Professional Documents
Culture Documents
1.112
1 1. CONTRACTOR TO VERIFY ALL LEVELS,
North HEIGHTS & DIMENSIONS ON SITE PRIOR TO
1.116 COMMENCEMENT OF WORK.
2. LARGE SCALE DRAWINGS ENJOY
PREFERENCE OVER SMALL SCALE
DRAWINGS.
3. DO NOT SCALE DRAWINGS, DIMENSIONS
ONLY TO BE USED.
2175
1075 1075
20 / 1000
150
All dimensions are in millimeters, unless otherwise
650
ab ab ab ab indicated
W1 W2
ab
910
D1
3750
3
3700
Milk Store
D2
1680
17 m²
4790
D3
ab
ab
12200
East
West
2
1360
7850
1400
7850
150
1.113 W1 1
1.113
Feed Store No. Description / Revisions Date
850 150
ab
35 m²
ab
D3 4
1810
3700
Office W2 DATE
3250
17 m²
3750
SCALE 1 : 100
2750
ab
DESIGNED BY
950
W1 W2
ab ab 20 / 1000 ab ab
CHECKED BY
150
DRAWN BY
CHECKED BY
1075 1075
2175
2175
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
South
1
1.112
Floor Plan
1 1 : 100 TITLE
+250
T.O. Fnd. Wall
+150
EGL
All dimensions are in millimeters, unless otherwise
+0 indicated
Front View 1
1 1 : 100
1.116
DATE
SCALE 1 : 100
T.O. Roof
DESIGNED BY
+4820
CHECKED BY
Wall Plate
DRAWN BY
+3050
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
T.O. Lintel
+2560
T.O. Slab
MINISTRY OF AGRICULTURE & LIVESTOCK
+250
T.O. Fnd. Wall
+150
EGL
+0
Rear View
2 1 : 100
TITLE
RHS View
1 1 : 100
DATE
T.O. Roof
SCALE 1 : 100
+4820
DESIGNED BY
CHECKED BY
DRAWN BY
Wall Plate
CHECKED BY
+3050 CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
T.O. Lintel
+2560
T.O. Slab
+250
T.O. Fnd. Wall MINISTRY OF AGRICULTURE & LIVESTOCK
+150
EGL
+0
LHS View
2 1 : 100
TITLE
600
1675
1675
All dimensions are in millimeters, unless otherwise
600
600
indicated
Con
forc
e 25
T& 7
B
12800
12800
1
East
West
2
7050
7050
1.113 1.113
No. Description / Revisions Date
DATE
SCALE 1 : 100
DESIGNED BY
CHECKED BY
600
600
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY
1675
1675
ACCURACY COMPLIANCE COMPLIANCE
CHECKS
600
600
MINISTRY OF AGRICULTURE & LIVESTOCK
South
1
1.112
Foundation Layout
1 1 : 100
TITLE
2250
REGULATIONS.
B
1100
C
1100
E
1100
F
1000
13350
1
East
West
8675
2
1.113 1.113
1000
H DATE
SCALE 1 : 100
2200
I DESIGNED BY
CHECKED BY
J DRAWN BY
1100
CHECKED BY
CONTENT & DESIGN PROJECT
K QUALITY
2425
ACCURACY COMPLIANCE COMPLIANCE
CHECKS
1100
L
4825 15250 4825 MINISTRY OF AGRICULTURE & LIVESTOCK
24900
South
1
1.112
Roof Plan
1 1 : 100
TITLE
12.50°
CHS114.3x5 columns PREFERENCE OVER SMALL SCALE
EAVES Wall Plate DRAWINGS.
500mm overhang 3. DO NOT SCALE DRAWINGS, DIMENSIONS
225 x 25 fascia board +3050 ONLY TO BE USED.
nailed to 150 x 50 truss 4. DAMAGE TO UNKNOWN SERVICES - THE
members. CONTRACTOR'S LIABILITY WHEN HE
SUPERSTRUCTURE T.O. Lintel ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
WALLS THEREOF IMMEDIATELY AND TO SUSPEND ALL
150mm hollow concrete block work reinforced with brick force BEAMS
+2560
AFFECTED WORK IN THE IMMEDIATE VICINITY
every third course & rendered with 13 mm thick sand cement
plaster (internally & externally) and painted one coat primer and All side rails
UNTIL WRITTEN INSTRUCTION TO PROCEED
150 x 200 reinforced concrete ring beam / lintols
two finishing coats to clients colour schedule internally. 48.5mm dia HAS BEEN GIVEN BY THE PROJECT
hot rolled ENGINEER.
Circular Hollow Sections (CHS) structural 5. IF ANY PARTICULARS OR THE MEANING OF
CHS114.3x5 columns as supports tubing FLOORS T.O. Slab THE DESCRIPTION OF ANY ITEM IS NOT CLEAR
(3mm thick) OR IS AMBIGUOUS, INDISTINCT OR CAUSES
40mm sand cement screed on 100 +250 CONFUSION AS TO ITS MEANING OR IF ANY
concrete floor slab reinforced with wiremesh
on 150 micron damp proof membrane on OBVIOUS ERROR OCCURS ON THE DRAWINGS,
sand blinding on 150 well compacted T.O. Fnd. Wall THE CONTRACTOR MUST INFORM ILISO
Spoon Drain hardcore fill. The milking areas shall have a IMMEDIATELY IN ORDER TO HAVE THE ERROR
broom finish and a 2% slope towards the +150 CORRECTED OR EXPLAINED, AS THE CASE
20 / 1000 20 / 1000 spoon drain MAY BE.
EGL 6. ALL WORK TO BE EXECUTED IN ACCORDANCE
WITH THE SPECIFICATIONS, BUILDING
+0 REGULATIONS AND THE LOCAL BY-LAWS &
REGULATIONS.
T.O. Footing
-900
B.O. Footing
-1100
All dimensions are in millimeters, unless otherwise
600x200 Reinforced concrete footing layed to minimum depth of 800mm Rail uprights 76.2mm dia hot rolled
structural tubing (5mm thick) indicated
Cross-Section
1 1 : 75
SCALE As indicated
DESIGNED BY
2137
2137
2110
CHECKED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
Quantity 1 1 2 Quantity 3 3
SUMMARY
1 Substructure
2 Concrete Work
4 Roofing
6 Structural Steelwork
8 Finishes
10 External Works
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
ℓ 15.40
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls 1.67
6 150mm blocks
150mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2 103.8
Concrete Blocks No. 1349
Cement 50 kg Bags 12.45
Building Sand tonnes 1.2
15mm cement and sand (1:4) plaster with wood float finish on
8 exterior of Concrete block walls - Foundation Wall m2 129.7
Cement 50 kg Bags 16
Building Sand tonnes 5.0
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
4 Tying Wire
Tying Wire (1.5mm x 16 gauge, approx 120 m/kg) kg 1
5 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 63.5
Timber Pegs size 50mm x 50mm m 26.0
4" Nails (typically 80 pieces per kg) kg 1.3
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 150mm blocks
150mm walls - Precast concrete hollow blocks bedded in
cement and sand mortar (1:4) m2 224.8
Concrete Blocks No. 2922
Cement 50 kg Bags 26.97
Building Sand tonnes 8.1
2 100mm thick Pan Bricks for Window Cills in 1:4 Cement Mortar
BullNose shaped Pan Bricks (190mm x 90mm x 90mm)
No. 270
Cement 50 kg Bags 0.8
Building Sand tonnes 0.2
3 DPC
Standard Damp Proof Course - 2-ply bituminous felt
DPC (20m per roll) 6
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Doors
External Quality Door, Size 910mm x 2110mm No. 1
Internal Quality Door, Size 910mm x 2110mm No. 2
Internal Quality Door, Size 910mm x 2110mm No. 2
3 Curtain rails
2.0m long curtain rails No. 3
1.5m long curtain rails No. 3
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Glass
Clear Glass m2 11.5
4 Putty kg 6
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Knot, Prime, Stop and Apply Undercoat and two high gloss
8
finishing coats on general surfaces of flush doors m2 7.7
Undercoat ℓ 1.0
two coats High Gloss finishing paint ℓ 1.5
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
TOTAL COST
1075 1075
2175
2175
20 / 1000
150
650
D1
3750
3700
D2 Milk Store
1680
4790
17 m²
D3
12200
1360
7850
1400
7850
1
East
West
150
2 W1
1.123 1.123
Feed Store
850 150
35 m²
No. Description / Revisions Date
D3
Office
1810
3700
17 m²
W2
3250
DATE
3750
SCALE 1 : 100
2750
950
DESIGNED BY
W1 W2
150
CHECKED BY
20 / 1000
DRAWN BY
2175
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
South
1
1.122
1 2 3 4 5 DRAWINGS.
3. DO NOT SCALE DRAWINGS, DIMENSIONS
ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
CONTRACTOR'S LIABILITY WHEN HE
ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
THEREOF IMMEDIATELY AND TO SUSPEND ALL
AFFECTED WORK IN THE IMMEDIATE VICINITY
T.O. Roof UNTIL WRITTEN INSTRUCTION TO PROCEED
HAS BEEN GIVEN BY THE PROJECT
+4820 ENGINEER.
5. IF ANY PARTICULARS OR THE MEANING OF
Wall Plate THE DESCRIPTION OF ANY ITEM IS NOT CLEAR
OR IS AMBIGUOUS, INDISTINCT OR CAUSES
+3050 CONFUSION AS TO ITS MEANING OR IF ANY
OBVIOUS ERROR OCCURS ON THE DRAWINGS,
THE CONTRACTOR MUST INFORM ILISO
IMMEDIATELY IN ORDER TO HAVE THE ERROR
T.O. Lintel CORRECTED OR EXPLAINED, AS THE CASE
MAY BE.
+2560 6. ALL WORK TO BE EXECUTED IN ACCORDANCE
WITH THE SPECIFICATIONS, BUILDING
T.O. Slab REGULATIONS AND THE LOCAL BY-LAWS &
REGULATIONS.
+250
T.O. Fnd. Wall
+150
EGL
+0 All dimensions are in millimeters, unless otherwise
indicated
Front View
1 1 : 100
1
1.126
5 4 3 2 1
DATE
SCALE 1 : 100
DESIGNED BY
T.O. Roof
CHECKED BY
+4820
DRAWN BY
Wall Plate
CHECKED BY
+3050 CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
T.O. Lintel
+2560
MINISTRY OF AGRICULTURE & LIVESTOCK
T.O. Slab
+250
T.O. Fnd. Wall
+150
EGL
+0
2 1 : 100
Milk Parlour / Dairy Shed (4 Cow Unit)
Front and Rear Elevations
PAPER DRWG. NO.
SIZE A3 1.122
GENERAL NOTES
1. CONTRACTOR TO VERIFY ALL LEVELS,
HEIGHTS & DIMENSIONS ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2. LARGE SCALE DRAWINGS ENJOY
PREFERENCE OVER SMALL SCALE
DRAWINGS.
3. DO NOT SCALE DRAWINGS, DIMENSIONS
ONLY TO BE USED.
T.O. Roof 4. DAMAGE TO UNKNOWN SERVICES - THE
CONTRACTOR'S LIABILITY WHEN HE
+4820 ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
Wall Plate THEREOF IMMEDIATELY AND TO SUSPEND ALL
AFFECTED WORK IN THE IMMEDIATE VICINITY
+3050 UNTIL WRITTEN INSTRUCTION TO PROCEED
HAS BEEN GIVEN BY THE PROJECT
ENGINEER.
5. IF ANY PARTICULARS OR THE MEANING OF
T.O. Lintel THE DESCRIPTION OF ANY ITEM IS NOT CLEAR
OR IS AMBIGUOUS, INDISTINCT OR CAUSES
+2560 CONFUSION AS TO ITS MEANING OR IF ANY
OBVIOUS ERROR OCCURS ON THE DRAWINGS,
T.O. Slab THE CONTRACTOR MUST INFORM ILISO
IMMEDIATELY IN ORDER TO HAVE THE ERROR
+250 CORRECTED OR EXPLAINED, AS THE CASE
T.O. Fnd. Wall MAY BE.
6. ALL WORK TO BE EXECUTED IN ACCORDANCE
+150 WITH THE SPECIFICATIONS, BUILDING
EGL REGULATIONS AND THE LOCAL BY-LAWS &
REGULATIONS.
+0
1 1 : 100
DATE
T.O. Roof SCALE 1 : 100
+4820 DESIGNED BY
CHECKED BY
DRAWN BY
Wall Plate CHECKED BY
+3050 QUALITY
CONTENT &
ACCURACY
DESIGN
COMPLIANCE
PROJECT
COMPLIANCE
CHECKS
T.O. Lintel
+2560
T.O. Slab
+250 MINISTRY OF AGRICULTURE & LIVESTOCK
T.O. Fnd. Wall
+150
EGL
+0
LHS View
2
TITLE
600
REGULATIONS AND THE LOCAL BY-LAWS &
REGULATIONS.
1650
1650
600
600
All dimensions are in millimeters, unless otherwise
indicated
2475
600
12800
Co
nfo
7100
7100
1
East
West
950
2 rc
1.123 T & e 257 1.123
B
600
DATE
2475
SCALE 1 : 100
DESIGNED BY
CHECKED BY
600
600
DRAWN BY
CHECKED BY
1650
1650
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
600
600
MINISTRY OF AGRICULTURE & LIVESTOCK
South
1
1.122
Foundation Layout
1 1 : 100
TITLE
2425
1100
B
1100
indicated
D
1100
E
1100
13700
1200
8850
1
East
West
2
1.123 1.123
G No. Description / Revisions Date
1100
H
1100
DATE
SCALE 1 : 100
I DESIGNED BY
1100
CHECKED BY
J DRAWN BY
1100
CHECKED BY
K QUALITY
CONTENT &
ACCURACY
DESIGN
COMPLIANCE
PROJECT
COMPLIANCE
1100
CHECKS
2425
L
18450
South
1
1.122
Roof Plan
1
TITLE
12.50°
CHS114.3x5 columns HAS BEEN GIVEN BY THE PROJECT
EAVES
ENGINEER.
Wall Plate 5. IF ANY PARTICULARS OR THE MEANING OF
500mm overhang
225 x 25 fascia board THE DESCRIPTION OF ANY ITEM IS NOT CLEAR
+3050
nailed to 150 x 50 truss OR IS AMBIGUOUS, INDISTINCT OR CAUSES
members. CONFUSION AS TO ITS MEANING OR IF ANY
Ceiling
SUPERSTRUCTURE OBVIOUS ERROR OCCURS ON THE DRAWINGS,
+2910 THE CONTRACTOR MUST INFORM ILISO
WALLS IMMEDIATELY IN ORDER TO HAVE THE ERROR
150mm hollow concrete block work reinforced with brick force BEAMS T.O. Lintel CORRECTED OR EXPLAINED, AS THE CASE
every third course & rendered with 13 mm thick sand cement MAY BE.
plaster (internally & externally) and painted one coat primer and All side rails 150 x 200 reinforced concrete ring beam / lintols
two finishing coats to clients colour schedule internally.
+2560 6. ALL WORK TO BE EXECUTED IN ACCORDANCE
48.5mm dia
hot rolled WITH THE SPECIFICATIONS, BUILDING
Circular Hollow Sections (CHS) structural REGULATIONS AND THE LOCAL BY-LAWS &
CHS114.3x5 columns as supports tubing FLOORS T.O. Slab REGULATIONS.
(3mm thick)
40mm sand cement screed on 100
concrete floor slab reinforced with wiremesh +250
on 150 micron damp proof membrane on
sand blinding on 150 well compacted T.O. Fnd. Wall
Spoon Drain hardcore fill. The milking areas shall have a
broom finish and a 2% slope towards the +150
20 / 1000 20 / 1000 spoon drain
EGL All dimensions are in millimeters, unless otherwise
indicated
+0
T.O. Footing
-900
B.O. Footing
-1100
Cross Section
600x200 Reinforced concrete footing layed to minimum depth of 800mm
1 1 : 75
Rail uprights 76.2mm dia hot rolled
structural tubing (5mm thick)
No. Description / Revisions Date
SCALE As indicated
DESIGNED BY
2137
2137
2110
CHECKED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
Quantity 1 1 2 Quantity 3 3
SUMMARY
1 Substructure
2 Concrete Work
4 Roofing
6 Structural Steelwork
8 Finishes
10 External Works
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
ℓ 11.80
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls 1.22
6 150mm blocks
150mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2 82.8
Concrete Blocks No. 1076
Cement 50 kg Bags 9.94
Building Sand tonnes 1.0
15mm cement and sand (1:4) plaster with wood float finish on
8 exterior of Concrete block walls - Foundation Wall m2 103.5
Cement 50 kg Bags 13
Building Sand tonnes 4.0
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
4 Tying Wire
Tying Wire (1.5mm x 16 gauge, approx 120 m/kg) kg 1
5 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 50.6
Timber Pegs size 50mm x 50mm m 19.0
4" Nails (typically 80 pieces per kg) kg 0.96
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 150mm blocks
150mm walls - Precast concrete hollow blocks bedded in
cement and sand mortar (1:4) m2 205.5
Concrete Blocks No. 2671
Cement 50 kg Bags 24.66
Building Sand tonnes 7.4
2 100mm thick Pan Bricks for Window Cills in 1:4 Cement Mortar
BullNose shaped Pan Bricks (190mm x 90mm x 90mm)
No. 270
Cement 50 kg Bags 0.8
Building Sand tonnes 0.2
3 DPC
Standard Damp Proof Course - 2-ply bituminous felt
5
DPC (20m per roll)
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Doors
External Quality Door, Size 910mm x 2110mm No. 1
Internal Quality Door, Size 910mm x 2110mm No. 2
Internal Quality Door, Size 910mm x 2110mm No. 2
3 Curtain rails
2.0m long curtain rails No. 3
1.5m long curtain rails No. 3
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Glass
Clear Glass m2 11.5
4 Putty kg 6
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Knot, Prime, Stop and Apply Undercoat and two high gloss
8
finishing coats on general surfaces of flush doors m2 7.7
Undercoat ℓ 1.0
two coats High Gloss finishing paint ℓ 1.5
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
TOTAL COST
300
2"x3" 3"x3" COMMENCEMENT OF WORK.
2 LARGE SCALE DRAWINGS ENJOY
PREFERENCE
OVER SMALL SCALE DRAWINGS.
BASE PLATE IN CONCRETE
230mm x 230mm x 5mm THICK STEEL PLATE 3 DO NOT SCALE DRAWINGS,
DIMENSIONS ONLY TO BE USED.
UNKNOWN SERVICES IS TO
2000
NOTIFY THE ENGINEER/PROJECT
MANAGER THEREOF
150mm thick SPLASH WALL IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE
102mmØ x 4mm POSTS
63.5mmØ x 4mm POSTS IMMEDIATE VICINITY UNTIL
450
@2000mm c/c MAX.
@2000mm c/c MAX. WRITTEN INSTRUCTION TO
PROCEED HAS BEEN GIVEN BY
102mmØ x 4mm POSTS
@2000mm c/c MAX.
THE PROJECT ENGINEER.
5 IF ANY PARTICULARS OR THE
300 230mm x 230mm x 5mm MEANING OF THE DESCRIPTION
THICK STEEL PLATE OF ANY ITEM IS NOT CLEAR OR IS
CONCRETE BASE WELDED TO BOTTOM
END OF POLE
AMBIGUOUS, INDISTINCT OR
102mmØ x 4mm POSTS
CAUSES CONFUSION AS TO ITS
@2000mm c/c MAX. MEANING OR IF ANY OBVIOUS
ERROR OCCURS ON THE
DRAWINGS, THE CONTRACTOR
230mm x 230mm x 5mm 230mm x 230mm x 5mm MUST INFORM ILISO
THICK STEEL PLATE THICK STEEL PLATE
WELDED TO BOTTOM WELDED TO BOTTOM IMMEDIATELY IN ORDER TO HAVE
SHED - DIPPING AREA END OF POLE
300mm x 300mm x
END OF POLE
150mm thick reinforced
concrete slab THE ERROR CORRECTED OR
450mm MASS
CONCRETE BASE EXPLAINED, AS THE CASE MAY BE.
SHED - DIPPING AREA
6 ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SATCC
SPECIFICATIONS, BUILDING
102mmØ x 4mm POSTS
450
1000
2000
102mmØ x 4mm POSTS
@2000mm c/c MAX. DATE
DESIGNED BY
63.5mmØ x 4mm POSTS
@2000mm c/c MAX. CHECKED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
2600
600
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
450
150
Y12 @ 200 C/C
2
DIPPING ZONE 1 200mm REINFORCED CONCRETE GRADE 30/19mm
FFL - 1.50
1500
200
300
REINFORCING DETAILS 1 - DIPPING AREA 570
TITLE
450
PROCEED HAS BEEN GIVEN BY
THE PROJECT ENGINEER.
450
150
230mm x 230mm x 5mm THICK STEEL 5 IF ANY PARTICULARS OR THE
CONCRETE BASE PLATE WELDED TO BOTTOM END OF
FOOT BATH 0.3x0.3.x0.45 m MEANING OF THE DESCRIPTION
POLE
2600
OF ANY ITEM IS NOT CLEAR OR IS
2300
150
300mm x 300mm x 450mm MASS AMBIGUOUS, INDISTINCT OR
450
200mm thick reinforced CONCRETE BASE CAUSES CONFUSION AS TO ITS
concrete slab
150
MEANING OR IF ANY OBVIOUS
300mm HARD CORE FILLING ERROR OCCURS ON THE
COMPACTED TO 98% MOD AASHTO
4400 DRAWINGS, THE CONTRACTOR
MUST INFORM ILISO
IMMEDIATELY IN ORDER TO HAVE
THE ERROR CORRECTED OR
200
EXPLAINED, AS THE CASE MAY BE.
6 ALL WORK TO BE EXECUTED IN
1300 200 4400 7350 5200 ACCORDANCE WITH THE SATCC
SPECIFICATIONS, BUILDING
REGULATIONS AND THE LOCAL
BY-LAWS & REGULATIONS.
SECTION A-A
GATE VALVE
PVC PIPE 50mm
DATE
600 200
EDGE OF ROOF
SCALE NTS
DESIGNED BY
CHECKED BY
DRAWN BY
1 2 3 4 5 6 7 8 9 10 11 12 13
15000
200
19000
PROJECT
TITLE
450
450
150
CONCRETE BASE
230mm x 230mm x 5mm THICK STEEL
PLATE WELDED TO BOTTOM END OF
3 DO NOT SCALE DRAWINGS,
FOOT BATH 0.3x0.3.x0.45 m POLE
2600
DIMENSIONS ONLY TO BE USED.
2300
150
300mm x 300mm x 450mm MASS
450
200mm thick reinforced CONCRETE BASE
concrete slab 4 DAMAGE TO UNKNOWN SERVICES
150
300mm HARD CORE FILLING
COMPACTED TO 98% MOD AASHTO - THE CONTRACTOR'S LIABILITY
4400
WHEN HE ENCOUNTERS
UNKNOWN SERVICES IS TO
200
NOTIFY THE ENGINEER/PROJECT
1300 200 4400 7350 5200 MANAGER THEREOF
IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE
SECTION A-A IMMEDIATE VICINITY UNTIL
WRITTEN INSTRUCTION TO
PROCEED HAS BEEN GIVEN BY
THE PROJECT ENGINEER.
5 IF ANY PARTICULARS OR THE
MEANING OF THE DESCRIPTION
OF ANY ITEM IS NOT CLEAR OR IS
600 200
EDGE OF ROOF
600 1200
DIPPING ZONE DRAINING AREA HOLDING AREA - POST DIPPING
1000
1200
ACCORDANCE WITH THE SATCC
600
600
1 2 3 4 5 6 7 8 9 10 11 12 13
200
19000
DATE
SCALE NTS
DESIGNED BY
CHECKED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
1200
500
150
150
50
150
PROJECT
4500
150mm thick reinforced 150mm thick reinforced
concrete slab concrete slab
50mm thick rough
surface TITLE
SUMMARY
1 Substructure
2 Concrete Work
4 Roofing
6 Finishes
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at
1ℓ Bottles 8
5ℓ/m2 (1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll)
rolls 1
6 200mm blocks
200mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4)
m2
Concrete Blocks No.
Cement 50 kg Bags
Building Sand tonnes
Cost of Materials
TOTAL COST
2. CONCRETE WORKS
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
4 12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c m 5976
6m bars No. 1146
5 Tying Wire
No. of 1Kg Rolls required No. 229
7 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 105.9
Timber Pegs size 50mm x 50mm m 30.0
4" Nails kg 5.0
Cost of Materials
TOTAL COST
3. BLOCKWORK AND BRICKWORK
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 200mm blocks
150mm walls - Precast concrete hollow blocks bedded
in cement and sand mortar (1:4) m2 121.5
Concrete Blocks No. 1518
Cement 50 kg Bags 15
Building Sand tonnes 4.4
5 DPC
Standard Damp Proof Course - 2-ply bituminous
felt DPC (20m per roll) 8
Cost of Materials
TOTAL COST
4. ROOFING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Valley m
9 5" nails Kg 3
10 4" nails Kg 3
11 Roofing nails Kg 4
12 Tying Wire Kg 4
Cost of Materials
TOTAL COST
5. CARPENTRY, JOINERY & IRON-MONGERY
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Poles
102mm diam x 4mm posts No. 42
5 Gates
3.0m gate No 3
2.5m gate No 2
1.0m gate No 1.00
Sliding gate No 3.00
Cost of Materials
TOTAL COST
6. FINISHES
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
GENERAL NOTES:
1 CONTRACTOR TO VERIFY ALL
LEVELS, HEIGHTS & DIMENSIONS
ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2 LARGE SCALE DRAWINGS ENJOY
PREFERENCE
OVER SMALL SCALE DRAWINGS.
3 DO NOT SCALE DRAWINGS,
8000
DIMENSIONS ONLY TO BE USED.
2000 2000
4 DAMAGE TO UNKNOWN SERVICES
- THE CONTRACTOR'S LIABILITY
20
00 WHEN HE ENCOUNTERS
2000
UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT
MANAGER THEREOF
20
00 IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE
2000
3000 20
00
CATTLE DIP TANK CAUSES CONFUSION AS TO ITS
MEANING OR IF ANY OBVIOUS
ERROR OCCURS ON THE
DRAWINGS, THE CONTRACTOR
MUST INFORM ILISO
20
00 IMMEDIATELY IN ORDER TO HAVE
HOLDING PEN THE ERROR CORRECTED OR
EXPLAINED, AS THE CASE MAY BE.
10000
6 ALL WORK TO BE EXECUTED IN
15
HOLDING
00
1200
3215
600
A
12000
HOLDING
PEN
DATE
SCALE NTS
30
00
DESIGNED BY
NECK CLAMP WITH
HEAVY DUTY
SORTING GATE
CHECKED BY
DRAWN BY
60
00
CHECKED BY
30
00
2000 1500
3500
PROJECT
TITLE
HANDLING FACILITIES 1
20
00
2000
2 LARGE SCALE DRAWINGS ENJOY
PREFERENCE
OVER SMALL SCALE DRAWINGS.
3 DO NOT SCALE DRAWINGS,
20
DIMENSIONS ONLY TO BE USED.
00
4 DAMAGE TO UNKNOWN SERVICES
- THE CONTRACTOR'S LIABILITY
2000
16
UNKNOWN SERVICES IS TO
57
NOTIFY THE ENGINEER/PROJECT
MANAGER THEREOF
IMMEDIATELY AND TO SUSPEND
10000 ALL AFFECTED WORK IN THE
IMMEDIATE VICINITY UNTIL
2000
WRITTEN INSTRUCTION TO
PROCEED HAS BEEN GIVEN BY
THE PROJECT ENGINEER.
5 IF ANY PARTICULARS OR THE
MEANING OF THE DESCRIPTION
HOLDING PEN
10000
55
SPECIFICATIONS, BUILDING
REGULATIONS AND THE LOCAL
20000
SCALE NTS
CRUSH PEN
CHECKED BY
QUALITY
CHECKS
CLIENT
30
HEAVY DUTY
00
NECK CLAMP
56
57
26
57
PROJECT
2000 1500
3500
TITLE
HANDLING FACILITY
A HEAVY DUTY GENERAL NOTES:
NECK CLAMP WITH 1 CONTRACTOR TO VERIFY ALL
LEVELS, HEIGHTS & DIMENSIONS
SORTING GATE ON SITE PRIOR TO
COMMENCEMENT OF WORK.
1000
CRUSH PEN
00
2 LARGE SCALE DRAWINGS ENJOY
15
PREFERENCE
1500
OVER SMALL SCALE DRAWINGS.
00
3 DO NOT SCALE DRAWINGS,
15
00
DIMENSIONS ONLY TO BE USED.
12000
20
3500
4 DAMAGE TO UNKNOWN SERVICES
- THE CONTRACTOR'S LIABILITY
HOLDING
WHEN HE ENCOUNTERS
00
4000
2000
UNKNOWN SERVICES IS TO
20
00
NOTIFY THE ENGINEER/PROJECT
20
MANAGER THEREOF
PEN
HOLDING
HOLDING
IMMEDIATELY AND TO SUSPEND
8000
00
IMMEDIATE VICINITY UNTIL
20
WRITTEN INSTRUCTION TO
PEN
PROCEED HAS BEEN GIVEN BY
PEN
2000
00
5 IF ANY PARTICULARS OR THE
30
MEANING OF THE DESCRIPTION
OF ANY ITEM IS NOT CLEAR OR IS
AMBIGUOUS, INDISTINCT OR
CAUSES CONFUSION AS TO ITS
3000
3000
00
MEANING OR IF ANY OBVIOUS
60
ERROR OCCURS ON THE
2000
00
MUST INFORM ILISO
30
IMMEDIATELY IN ORDER TO HAVE
THE ERROR CORRECTED OR
EXPLAINED, AS THE CASE MAY BE.
KRAAL PANEL KRAAL PANEL KRAAL PANEL KRAAL PANEL KRAAL PANEL 1M GATE KRAAL PANEL KRAAL PANEL KRAAL PANEL KRAAL PANEL KRAAL PANEL KRAAL PANEL 1M GATE KRAAL PANEL KRAAL PANEL 3 METER GATE
300
SCALE NTS
DESIGNED BY
DRAWN BY
38X1.5mm MILD STEEL
CHECKED BY
2300
2300
1600
1600
730
300
300
1000
1000
2000
2000 1000
350
LEVELS, HEIGHTS & DIMENSIONS
ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2 LARGE SCALE DRAWINGS ENJOY
PREFERENCE
OVER SMALL SCALE DRAWINGS.
3 DO NOT SCALE DRAWINGS,
DIMENSIONS ONLY TO BE USED.
350
4 DAMAGE TO UNKNOWN SERVICES
- THE CONTRACTOR'S LIABILITY
WHEN HE ENCOUNTERS
UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT
MANAGER THEREOF
IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE
IMMEDIATE VICINITY UNTIL
350
WRITTEN INSTRUCTION TO
1850
PROCEED HAS BEEN GIVEN BY
THE PROJECT ENGINEER.
5 IF ANY PARTICULARS OR THE
MEANING OF THE DESCRIPTION
OF ANY ITEM IS NOT CLEAR OR IS
AMBIGUOUS, INDISTINCT OR
CAUSES CONFUSION AS TO ITS
350
MEANING OR IF ANY OBVIOUS
ERROR OCCURS ON THE
DRAWINGS, THE CONTRACTOR
MUST INFORM ILISO
IMMEDIATELY IN ORDER TO HAVE
THE ERROR CORRECTED OR
EXPLAINED, AS THE CASE MAY BE.
6 ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SATCC
SPECIFICATIONS, BUILDING
DETAIL 1
450
REGULATIONS AND THE LOCAL
BY-LAWS & REGULATIONS.
SWIVEL GATE
3600
FOR INFORMATION
WASHER DETAIL
33
PL 9.5x100
66
STEEL TUBE 63.50mm
9.5
DATE
SCALE NTS
DESIGNED BY
50 CHECKED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
350
CHECKS
460
CLAMP
DETAIL 'A'
300
SUMMARY
1 Substructure
2 Concrete Work
4 Finishes
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 8
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls N/A
Cost of Materials
TOTAL COST
2. CONCRETE WORKS
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
4 12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c m 2330
6m bars No. 447
5 Tying Wire
No. of 1Kg Rolls required No. 89
7 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 198.0
Timber Pegs size 50mm x 50mm m 30.0
4" Nails kg 5.0
Cost of Materials
TOTAL COST
5. CARPENTRY, JOINERY & IRON-MONGERY
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Neck Clamp
Heavy Duty Neck Clamp with Sorting Gate No. 1
2 Crush Pen
2 x 1.6m high Kraal Panel No. 12
1m x 1.6m high Kraal Panel No. 2
3 Holding Pen
3m x 1.6m high Kraal Panel No. 2
2 x 1.6m high Kraal Panel No. 16
1.5 x 1.5m high Kraal Panel No. 3
1m x 1.6m high Kraal Panel No. 2
4 Gates
3.0m swing gate No 2
2.5m gate No 1
1.0m access pen gate No 4
Sliding gate No 1
Cost of Materials
TOTAL COST
6. FINISHES
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
1600 GENERAL NOTES
1150 1. CONTRACTOR TO VERIFY ALL LEVELS,
HEIGHTS & DIMENSIONS ON SITE PRIOR TO
1 COMMENCEMENT OF WORK.
950 103
2. LARGE SCALE DRAWINGS ENJOY
PREFERENCE OVER SMALL SCALE
DRAWINGS.
810 3. DO NOT SCALE DRAWINGS, DIMENSIONS
ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
T.O. Trough
CONTRACTOR'S LIABILITY WHEN HE
+800 ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
Inner Base THEREOF IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE IMMEDIATE
+200 VICINITY UNTIL WRITTEN INSTRUCTION TO
PROCEED HAS BEEN GIVEN BY THE
10% EGL PROJECT ENGINEER.
10% 5. IF ANY PARTICULARS OR THE MEANING OF
+0 THE DESCRIPTION OF ANY ITEM IS NOT
CLEAR OR IS AMBIGUOUS, INDISTINCT OR
B.O. Trough CAUSES CONFUSION AS TO ITS MEANING
OR IF ANY OBVIOUS ERROR OCCURS ON
-200 THE DRAWINGS, THE CONTRACTOR MUST
INFORM ILISO IMMEDIATELY IN ORDER TO
B.O. Slab HAVE THE ERROR CORRECTED OR
EXPLAINED, AS THE CASE MAY BE.
-600 6. ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SPECIFICATIONS,
BUILDING REGULATIONS AND THE LOCAL
BY-LAWS & REGULATIONS.
Cross Section
1 1 : 40
All dimensions are in millimeters, unless otherwise
indicated
950
DATE
SCALE 1 : 40
DESIGNED BY
CHECKED BY
DRAWN BY
1 CHECKED BY
3500
10% 10%
Plan
2 1 : 40 TITLE
FOR TENDER
DATE 2014-11-28
SCALE NTS
FOR ILISO CONSULTING
DESIGNED BY .
CHECKED BY .
PROJECT ENGINEER
DRAWN BY VM
CHECKED BY .
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
CLIENT
PROJECT
TECHNICAL AND INSTITUTIONAL DESIGN OF
LIVESTOCK INFRASTRUCTURE
TITLE
WATER TROUGH
Pipe Connection Details
PAPER SIZE PROJECT NO. DRWG. NO. REV.
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
2 Water Piping
Cost of Materials 0
TOTAL COST 0
GENERAL NOTES
1. CONTRACTOR TO VERIFY ALL LEVELS,
HEIGHTS & DIMENSIONS ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2. LARGE SCALE DRAWINGS ENJOY
PREFERENCE OVER SMALL SCALE
DRAWINGS.
3. DO NOT SCALE DRAWINGS, DIMENSIONS
ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
1 CONTRACTOR'S LIABILITY WHEN HE
ENCOUNTERS UNKNOWN SERVICES IS TO
2.113 NOTIFY THE ENGINEER/PROJECT MANAGER
2 THEREOF IMMEDIATELY AND TO SUSPEND
2.112 ALL AFFECTED WORK IN THE IMMEDIATE
VICINITY UNTIL WRITTEN INSTRUCTION TO
North PROCEED HAS BEEN GIVEN BY THE
PROJECT ENGINEER.
5. IF ANY PARTICULARS OR THE MEANING OF
THE DESCRIPTION OF ANY ITEM IS NOT
CLEAR OR IS AMBIGUOUS, INDISTINCT OR
A B C CAUSES CONFUSION AS TO ITS MEANING
OR IF ANY OBVIOUS ERROR OCCURS ON
THE DRAWINGS, THE CONTRACTOR MUST
3.00m posts INFORM ILISO IMMEDIATELY IN ORDER TO
HAVE THE ERROR CORRECTED OR
EXPLAINED, AS THE CASE MAY BE.
4200 6. ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SPECIFICATIONS,
BUILDING REGULATIONS AND THE LOCAL
2100 2100 BY-LAWS & REGULATIONS.
1500
East
West
3
3000
2.113 2 2.113
3.15m posts
1500
3 DATE
SCALE 1 : 50
DESIGNED BY
CHECKED BY
3.30m posts
DRAWN BY
CHECKED BY
1650 900 1650 QUALITY
CONTENT & DESIGN PROJECT
ACCURACY COMPLIANCE COMPLIANCE
CHECKS
South
Floor Plan
1 1 : 50
TITLE
Floor Plan
PAPER DRWG. NO.
SIZE A3 2.111
GENERAL NOTES
1. CONTRACTOR TO VERIFY ALL LEVELS,
HEIGHTS & DIMENSIONS ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2. LARGE SCALE DRAWINGS ENJOY
PREFERENCE OVER SMALL SCALE
DRAWINGS.
3. DO NOT SCALE DRAWINGS, DIMENSIONS
ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
CONTRACTOR'S LIABILITY WHEN HE
ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
THEREOF IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE IMMEDIATE
VICINITY UNTIL WRITTEN INSTRUCTION TO
PROCEED HAS BEEN GIVEN BY THE
PROJECT ENGINEER.
5. IF ANY PARTICULARS OR THE MEANING OF
THE DESCRIPTION OF ANY ITEM IS NOT
CLEAR OR IS AMBIGUOUS, INDISTINCT OR
CAUSES CONFUSION AS TO ITS MEANING
OR IF ANY OBVIOUS ERROR OCCURS ON
THE DRAWINGS, THE CONTRACTOR MUST
INFORM ILISO IMMEDIATELY IN ORDER TO
1 1
HAVE THE ERROR CORRECTED OR
2.113 2.113 EXPLAINED, AS THE CASE MAY BE.
6. ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SPECIFICATIONS,
BUILDING REGULATIONS AND THE LOCAL
BY-LAWS & REGULATIONS.
A B C C B A
Upper RoofLevel Upper RoofLevel All dimensions are in millimeters, unless otherwise
indicated
+2400 +2400
RaisedFloor RaisedFloor
No. Description / Revisions Date
+600 +600
EGL EGL
+0 +0 DATE
SCALE 1 : 50
DESIGNED BY
CHECKED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
TITLE
Elevations
PAPER DRWG. NO.
SIZE A3 2.112
GENERAL NOTES
3 2 1 1. CONTRACTOR TO VERIFY ALL LEVELS,
HEIGHTS & DIMENSIONS ON SITE PRIOR TO
ROOF COMMENCEMENT OF WORK.
2. LARGE SCALE DRAWINGS ENJOY
1 in 10 MONO PITCH PREFERENCE OVER SMALL SCALE
Corrugated Iron Roofing Sheets Upper RoofLevel DRAWINGS.
on 75 x 50 purlins (@1500 c/c) 3. DO NOT SCALE DRAWINGS, DIMENSIONS
+2400
100 / 1000 ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
CONTRACTOR'S LIABILITY WHEN HE
Lower RoofLevel
ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
+2100
RAILINGS THEREOF IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE IMMEDIATE
8 - 10 cm dia. poles or 150 - 200mm sawn timber. VICINITY UNTIL WRITTEN INSTRUCTION TO
Offcuts can also be used
PROCEED HAS BEEN GIVEN BY THE
PROJECT ENGINEER.
WOOD PRESERVATION
5. IF ANY PARTICULARS OR THE MEANING OF
Treat all woodwork with appropriate termicide THE DESCRIPTION OF ANY ITEM IS NOT
CLEAR OR IS AMBIGUOUS, INDISTINCT OR
CAUSES CONFUSION AS TO ITS MEANING
ALL POSTS RaisedFloor OR IF ANY OBVIOUS ERROR OCCURS ON
15cm dia Posts embedded in THE DRAWINGS, THE CONTRACTOR MUST
wooden ramp constructed
+600 INFORM ILISO IMMEDIATELY IN ORDER TO
300 x 300 x 400mm Grade C25
out of sawn timber Concrete Footings HAVE THE ERROR CORRECTED OR
EGL EXPLAINED, AS THE CASE MAY BE.
6. ALL WORK TO BE EXECUTED IN
+0 ACCORDANCE WITH THE SPECIFICATIONS,
BUILDING REGULATIONS AND THE LOCAL
T.O. Footing BY-LAWS & REGULATIONS.
-500
B.O. Footing
-900
All dimensions are in millimeters, unless otherwise
indicated
Cross Section
1 1 : 50
3 2 1 1 2 3
DATE
SCALE 1 : 50
DESIGNED BY
Upper RoofLevel Upper RoofLevel
CHECKED BY
+2400 +2400
DRAWN BY
Lower RoofLevel Lower RoofLevel CHECKED BY
+600 +600
EGL EGL
+0 +0
2 1 : 50
3 1 : 50 PAPER
Cross Section & Side Views
DRWG. NO.
SIZE A3 2.113
Schedule of Materials for a 30 Capacity Goat House
SUMMARY
1 Substructure
2 Floor
3 Walls
4 Roofing
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 0.68
(1ℓ diluted with water to make 200ℓ solution)
3 Timber posts
3.00m Posts No. 3
3.15m Posts No. 2
3.30m Posts No. 4
4 Wood preservative
Wood Preservative for the posts, applied at 10m2/ℓ ℓ 1.34
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Walls
Timber Railings 150mm x 50mm (Front Wall) m 13.20
Timber Railings 150mm x 50mm (Rear Wall) m 25.20
Timber Railings 150mm x 50mm (Side Walls) m 39.00
4" Nails (typically 80 pieces per kg) kg 1.40
2 Access Ramp
Timber Railings 150mm x 50mm m 12.43
3 Wood preservative
Wood Preservative, applied at 10m2/ℓ ℓ 3.59
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Roofing sheets
Corrugated Iron roofing sheets, 0.75m width m 33.25
6 Wood preservative
Wood Preservative, applied at 10m2/ℓ ℓ 1.67
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Doors
External Quality custom-made Door, Size 900mm x 1740mm No. 1
SUMMARY
1 Substructure
2 Floor
3 Walls
4 Roofing
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 1.08
(1ℓ diluted with water to make 200ℓ solution)
3 Timber posts
3.00m Posts No. 5
3.15m Posts No. 3
3.30m Posts No. 6
4 Wood preservative
Wood Preservative for the posts, applied at 10m2/ℓ ℓ 2.09
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Walls
Timber Railings 150mm x 50mm (Front Wall) m 29.90
Timber Railings 150mm x 50mm (Rear Wall) m 42.00
Timber Railings 150mm x 50mm (Side Walls) m 39.00
4" Nails (typically 80 pieces per kg) kg 2.00
2 Access Ramp
Timber Railings 150mm x 50mm m 12.43
3 Wood preservative
Wood Preservative, applied at 10m2/ℓ ℓ 4.93
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Roofing sheets
Corrugated Iron roofing sheets, 0.75m width m 83.05
6 Wood preservative
Wood Preservative, applied at 10m2/ℓ ℓ 2.42
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Doors
External Quality custom-made Door, Size 900mm x 1740mm No. 1
3.00m posts
1
All dimensions are in millimeters, unless otherwise
indicated
1500
3.15m posts
East
West
3
3000
2.123 2 2.123
1500
3
DATE
SCALE 1 : 50
DESIGNED BY
CHECKED BY
3.30m posts
DRAWN BY
3050 900 3050 CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
South
1
2.122
MINISTRY OF AGRICULTURE & LIVESTOCK
Floor Plan
1 1 : 50
TITLE
Floor Plan
PAPER DRWG. NO.
SIZE A3 2.121
1 GENERAL NOTES
2.123
1. CONTRACTOR TO VERIFY ALL LEVELS,
HEIGHTS & DIMENSIONS ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2. LARGE SCALE DRAWINGS ENJOY
PREFERENCE OVER SMALL SCALE
A B C D E DRAWINGS.
3. DO NOT SCALE DRAWINGS, DIMENSIONS
ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
CONTRACTOR'S LIABILITY WHEN HE
ENCOUNTERS UNKNOWN SERVICES IS TO
Upper RoofLevel NOTIFY THE ENGINEER/PROJECT MANAGER
THEREOF IMMEDIATELY AND TO SUSPEND
+2400 ALL AFFECTED WORK IN THE IMMEDIATE
VICINITY UNTIL WRITTEN INSTRUCTION TO
Lower RoofLevel PROCEED HAS BEEN GIVEN BY THE
PROJECT ENGINEER.
+2100 5. IF ANY PARTICULARS OR THE MEANING OF
THE DESCRIPTION OF ANY ITEM IS NOT
CLEAR OR IS AMBIGUOUS, INDISTINCT OR
CAUSES CONFUSION AS TO ITS MEANING
OR IF ANY OBVIOUS ERROR OCCURS ON
THE DRAWINGS, THE CONTRACTOR MUST
INFORM ILISO IMMEDIATELY IN ORDER TO
HAVE THE ERROR CORRECTED OR
EXPLAINED, AS THE CASE MAY BE.
RaisedFloor 6. ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SPECIFICATIONS,
+600 BUILDING REGULATIONS AND THE LOCAL
BY-LAWS & REGULATIONS.
EGL
+0
Front Elevation
1 1 : 50
1
2.123
E D C B A
DATE
Upper RoofLevel SCALE 1 : 50
+2400 DESIGNED BY
CHECKED BY
Lower RoofLevel
DRAWN BY
+2100
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
RaisedFloor
+600
MINISTRY OF AGRICULTURE & LIVESTOCK
EGL
+0
2 1 : 50 PAPER
Elevations
DRWG. NO.
SIZE A3 2.122
GENERAL NOTES
3 2 1 1. CONTRACTOR TO VERIFY ALL LEVELS,
HEIGHTS & DIMENSIONS ON SITE PRIOR TO
ROOF COMMENCEMENT OF WORK.
2. LARGE SCALE DRAWINGS ENJOY
1 in 10 MONO PITCH PREFERENCE OVER SMALL SCALE
Corrugated Iron Roofing Sheets Upper RoofLevel DRAWINGS.
on 75 x 50 purlins (@1500 c/c) 3. DO NOT SCALE DRAWINGS, DIMENSIONS
+2400
100 / 1000 ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
CONTRACTOR'S LIABILITY WHEN HE
Lower RoofLevel
ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
+2100
RAILINGS THEREOF IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE IMMEDIATE
8 - 10 cm dia. poles or 150 - 200mm sawn timber. VICINITY UNTIL WRITTEN INSTRUCTION TO
Offcuts can also be used
PROCEED HAS BEEN GIVEN BY THE
PROJECT ENGINEER.
WOOD PRESERVATION
5. IF ANY PARTICULARS OR THE MEANING OF
Treat all woodwork with appropriate termicide THE DESCRIPTION OF ANY ITEM IS NOT
CLEAR OR IS AMBIGUOUS, INDISTINCT OR
CAUSES CONFUSION AS TO ITS MEANING
ALL POSTS RaisedFloor OR IF ANY OBVIOUS ERROR OCCURS ON
15cm dia Posts embedded in THE DRAWINGS, THE CONTRACTOR MUST
wooden ramp constructed
+600 INFORM ILISO IMMEDIATELY IN ORDER TO
300 x 300 x 400mm Grade C25
out of sawn timber Concrete Footings HAVE THE ERROR CORRECTED OR
EGL EXPLAINED, AS THE CASE MAY BE.
6. ALL WORK TO BE EXECUTED IN
+0 ACCORDANCE WITH THE SPECIFICATIONS,
BUILDING REGULATIONS AND THE LOCAL
T.O. Footing BY-LAWS & REGULATIONS.
-500
B.O. Footing
-900
All dimensions are in millimeters, unless otherwise
indicated
Cross Section
1 1 : 50
3 2 1 1 2 3
DATE
SCALE 1 : 50
DESIGNED BY
Upper RoofLevel Upper RoofLevel
CHECKED BY
+2400 +2400
DRAWN BY
Lower RoofLevel Lower RoofLevel CHECKED BY
+600 +600
EGL EGL
+0 +0
2 1 : 50
3 1 : 50 PAPER
Cross Section & Side Views
DRWG. NO.
SIZE A3 2.123
Schedule of Materials for a 100 Capacity Goat House
SUMMARY
1 Substructure
2 Floor
3 Walls
4 Roofing
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2 (1ℓ diluted with water
1ℓ Bottles 3.97
to make 200ℓ solution)
3 Compacted laterite hardcore filling for the 1.8m, 2.475m, 2.125m & 1.825m posts
Laterite Tonnes 2.42
4 Timber posts
3.100m Posts No. 29
1.800m Posts No. 16
2.475m Posts (Access Ramp Supports) No. 4
2.125m Posts (Access Ramp Supports) No. 4
1.825m Posts (Access Ramp Supports) No. 4
5 Wood preservative
Wood Preservative for the posts, applied at 10m2/ℓ ℓ 6.80
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Walls
Timber Railings 150mm x 50mm (Front Wall) m 69.05
Timber Railings 150mm x 50mm (Rear Wall) m 80.00
Timber Railings 150mm x 50mm (Side Walls) m 45.00
4" Nails (typically 80 pieces per kg) kg 4.38
3 Wood preservative
Wood Preservative, applied at 10m2/ℓ ℓ 9.35
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Roofing sheets
Corrugated Iron roofing sheets, 0.75m width m 388.70
6 Wood preservative
Wood Preservative, applied at 10m2/ℓ ℓ 12.82
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Doors
External Quality custom-made Door, Size 900mm x 1740mm No. 2
3.1m posts
All dimensions are in millimeters, unless otherwise
A indicated
1125
B
1125
1
East
4500
West
2
2.133 C 2.133
1125
D
1125
No. Description / Revisions Date
E
1.8m posts DATE
1000
3000
SCALE 1 : 100
DESIGNED BY
1000
UP UP CHECKED BY
DRAWN BY
940 940
CHECKED BY
16000 QUALITY
CONTENT &
ACCURACY
DESIGN
COMPLIANCE
PROJECT
COMPLIANCE
CHECKS
South
1
2.132 MINISTRY OF AGRICULTURE & LIVESTOCK
Floor Plan
1 1 : 100
TITLE
2 4 6 8 10 12 14 16 17 ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
CONTRACTOR'S LIABILITY WHEN HE
ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
THEREOF IMMEDIATELY AND TO SUSPEND
Front Elevation
1 1 : 100
3
2.133 No. Description / Revisions Date
DATE
17 16 14 12 10 8 6 4 2 SCALE 1 : 100
DESIGNED BY
CHECKED BY
15 13 11 9 7 5 3 1 DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
Roof Apex
+3490
RaisedFloor
+1000
EGL
+0
2 1 : 100
Proposed 100 capacity Goat House
Elevations
PAPER DRWG. NO.
SIZE A3 2.132
GENERAL NOTES
E D C B A A B C D E 1. CONTRACTOR TO VERIFY ALL LEVELS,
HEIGHTS & DIMENSIONS ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2. LARGE SCALE DRAWINGS ENJOY
PREFERENCE OVER SMALL SCALE
DRAWINGS.
3. DO NOT SCALE DRAWINGS, DIMENSIONS
ONLY TO BE USED.
4. DAMAGE TO UNKNOWN SERVICES - THE
CONTRACTOR'S LIABILITY WHEN HE
ENCOUNTERS UNKNOWN SERVICES IS TO
NOTIFY THE ENGINEER/PROJECT MANAGER
THEREOF IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE IMMEDIATE
VICINITY UNTIL WRITTEN INSTRUCTION TO
PROCEED HAS BEEN GIVEN BY THE
PROJECT ENGINEER.
5. IF ANY PARTICULARS OR THE MEANING OF
THE DESCRIPTION OF ANY ITEM IS NOT
CLEAR OR IS AMBIGUOUS, INDISTINCT OR
CAUSES CONFUSION AS TO ITS MEANING
OR IF ANY OBVIOUS ERROR OCCURS ON
THE DRAWINGS, THE CONTRACTOR MUST
INFORM ILISO IMMEDIATELY IN ORDER TO
HAVE THE ERROR CORRECTED OR
EXPLAINED, AS THE CASE MAY BE.
6. ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SPECIFICATIONS,
BUILDING REGULATIONS AND THE LOCAL
RHS View LHS View BY-LAWS & REGULATIONS.
1 1 : 100
2 1 : 100
All dimensions are in millimeters, unless otherwise
indicated
E D C B A
ROOF
+3490
DATE
SCALE As indicated
DESIGNED BY
Roof Base
CHECKED BY
+2200
wooden ramp constructed RAILINGS DRAWN BY
out of sawn timber
8 - 10 cm dia. poles or 150 - 200mm sawn timber
CHECKED BY
1200
ALL AFFECTED WORK IN THE
SLOPE = 1% 50mm uPVC inlet pipe SLOPE = 2% IMMEDIATE VICINITY UNTIL
12
10
11
WRITTEN INSTRUCTION TO
750
TOP WATER LEVEL 9
7
8
PROCEED HAS BEEN GIVEN BY
1500
6
CONCRETE BASE
0.3x0.3.x0.45 m 4
5 CONCRETE BASE
- 0.3x0.3.x0.45 m
THE PROJECT ENGINEER.
750
3
DIPPING ZONE 2
1
5 IF ANY PARTICULARS OR THE
75mm uPVC outlet pipe
MEANING OF THE DESCRIPTION
600 2400 2400
OF ANY ITEM IS NOT CLEAR OR IS
5400 AMBIGUOUS, INDISTINCT OR
CAUSES CONFUSION AS TO ITS
MEANING OR IF ANY OBVIOUS
ERROR OCCURS ON THE
DRAWINGS, THE CONTRACTOR
MUST INFORM ILISO
SECTION A-A SCALE: 1/50
IMMEDIATELY IN ORDER TO HAVE
THE ERROR CORRECTED OR
EXPLAINED, AS THE CASE MAY BE.
6 ALL WORK TO BE EXECUTED IN
5586
ACCORDANCE WITH THE SATCC
SPECIFICATIONS, BUILDING
REGULATIONS AND THE LOCAL
BY-LAWS & REGULATIONS.
GATE VALVE
600
DIPPING ZONE
INS
8077
PE
PLAN VIEW
ION
SLIDING GATES
PVC PIPE 75mm
SCALE: 1/50
UN
IT
DATE
SCALE NTS
DESIGNED BY
CHECKED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
HOLDING AREA
50m2 - 50 GOATS
TITLE
750
OF ANY ITEM IS NOT CLEAR OR IS
TOP WATER LEVEL 9 AMBIGUOUS, INDISTINCT OR
8
CAUSES CONFUSION AS TO ITS
7
1500
MEANING OR IF ANY OBVIOUS
6
ERROR OCCURS ON THE
CONCRETE BASE 5 CONCRETE BASE DRAWINGS, THE CONTRACTOR
0.3x0.3.x0.45 m 4 - 0.3x0.3.x0.45 m
750
MUST INFORM ILISO
3
IMMEDIATELY IN ORDER TO HAVE
DIPPING ZONE 2
THE ERROR CORRECTED OR
1
EXPLAINED, AS THE CASE MAY BE.
6 ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SATCC
SPECIFICATIONS, BUILDING
75mm uPVC outlet pipe REGULATIONS AND THE LOCAL
BY-LAWS & REGULATIONS.
600 2400 2400
5400
GATE VALVE
ATES DATE
PVC PIPE 50mm
SCALE NTS
DESIGNED BY
CHECKED BY
DRAWN BY
CRUSH PEN
1000
600
1 2 3 4 5 6 7 8 9 10 11 12 DRIPPING AR
6900
PVC PIPE 75mm
DIPPING ZONE
PROJECT
EC
ON SITE PRIOR TO
300
500
2"x3" 3"x3" COMMENCEMENT OF WORK.
2 LARGE SCALE DRAWINGS ENJOY
PREFERENCE
OVER SMALL SCALE DRAWINGS.
BASE PLATE IN CONCRETE
230mm x 230mm x 5mm THICK STEEL PLATE 3 DO NOT SCALE DRAWINGS,
DIMENSIONS ONLY TO BE USED.
2000
MANAGER THEREOF
IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE
IMMEDIATE VICINITY UNTIL
450
@2000mm c/c MAX.
@2000mm c/c MAX. WRITTEN INSTRUCTION TO
PROCEED HAS BEEN GIVEN BY
@2000mm c/c MAX.
THE PROJECT ENGINEER.
5 IF ANY PARTICULARS OR THE
300 230mm x 230mm x 5mm MEANING OF THE DESCRIPTION
THICK STEEL PLATE OF ANY ITEM IS NOT CLEAR OR IS
CONCRETE BASE WELDED TO BOTTOM AMBIGUOUS, INDISTINCT OR
END OF POLE CAUSES CONFUSION AS TO ITS
@2000mm c/c MAX. MEANING OR IF ANY OBVIOUS
ERROR OCCURS ON THE
DRAWINGS, THE CONTRACTOR
230mm x 230mm x 5mm 230mm x 230mm x 5mm MUST INFORM ILISO
THICK STEEL PLATE THICK STEEL PLATE
WELDED TO BOTTOM WELDED TO BOTTOM IMMEDIATELY IN ORDER TO HAVE
SHED - DIPPING AREA END OF POLE END OF POLE
150mm thick reinforced
300mm xTHE
300mmERROR CORRECTED OR
300mm x 300mm x concrete slab
x
450mm MASS 450mm MASS
EXPLAINED, AS THE CASE MAY BE.
CONCRETE BASE
SHED - DIPPING AREA CONCRETE BASE
FOR TENDER
1000
2000
@2000mm c/c MAX. DATE
DESIGNED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
1500
150
450
Y12 @ 200 C/C
2
DIPPING ZONE 1 150mm REINFORCED CONCRETE GRADE 30/19mm
FFL - 1.50
1500
150
300
REINFORCING DETAILS 1 - DIPPING AREA 570
TITLE
SUMMARY
1 Substructure
2 Concrete Work
4 Roofing
6 Finishes
TOTAL
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 5
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls 1
6 200mm blocks
200mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2
Concrete Blocks No.
Cement 50 kg Bags
N/A
Building Sand tonnes
15mm cement and sand (1:4) plaster with wood float finish on
8 exterior of Concrete block walls - Foundation Wall m2 20.0
Cement 50 kg Bags 3
Building Sand tonnes 1.0
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
4 12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c m 972
6m bars No. 187
5 Tying Wire
No. of 1Kg Rolls required No. 2
7 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 42.0
Timber Pegs size 50mm x 50mm m 30.0
4" Nails kg 5.0
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 200mm blocks
150mm walls - Precast concrete hollow blocks bedded in
cement and sand mortar (1:4) m2 23.4
Concrete Blocks No. 293
Cement 50 kg Bags 3
Building Sand tonnes 0.8
5 DPC
Standard Damp Proof Course - 2-ply bituminous felt
DPC (20m per roll) 4
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Valley m
9 5" nails Kg 3
10 4" nails Kg 3
11 Roofing nails Kg 4
12 Tying Wire Kg 2
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Poles
102mm diam x 4mm posts No. 8
5 Gates
3.0m gate No 3
2.5m gate No 2
1.0m gate No 1.00
Sliding gate No 3.00
Cost of Materials
TOTAL COST
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
900
ROOF CONSTRUCTION.
IT4 roofing sheets on 75*50mm steel purlines 1 CONTRACTOR TO VERIFY ALL
spaced at 1200mm centres on 150*50mm
rafters spaced at 1200mm cetres LEVELS, HEIGHTS & DIMENSIONS
ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2 LARGE SCALE DRAWINGS ENJOY
2500
PREFERENCE
OVER SMALL SCALE DRAWINGS.
3 DO NOT SCALE DRAWINGS,
DIMENSIONS ONLY TO BE USED.
4 DAMAGE TO UNKNOWN SERVICES
- THE CONTRACTOR'S LIABILITY
WHEN HE ENCOUNTERS
UNKNOWN SERVICES IS TO
SIDE ELEVATIONS FRONT AND BACK ELEVATIONS NOTIFY THE ENGINEER/PROJECT
MANAGER THEREOF
IMMEDIATELY AND TO SUSPEND
ROOF CONSTRUCTION. ALL AFFECTED WORK IN THE
IT4 roofing sheets on 75*50mm steel purlines
spaced at 1200mm centres on 150*50mm IMMEDIATE VICINITY UNTIL
rafters spaced at 1200mm cetres WRITTEN INSTRUCTION TO
PROCEED HAS BEEN GIVEN BY
THE PROJECT ENGINEER.
900
5 IF ANY PARTICULARS OR THE
MEANING OF THE DESCRIPTION
OF ANY ITEM IS NOT CLEAR OR IS
600 AMBIGUOUS, INDISTINCT OR
3400
200 3500 200 CAUSES CONFUSION AS TO ITS
725 MEANING OR IF ANY OBVIOUS
2500
ERROR OCCURS ON THE
1500
1500
1500
DRAWINGS, THE CONTRACTOR
1000
250
EXPLAINED, AS THE CASE MAY BE.
900
900
200
200
900
6 ALL WORK TO BE EXECUTED IN
200
ACCORDANCE WITH THE SATCC
600 600 SPECIFICATIONS, BUILDING
600 REGULATIONS AND THE LOCAL
SECTION B-B SECTION A-A
BY-LAWS & REGULATIONS.
11775
150 150 150 150
200 2825 2500 2500 2500 650
650
APRON
1300
650
DRAIN
FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH COMPUTER FILE NAME: 1305-LISP- 2-SOW-T-01
DATE
SCALE NTS
FARROWING PEN 2500 DESIGNED BY .
CHECKED BY .
FATTENING PEN FATTENING PEN DRY SOW PEN DRAWN BY ES
725 2100 CHECKED BY .
5800
3900
3500
3500
600
200
A3 1305-LISP-2-SOW
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
2 Sow Piggery
PO Box 50197
Lusaka, Zambia
1 Substructure
2 Concrete Work
4 Roofing
6 Finishes
TOTAL
7
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
2 Sow Piggery
PO Box 50197
Lusaka, Zambia
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 3
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls 1
6 200mm blocks
200mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2 45.4
Concrete Blocks No. 454
Cement 50 kg Bags 6
Building Sand tonnes 1.6
15mm cement and sand (1:4) plaster with wood float finish on
8 exterior of Concrete block walls - Foundation Wall m2 45.4
Cement 50 kg Bags 6
Building Sand tonnes 2.0
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House 2 Sow Piggery
Independence Avenue
PO Box 50197
Lusaka, Zambia
2. CONCRETE WORKS
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c m 873
6m bars No. 168
4 Tying Wire
No. of 1Kg Rolls required No. 34
6 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 35.0
Timber Pegs size 50mm x 50mm m 15.0
4" Nails kg 2.0
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
2 Sow Piggery
PO Box 50197
Lusaka, Zambia
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 150mm blocks
150mm walls - Precast concrete hollow blocks bedded in
cement and sand mortar (1:4) m2 36.5
Concrete Blocks No. 475
Cement 50 kg Bags 5
Building Sand tonnes 1.3
5 DPC
Standard Damp Proof Course - 2-ply bituminous felt
DPC (20m per roll) 2
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
2 Sow Piggery
PO Box 50197
Lusaka, Zambia
4. ROOFING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Valley m
9 5" nails Kg 7
10 4" nails Kg 8
11 Roofing nails Kg 10
12 Tying Wire Kg 10
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
2 Sow Piggery
PO Box 50197
Lusaka, Zambia
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Steel Poles
100mm x 5mm thick hollow steel tubes 1.8m No. 2
100mm x 5mm thick hollow steel tubes 0.95m No. 2
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
2 Sow Piggery
PO Box 50197
Lusaka, Zambia
6. FINISHES
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
GENERAL NOTES:
900
ROOF CONSTRUCTION.
IT4 roofing sheets on 75*50mm steel purlines
spaced at 1200mm centres on 150*50mm
1 CONTRACTOR TO VERIFY ALL
rafters spaced at 1200mm cetres LEVELS, HEIGHTS & DIMENSIONS
ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2 LARGE SCALE DRAWINGS ENJOY
PREFERENCE
2500
OVER SMALL SCALE DRAWINGS.
3 DO NOT SCALE DRAWINGS,
DIMENSIONS ONLY TO BE USED.
4 DAMAGE TO UNKNOWN SERVICES
- THE CONTRACTOR'S LIABILITY
WHEN HE ENCOUNTERS
UNKNOWN SERVICES IS TO
SIDE ELEVATIONS FRONT AND BACK NOTIFY THE ENGINEER/PROJECT
MANAGER THEREOF
ELEVATIONS IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE
ROOF CONSTRUCTION. IMMEDIATE VICINITY UNTIL
IT4 roofing sheets on 75*50mm steel purlines
spaced at 1200mm centres on 150*50mm WRITTEN INSTRUCTION TO
rafters spaced at 1200mm cetres
PROCEED HAS BEEN GIVEN BY
THE PROJECT ENGINEER.
900
5 IF ANY PARTICULARS OR THE
MEANING OF THE DESCRIPTION
OF ANY ITEM IS NOT CLEAR OR IS
AMBIGUOUS, INDISTINCT OR
3400
600 200 3500 200
CAUSES CONFUSION AS TO ITS
2500
725
MEANING OR IF ANY OBVIOUS
ERROR OCCURS ON THE
1500
1500
1500
DRAWINGS, THE CONTRACTOR
1000
250
IMMEDIATELY IN ORDER TO HAVE
900
THE ERROR CORRECTED OR
200
EXPLAINED, AS THE CASE MAY BE.
900
900
200
200
600 6 ALL WORK TO BE EXECUTED IN
ACCORDANCE WITH THE SATCC
600 600 SECTION A-A SPECIFICATIONS, BUILDING
REGULATIONS AND THE LOCAL
14100
APRON APRON
1300
650
DRAIN
200
FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH
3500
DATE
SCALE
200
600 DESIGNED BY .
DRAIN
200
CHECKED BY .
DRAWN BY ES
CHECKED BY .
9000
1200
200
2500
3500
3500
2825
FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH
200
650
DRAIN DRAIN
1300
650
APRON APRON
TITLE
A3 1305-LISP-6-SOW
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
6 Sow Piggery
PO Box 50197
Lusaka, Zambia
1 Substructure
2 Concrete Work
4 Roofing
6 Finishes
TOTAL
7
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
6 Sow Piggery
PO Box 50197
Lusaka, Zambia
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 5
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls 1
6 200mm blocks
200mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2 99.8
Concrete Blocks No. 998
Cement 50 kg Bags 12
Building Sand tonnes 3.6
15mm cement and sand (1:4) plaster with wood float finish on
8 exterior of Concrete block walls - Foundation Wall m2 99.8
Cement 50 kg Bags 12
Building Sand tonnes 4.0
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House 6 Sow Piggery
Independence Avenue
PO Box 50197
Lusaka, Zambia
2. CONCRETE WORKS
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c m 1509
6m bars No. 290
4 Tying Wire
No. of 1Kg Rolls required No. 58
6 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 47.4
Timber Pegs size 50mm x 50mm m 15.0
4" Nails kg 2.0
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
6 Sow Piggery
PO Box 50197
Lusaka, Zambia
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 150mm blocks
150mm walls - Precast concrete hollow blocks bedded in
cement and sand mortar (1:4) m2 84.6
Concrete Blocks No. 1100
Cement 50 kg Bags 11
Building Sand tonnes 3.0
5 DPC
Standard Damp Proof Course - 2-ply bituminous felt
DPC (20m per roll) 4
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
6 Sow Piggery
PO Box 50197
Lusaka, Zambia
4. ROOFING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Valley m
9 5" nails Kg 16
10 4" nails Kg 20
11 Roofing nails Kg 24
12 Tying Wire Kg 24
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
6 Sow Piggery
PO Box 50197
Lusaka, Zambia
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Steel Poles
100mm x 5mm thick hollow steel tubes 1.8m No. 3
100mm x 5mm thick hollow steel tubes 0.95m No. 3
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
6 Sow Piggery
PO Box 50197
Lusaka, Zambia
6. FINISHES
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
GENERAL NOTES:
900
ROOF CONSTRUCTION.
IT4 roofing sheets on 75*50mm steel purlines
spaced at 1200mm centres on 150*50mm
1 CONTRACTOR TO VERIFY ALL
rafters spaced at 1200mm cetres LEVELS, HEIGHTS & DIMENSIONS
ON SITE PRIOR TO
COMMENCEMENT OF WORK.
2 LARGE SCALE DRAWINGS ENJOY
2500
PREFERENCE
OVER SMALL SCALE DRAWINGS.
3 DO NOT SCALE DRAWINGS,
DIMENSIONS ONLY TO BE USED.
4 DAMAGE TO UNKNOWN SERVICES
- THE CONTRACTOR'S LIABILITY
WHEN HE ENCOUNTERS
UNKNOWN SERVICES IS TO
SIDE ELEVATIONS FRONT AND BACK NOTIFY THE ENGINEER/PROJECT
MANAGER THEREOF
ELEVATIONS IMMEDIATELY AND TO SUSPEND
ALL AFFECTED WORK IN THE
ROOF CONSTRUCTION. IMMEDIATE VICINITY UNTIL
IT4 roofing sheets on 75*50mm steel purlines
spaced at 1200mm centres on 150*50mm WRITTEN INSTRUCTION TO
rafters spaced at 1200mm cetres
PROCEED HAS BEEN GIVEN BY
THE PROJECT ENGINEER.
900
5 IF ANY PARTICULARS OR THE
MEANING OF THE DESCRIPTION
OF ANY ITEM IS NOT CLEAR OR IS
AMBIGUOUS, INDISTINCT OR
3400
200 3500 200
CAUSES CONFUSION AS TO ITS
2500
MEANING OR IF ANY OBVIOUS
ERROR OCCURS ON THE
600
DRAWINGS, THE CONTRACTOR
MUST INFORM ILISO
725
250
IMMEDIATELY IN ORDER TO HAVE
1500
1500
1500
900
THE ERROR CORRECTED OR
200
1000
900
REGULATIONS AND THE LOCAL
200
200
BY-LAWS & REGULATIONS.
600 600
SECTION B-B
All dimensions are in millimeters,
16750 unless otherwise indicated
150 150 150 150 150 150
200 2825 2825 2500 2500 2500 2500
650
APRON APRON
1300
650
DRAIN
200
FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH
3500
DATE
SCALE
DESIGNED BY .
200
600
DRAIN
200
CHECKED BY .
DRAWN BY ES
CHECKED BY .
9000
1200
200
2500
3500
3500
2825
FARROWING PEN FARROWING PEN FATTENING PEN FATTENING PEN FATTENING PEN DRY SOW PEN
FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH FEED TROUGH
200
650
DRAIN DRAIN
1300
650
APRON APRON
TITLE
A3
DRWG. NO.
1305-LISP- 8-SOW
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
8 Sow Piggery
PO Box 50197
Lusaka, Zambia
1 Substructure
2 Concrete Work
4 Roofing
6 Finishes
TOTAL
7
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
8 Sow Piggery
PO Box 50197
Lusaka, Zambia
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 6
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls 1
6 200mm blocks
200mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2 109.2
Concrete Blocks No. 1092
Cement 50 kg Bags 14
Building Sand tonnes 3.9
15mm cement and sand (1:4) plaster with wood float finish on
8 exterior of Concrete block walls - Foundation Wall m2 109.2
Cement 50 kg Bags 14
Building Sand tonnes 4.0
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House 8 Sow Piggery
Independence Avenue
PO Box 50197
Lusaka, Zambia
2. CONCRETE WORKS
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c m 1792
6m bars No. 344
4 Tying Wire
No. of 1Kg Rolls required No. 69
6 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 51.0
Timber Pegs size 50mm x 50mm m 15.0
4" Nails kg 2.0
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
8 Sow Piggery
PO Box 50197
Lusaka, Zambia
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 150mm blocks
150mm walls - Precast concrete hollow blocks bedded in
cement and sand mortar (1:4) m2 54.3
Concrete Blocks No. 706
Cement 50 kg Bags 7
Building Sand tonnes 2.0
5 DPC
Standard Damp Proof Course - 2-ply bituminous felt
DPC (20m per roll) 5
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
8 Sow Piggery
PO Box 50197
Lusaka, Zambia
4. ROOFING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Valley m
9 5" nails Kg 18
10 4" nails Kg 22
11 Roofing nails Kg 27
12 Tying Wire Kg 27
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
8 Sow Piggery
PO Box 50197
Lusaka, Zambia
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Steel Poles
100mm x 5mm thick hollow steel tubes 1.8m No. 6
100mm x 5mm thick hollow steel tubes 0.95m No. 6
Cost of Materials
TOTAL COST
Ministry of Agriculture Materials Schedule
Mulungushi House
Independence Avenue
8 Sow Piggery
PO Box 50197
Lusaka, Zambia
6. FINISHES
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
14000
GENERAL NOTES:
13800
3501 3500 3350 3500
2350
2925
6000
5850
5700
5850
6000
1150
2925
2350 13700
14000
PLAN
SIDE ELEVATION
DATE
SCALE NTS
DESIGNED BY
CHECKED BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
3950
PROJECT
1 Substructure
2 Concrete Work
4 Roofing
7 Finishes
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 4
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls 1
6 200mm blocks
200mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2 60.0
Concrete Blocks No. 600
Cement 50 kg Bags 8
Building Sand tonnes 2.2
15mm cement and sand (1:4) plaster with wood float finish on
8 exterior of Concrete block walls - Foundation Wall m2 60.0
Cement 50 kg Bags 8
Building Sand tonnes 3.0
Cost of Materials
TOTAL COST
2. CONCRETE WORKS
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c m 1180
6m bars No. 227
4 Tying Wire
No. of 1Kg Rolls required No. 45
6 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 40.0
Timber Pegs size 50mm x 50mm m 15.0
4" Nails kg 2.0
Cost of Materials
TOTAL COST
3. BLOCKWORK AND BRICKWORK
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 150mm blocks
150mm walls - Precast concrete hollow blocks bedded in
cement and sand mortar (1:4) m2 50.8
Concrete Blocks No. 661
Cement 50 kg Bags 7
Building Sand tonnes 1.8
5 DPC
Standard Damp Proof Course - 2-ply bituminous felt
DPC (20m per roll) 2
Cost of Materials
TOTAL COST
4. ROOFING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Valley m 12.0
9 5" nails Kg 15
10 4" nails Kg 18
11 Roofing nails Kg 23
12 Tying Wire Kg 23
Cost of Materials
TOTAL COST
5. CARPENTRY, JOINERY & IRON-MONGERY
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Doors
External Quality Door, Size 1150mm x 2100mm No. 1
3 Window Mesh
area (m2) 57.0
using 38x38 SW - Size 3250*2100 No. 12.0
supporting hinges No. 136.0
Rolls of wire mesh No. 29.0
Cost of Materials
TOTAL COST
6. METALWORK & GLAZING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
7. FINISHES
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
8. PAINTING & DECORATION
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Knot, Prime, Stop and Apply Undercoat and two high gloss
8
finishing coats on general surfaces of flush doors m2 25.6
Undercoat 5ℓ containers 0.6
two coats High Gloss finishing paint 5ℓ containers 1.0
Cost of Materials
TOTAL COST
20000
4000 4000 3850 4000 4000 GENERAL NOTES:
3025
3025
9000
2800
2800
corrugated iron sheets
5350
5350
3950
3025
3025
structural pedestal
square section
2800
Blockwork 800mm
high
Compact
Hardcore to 95%
MOD AASHTO
NGL +0.00
PLAN
4500 4500
BACK ELEVATION
Compact Compact
Hardcore to 95% Hardcore at 95%
MOD AASHTO MOD AASHTO
NGL +0.00 NGL
+0.00
DATE
SCALE NTS
DESIGNED BY
CHECKED BY
DRAWN BY
4000 4000 3350 4000 4000
Corrugated iron sheets CHECKED BY
structural pedestal
square section
BLockwork 800mm
hight
Compact
Hardcore to 95%
MOD AASHTO
NGL +0.00
PROJECT
1 Substructure
2 Concrete Work
4 Roofing
7 Finishes
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at 5ℓ/m2
1ℓ Bottles 7
(1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll) rolls 1
6 200mm blocks
200mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2 60.0
Concrete Blocks No. 600
Cement 50 kg Bags 8
Building Sand tonnes 2.2
15mm cement and sand (1:4) plaster with wood float finish on
8 exterior of Concrete block walls - Foundation Wall m2 60.0
Cement 50 kg Bags 8
Building Sand tonnes 3.0
Cost of Materials
TOTAL COST
2. CONCRETE WORKS
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
4 Tying Wire
No. of 1Kg Rolls required No. 63
6 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 58.0
Timber Pegs size 50mm x 50mm m 15.0
4" Nails kg 2.0
Cost of Materials
TOTAL COST
3. BLOCKWORK AND BRICKWORK
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 150mm blocks
150mm walls - Precast concrete hollow blocks bedded in
cement and sand mortar (1:4) m2 74.7
Concrete Blocks No. 971
Cement 50 kg Bags 9
Building Sand tonnes 2.7
5 DPC
Standard Damp Proof Course - 2-ply bituminous felt
DPC (20m per roll) 2
Cost of Materials
TOTAL COST
4. ROOFING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Valley m 12.0
9 5" nails Kg 22
10 4" nails Kg 27
11 Roofing nails Kg 33
12 Tying Wire Kg 33
Cost of Materials
TOTAL COST
Schedule of Materials for Cottage at Hse No. 18 Muombo St. - Nkana East belonging to Dr. J. Ngungu
5. CARPENTRY, JOINERY & IRON-MONGERY
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Doors
External Quality Door, Size 1150mm x 2100mm No. 1
3 Window Mesh
area 86.4
using 38x38 SW - Size 3250*2100 No. 18.0
supporting hinges No. 168.0
Cost of Materials
TOTAL COST
6. METALWORK & GLAZING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
7. FINISHES
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
8. PAINTING & DECORATION
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Knot, Prime, Stop and Apply Undercoat and two high gloss
8
finishing coats on general surfaces of flush doors m2 25.6
Undercoat 5ℓ containers 0.6
two coats High Gloss finishing paint 5ℓ containers 1.0
Cost of Materials
TOTAL COST
GENERAL NOTES:
14000 4000
13800
380
3501 3500 3350 3500
1710
2350
2925
600
6000
5850
5700
5850
6000
1150
2000 2000
2925
2350
13700
NEST BOX
14000
PLAN
1260
1260
300
structural pedestal structural pedestal 460
square section round section
460
3500 3500 3350 3500
No. DESCRIPTION / REVISIONS DATE
DATE
SCALE NTS
DESIGNED BY
CHECKED BY
DRAWN BY
Corrugated iron sheets Corrugated iron sheets CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
PROJECT
1050
1200
GL
600
25m
unless otherwise indicated
14m
DATE
SCALE NTS
DESIGNED BY
CHECKED BY
DRAWN BY
CHECKED BY
CONTENT & DESIGN PROJECT
QUALITY ACCURACY COMPLIANCE COMPLIANCE
CHECKS
6m
PROJECT
20m TITLE
1
SUMMARY - SCHEDULE OF MATERIALS
1 Substructure
2 Concrete Work
4 Roofing
7 Finishes
TOTAL
1. SUBSTRUCTURE
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Anti-termite treatment
Termidan 1 litre Anti-Termite Solution, Applied at
1ℓ Bottles 4
5ℓ/m2 (1ℓ diluted with water to make 200ℓ solution)
3 DPM
Standard Damp Proof Membrane (100m x 1.8m per roll)rolls 1
6 200mm blocks
200mm walls - Precast concrete hollow blocks type A
6.1
(5.0N/mm2) bedded in cement and sand mortar (1:4) m2 60.0
Concrete Blocks No. 600
Cement 50 kg Bags 8
Building Sand tonnes 2.2
15mm cement and sand (1:4) plaster with wood float finish
8 on exterior of Concrete block walls - Foundation Wall m2 60.0
Cement 50 kg Bags 8
Building Sand tonnes 3.0
Cost of Materials
TOTAL COST
2. CONCRETE WORKS
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c m 1180
6m bars No. 227
4 Tying Wire
No. of 1Kg Rolls required No. 45
6 Formwork
Sawn formwork to sides/edges of floor slab
Timber 150mm x 50mm thick m 40.0
Timber Pegs size 50mm x 50mm m 15.0
4" Nails kg 2.0
Cost of Materials
TOTAL COST
3. BLOCKWORK AND BRICKWORK
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 150mm blocks
150mm walls - Precast concrete hollow blocks bedded
in cement and sand mortar (1:4) m2 50.8
Concrete Blocks No. 661
Cement 50 kg Bags 7
Building Sand tonnes 1.8
5 DPC
Standard Damp Proof Course - 2-ply bituminous
felt DPC (20m per roll) 2
Cost of Materials
TOTAL COST
4. ROOFING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 Valley m 12.0
9 5" nails Kg 15
10 4" nails Kg 18
11 Roofing nails Kg 23
12 Tying Wire Kg 23
Cost of Materials
TOTAL COST
5. CARPENTRY, JOINERY & IRON-MONGERY
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
1 Doors
External Quality Door, Size 1150mm x 2100mm No. 1
3 Window Mesh
area (m2) 57.0
using 38x38 SW - Size 3250*2100 No. 12.0
supporting hinges No. 136.0
Rolls of wire mesh No. 29.0
4 PERCH
38x38x 4000 No 5.0
38x38x1710 No 3.0
38x38x600 No 6.0
5 NEST BOX
38X38X1260 No 2.0
38x38x1140 No 2.0
38x38x1380 No 2.0
38x38x460 No 6.0
16x38x1380 No 2.0
SHATTERING BOARDS
16X50X1000 (LHS & RHS) No 16.0
16X50X1000 (REAR) No 26.0
38X50X1000 (FRONT) No 4.0
FLOOR BOARDS
6mm thick floor boards (460X1380) No. 2.0
Cost of Materials
TOTAL COST
6. METALWORK & GLAZING
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
7. FINISHES
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Cost of Materials
TOTAL COST
8. PAINTING & DECORATION
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
Knot, Prime, Stop and Apply Undercoat and two high gloss
8
finishing coats on general surfaces of flush doors m2 25.6
Undercoat 5ℓ containers 0.6
two coats High Gloss finishing paint 5ℓ containers 1.0
Cost of Materials
TOTAL COST
SCHEDULE OF MATERIALS FOR A WATER TANK AND STAND
ITEM MATERIALS & DESCRIPTION UNIT QTY PRICE (K) TOTAL (K)
3 WATER TANK
2500L
2500l polyethene tank No. 1
4 TANK STAND
Premanufactured tank stand No 1
7 Reinforcement
12mm dia. High Strength (Y) Mild Steel Bars @ 200c/c
12mm bars No. 71
Cost of Materials 0