.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
07.01.01.01.27.042Kayu Meranti (Balok 6/1 5) 0.011600 m3 2,928,000.00 33,964.80
Jumlah : 57,594.80
102
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN RANGKA PLAFOND KAYU
25.06.03.07 KAMPER M2
Upah
08.01.01.01.01.001Mandor 0.003900 OH 180,000.00 702.00
08.01.01.01.01.011Kepala Tukang Kayu 0.023100 OH 140,000.00 3,234.00
08.01.01.01.03.009Tukang Kayu 0.231000 OH 130,000.00 30,030.00
08.01.01.01.04.013Pekerja Tak Terampil 0.078000 OH 110,000.00 8,580.00
Jumlah : 42,546.00
Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.011600 m3 11,960,000.00 138,736.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
Jumlah : 139,506.00
Bahan/Material
07.01.01.01.27.042Kayu Meranti (Balok 6/1 5) 0.011600 m3 2,928,000.00 33,964.80
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
Jumlah : 34,734.80
Bahan/Material
07.01.01.01.23.002Plywood Uk 9 mm 0.381900 Lembar 200,000.00 76,380.00
07.01.01.01.31.022Paku 0.048600 Kg 25,000.00 1,215.00
Jumlah : 77,595.00
103
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.03.10 RANGKA PLAFON HANGER M3
Upah
08.01.01.01.01.001Mandor 0.006000 OH 180,000.00 1,080.00
08.01.01.01.01.011Kepala Tukang Kayu 0.012000 OH 140,000.00 1,680.00
08.01.01.01.03.009Tukang Kayu 0.120000 OH 130,000.00 15,600.00
08.01.01.01.02.025Pekerja Terampil 0.120000 OH 130,000.00 15,600.00
Jumlah : 33,960.00
Bahan/Material
07.01.01.01.27.043Kayu Meranti (Balok 6/12) 1.100000 m3 2,632,000.00 2,895,200.00
07.01.01.01.31.022Paku 2.000000 Kg 25,000.00 50,000.00
Jumlah : 2,945,200.00
Bahan/Material
07.01.01.01.27.026Kayu Kamper (Balok 5/7) 0.012000 m3 11,960,000.00 143,520.00
07.01.01.01.31.022Paku 0.140000 Kg 25,000.00 3,500.00
Jumlah : 147,020.00
104
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
PEMASANGAN RANGKA PLAFON KAYU
25.06.03.13 JATI M2
Upah
08.01.01.01.01.001Mandor 0.003900 OH 180,000.00 702.00
08.01.01.01.01.011Kepala Tukang Kayu 0.023100 OH 140,000.00 3,234.00
08.01.01.01.03.009Tukang Kayu 0.231000 OH 130,000.00 30,030.00
08.01.01.01.04.013Pekerja Tak Terampil 0.078000 OH 110,000.00 8,580.00
Jumlah : 42,546.00
Bahan/Material
07.01.01.01.27.020Kayu Jati (Balok 5/7) 0.011600 m3 25,240,000.00 292,784.00
07.01.01.01.31.022Paku 0.030800 Kg 25,000.00 770.00
Jumlah : 293,554.00
105
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Harga
Nomor Uraian Kegiatan Koef Satuan Harga
Satuan
25.06.03.16 RANGKA PLAFON ALUMUNIUM M2
Upah
08.01.01.01.01.001Mandor 0.075000 OH 180,000.00 13,500.00
08.01.01.01.01.011Kepala Tukang Kayu 0.025000 OH 140,000.00 3,500.00
08.01.01.01.03.009Tukang Kayu 0.250000 OH 130,000.00 32,500.00
08.01.01.01.04.013Pekerja Tak Terampil 0.150000 OH 110,000.00 16,500.00
Jumlah : 66,000.00
Bahan/Material
07.01.01.01.12.001Aluminium Profil 4" Coklat 2.750000 ml 30,000.00 82,500.00
07.01.01.01.12.046Paku Sekrup 4.000000 Buah 1,000.00 4,000.00
Jumlah : 86,500.00
106
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
G PEKERJAAN FINISHING
25.07 FINISHING
25.07.01 KUSEN,PINTU DAN JENDELA
25.07.01.01 KUSEN PINTU/JENDELA KAYU JATI M3
Upah
08.01.01.01.01.001 Mandor 0.300000 OH 180,000.00 54,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 2.000000 OH 140,000.00 280,000.00
08.01.01.01.03.009 Tukang Kayu 20.000000 OH 130,000.00 2,600,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 6.000000 OH 110,000.00 660,000.00
Jumlah : 3,594,000.00
Bahan/Material
07.01.01.01.27.022 Kayu Jati (balok 6/1 5) 1.100000 m3 25,240,000.00 27,764,000.00
Jumlah : 27,764,000.00
107
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
108
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
109
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
110
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Bahan/Material
07.01.01.04.02.057 Teakwood Uk 110 x 210 x 4 mm 0.500000 Lembar 49,000.00 24,500.00
07.01.01.01.31.022 Paku 0.050000 Kg 25,000.00 1,250.00
111
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Jumlah : 23,400.00
112
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Jumlah : 27,000.00
Bahan/Material
07.01.01.01.19.001 Engsel H 1.000000 Buah 14,500.00 14,500.00
Jumlah : 14,500.00
113
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Bahan/Material
07.01.01.01.22.002 Grendel Biasa (kecil) 1.000000 Buah 11,000.00 11,000.00
Jumlah : 11,000.00
114
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
115
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Jumlah : 29,000.00
116
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
117
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
118
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
119
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
120
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
121
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
122
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
25.07.01.59 RANGKA ATAP KASO2 5/7 & RENG 2/3 UTK GENTENG BETON, BHN M2
Upah
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00
123
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
25.07.01.60 RANGKA ATAP KASO2 5/7 & RENG 2/3 UTK GENTENG SIRAP, BHN M2
Upah
08.01.01.01.03.009 Tukang Kayu 0.100000 OH 130,000.00 13,000.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.100000 OH 110,000.00 11,000.00
08.01.01.01.01.011 Kepala Tukang Kayu 0.010000 OH 140,000.00 1,400.00
08.01.01.01.01.001 Mandor 0.005000 OH 180,000.00 900.00
Jumlah : 26,300.00
Bahan/Material
07.01.01.01.31.022 Paku 0.250000 Kg 25,000.00 6,250.00
07.01.01.01.27.050 Kayu Meranti Batu 0.044000 Ton 2,704,000.00 118,976.00
Jumlah : 125,226.00
124
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
25.07.01.64 DINDING PARTISI GYPSUM (9MM)DI CAT RANGKA ALM 2 1/4" X 1" M2
Upah
08.01.01.01.04.013 Pekerja Tak Terampil 0.695000 OH 110,000.00 76,450.00
08.01.01.01.03.019 Tukang 0.560000 Jam 110,001.00 61,600.56
Jumlah : 138,050.56
Bahan/Material
07.01.01.04.02.012 Dinding Partisi Gypsum 2.200000 M2 82,000.00 171,600.00
07.01.01.04.02.010 Cat Partisi Gypsum 1.000000 Kg 62,000.00 60,000.00
07.01.01.04.02.048 Rangka Alumunium + Accesories 2.500000 m1 168,000.00 400,000.00
Jumlah : 631,600.00
125
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
126
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
127
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
25.07.03 SANITAIR
25.07.03.01 PEMASANGAN DASAR SALURAN R 25 SEGMEN M
Upah
08.01.01.01.01.001 Mandor 0.023800 OH 180,000.00 4,284.00
08.01.01.01.04.013 Pekerja Tak Terampil 0.475000 OH 110,000.00 52,250.00
Jumlah : 56,534.00
Bahan/Material
07.01.01.01.21.028 Got Talang R 15 1.000000 Buah 11,000.00 11,000.00
128
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Jumlah : 20,000.00
129
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
130
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
131
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.01.03.004 Lem PVC 0.260000 Buah 25,000.00 6,500.00
07.01.05.04.01.031 Pipa PVC Class C dia. 2" 1.100000 Lonjor 25,000.00 27,500.00
Jumlah : 17,174.30
132
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Upah
08.01.01.01.03.011 Tukang Pasang Pipa 0.081800 OH 170,000.00 13,906.00
08.01.01.01.02.025 Pekerja Terampil 0.812800 OH 130,000.00 105,664.00
Jumlah : 119,570.00
Bahan/Material
07.01.05.04.01.036 Pipa PVC Class C dia. 6" 1.100000 Lonjor 62,000.00 68,200.00
07.01.05.01.03.004 Lem PVC 0.800000 Buah 25,000.00 20,000.00
Jumlah : 88,200.00
Bahan/Material
07.01.01.01.46.003 Kloset Jongkok Porselen 1.000000 Buah 392,000.00 392,000.00
Jumlah : 100,000.00
133
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Upah
08.01.01.01.01.003 Kepala Tukang Batu 0.150000 OH 140,000.00 21,000.00
08.01.01.01.03.001 Tukang Batu 1.500000 OH 130,000.00 195,000.00
Jumlah : 216,000.00
Bahan/Material
07.01.01.01.46.001 Kloset Jongkok 1.000000 Buah 300,000.00 300,000.00
Jumlah : 300,000.00
134
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
135
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Jumlah : 106,800.00
136
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
25.07.04 PAGAR
25.07.04.01 PEMASANGAN PAGAR MODEL BRC/PMG A M2
Upah
08.01.01.01.03.002 Tukang Besi 1.050000 OH 130,000.00 136,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.050000 OH 110,000.00 115,500.00
Jumlah : 252,000.00
Bahan/Material
Pagar BRC diameter 6 mm, panjang 240 cm,
07.01.01.01.40.002 tinggi 90 cm 0.364000 Batang 129,000.00 46,956.00
Jumlah : 46,956.00
25.07.04.03 PEMASANGAN PINTU SWING GANDA TYPE BRC/PMG UK (I,2 X3) M UNIT
Upah
08.01.01.01.03.002 Tukang Besi 1.050000 OH 130,000.00 136,500.00
08.01.01.01.04.013 Pekerja Tak Terampil 1.050000 OH 110,000.00 115,500.00
Jumlah : 252,000.00
Bahan/Material
07.01.01.01.46.009 Pintu Swing Ganda BRC/PMG Uk! 1 2x3 00 m2 0.291600 Unit 1,962,000.00 572,119.20
Jumlah : 572,119.20
137
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Jumlah : 572,119.20
25.07.05 PIPA
PEMASANGAN PIPA GALVANISH
25.07.05.01 TERMASUK ELEKTRODE M
Upah
08.01.01.01.01.001 Mandor 0.002000 OH 180,000.00 360.00
08.01.01.01.03.002 Tukang Besi 0.060000 OH 130,000.00 7,800.00
08.01.01.01.02.025 Pekerja Terampil 0.028000 OH 130,000.00 3,640.00
Jumlah : 11,800.00
Bahan/Material
07.01.01.01.17.002 Elektroda Baja 0.006000 Kg 15,500.00 93.00
Jumlah : 93.00
Sewa Peralatan
08.01.04.03.01.069 Welding Set 0.021000 jam 100,000.00 2,100.00
Jumlah : 2,100.00
138
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Jumlah : 80,000.00
139
DAFTAR HARGA SATUAN POKOK KEGIATAN(HSPK)
Upah
25.07.05.11 Ongkos Pemasangan Pipa 6.280000 M 11,800.00 42,138.80
Jumlah : 42,138.80
Bahan/Material
07.01.05.01.01.010 Besi Pipa Galvanish Medium Diameter 5" 1.000000 M1 371,000.00 371,000.00
Jumlah : 371,000.00
Upah
Jumlah : 11,800.00