You are on page 1of 20
www. yncoupling.com @Y cE [G LRQA Iso 9001 cE ke Since 1986 PIPE COUPLING Technology Revolution! PIPE COUPLING The YN-coupling is for installing new pipelines coupling and repairing clamp © ‘ounenaw wetAL.co, 10, a Le Cerny rind BLT Acquired Lloyd's Register Quality Assurance (LRQA) ISO 9001 + Lloyds Registers 50 9001-certfied enterprise for the fist time in the domestic PIPE COUPLING industry + Acquired certifications from the world leading classification societies in eight countries z TYPE APPROVAL CERTIFICATES FOR YN COUPLINGS H (Eight countries that granted class-type approvals) DNV-GL DNV -@L) Norway (eu av) RMRS) Germany France Russia > Short construction period > Maximum economic benefits from reduced use of raw materials > Easy installation and repairs of pipelines > Longer product lifespan 02-v wow yncousng.com YOUNGNAM METAL CO., LTD. For new installation and repairs of pipelines MODEL 2: GR-L MODEL 4 : MF-RL. MODEL 3 : MF-RS MODEL 8: RCD-L MODEL 7: RCD-S NW soaeGie [oo Material 1] Case SUS 304 /SUS316 EROM _| Water ak, ponder, ese ube, 2| puboer [NER | Vareus tse fond gas and 700) SILICONE | Fgh-lenperalue sea arse ube, oe, -S00~¥2800) VITON _ |For high-tenperaurechericalrancer 00) 3|__ Sine Plas _ [SUS 308/SUS3T6L 4 | Round Bw Washer [SUS 3037 SUS 3761 S| Round Bar Nut [SUS 3087 SUS S76 6|__ Bal 3083047 SUS STL T[GripRng _[SUS30H 73014 8[_Giprset _ |susa0e | Spacer __ | Special ubber or antilock! orange=NBR, blue=EPDM TO] _InserPlate_ [PE, SUS 04(Opton) No-03 GRIP-RING COUPLING (Dimensions) Model 2 : GR-L (GRIP RING ~ LONG) Model 1 : GR-S (GRIP RING - STANDARD) GR-S % PIPE 0,0. specs are available for al sizes, RD RI MIP ox 20H 0 318-5378 BSD LOM EP OWI x Tao [ 755 [157 [38014 [7a [1-3 [7199-17001 BO 7 Nonrlbianee ase Serge psianCkore(nin) Ol seul Ou Duet Ppelnin) D2 irr wate en "over Darter Coepinin) Mt Fee Dot Sze erg We Mere Peszebgl-e Wi Weg Punta) Coleen PF opimunt ach True ae Wil-en) The seeieatons are subject to change for eualtyimprovery vwww.yneousling.com YOUNGNAM METAL CO., LTD. MULTI-FLEX COUPLING (Dimensions) Model 3 : MF-RS (MULTF-FLEX ~ ROUND STANDARD) Model 4 : MF-RL (MULTI-FLEX ~ ROUND LONG) ‘x PIPE 0.D. specs are available forall size. {700~300 r700~300) O00) 7=900) DORON. mE BO~170 (BU0="700 200 0 10120 (GOO=1200 250 =H = so [= ToS A Foe Bo Se ergh ini > ierorgPessaetgt-endh MIT Wegh Peru) FF opiman| sing Terese kl-en 2 The specications are subject to change for qually improvement PLING 05 Ei REPAIR CLAMP HINGE COUPLING (Dimensions) Model 6 : RCH-L (REPAIR CLAMP HINGE ~ LONG) RCH-S (15A~1 ,000A) X PIPE 0.D. specs are available for all sizes. Tex a 30) CaO=S0r FTO OO OTD MBX SOL, 56 a=B0) ‘Of s1-0| Nex SOL a6 A801 ODEO MIO SL B=T0- BO OMDSTLO | MIO eo a0 De 29-25 DO-750 ODE 25-200 230 ‘OTS. 5-95 00-350 omar 3-35 00350 ‘OMDS7 0] wre x TOL 507300 DEPP we x 0. 5000300 DEE 80600 A00 De Te=800 0120 ron RCH-L TSA? 2. Mex] 7 | | me | 8 | Om | S85 Toy Aa r Mg aot || as fae 8 aT i a rr re z ‘Orb0.8 | Wex oot | Too] | 1 a6 B01 ak IBEW SOL | TON | Bt Te [ea i BOIS [OTT Mo wl | S| [STO 100 BAT TED e SOE w ws TT Te T ETOH TO AF a3 88 Lomas Pw wo | Poss a2 PO SoA EC A TWA TEED ost Pwr wo 70s [as [ae te 20 75 O78 Tsay TEE aT Pobsts pwr wtf Me [ae [7s] 3=95 (BO0-250 150 165 7TeES POSS Poi ef Plea | r 7 {30°35 en0=350 THI Tet DP wie x TH | [+ 0-50 HOO 300 T TET Pera Bie Wot 2330 soon ws weDL omar [we tao | 785 —[ i015 [aa 00~ a0 Bane [a 0368.0 OD 1a0 [758 [189 [aa 500. a 0479-0 Sure 1all [758 To [18-8 [a T00- 800 oOo. a So Ws TsoC | 7 a A CPO Use birt otCapto ini tute be Seem rim vr niger lcalions are subject to change for qualty improvement www. yncoupling.com_YOUNGNAM METAL CO., LTD. CLAMP DOUBLE LOCK COUPLING (Dimensions) Pipes Split Clamp Joints Model 7 : RCD-S (REPAIR CLAMP DOUBLE LOCK ~ STANDARD) Model 8 : RCD-L (REPAIR CLAMP DOUBLE LOCK ~ LONG) RCD-S(20A~5,000A) ‘x PIPE 0.D. specs are available forall sizes. Max 28-57 S10 30~0) Wrox ss [8 =i on rsor Isat 75-1100 150 Tire x T00L WWT6 x 100L BOE fé'3 118.0, i 2030 (200-300) Tat fr 25900300 ‘RDD=1001 250 TAO TBO Dr: teu OuerDarter espe i=) OE Max, wade Lint Pin eer ressaetg end) WT Meg Peas) as ware oC [758 [ 170300 78 p79 Se See Wie x10 [7551 350 5 10: Nonrtone | sank Sereapeapsion Cree nin) over Dieters cere ini) Fae So Sankar cours ih ie ProsimunLachng Tree Ve em) The specications are subject ta change for qualty improvement No-O7 FPC-GRIP RING COUPLING (Dimensions) LH Laces oak Se ce DAL ea a Clic CILLLS 4 The product just before the fire test, afterbeing installed 4 The product during the fire test according to SO 19922 inafumace regulation ‘a The product after completion of the test with normal ‘a The product with flame temperature being maintained pressure being maintained at over 800°¢ atover 800% 44 The product with absolutely no internal structre problems after the test. FPC-GR-S 708. uy 08 TESTED 30 7 Ta 3 5 a www. yncoupling.com_YOUNGNAM METAL CO., LTD. YN -COUPLING NEW MODELS on TATE Retina YN- COUPLING YN- COUPLING ieee) ioe come (Width 300mm ) (Width 500mm ) (Width 700mm ) 300A~3,000A Eee roy Bier) ‘4 Remark Y,N COUPLING Lengthimm) (L:300, L:500, L700 Available by order) [Aone onan sons ned Pipes Connecting Test Report Tenant Reporte Dngwoo / 2 Aig 2011 Te upg acs om sy Arcs pti G YN PPE COUPLING “09 OPERATING PRINCIPLES AND INSTALLATION Because the protrusion ofthe inne sealing, devised by special principles to accurately maintain pressure ina tight state inside, assures semi-permanent lf and the LIP inthe shape of lips keeps the contents flowing ito the inside absolutely watertight under any circumstances, leaks are guaranteed tobe practically ri. In particu, the length of product MODEL RL. ROUND LONG} s1.6~1.8 ies longer than MODEL RS (ROUND STANDARD}, and therefreits use s concentrated in places where shrinkage and expansion ae frequent Inthe diagram, the dotted Ines leading up to the arows represent the function that allows the maximum shrinkage and expansion fhoth sides ofthe pipe are not fixed inplace when using the MF-RSIMF-L Type it ishighy likely thatthe pipe willbe pulled out due pressure inside the pipe) é Maximum allowable shrinkage/expansion space YN - PIPE COUPLING CONNECTION GUIDE oO x “AMUITI-FLEX COUPLING AFLANGE " I ee oe RRO SE ib : 7 ‘AUNION ‘ASOCKET “AWELDING “AREPAIRING THE PIPES “ACOMPLETED THE REPAIRING www.yncousling.com YOUNGNAM METAL CO., LTD. TEST SPECIFICATION OF PIPE COUPLING Recrrng ied aca) 1 Tightness Test Applied Applied aur Connect a mechanical joint in the space between pipespres surietwith pressure 15 times the design pressureand main- taint for S minutes. PASS ifitisleak fee 2 Vibration Test Applied Perform the three tests on the pipe connected to@ mechanical joint by maintaining design pressure. PASS onl ifall three tests prove tobe leak re. SEEN 3x10" 0.06 100 EEA 0.5 ay Sx10F 215 10. 3 | Pressure Pulsation Test Applied Atestto check whether an assembly with mechanicaljointscan withstand pressure pulsation. Increase the impact pressure to 15 times the design pressure from zero within a frequency range of 30~ 50 cycles per minute, wth the number of cycles boeing over 500,000, and check for any leaks or signs of faut. PASS only fno faults are detected, 4 Burst Pressure Test Applied Applied Atestintended to check whether an assembly that passed wa- ‘ertight test can withstand a burst pressure four times the de- sign pressure PASS only fits leak ree even when the foregoing pressures applied 5 Pull-OutTest Applied When the load pressurized up to the design pressure and cal ulated by the following equation is applied to an assembly in the direction of axalload to verify thatthe assembly with ame- chanical joint is not separated from the connected pipe under the axial load that can be generated while the assembly isin use, It must be leak fee to be declared as PASS. L=-“.p.-p (Axial Lose) (Tube Size) w/Pressure) 6 FireTest Applied Applied Expose an assembly with a mechanical joint to a flame at 800°Cdmifor30minutesinastate where waterisin circulation at over Sounder the design pressure of joint (Havethe flame envelop the test material) PASS only if there is no leak 7 Vacuum Test Applied Applied Connect the assembly that has a mechanical joint toa vacuum pump to make the pressure 170hPa (absolute pressure). Ifthe pressures stabilized, separate the vacuum pump from the as- sembly with a mechanical joint being tested and keep it inthis, condition for rinutes. PASS only ifno fault ccursin this tate. 8 | Repeated Assembly Test Applied Combine and separate the test material with a mechanical joint times according tothe manufacturersinstructionsand carry out the prescribed watertight test. PASS ifthere sno leak. No 11 TEST DATA FOR PIPE COUPLING MER gap [MAMaREEIT sat tat? 1008 Nonnat | Hydraulitest; Normal we , cet) acd MERS atiem: | Both sides Mon | 30k 3 Normal (15mm Misalinged) GR-S65A, 24 36 9.6 Sees Pressure Recording a 404 500,000 404 00,000 700A 500,000 700A 500,000 200A 500,000 200A 500,000 WeeeriT 4 Impulse Pressure Diagram www.yncousling.com YOUNGNAM METAL CO., LTD. TEST DATA FOR Y.N GRIP RING PIPE COUPLING | PULL OUT LOAD TEST (seer 11) 408, 04 408, 04 TOA 7 TOA Ww 2008 45 2008 45 Test Administration Agency : Safety Economy Engineering | Test Name: Vibration Test, Pressure Test, Vacuum Test ‘Vibration Test Method (SeeP. 11) “£006 100 Repeat Sequence 3x10" 405 45 Satisfactory HS: 10 © Pressure Test Method (SeeP.11) 32kgtlem? Satisfactory (Pressure tice ashigh as working pressure) BesuleSaifatony ‘© Vacuum Test (Time) (See?.11) ‘Vacuum Test Pressure: 170mbar Result Satistactory “Test Administration Agency : Korea Maritime Equipment Research institute | Scene of vibration tests | Scene of Fire Test (Flame Test) (simultaneously conducted) Test Administration Agency Changwon Techno-Patk Equipment Research institute Test Detals: Simultaneous performance ofthe above Test Details fire resistance test was conducted for 30 minutes 800°C. Pressure oF 18kgffcm* maintained) Test Regulations:ISO 19521,150 19922 No-13 PIPE COUPLING SITE APPLICATION = innominate With the exception of high-pressure lines such as firefighting ines, plumbing, ballast, sanitary, compressed ar cooling water ystems, seawater fresh wate drains soundings, electiccablepro- tection, iltransfer and fuel oilines, MULTEFLEX, GRIP RING PIPE COUPLINGS are used in a wide range of applications. They have front and back leftand right torsionsinthe calibrated part ofthe Cente line, For places with a high noise level, they guarantee various useful functions such asa 30% lighter weight than the general ange connection process In patculay, the lng-sized cou pling vith ts lng attachmentlength, isan novative productfor the shipbulding industry, where Sever vibration, shrinkage, and expansion commonly occu For gas supply and piping for district heating works Gas pipes and dual pipes fr heating works are mostly welded: hwever, sucha welding process hast drawbacks the weld zone requires uiltr-precision welding technology, and ifafault about ‘the size ofthe eye of a needle develops, gas and warm waters sue to continue to leak under- ground thereby causing fatigue phenomena soft around, and excessive oad. We are justly proud that this products the only soltion to prevent amajor accident arsing from such factors pati lly with respect to pipes buried underground, ee A itis used annually for repais to cold and warm water pump lines and LPG, LNG, and GAS pipelines, its cost efficency has alteady been proved. particulay, the pipe ends do not need to bbemachined butcan be used as they are. there are no severe rock pockets, orrust rock pockets are minor ts functions remain intact and in perfect condition, Piping in mechanical device sectors that experience vibrations Wiel used as intake and discharge piping for clean water, seawater and cooling water and as pipes for compressed ar, powdery, chemicals coal etc. the pipe is blocked due to wastewater fad intake and discharges prevented the coupling canbe detached again cleanedandreasser- bled, thereby minimizing the hassle cost, and manpower. nnn As tredces stationary vibrations and noise occuring from continuous vibration and from the ‘mechanical pars of rotating machine or power unitsby more than 60% stains onthe accessory ‘equipment or auges are reduced, Ie ens Itis used forconnecting PVC pipes with stainless steel pipes made of entirely cfferent materials, and for coupling heterogeneous pipes suchas stainless steel pipes and cast iton pipes. Even though a deviation of about 10" occurs a tightness definitely maintained www.yncousling.com YOUNGNAM METAL CO., LTD. APPLICATION OF PIPE COUPLING ‘Installed inthe indoor and outdoor pipelines of factories, general buildings and in insulated dal pipes (alistrict heating works) ‘Used forinstaling/tepairing new pipes in commercial ships and battleship engines and decks, and formaking repairs tothe pipes of vessels in operation. ‘Used to connect water and sewage pipes dainpipes, firefighting pipes, water supply pipes, agricultural water supply pipes, conduits, hhume pipes and PVC, RP pipes, et. ‘Used for insaling water pipes and drainpipes in nuclear, thermal, and hydroelectric power plants ‘Used fr installing subway structures andor pipes buried underground and underwater. ‘*Used forinstalling ll pipelines in refineries and gas pipes buried underground. ‘Used forinstaling equipment pipes, transmission pipes in refrigeration plants and others. Cre Easy use for repair of indoor and outdoor No need for special tools. t has the func Made of strong corrosion-esistant stain piping in new or old buildings, tion of completely absorbing externalim- less steel 304 materials it prevents corto pacts and vibrations sion even in contact with corrosive waste- water or chemicals from the outside. srt Designed and manufactured by an effi The centertorsion is alowed upto 10"on The contents remain airtight even when cient construction method for useeven in- both sides (one side up to), outside impacts are applied to the front, confined spaces its cost efficiency is guar- rear left and right instantaneously in suc Nanteed cession hR— Y Absolutely no problems occur even ifthe Despite the instantaneous inside pressure pipe outer diameter (diameter is either inflow or vacuum state, its function remains larger or smaller by about 2% in perfect condition Youngnam Metal's multipurpose PIPE COUPLINGS will provide the most efficiency for your design and installation in terms ofits use and economy and will enhance your design quality Drainage Line YNPIPE COUPLING: 15 OPERATING PRINCIPLE AND INSTALLATION GGRIP RING PIPE COUPLING is structurally designed to securely fasten the pipe under high pressure, and may be used for any ‘ype of piping. tis the most practical and efficient pipe coupling process ever devel- ‘oped, and has eliminated the hassle of ex- isting processes, such as the flange welding, socket ‘and union installation processes — = GRIP RING PIPE COUPLING can guarantee ‘ot onl semi-permanent use, but aso per- fectly and securely fastens the pipe under pressure since the ripringis designed and fitted at 45", as shown below. ‘GRIP RINGPIPE COUPLING can be installed Uuptoamaximum allowable angle of 10° on both axes. GRP RING LONG SIZE (GR-L) can be installed upto6" evenifthe centers af- fected by torsion on ether side, With aspecaly structuredinner sealing, air tightnessis perfect. Simultaneous vibration and continuous noise are reduced by over ‘608, and instantaneous vibration, station- ‘any vibration, and one-side vibration areab- sorbed as well GGRIPRING PIPE COUPLING can bein stalled by anyone, anytime and anywhere, with the utmost eas, Installation in one place requires only 10 minutes. Space use is minimized through construc- tion in concrete structures and in other na row spaces such as the pit space in an apartment, and the construction process is ‘excellent inthe ace of chronic problems of stagnating wastewater, rainwater, etc. The product, with its simple design, will be an Integral part of your piping technology. www.yncousling.com YOUNGNAM METAL CO., LTD. Very large pipe couplings 63120mm Developed Now! a 93120mm for ocean bed connection (hydraulic test 10kgfscm?) Installating prepare Installation of ocean bed blocks YN PPE COUPLING: 17 YN-PIPE COUPLING FROM MANUFACTURING TO SITE ; a www.yncousling.com YOUNGNAM METAL CO., LTD. PIPE COUPLING APPLICATION TECHNOLOGY ‘4 Underground drainage repair(Maintenance) works PN cla eee ae un ee Eu kein il: f Y Head Office, Youngnam Metal Co., Ltd. yy Youngnam Metal Local Subsidiary in China VY Participation in the Korean pavilion at Middle East Fair 12-3, Jilye-ro 74beon-gil, Jilye-myeon, Gimhae-si, ; Gyeongsangnam-do, 50874 Korea © vowownnera.co,i, eee ee Revised 14th Imprint

You might also like