EQUIPMENT CODE CONSUMER ELECTRONIC SERVICING NC-II LOCATION PRACTICAL WORK AREA Schedule for the Month of November 2012 ACTIVITIES MANPOWER Every Every Daily other Weekly 15th Monthly Remarks Day Day White board & equipment wiped and cleaned polished to avoid Trainee √ accumulation of dusts. Computer set & equipment maintained Trainee √ regularly Equipment checked for any defects Trainee √ Electrical wirings and cables arranged and Trainee √ secure properly Equipment ceiling instrument turned off Trainee √ when not in use Spare equipment, tools and materials stored in Trainee √ the proper places Locations of all firefighting equipment Trainee √ clearly identified