You are on page 1of 4
eo" a eta oes Pair fat warts agree oe aT vor ‘wet wo 418 Ef, afer sot ag Rett http://cpwd.gov.in ‘eefbar—011-23062330 lelsetascsq.cpwd@nic.in OFFICE MEMORANDUM Sub:- Modification to PAR-2019 incorporating re-categorization of Non-Residential Buildings into 03 categories segregating school buildings as independent category. In partial modification to PAR-2019 issued vide OM of even no. dated 28.06.2019. The rates for school buildings have been segregated and incorporated as independent category from office and college. The rates have been worked out and inserted (modified as page no. 1). ‘Also Specifications for Non-Residential Buildings too have been segregated for school buildings (modified as per page no. 14 and 15). Therefore now onward page no. 1 and page no. 14 and 15 of the OM issued on 28.06.2019 may read as under. PLINTH AREA RATES AS ON 01.04.2019 ANNEXURE - 1, Page-1 SI.No. Description ‘Non-Residential Buildings Residential Buildings Office’ | Hospital | Schools Hostels Quarters College (Type- I to Type-VP) & Bunglows (Type-VII & vill) (Rates in Rupees Per Sqm.) .0_ [BUILDING COST Gpecifications as per Annexure-II) 11 [RCC FRAMED STRUCTURE (Upto Six Storeys) LLL | Floor ht. 3.60 m. 25500 26800 20500 - 1.12 | Floor. 2.90 m. : - - 19500 12, [COMPOSITE (PARTIALLY LOAD BEARING AND RCC FRAMED) STRUCTURE (Upto Four storeys) 12 | Floor ht 3.607. [31700 [23800 [17500 122 |Floorht 290m, eee = 76600 INote:: Rates for schools as mentioned in 11.1 and 12:1 are with different specifications which a {comparatively leaner with relation to office/college. If the specifications for schools to be followed are, {similar to those of college the rates mentioned for office and college in the respective items shall apply. 13_ [EXTRA FOR 13.1 | Extra for every additional storey over | 580 six storeys upto twelve storeys (For RCC Framed Structure only) 1.32 | Every 0.3 m. additionaVlesser height of 335 floor above normal floor height of 3.60 m/2.90 m, 133 | Every 0.3 m. higher plinth over normal 335 plinth height of 0.45 m. (on G.F. area only) 1.34 | Every 0.30 m. deeper foundations over 160 normal depth of 1.20 m. (on G.F. area only) 1.35 | Making stronger foundations to take 1470 350 ad of one additional floor at a twer | For RCC framed structures (For load bearin date (on area of additional floor only) : ia a 1.36 | Resisting Earthquake forces 1200 800 (For RCC framed structures only) | (For load bearing structures only) 13.7 |R.CC. Raft foundations (Ground floor 5150 ly) 1.38 | Pile foundation (On ground floor area 16600 nly) 1.39 | Swonger structural members to take 1660 heavy Toad above 500 Kgs./sqm. upto 1000 Kgs./Sqm, 1.4 [BASEMENT FLOOR 14.1 | Floor ht upto 3.35 m. with Kot 30000 Stones/HDPE membranee ic integral crystalline water proofing 142 | Add or deduct for every 030 m. 900 height against normal height of 3.35 15_| FIRE FIGHTING 1.5.1 | With wet riser system 800, 1.52 [ With wet riser and sprinkler system 1200 Page no. 14 & 15 SPECIFICATIONS FOR NON - RESIDENTIAL BUILDINGS ITEM DESCRIPTION ‘SPECIFICATION NO. 1.0 | FOUNDATION A per structural design based on soil investigation. (Primaril 1.1 [For RCC framed structure with RCC footings, columns, raft ete.) 1.2 | For composite (partially Toad bearing and| RCC framed structure) As per structural design based on soil investigation, (Brick/ston work spread footings on cement concrete base upto 1.5 mtr| depth below GL, with or without RCC isolated combint footings with plinth beams/bands) 2.0 | SUPER STRUCTURE 2.1 [For RCC framed structure RCC. framed construction having filer walls with fy ashi bricks forick work’ ACC blocks 22 | For composite (parially load bearing and Load bearing construction in brick work/sione masonry/ACC] blocks/fly ash bricks with intermediate columns and RCC bends at lintle/ceiling levels as per design. RCC framed structure) 2.3 | Intemal paritions:- OfficelCollege? 23.1 Hospital Light weight auto claved aerated conerete blocks 232 ‘Gypsum Blocks. 23.3 ‘Non asbestos double skin cement boards, 23.4 Fly ash bricks. Schools Light weight auto claved aerated concrete blocks/brick work 3.0_|DOORS & WINDOWS W ee 3.1_[ Frames 3.11 | Door frames:- Office/College/Hospital | Door frames of 2nd class Indian teakwood or equivalent ia officer's room. Anodized / Powder coated! Polyester powde coated Aluminium sections/Extruded hollow M.S pipes {mninimum 2mm thickness). Schools Locally available Hardwood/Extruded hollow MS pipes (cvinimum 2mm thickness). 3.12 | Window frame:- Office/College” ‘Standard sections of UPVC window frame membersExiruded Hospital ‘Aluminium tubular sections ‘Schools ‘Standard sections of UPVC window frame members/Standard MS. Z-section steel frame members. 3.2_| Door Window Shutters 3.2.1 | Door Shutter: Office/College/tTog Panelled type in 2nd class teak wood or flush door with veal] veneered ply/ commercial ply or Anodized/powder coated] Polyester powder coated Aluminium shutters with toughened| glass glazing/paneling where required as per CPWI Specifications/as per design. ‘Schools Flush door shutters with teak ply veneering/commercial pl veneering 3.23 | Frame and shatters in wel area PVCIFRP door frames & shutters in wet areas. 3.3 | Window shutters:- Office/College! Factory made Anodised’ powder coated’ Polyester powder Hospital coated *Z’ section aluminium shutters! standard UPVC section for windows with toughened glass glazing ‘Schools Sundard uPVC window sash shuters ‘Witt double layered slazing/M.S. Z-section stel shutter members. 34_| Fittings ‘Anodized aluminium /stainless steel or equivalent. 3.5_| Fire check door ‘As per fire safety specifications 4.0 | FLOORING 4.1] Main entrance hall Office/College? Pre polished granite flooring. Hospital Schools Pre polished granite flooring in entrance 1obb 42_| Comidors= Office/College/Hospital Matt finished vitrified tiles/Granite flooring/combination 0 marble and granite Schools Kota stone flooring and corresponding skining. 43 _| Rooms Office/College/HTospital Granite tiles Vitrified tles/Engineered wood flooring (in officers chambers) ‘Schools Kota stone flooring and corresponding skining. In_ principal room and office area vitrified tiles of size 600x600 mm and ‘matching skirting/dado, 44 | Lavatory Blocks:- Office/College” Granite flooring. Hospital | ‘Schools Rectified antiskid tiles (of size not less than 400/400 mam). 45 | Laboratories in Schools Rectrified antiskid tiles (of size not less than 400/400 mm) and] Chemical resistance tiles in floor/counters/shelves of chemistry labs. 46_| Flooring in basement Vacuum dewatered concrete. 4.7_| Rest ofthe area Kota Stone flooring. 5.0_| STAIRCASE 5.1 | Internal staircases.- Office/College’ Single piece Granite or marble Mooring in treads & risers with Hospital dado of matching permanent finish specifications. ‘Schools ‘Single piece Kota stone flooring in treads & risers withl2 mi __high dado of ceramic glazed tiles of size 300/450 mm. 5.2__| Fire escape staircase J" Single piece kota stone flooring in treads & risers with dado of matching permanent finish specifications. 60 _| RAILING: Office/College’Hospital Stainless steel railings. Schools 1.2 mtr. high parapets minimum 100 mm thickStainless steel railing. 7.0_| TOILETS:- Office/College/Hospital Granite flooring, Glazed tiles of size not less than 300 x 450/400] x 600 mm in dado upto ceiling height. Granite counters. Rimless| ‘counter sunk basins/Stainless steel sinks. Mirrors with moulded| PVC frame. FRP/PVC doors with frames. Xo ‘Schools Rectified antiskid tiles of size not less than 400/400 mm and dado upto door height with ceramic glazed wall tiles of size not Jess 300450 mm, 30_| ROOFING 8.1 | Roof treatment Coba weaimenvover deck insulation with Puf sl, 82__| False ceiling Office/College/ False exling in office area & toilets to cover the servicesas Hospital per design requirement Schools Fall ceiling in office area principal room and in tiles (If nesded t height sanitary pies) 9,_| FINISHING 9.1] External:- Office/College/Hospital Dry Stone cladding/washed grit plaster/water proof weather ci paints/ Structural Glazing/ ACP cladding conforming to Ene Conservation Building Code. Schools Dry stone cladding/washed grit plaster upto certain specifi heights rest cement plastered surface with white cement based putty] and acrylic smooth exterior paints. 33 [Office Colegltospial 321 Gypsum plaster dy areas 922 ‘Cement plaster in wet areas 923 Dry acrylic distemper in service area & basement 924 ‘Aerylic emulsion paint Textured pant (ow V.0.0) 925 ‘Wall panelling as per approved Architecture Design upto sil el meer, height or celina at Schools Cement plastered wall surfaces with POP (one tie) and acy sea neon pains in classrooms, coridrs and labs et, In frinepal room and offic texture paint over POP surfs 53} Taming Offic Calegetiapiad ~~] Doors & windows — Paintingpolishing on wood work as ps design requirement Schools Date and windows To Be pained with syntti enamel paint and inveomidors upto 1.3 mit, height onthe exterior of classroon vals and upto parapet eight onthe other side tobe painted wit Synthic enamel alt. Ind | PROVISION FORBARRIERFREE | Ramps, woilets for physically challenged, chequered ales use o BUILDING Bale sigages & lifts ete.GRC (Glass reinforced concrete) ils in Ramp area {are Executive Engineer (TAS) 80, CPWD, Nirman Bhawan, New Deli No. 62/SE (TASYPAR/2020/ 7 Ry Dated: (L /03/2020 Copy to: ll the SDG/ADGICES/CPMS through CPWD website htip:/epwd.gov-in. nee OP Executive Engineer (TAS)

You might also like