Sl.# Drawing # Line# Contractor concern


01 RB-848715 6”-P-19144-ILE1P11 1.NDT coverage
2.coating spec/selection
3.sis
02 RB-848716 8”-P-19147-1LE1P11 1.NDT coverage for the line
2.coating spec/selection
3.sis-IFC
03 RB-848717 3”-D-19229-ILE1P11 1.NDT coverage for the line
2.coating spec/selection
3.sis-IFC
04 RB-848744 12”-P19163-1CS1P 1.NDT coverage for the line
2.coating spec/selection
3.sis-IFC
05 RB-848745 10”-P-19162-1CS1P 1.NDT coverage for the line
2.coating spec/selection
3.sis-IFC
06 RB-848743 8”-P-19156-ICS1P 1.NDT coverage for the line
2.coating spec/selection
3.sis-IFC
07 RB-848742 6”-P-19156-ICS1P 1.NDT coverage for the line
2.coating spec/selection
3.sis-IFC
08 RB-864422 4”-D-19231-1LE1P11 1.NDT coverage for the line
2.coating spec/selection
3.sis-IFC
( The has redlined to 4” )