DRAFT MATERIAL REQUEST FOR

SITE ID
SITE NAME

SITE ADDRESS

SITE TYPE
Contact No :
Keys Availabilty :
Contact no. for Keys :
BTS Configuration:-
Oracle code
AIRSCALE HW
N4SHN0019
NCLHID165

RF Modules

NCLHID076
NCLHID454
N4LHI0013
GSM Antenna
NET004264
NET003692
N4GHIM763
COMNET076
COMNET074
E2LHI0884
E2LHI0885
NET005018
NET005134
NCLHID444
NCLHI0087
LBCC99004
BTS Installation Materials

NCLHID252
LMCC11293
N2LHI0122
NCLHI0029
N2LHI0025
NCLHID001
NCLHID015
NCLHID015
NCLHID012
NCLHI0111
NCLHI0112
NCLHI0113
NCLHID001
NCLHID449
Requested By :

Project / Site Manager


______________________________________________________________________
Logistics Dept.
DRAFT MATERIAL REQUEST FORM (TDD 4th Sector AIRSCALE
BAPAT-121
PATNA-121

Mr. Anil kumar , s/o nageswar prasad manpura patna GPO,P

GBT
8294243748
IWS

Item descriptions Unit

4G LTE-FD FOSH Optical SFP H 850nm 6G 300m MM Nos.


RNC--Others:SFP 10GBA SE SR Fibre Multi Mode Nos.
AZNA Power Connector Nos.

FPKA Nos.
NodeB--Others:HW - AZNA_ RRH module 2300 Mhz Nos.
Installation material : Installation kit-System Module ( AirScale) Nos.
4G LTE-FDD_Installation kit Additional Sector for DBS Macro Nos.

8 Port Wide Band dual beam antenna 4T4R 10 deg: XXDWH-19-33ie-iVT-DB-8P Nos.
8-Pin Circular male ; 27 inch(0.686 Mtr)RET to RET Cable-AISG Cable for Integrated RET Antenna Nos.
Jumper Cable-7M  1/2 SF Jumper 4.3/10 M straight to D M straight Nos.
Jumper Cable-3M - 1/2 SF Jumper 4.3/10 M straight to 4.3/10 M straight Nos.
Jumper Cable-3M -1/2 SF Jumper 4.3/10 M straight to 4.3/10 M straight
Jumper Cable - 4.3/10 (M) to N M Right Angle Length 3m Width 1/2" Jumper with waterproof boot Nos.
Jumper Cable - 4.3/10 (M) to N M Right Angle at both ends
Length 5m Width 1/2" Jumper with waterproof boot Nos.
8-port Twin Beam Antenna, 8x 1695-2690 MHz, 33 HPBW. RET compatible by replacing the manual Nos.
at both ends
Twin Beam- 8 Port WB DualtiltTwincartridge
Beam -on 4xsite with the plug-in
(1695-2690) MHz, with RET4.3-10 Connector and beam Nos.
Isolation 30 dB Nos.
Installation material : Lable set for single cable Nos.
Nylon Cable Tie (Tie Wraps) Nos.
Weatherproofing Kit 221213 - E Nos.

ret cable Nos.


Installation Material : 6 pair Patch Cord Optical Fiber Distributed Box, 12P LC-LC, F-F Nos.
Installation Material Unclassified - Flexi.MR - IM : 2G_Power Cable - 6 Sq mm XCMK Mtr
BTS - Flexi MR - Installation Material : 2G_6 Sqmm Copper grounding cable -Y/G Mtr
16 Sq. mm Copper flexible grounding cable y/g_Box Nos.
Power Cable - 16 sq mm XCMK(For Airscale SY Module) Nos.
NodeB - - Installation material : CPRI 8.2mm Armourd Cable_5M Nos.
NodeB - - Installation material : CPRI 8.2mm Armourd Cable_20M Nos.
BTS--Installation material:CPRI 8.2mm Armourd Cable_30M Nos.
BTS--Installation material:CPRI 8.2mm Armourd Cable_50M Nos.
NodeB - - Installation material : CPRI 8.2mm Armourd Cable_40M Nos.
NodeB - - Installation material : CPRI 8.2mm Armourd Cable_60M Nos.
NodeB - - Installation material : CPRI 8.2mm Armourd Cable_80M Nos.
NodeB - - Installation material : CPRI 8.2mm Armourd Cable_5M Nos.
CPRI 8.2mm Armord-Corr OFC LC-LC+600mm MM Dplx Fan out 50M Nos.

____________________________________________________________
s
QUEST FORM (TDD 4th Sector AIRSCALE)
BAPAT-121
PATNA-121

nageswar prasad manpura patna GPO,PS Patliputra. 06122270188

GBT
8294243748
IWS

Issued Qty
Standard Approved Qty By NSN by Additional req Qty used at Site
Warehouse

As per Req IF TD DC not running


As per Req 2 As par plan
As per Req 1

As per Req 2
As per Req 1
As per Req For AS BTS
As per Req According to Sec plan

As per Req According to Sec plan


As per Req According to Sec plan
As per Req According to Sec plan
As per Req 8 According to Sec plan  AZNA to TB Antenna
As per Req According to Sec plan( In special cases ) AZNA to TB Antenna
As per Req According to Sec plan  FZNI to TB Antenna
As per Req According to Sec plan( In special cases )  FZNI to TB Antenna
As per Req
As per Req
As per Req For specal Casses
As per Req
As per Req

As per Req 1
As per Req
As per survey 30*1 For RF
As per survey For RF
As per survey FOR SY
As per survey FOR SY
As per survey
As per survey
As per survey
As per survey
As per survey 40*1
As per survey
As per survey
As per survey
As per Req Fanout Cable
Signature / Date: 19/07/11 Signature / Date

Signature / Date Signature / Date

Signature / Date
Balance
Material
available at
Site

In

You might also like