You are on page 1of 2

TRACERMATE II Quick Start Guide

Power and Setup


1

Electrical and Regulator Setup

AC POWER CABLE

IO PINOUT

PIN 14 PIN 1

REFERENCE GAUGE LABELS


FOR MAXIMUM AND
MINIMUM PRESSURES

PIN 25 PIN 13

HARD VAC GAUGE

Cincinnati Test Systems Inc • 10100 Progress Way • Harrison, OH 45030 • Tel. (513) 367.6699 • www.cincinnati-test.com
Port Connections
2

Test, Source and Output Connections

Note: While installing compression fittings its important not to over tighten. Please
install according to the following diagram.
1 and 1/2 Turns

PLEASE REFERENCE THE MANUAL SHIPPED WITH YOUR INSTRUMENT


FOR COMPLETE INSTRUCTIONS ON SETTING UP AND RUNNING TESTS

Cincinnati Test Systems Inc • 10100 Progress Way • Harrison, OH 45030 • Tel. (513) 367.6699 • www.cincinnati-test.com