Professional Documents
Culture Documents
INSTRUCTIONS
Herewith sending the method statement for the rectification work for the plastic settlement cracks in
Block 03 Podium Raft Foundation.
a. Identify the locations of plastic settlements occurred at site
b. Remove the concrete