You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

H H

9" 3-Y12 9" 2-Y16


9" 2-Y16
G G

2L - Y8 @
1'-9"

150c/c 2L - Y8 @ 100c/c 2L - Y8 @ 100c/c


Y8 @ 150c/c Y8 @ 150c/c

3"

3"
3-Y12
3-Y12 3-Y12

2"

2"
F F
+8'-0" lvl +8'-0" lvl +8'-0" lvl
B1 : 9" x 1'-9" Y8 @ 175c/c B2: 9" x 9" Y8 @ 175c/c B3: 9" x 1'-0"

E TIE BEAM DETAILS @ +8'-0 LEVEL (BOB) E

D 9" 3-Y12
D

9" 3-Y12
+12'-0" lvl
+12'-0" lvl
1'-0"

2L - Y8 @ 100c/c 2L - Y8 @ 100c/c
9"

C C
3-Y12 3-Y12

GOVERNMENT OF TELANGANA
B101: 9" x 1'-0" B102: 9" x 9" PANCHAYAT RAJ ENGINEERING DEPARTMENT

B B

NAME OF WORK:- CONSTRUCTION OF


RYTHU VEDIKA WORK SHED.
TIE BEAM DETAILS @ +12'-0 LEVEL (TOB)
Drg. Title : BEAM DETAILS REV
A
(RO) A

Drg. No : SD - 06