You are on page 1of 46

VOLUME XXIII NUMBER 1.

FIRST QUARTER 1983

MODERN STEEL
CONSTRUCTION
An engineering breakthrough • • •
Introducing the
MI-JACK Translift I
A reliable product made better through MI-JACK'S engineering improve-
ments to simplify heavy material handling.
Faster hoist speeds allow the MI-JACK Translift I to maneuver oversize mate-
rial from any position more quickly and more efficiently. The Translift I is en-
gineered for ease of maintenance at lower cost through one of MI-JACK 'S 13
service and parts centers all across the nation.
The self-propelled Translift I mobile cranes are available in lifting capacities
between 10 and 300 tons.
Compare the benefits of buying , renting or leasing aMI-JACK Translift I.
Call us collect at (312) 596-5200 for equipment and specifications.
We can also arrange for a demonstration of the new MI-JACK Translift I.

MI-JACK Products
3111 w. 167th Street
Hazel Crest, Illinois 60429
Call Collect: (312) 596-5200
"Where Service is Golden "

2 MODERN STEEL CONSTRUCTION


DESIGN DATA SHEET
_______ Na2 _________
ROOF DECK SPANS
MAXIMUM SPAN
UNITED STEEL DECK, INC. DESIGN -,-- -
ROOF DECK PROFILE METAL GA. SINGLE MULTIPLE CANTILEV ER
THICKNESS SPAN SPAN SPAN
0.0295" 22 5'·10"
- --
6'·11" 2'.()"
2'~
I- ~ 1'12'1
0.0358" 20 6'·7"
- 7'·9" 2'-4"
- _. -
B (WIDE RIB) T 0.0474"
0.0598"
18
16
7'·11"
9'·0"
9'·5"
_.-
10'-8"·
r-
2'·10'"
3'-0"
l'Q I- 6'·1" - I-
~ 1112"1 0.0295" 22 5'·1"
- r- - I--
1'-6"
-
0.0358" 20 5'-9" 6'-9" 1'·9"
- f-
F (INTERMEDIATE RIB) T 0.0474" 18 6'-11 " 8'-2"
-
2'-3"
- I ~--pV2"~ 0.0295" 22 11 '-6" · 13'-6'" 4'.()"
-
,-- r--
~3"
- 0.0358- ;;- 20 -13'.()"
-
• 15'·4'" 4'-7"
-r
~

0.0474" 18 15'-9" · 18'·],, ' - 5'·5"


NS (LONG SPAN , WIDE RIB)
0.0598" 16 18'·3'"
-
21'-6"·
r- 6'.()"
-

• Exceeds normal applications

NOTES :
All maximum spans are center to center and are based on SDI loading criteria and United Steel Deck, Inc . roof
deck sections.
1.) Regular spans (not canWever) are governed by a maximum stress of 26600 psi and a maximum deflec·
tion of 1/240 with a 200 pound concentrated load at midspan on ai' ·0" wide section of deck.
2.) Cantilever spans are based on:
a.) construction load of 10 psf on adjacent span and canWever, plus 200 pound load at end of can·
tilever - stress limit is 26600 psi; or
b.) service load of 45 psf on adjacent span and canWever, plus 100 pound load at end of canWever
·stress limit is 20000 psi and cantilever deflection limit is 11120.
c .) maximum, and less than maximum, adjacent spans were used to find the cantilever spans; the
governing shorter spans are sbown in the table.
3.) Check any applicable insurance requirements (Underwriters Laboratories and Fac lory Mutual) as they
may require smaller spans.
4.) Uniform loads are shown in the U.S .D. catalog for spans greater than the maximums shown in this
table , Frequently deck is used in applications other than roofs· siding, lemporary slruc lures, shelving,
etc., and load data is desired,
5.) Reprints available on request.


LL...>I- \.Ic''''''''''-'I J-.JL....::~L...J N Ie H 0 u\ S J. BO URA S. INC I
PO BOX 66'2, 475 SPR INGIIU 0 Avr ..
SUMM IT, NEW ILRSEY 07901 1'20 11 '277 16 17 ASSOCIATE MEMBER
MODERN
CONSTRUCTION
Published by
CONTENTS
Steel Construction-Rising to the Occasion 5

A New Boston-Vibrant, Dynamic-Sheds Its Skin 6
American Institute
Back Bay Hilton: The Team Cheers "Go Steel!" 8
of Steel Construction
The Wrigley BUilding
Dewey Square Tower: Drama at South Station 11
400 North M ichigan Avenue Burberrys Limited: A "Gem" Rises from the Ashes 14
Chicago. IlIlOois 60611 Copley Place: Complex is the Word for It I 16
OFFICERS Transportation Building: Designed for a Perfect Fit 19
Phillip 0 Elbert. Chairman Bostonian Hotel: Posh Amongst the Pushcarts 22
John H Busch, First Vice Chairman 155 Federal: Molding Today to Yesterday 25
Werner H Ouasebarth. Designs in Steel 31
Second Vice Chairman Constitution Quarters: Architecture Restored 34
Oscar W Stewart. Jr .. Treasurer Northeastern University Engineered in Steel 36
Richard G Altmann. President Seal Harbor Condos: Luxury in Panorama 38
Wilham W lanigan,
Tufts Center: Challenge in Site and Search 40
Secretary & General Counsel
Wilham A Mllek.
Vice President. Engineering
LewIs Brunner.
21s1 AISC ARCHITECTURAL AWARDS OF
V,ce President, Marketing
EXCELLENCE ANNOUNCED
AISC agam sponsors Its Architectural Awards of Excellence Competlllon
--()ur 21 st. The contest seeks to recognize and honor the most outstand- •
EDITORIAL STAFF ing buildmgs in the U.S .. both technically and aesthetically. completed
Daniel Farb. Director of Publications dunng 1981-1982--using fabncated steel frammg
George E. Harper. Editor Winnmg structures will be featured m a special section of the October
Amy Kragnes, Edllorial Assistant Architectural Record. Also, a representative of each wmnmg firm will be
an honored guest of the steel mdustry at AISC's prestigious Annual
Awards Banquet on November 1
ThiS year's d,stmgUlshed panel 01 judges mcludes
REGIONAL OFFICES Gunnar Blrkerls, FAIA, Gunnar B"kerts & Associates. B"mmgham.
Michigan
NORTHEAST REGION
New York, NY (Hdq) 212,695-4291
Wayne R. Bishop, AlA, Ellerbe AsSOCiates. Mmneapolls. Mmnesota
Boston. MA 6'7329-7417 Stanley D. Undsey, Ph.D., Stanley D. Undsey and Associates.
Philadelphia PA 609 858-9354 NashVille. Tennessee
Pittsburgh, PA 4'Z44~O George M. Notter, Jr., FAIA, Anderson Notrer Finegold,
NORTH CENTRAL REGION Washmgton. D.C.
Chicago, IL (Hdq) 31Z67~2400 George Schlpporelt, AlA, Illinois Institute of Technology.
Detrol!, MI 313'352-5558 Chicago. illinOIS
Minneapolis, MN 612/888--3791
Entnes Will be Judged on June 7. 1983. Entnes must be postmarked by
SOUTHEAST REGION
Atlanta GA (Hdq ) 404,458-7679 May 15. Further details and entry forms may be secured from Awards
Charlotte. NC 704 54 1-0960 Commltree. A/SC. 400 N Michigan Ave., Chicago, IL 60611
Tampa FL 8 I 3,879-<>429 3121670-2400.
SOUTHWEST REGION
Dallas. TX (Hdq ) 214~5236 NEW LIGHTWEIGHT 8TH EDITION MANUAL RELEASED
Houston, TX 71327~ Not qUite pocket slze-but the new lightweight version 01 the Manual of
St LouIs. MO 314'721-1332 Steel Constructton fits eaSily mto bnefcase or tote bag-perfect for field
WESTERN REGION tnps or travel. Ught,lIexible cover. and prmtmg on 'bible" paper cuts ItS
Los Angeles CA (Hdq ) 213444-4519 weight down to lib. -5\7 oz. and ItS thickness to !'a-m Same number of •
Denver. CO 303 831-4622 pages. same type size, same contents as the standard verslon-and the
San Francisco, CA 415,495-3550 same pnce-S36. Order your copy today I
Seattle. WA 206624-5460
AISC HEADQUARTERS
Chlcago.IL
Steel Construction-Rising to
ethe Occasion in Boston
by Emile W. J . Troup

his landmark Issue of Modern Steel


T Construction , the largest ever pub-
lished , IS a celebration of the rejuvenation
more than 200 stores to those In the
trad itional shopping districts
• Five mid-rise office bUildings (17 to 23
and growth of one of the country 's oldest, stories) are under construction In 1983.
most unique and excIting cities It IS a totaling $165 million . al/ steel-framed
celebration of effective solutions orches- Both high-rise office bUildings due to top
trated for recycled and new construction out this year Will total 95 stories. with over
by publiC and private agencies, owners, 2 million sq It of steel framed space
developers. deSigners and bUilders And • Two mafOr new health care facilities
It IS a celebrallon of the contributions opened In 1982 were both framed with
made by the structural steel Industry to steel and totaled $54 million . Several
the successful framing of many challeng- other hospital expansions In steel are
Ing projects underway dUring 1983
SoliCIting articles for thiS Issue reqUIred
At the outset. several framing materials
scrutiny of more than 75 Important steel-
are usually and rightly Investigated for
frame projects In Boston and Cambridge.
each project Some challenges of Boston!
recently completed or under construction
Cambridge construction projects are an
W,lh thiS kind of Inventory. It was hardly
irregular footprint. constricted . tight sites;
possible to expand conSideration to the
unfavorable soil conditions; underground
suburbs , Within a 3D-mile radius, which • Hynes AuditOrium expansion. perhaps
obstructions (old utilities. subways. tun-
0Uld have added hundreds more worthy one of the more Important projects,
nels. etc); hlstorlcaliarchltectural signifi-
• rOlects to an already lengthy list WhiCh , In concert With a doubling of hotel
cance of adjacent or nearby structures;
Dozens more exciting downtown proj- space, will put maJor conventions on
future expansion considerations. modlfl-
ects, from $5 to $500 million, Will break notice
callons to eXisting bUildings . and encoun-
ground dUring 1983 and t984 . and Will be
tering the unexpected
candidates for future Issues of MSC, for Billion a Year Expansion
Unquesllonably fabricated structural
example The rate of construction In Boston since
steel IS the problem-solver among the
1981 and for at least the next few years. IS
• BOSCOM. the $1 OO-mlilion conversion of various framing materials And when thiS
on the order of $1 billion dollars per year
Commonwealth Pier exhibition space Into fact IS combined with the local expertise In
Steel-frame proJects Included In thiS Issue
a I-million sq It marketplace for the Infor- deSign. fabrication and erection. It be-
represent about one-half billion dollars of
mation Industry comes clear why steel has ultimately been
Investment They range In Size from $1 V2
• East Cambridge Riverfront along the the chOice for most profects In New
to $100 million, from one to 46 stories; and
Charles River a $180-mililon publici from 10,000 to over 1 million sq ft. England , over 200 structural engineers
private development of perhaps the most The phenomenal achlevemenl of the are well-lnformed . Professional Members
deSirable property In the area, with an redevelopment and construction program of AISC , and at least 80 to 90% of the steel
assortment of some 20 new and recycled IS a result of many factors There has been fabricating capacity rests with AISC Ac-
bUildings an appreciation of, and response to, the tive Members. And we have not even
• Lafayette Place . a $150-million parklngl region 's unique history of events and ar- alluded here to steel's many traditional
commerclal!hotel complex In the heart of chitecture Also, concentration of archltecV advantages-speed of construction. fleXI-
Boston. featUring the clty's first engineer talent In the Boston/Cambridge bility. economy. effiCiency and the oppor-
staggered-truss structure , the 22-story area IS perhaps the highest of any city tuntty for winter construction.
Intercontinental Hotel And what about the role of structural From one to 46 stories. fabricated struc-
' 399 Boytston Street , a block-long rede- steel? Is It the key framing material In tural steel rises to the occasion In Boston
velopment involVing recycling of the hiS- Boston dUring the 80's? Consider the fol- It does the job It was made to do prOVide
tOriC Warren Chambers BUilding . adja- owners with fleX ible . durable. attractive
lOWing
cent to a new 13-story retall!offlce and rapidly constructed bUildings at the
bUilding • Three luxury hotels opened dUring 1982 best cost. These bUildings rise now. but
The BostOnian (five stories), Marriott they represent the future of Boston . ThiS
Long Wharf (nine stories) . and the Back memorable Issue. the result of the greal
e mIle Troup , PE , AISC 's regIonal engineer, ISa
life-long resident of the Boston area He
Bay Hilton (25 stories) . Totals' 917 rooms interest and diligence of liS authors. hope-
holds nothing back in hiS enthUSiasm for the $73 million, all framed with steel. fully records a Significant chapter of an
future of Boston . and for his good fortune of • DUring 1983, two mUlti-level , steel- astounding rejuvenation
being In the thick of the most exiting transfor- framed superblock shopping malls So-read on-and let the celebration
mahan In the city' s recent history (Lafayette Place, Copley Place), Will add begln l 0
151 Quaner 1963 5
A New Boston-
STRUCTURAL
PRODUCTS
What% of your needs
Vibrant, Dynamic-
Sheds Its Skin

require ST. LOUIS by Robert J. Ryan
SCREW & BOLT HIGH
Twenty-five years ago. Boston was from Boston's hlstoncally high property
STRENGTH Bolts?
I often referred to ,n the past tense. Its tax rate
future as a viable city was openly ques- Chapter 121A also signaled the city
Consider this - tioned The gloom-and-doom prophets administratIon's willingness to provide pri·
had only to point to an eroding economic vate Investors With vanous incentives If
.American Made base to buttress thelf pessimistic fore- they were Willing to build In Boston Addi-
• Tested & Certified casts. Boston, It was said , had never tionally, massive public improvements tar-
• Full Range of recovered from the 1929 DepreSSion geted under the urban renewal program
Worse stili, the process of suburbanlzatlon upgraded the phYSical enVIronment of
Type I & ill Products
which followed World War II lured Jobs and downtowfl--and also set the stage for
• Fast Delivery people from the city to the outer reaches Improving the Boston Investment climate
.95 Years of of the metropolitan area The city once Of equal Importance. the BRA. by uSing
Dependable Service called "Hub of the Universe" was hard- Federal funds to acquire rundown and
pressed to maintain lts role as economic blighted buildings . then deliver sites to
and cultural capital of New England developers at a 'wntedown," paved the
Today, of course , Boston has emerged way for rebuilding the downtown area
as one of the most excIting and dynamiC Scollay Square an area of honky-tonk
Cities ,n the country II IS one of the few bars, tatoo parlors and burlesque houses,
urban centers weathenng the national was cleared In ItS place-almost as soon
economic recession At the same time , as demolition was completed-foundation
our city is expenenclng development ac- work began on a number of governme.
tivity that IS Without parallel In its long buildings Centerpiece of the 50-acre
history. A remarkable comeback from project was New City Hall. a building
economic stagnation and phYSical deten- whose stark, modernistic deSign symbo-
oration IS the story of concerted public- lized the new era the new splfit of Boston
pnvate sector cooperation, or more spe- Nearby, on Boston's hlstonc waterfront,
Cifically, a public Investment strategy an area filled With under-utilized ware-
which created the underpinnings for pn- houses and decaying piers and sheds,
vate sector growth . the city's renewal agency was creating a
Boston, in the 1960's, launched a pro- new residential neighborhood A mix of
gram of renewal that was both ambitiOUS commercial uses and regional attractions ,
and far-reaching A new agency, the Bos- such as the New England Aquarium. was
ton Redevelopment Authonty (which had bringing new life to the area. re-estab-
absorbed the powers of the City Planning Ilshlng Boston's histOriC ties to the sea
Board) was able to tap Federal funding for The clty's aggressive Intervention In the
showcase projects such as Government process of development and growth
Center and the Downtown-Waterfront proj- began to bear frUit as one alter another of
ect, as well as neighborhood renewal ef- the large banks, Insurance companies
We wantto be involved . forts In Charlestown, Washington Park and and linanclallnstltutlons announced plans
a number of other residential areas. for new high-rise towers The bUSiness
CALL US COLLECT! The Prudential Center began to take community was responding to the Im-
Todayat314-389-7500 shape on 24 acres of abandoned railyards proved Investment climate In the city.
in the Back Bay thanks to legislation Boston business was also In the fore-
ST LOUISSCREW & BOLTCO which allowed for Chapter 121A limited front of the dramatic change taking place

I.
6902 NORTH BROADWAY diVidend corporations Under the new law, In the American economy The segment of
ST LOUI S MI SSO URI 63 14 7·9990 enacted In 1960, a 121 A development the national economy which began to
PHON E (314) 38 9 7500 was exempted from real estate taxes but grow most rapidly in the 1960's was
paid an In-lieu tax levy based on percent- high-grade service activities Conse-

. .~
~~
f'9\ ....... ... age of growth Income Chapter 121A quently, the rate of fob growth
, ~ . W - 95 creased dramatically In banking, Insur·
" _s._ . proVided new developments some relief
ance, finance , higher education and
medIcal research , aU areas of economIc
-'"' Robert J Ryan IS director of the Boston Rede-
velopment AuthOrity and deputy mayor for activity which had been traditional Boston
development for the City of Boston

6 MODERN STEEL CONSTRUCTION


DynamiC Boston 8rea sprouts new bulld~
mgs at $1 billion 8 year (are Ha!l4bllhon


dollar Capley Place (c .) IS supenmposed
on aerial vIew

rlUm, Boston'S majOr convention facility


The Hynes eXpanSion, to be completed '"
1986, doubles the sIZe of that facIlity and
enhances Bostons capacity to attract
larger conventions
Moreover with all thiS development BC-
ltVlty underway the city IS formulating
development plans for another generalton
of growth In the SPring, construction Will
begin on a $75-mllllon federal office bUild
Ing In North Station. the first phase of a
development that Will see the creation of a
new residential complex on an Island In
the Charles River At the Charlestown
Navy Yard , abandoned by the U S Navy
In 1974 the BRA IS creating another reSI-
strengths Suddenly, a city suffering from Boston's retail district EVidence of thiS dential communtty on Boston Harbor
the steady loss of blue-collar JObs found became eVident when construction began Here again the new apartments and can·
Itself developing an employment base on Copley Place. a combined retall-hotel- domlnlums Will consist of warehouse and
consisting of white-collar JObs office center which represents the largest manufactUring bUildings recycled for a
The city which had seen httle prlvale private Investment In the history of the new use
Investment between 1930and 1960. began city . In addition. Lafayette Place , another In addillon, the city IS marketing the
to catch up with Itself development featUring a retail and hotel larger bUildings at the Navy Yard for hght
The story, of course , IS Writ large on our complex, IS under construction on Wash- Industrial or office uses And South Sta
skyline New office buildings-more than Ington Street, In the heart of the retail tlon. once the hub of rail. as well as
half of the city's office space has been district Intercity and commuter bus operattons .
bUilt since 1960-spelled out the transfor- In 1983 Boston IS experiencing the lakes on a new life Later atHlghts over
• mation and growth of Bostons economy third year In succession where private the track area of South Station Will be
Moreover beginning In the late 1960's, Investment IS moving at $1 billion a year developed by BRA for office and hotel
the city refocused ItS renewal and devel- Malar office towers underway Include use And across the Fort POint Channel .
opment efforts In ItS neighborhoods Hav- mlilion-sq It office buildings at Dewey plans have been announced for a malar
Ing restored some semblance of health Square (near South Station) . a JOint ven hotel condominium complex to be bUilt by
and activity to ItS downtown the city was ture of Rose ASSOCiates of New York and Anthony Athanas and Hyatt Hotels
trying to strengthen confidence ,n ItS Metropolitan Life Insurance Company, Today's Boston has httle In common With
neighborhoods by providing new pubhc and Exchange Place on State Street. the slumbering towns of the mld -1950's
facilities The social turmoil generated by being developed by Olympia-York Co Today's Bostontan might not inSiSt on call·
school bUSing In the early 1970s under- With an office vacancy rate standing at Ing thiS old city the Hub of the Universe
mined some progress. but by 1976, Bos- 3% for Class A space a number of but the city has reclaimed us title as the
ton displayed a sparkling new face when medium-sIZed bUildings are being devel- leading prOVider of goods and services In
the nation's attention turned to thiS old city oped , both In the Back Bay and In the New England It IS a city which has shed
for the bicentennial celebration . City'S financial district In all. about 4 mil- ItS skin, but not lost ItS soul. a city which
The Fourth of July extravaganza on the lion sq ft of space is under construction has a development agenda that Will en-
Charles River Esplanade . the VISit of the Boston. with an Inventory of 7,000 hotel sure growth and expansion Into the 21st
Tall Ships and Queen Elizabeth II , the rooms. ran Into problems in attracting ~~ry 0
opening 01 the new park on Boston's sIZable conventions But In the past two
refurbished waterfront. and the Faneull years, the city has seen the opening of the
Hall Marketplace attracted thousands of Long Wharf Marriott (400 rooms). the Key to Baston convenlJon growth 1$ Hynes
VISitorS Those who did not VISit watched Hotel Meredlen (300 rooms) . the Ritz Carl· Audltoflum, soon to be expanded to match
TV coverage of these events and became ton addition (60 rooms), the Hotef Bostont· area busmess/touflsm explosIOn ,
aware of the remarkable rebUild ing which an (155 rooms). and the Back Bay Hilton
was taking place (350 rooms) In addltton. construction IS
The public perception of us as a city now underway on the 25D-room Four Sea·
caught up In the backwash of suburban- sons Hotel , the 7QO-room Westin Hotel
Izatlon began to fade away Boston be- and a 1 200-room Mamott the last two a
came a city where people wanted to VISit part of Copley Place
• to itve, to shop, to work By 1980, alter two HaVing encouraged a significant ex-
decades of development activity, there pansion of hotel space, the city working
was a shortage of hotel space and of with the newly created Massachusetts
office space The spectacular success of Convenllon Center Authority, IS about to
Faneull Hall Marketplace had revitalized begin reconstruction of the Hynes Aud'to ~

1sl Duarter 1983 7


Back Bay Hilton:
The Team Cheers "Go Steen"

At a Breakfast Meeting (fate 1981) of the Struc- get thiS project off the ground, and asked our minds a fast track, In other words, the
tural Steel Fabocalors of New England, an if I would be interested We made some ability to formulate our plans, move for-
owner/developer and a noted structural engi- feasibility studies and went forward . We ward and erecl thiS holel In the fastest
neer say some potent things about structural found out thiS was a great location and time possible . Of cou rse, who knew Ihen
steel that are worthy of sharmg with our many deserved the type of hotel we would like to that Interest rates were going to 20 10
MSC readers -ad. 22%. We didn't have Ihal In our crystal
put In this particular location. But we had
certain problems to overcome. Our piece ball.
Roberl Sage, presidenl 01 Sage HOlels of land totaled about an acre On thai acre As a result, IrVing and I sat down with
speaks lirsl: there were 30,OOO·plus sq ft of land , and Bill LeMessuner and deCided on a plar>-
we had to go over the Boston Edison probably the mosl open plan I have ever
would like 10 say Ihat II pallence IS a sub·stallon to pick up another 12 or seen. I never worked With people so re-
I Vlftue. we probably have the most VIrtU'
ous people In town. Back In 1966, a group
13,000 sq ft
As far as I am concerned, only one
ceptive to new Ideas We decided we
would Invite a general contractor to Sit
of my Inends purchased the property person could answer that problem-and It down With us to go over Ihe plans, and
where we lust bUilt the Back Bay Hilton was Irving Salsberg Irving deSigned the delermlne In a team effort exactly what
Hotel. They bought It with the Idea 01 first hotel for us back In 1959, so we have this would do for us . As a result, we sat
putting up a hotel and many other faclli· a relallonshlp of over 22 years As a result down with the Vappi Company, the engi-
ties. of what we have done , we tried to be as neers and architects and came up wllh
In 1976, or 1977, they came and said innovative as possible-I don't think thai Ihe Idea to erecl a steel hotel. II was Ihe
they were having diHicutty and could not any 01 our six hotels look alike. We think hrst expenence we have ever had With
we blend very well into the communities steel. I'm the fellow who has 10 pay Ihe
where Ihese hotels were built . bills and do nol know much aboul the
technical aspecls of bUilding a hotel. I •
Properly Use Vila I 10 Plans relied upon people wllh experllse in other
First, we Ined to deCide which was the helds As a result, we decided to move
best way to bUild a new Back Bay Hilton. forward
W,lh a little bit of macho In every one of
us , we did not wanl to be subordinate to Moving RighI Along!
any other hotels In the area Now, I can just tell you what this means to
Frankly, I am very, very Impressed wilh us, as an owner and developer of a hotel
the ulilization of the property We have a First of all, If everything goes well, we
25·slory tower, a seven·story garage in hope to open in Ihe fall of 1982 Since we
the back and a three·story public facility slarted construcllon last January, that IS
to the side to give II more dimension. II less than two years I Interestingly enough,
does not look as if we covered every inch we bUilt thiS 15·story, 205-room hotel we
of space, when in fact we have But, what are meeting In With a different type of
is more important, we gave some dimen- construclion. II look us two years I Our
sion to It. From an architectural stand- new hote1-372 rooms, 25 stones, seven·
poinl, I Ihink we can put thiS up against story garage and three stones of public
any hotel In town. II IS outslandlng. facllilies Will probably take us less lime.
What we did allhat pOint was 10 decide I really think it's due, qUite frankly, to the
the most efflcienl and best way to bUild a deSign of Ihe bUilding I also give credilio
hotel. As a result , we had In the back of Ihe general contractor, the steel fabricator

.'


:

New sceel-framed Back Bay Hilton was


designed for tight SIte, speed of
construction. Floor plan (r.) shows
dlff/cult site plan. < - - -""
" , ., '

8 MODERN STEEL CONSTRUCTION



and the erector No matter what ptans hotel which cost $140,000 per room, you In thiS particular arrangement But when
we accomplished , nothing would have have to charge an average of $140 per you do It In detail and talk to some of our
worked without thelf cooperation. It was night. We forecast on thiS project that the bUilders around here for adVice you find
really a team effort. total price per room will probably be some serious problems What about those
around $81 to $82 ,000, which means our concrete shear walls? There are a lot of
Rlppte Effect Important average room rate Will be about $82 to them and they take a long time to form
The other thing I should bring to your $85 per night. That IS very important from They do not really work In terms 01 energy.
attentton IS , as the owner, what It means a standpoint of being competitive. If you because when you put them up, you really
to get a hotel up this fast There IS a ripple buy right you can sell right. As far as we have to Insulate the outside Then you
effect. The ripple effect IS that If the steel- are concerned , we feel very strong In the have to cover the insulation with some-
workers can erect the hotels quickly, it market at that price thing "you Insulate the InSide In a tall
helps the other sub-contractors First, In So for these many reasons, It'S very, bUilding you Will get differential tempera-
the construction business, like In our busI- very important that we are very happy we ture movements tearing things apart. And
ness. the faster you get in, the faster you went along With thiS system. If you are the earthquake problems are lust ampli-
get out. That's when contractors have the looking for an endorsement for steel , you fied With heaVier bUildings
opportunity to make some money Sec- certainly have our vote So we went through a falfly conscien-
ondly, If sub-contractors are trying to fig - tiOUS preliminary study and then got coun-
ure what the material and labor costs are, William LeMessurier, chairman of SCI sellrom builders on the time and the cost
the faster they get In , the faster they get sums up: Together With IrVing and Mr Sage we
out. It's very helpful to them, so from that It is qUite remarkable that thiS is a steel made the deCISion to go steel. I don't think


standpOint it's like a two-way street. It bUilding Architect IrVing Salsberg , in my anyone has any reg rets
helps us get the bUilding built faster, but It opinion , IS one 01 the most talented de- We ended up framing thiS building With
also helps the rest of the trades, and signers of concrete in the country. what could be called a tube The Idea IS to
everybody else on the fOb When I first was shown the design for mobilize all 01 the exterior walls Into a
The other thing , which IS very Important. what IS now the Back Bay Hilton, I said, continuous system Where there Bre Win-
IS Interest rates Basically, as It is right "Well, he's done It again; a wonderful dows . and balconies In some cases, the
now, every month we save at the end of a concrete bUilding " He had built a model framing IS conventional moment-resisting
fOb , we are talking about saving, just In and the conception In concrete terms was frame~lmost conventional . With a few
Interest alone, between $250,000- qUite clear The bUilding IS on an amazing- exceptions But when It came to the cor-
$300,000 That's an awful lot of money As ly difficult site The street pattern led to a ners, where the onglnal deSign already
a matter of fact, I was Just thinking, that If triangular bUilding And It IS not lust some was arranged Without Windows, these
we save $600,000, I think that IS what It architect's whim, It IS an elegant and prac- were natural places to put diagonal brac-
cost us to build our Jirst motel in 1959 tical solution to an extremely difficult site Ing So, the bUilding In conceplion IS a
When you try to relate to those figures , It is problem. plan which has Ihree walls on the three
really frightening . So, when we began to study thiS build- Sides of a triangle. framed With moment-
The other thing which is very Important Ing , I don't think It was very much apprecI- resisting beams and columns , and the
to us as an owner and operator IS the fact ated when we suggested , as a matter of corners In aU faces framed With diagonally
there will be 4,000 new hotel rooms com- policy, we should look at steel as well . I braced shear panels These are shear
Ing to Boston between now and 1985 think it a cliche In every deSigner's mind walls In steel as the way to think about
QUite frankly , we want our share of the that common widom dictates you always them
market The faster we can open our hotel , bUild hOUSing and hotels out 01 concrete Let's start at the foundation One of the
the faster we can solidify our position as But things are a little different these days, pecul,aril,es 01 a steel bUilding IS It IS so
far as our customers are concerned It's espeCially In Boston I do not think we lightweight that even though you mobilize
very Important to us to get In as fast as we have the teams who know how to build the whole bUilding , In thiS case to resist
can from the standpoint of staffing and concrete as last as other places in the lateral forces , you sometimes run OUI of
developing new bUSiness country We do have good steel fabrica- resistance to overturning capacity So we
Furthermore, I think that With the hotels tors We have temble Site conditions In the have some piles here that are qUite long
opening up right now, or Will be Within the Back Bay which means that weight saving t 4-1n precast piles With all thiS steel stick·

• next few years, you are talking about an


average construction cost of $100-
$140.000 per room How that relates to
our bUSiness IS frightening . Years ago, I
remember reading that for every $1 ,000 In
construction cost, It was like a dollar for
room rate So If you are talking about a
is an advantage

Steel, with No Regrets


We went through this, however, looking at
concrete and steel very, very carefully I
must admit I shuddered when I thought of
trYing to Ilgure out how to do a steel frame
Ing up to engage them In tension to hold
the bUilding down That Will never happen
at deSign load levels, but to achieve the
proper load factor, you do need to have
some tenSion anchors Because of our
reqUIrements lor seismic deSign In Massa

1s1 Quarter 1983 9


chusetts now, we tie all of Ihe footings
(pile caps in thiS case) together With tie
can prove the formula yourself. ObViously,
there are so many variables left out that It

beams 10 give a good foundallon , which IS rather crude. But It IS a pretty good
unlles Ihe building as a whole right at the gUide which we use all the time, particu-
ground level. larly to extrapolate. If someone asks you
It IS a nice overlap when you have a pile what a 30-story building costs compared
foundation to support steel framing for two to a 25-story bUilding , use the formula .
reasons: one is that steel is a lighter load Sometimes people wonder how to de-
Secondly, there IS always the lime neces- sign for lateral load. We deSigned thiS
sary to fabricate the steel and get a back- bUilding for Boston code wind loads. In
log So, if a certain lime has to be spent in the middle of Back Bay, we went for the
the ground putllng in pites , doing excava- lightest wind load . With that we used a
tion, that time can be used to fabricate the drift limit of 1/450
steel. When you start erection , you have a There are some peculiar conditions In
good backlog and can go very fast thiS building . In some cases. when we
brought the frame down to the ground , we
The The Drama of Steel Framing needed to open up the framing at the
A closer look at some of the framing-the bottom. To transfer the shear out of the
re-entrant corner is really a difficult prob- frame In the bottom story, some diagonal
tern We have a diagonally braced shear braCing shows up In odd places That
wall in each of the two planes leading Into allows some freedom in openings else-
the corner But right in the middle-right where in the wall
In the very InSide corner-there IS a striP With regard to the typical floor framing ,
of windows. This will all be glazed , and the the ceiling goes up after the fireproofing is •
Typical connections at reentrant corners drama of thiS emerges as the building IS en- on the floor beams , up tight so that the
(top): typical connection at bracmg detail closed The building is diagonally braced , depth of the construction is about as thin
(bolt photo) and a series of beams With moment con- as you can get It in steel. The total sand-
nections connect the the two braced bays wich, including the slab, IS 1 ft-6 In All the
together floor beams, and the girders Into which
Now let's consider the lateral load re- they frame on the InSide of the bUilding ,
sistance We had to design here not only are 12 in. Bar jOists would have been
for Wind but also for earthquake To face deeper. Normally, In a hotel there IS not
Architect these problems, this building would be a much need to inter-penetrate beams with
Irving Salsberg & Associates, Inc case of taking K= 1 In the earthquake ductwork. The air usually goes verllcally In
Brookline, Massachuseus
system. We have shear walls In steel com- chases, exhausts , etc . So, the ceiling up
Structural Engineer bined With moment-resisting frames That light against the steel is pretty feasible .
LeMessurier Associates/SCI combination with the moment-resisting We really did not waste much story height
Cambridge, Massachusetts frame part gives the extra boost in ductili- here
ty which IS highly deSirable In earthquake In summary, thiS building went up fast.
General Contractor design. But it still is not qUite the case They started putting up steel in June
VapPI & Co where we could use K= 8, because these 1981. I was busy all summer. and later I
Cambridge, Massachusetts
shear walls are not capable of taking all of said, "Where are they in the steel?" I was
Steel Fabricator the over-turning forces by themselves, sc told, "Oh, they're topping out next week."
West End Iron Works it is a K=1 building . So I missed the whole thing That speaks
Cambridge. Massachusetts The weight of this superstructure is 13 4 for Itself
psf We have kind of a target goal. It says We're working on another project In
Steel Erector
that If you have a steel building (it is such Dallas and the same story of time is the
Damel Marr & Son Co
a loose formula it covers all high-rise steel whole secret in building in steel. We stud-
Boston, Massachusetts
buildings), a target for the designer is to ied two different designs in considerable
OwneriDeveloper diVide the number of stories by three. You detail. In terms of raw dollars, concrete
Sage Hotel Corporation get a number which is Ibs. per sq ft ; then came out cheaper on the 75-story bUild-
Boston, Massachusetts add six to that. For a 25-story bUilding , ing But when you have Interest costs for •
you divide by three, to get 8.3 psI. Add SIX somewhere between four and seven
and you get 143 psf In 13.4 psf for the months extra construction time-forget it.
Back Bay Hilton we beat our target. You You go steel! 0

10 MODERN STEEL CONSTRUCTION


Dewey Square Tower:
• Drama at Historic South Station
hat do you do with a 1 23 acre
W historic wedge-shaped site In the
heart of Boston's transportation hub? The
answer Dewey Square Tower. a 46-story
office bUilding with a dramatic atrium en-
trance and public facilities to enliven the
streetscape near historic South Stalion
The complex was conceived as a Signifi-
cant link between the developing Fort
POint Channel area and Boston's Financial
District by New York-based developers,
Rose Associates
Architects and engineers were faced
with two eXisting physical constraints a
ramp for the Central Artery and a Depart-
ment of Public Works building remaining
on the site. Conceived with SIX parallel
Sides, the tower encloses the DPW BUild-
ing and adjoins the Central Artery. Al -
though the plan configuration was arrived
at early In the design, the bUilding's maxi-
mum height remained undetermined until


agreement was obtained from all publiC
agencies The tower's structural system
was planned to be adaptable to a bUilding
from 30-to 50-stOries high.

Dramatic Entry
Entry to Dewey Square Tower IS through a
unique, glass-enclosed atrium. For thiS
90-1t high space, designers selected a
cost-effective steel truss system . The atri-
um rocf frame IS an unusual design for
covering a column-free triangular area
measuring 80 x 120 It Drywall-clad steel
trusses are set at a 45· angle to form a
coffered ceiling With a skylight above
Three columns near each corner support
the triangular rocf truss system and ex-
posed steel members along the perimeter
brace the glass walls. JOints at the Inter-
seclion of the trusses ' top and bottom
chords are moment-connected With splice
plates. All structural steel for rocf trusses
is clad With architectural finishes The
glazed window wall system is made of
horizontal structural steel mullions at a
spacing of 12 1t-6 In" supported on W27
verlical mullions that span 90 It verlically,
and braced by the atrium rocf.

• Dewey Square Tower graces heart of Bos-


ton's transportation hub . Model by Archi-
tects JunglBrannen AsSOCiates and Pietro
Belluschl, Inc.

11
Dewey Square Tower IS the only struc- Dewey Square Tower. The building is de- steel. Girders and Interior columns are
ture In Boston clad with a precast con- signed on a 30-ft square structural grid to A572 Grade 50, except bUilt-up Interior


crete rain screen system This system, optimIZe Interior floor layouts, perimeter columns are Grade 42. High-strength
developed In Canada, uses the pressure columns are spaced 15 ft oc The center steels were chosen where the deSign was
equalization principle to minimIZe water line of the structural steel IS held back governed by strength conSiderations
penetration. Each rain screen consists of 2 ft-6 In from the facade to permit uninter- Where the deSign IS primarily governed by
an exterior and Interior precast panel with rupted expression of hOrizontal window deformation Criteria, as for exterior col-
air space and Insulation board sand- bands, and greater Window area in tenant umns, lower strength steels were used .
wiched between . SpeCially designed an- spaces The tower has a structural depth of
chors secure one panel to the other. Thus, Since all of the structure's lateral stiff- 120 ft, With a height-to-depth ratio of al-
the exterior panel IS free to expand and ness IS provided around the perimeter, all most 5 to 1 This, coupled with ItS unusual
contract within a determined margin. interior beam-ta-beam connections are of shape, suggested the use of a wind-
the simple shear type . Spandrel girders tunnel test to verify both the magnitude
Alternate Systems Examined on typical floors are generally 45 in. deep , and the local variations of Wind forces .
After examining many alternate systems, varying from a minimum of 39 In. at the top Test results very closely matched the over-
the project designers concluded that a of the building to 49 In at the bottom. all forces reqUired under Massachusetts
steel structure with a rigid frame around Columns are bUilt-up members 30 In. code . Local hot spots were found to exist
the perimeter was most economical and deep along the building face . except particularly at the Intersection between
would resolve the requirements for Inte- where rolled sections are used above the the tower and the atrium.
grating the structure with the curtain wall 33rd floor Perimeter columns are ar-
Resistance to wind and seismiC forces IS ranged to prOVide open corners. That IS, Useful Future Information
prOVided by the framed tube which forms the ladder section always ends with a AnalYSIS of the structure for lateral forces
the tower perimeter. The tube is created beam stub at the corner ThiS scheme Yielded information useful for future proJ-
by rigid connections between columns aVOids the complication of three-dimen- ects It IS well known that the effect of
and beams To economize on field work, Sional corner columns with welded stubs shear deformallon becomes magnified
parllcularly field welding, spandrel units gOing in two directions , as well as the with an increase In the depth-span rallo of
consist of trees with columns and welded biaxial bending problem of a corner col- the beam Since, In a frame such as thiS,
stub girders . Field connections of the gird- umn . the depth-span ratio is on the order of 1 to
ers at the center hne between columns are Designers selected a variety of steels to 5, shear deformations contribute a large
bolted shear connections. use throughout the structure exterior col- part of the total lateral deformation of the


Column spacing is a unique feature of umns and interior floor framing are of A36 structure . Specifically, in thiS case, the

Architects
I PIetro Belluschl, Inc
• and

,
Jung/Brannen Associates , Inc
I Boston, Massachusetts
I
Structural Engineer
Wetdllnger ASSOCiates
~ " New York, New York. Cambndge.
" Massachusetts

Construction Manager
Steel-framed Dewey Square (/.) nears top
Morse Diesel Inc
shows perimeter
out . Above, IsomelflC Boston, Massachusetts
steel framing Steel Fabricator
The Standard Structural Steel Company
Newington, Connecticut


Owner (a joint venture)
Metropolitan LIfe Insurance Co
and
Rose ASSOCiates
Boston, Massachusetts

12 MODERN STEEL CONSTRUCTION


lateral deflection of dnft of the bUilding minimum and expedited erection as well. mat two stones below grade and nses
can be attnbuted In roughly equal parts In erecting the steel tower, three self- 590 ft. The 6-to 8-ft thick mat rests on
to climbing tower cranes were used , in lieu hardpan, prOViding an economical foun-
of the more conventional two ThiS Insured dation . The area of the bUilding surround-
• · Overall deformalions of the frame (shear
maximum erection speed and facilitated Ing the tower has columns resting on
deflections)
the erection of the precast panels, also spread footings and Incorporates an un-
· Column shortening (bending deflection)
• Shear deformation of beams and col- part of the steel contractor's work . Dewey derdraln system below the sub-basement
umns. Square Tower is granite-clad on the lower slab
two floors With precast rain-screen panels Tower fire protection Includes full spnn-
Since girder webs are relatively thin from the third floor to the sloped glass kler system, fire alarm, stair pressurization
compared to column web thicknesses, the crown of the 46th story. Continuous bands and smoke-detector systems The atnum
malar portion of the shear deformation IS of tinted reflective glass alternate With has a complete fire suppression and Inde-
attnbutable to the beam web, bands of exposed granite aggregate set pendent smoke evacuation system All
The steel fabncators used both auto- in white cement. Structural connections structural steel members are protected
matic and semi' automatic welding on the for the panels were developed With Input With either concrete encasement , con-
exterior columns. almost all of which are from both the panel fabncator and the crete block, drywall or spray firep roofing
bUilt-up from steel plates, as opposed to steel contractor. The typical panel IS at- Stair and elevator shafts are protected
standard rolled seclions Wherever POSSI- tached by two load-beanng connections With drywall construction Within the tower
ble In the established program, the fabn- and two lateral connections shop-welded and encased In block on lower levels
cator elected to substitute fillet welding for to the penmeter columns Structural beams and penmeter steel are
the connection between the spandrel The vertical load IS transferred to the protected With minerai frber spray fire-
girder flanges and the pen meter columns, perimeter columns through a W10x30 proofing The steel In the lower garage
ThiS was chosen over the speCIfied full- outngger, while the lower lateral load IS levels IS treated With hard-coat spray flre-
penetration weld taken by struts to the spandrel girder. The proofmg
Also, whenever the erection equipment top flange of the outriggers is above the The overall economy of thiS prolect is
would allow, the fabncator used two-story lloor level. Thus, the lloors are poured clear from the fact that the average steel
tiers for extenor columns. These consisted completely without providing pockets In used IS 21 Ibs.lsq ft. FollOWing a fast-track
of the full 25-ft column, With two spandrel the floor for precast connection Floor deSign schedule, steel erection began In
girder stubs on each Side The spandrel construction consists of 2-ln composite May 1982, With Initial occupancy slated for
girders were then bolted together at mid deck with a 3%-ln, lightweight conc rete the end of 1983 D


span . ThiS method kept field welding to a topping. The tower starts on a concrete

T H E STRUCTU RAL GROUP, BOSTON SOC I ETY OF C IVIL ENGINEERS SECTION / ASCE
announces
A N EW 1983 LECTURE SERIES

STRUCTURAL DETAILS IN STEEL AND CONCRETE BUILDINGS

DATES : Six Tuesday Nights : 27 September; 4, 11,18, 25 October; 1 November 1983,


LOCATION : Boston area,
CONTENT : Three lectures on structural steel , including bolted and welded details , based on th e rev ised
AISC Engineering Detailing Manual scheduled for publication during the summer of 1983.
Three lectures on cast-tn -place reinforced concrete . Emphasis will be on new design proce-
dures and economical practices. Lecturers will be prof essionals experi enced in design,
fabr ication and construction .

To be placed on a special mailing list for advance registration and program information,
complete the cutoff form below and return to :

.
r - - --- - ----------- -- --- ------------- - ----- -- - - -------- -------- ----------- ~
,
o
o
Use th is form to requ est advance information on the BSCES/ ASCE Lecture Series.

NAME :
,0~
0
,


MR . EM I LE W. J. TROUP, P.E. o
,
o

AISC, One Fuller Place COMPAN Y: I


o
o
Dedham , Massachusetts 02026
MAILING ADDRESS : :
I
o
I
ZIP :
----------------------- - ----------------------- - ------ ---------------- - - ~

This space donated by the Structural Steel Fabricators of New Engl and .
Burberrys Limited:
A "Gem" Rises from the Ashes
pigmented cement Where total replace-
ment was necessary, latex molds were
taken of the eXisting window surrounds

Plaster casts were then poured and
sculpted by Rudco's artists Finally pre-
on a filled area of Back Bay, so there was cast concrete replacements were made to
a need for a completely new dry founda- replace the severely damaged brown-
tion to support the new structure. To mini- stone. In addition, enough salvaged brick
mize the Impact of noise in the neighbor- was saved from the crumbling , fire-
hood and risk to the frail bUilding, It was damaged walls to face the portion of the
deCided to drill rather than drive founda- new bay at the rear of the bUilding faCing
tion piles. Forty-sIX Fondedile piles, each onto Newbury Street
of 50-ton capacity were drilled to a depth The engineer's staging schedule for
of 80 ft The client, anxIous to establish a erection was well orchestrated by the gen-
presence In Boston, set a short SChedule eral contractor At one point, foundations
for occupancy and called for fast-track were being drilled . structural steel was
construction being erected , steel decking being In-
Structural steel was the Ideal matenal to stalled, tYing back the exterior masonry
accommodate thiS accelerated construc- wall was underway and the new roof was
tion schedule . A steel erection methodolo- being framed out-Simultaneously
gy was employed to ease phaSing of The end result , which was finished on
construction In a limited erection area. The schedule, prOVides Burberrys with an ele-
eXisting wooden structure left standing gant showcase to display their quality
after the fire was literally holding the build- merchandise. Uncompromising attention
Ing together. Due to ItS flexibi lity In staging to detail resulted in a building renovallon
and assembly, the structural steel frame that has been widely acclaimed as Da •
could be erected In three stages to func- gem.
tion as braCing for the eXisting walls as the
Interior was completely gutted.
hen does It make sense to restore a DUring early stages of construction, II
W badly fire-damaged building, rather was discovered that one of the outer walls
than bUild a new one? When the client IS was buckling , and It reqUIred tying back
Burberrys limited of London, a company to the steeL A system of ties, set With
Internationally famous for ItS quality raln- epoxy into the old masonry wall , bolted to
wear and leisure clothing And when the steel bracing angles and fastened back to
bUilding IS a histOriC townhouse located In the structural frame, was Ideal to resolve
the heart of Boston, a city where quality thiS problem.
and tradition are completely In keeping To meet the client 's program needs, and
With the client's Image gain additional square footage In the
Burberrys Umited rose from rUins (f-J. View
HaVing planned to expand their opera- building , the architects made effective
above show~ ravages of fire
tion to Boston, Burberrys undertook an use of the basement space, added a full
investigation of existing commercial build- sixth floor to the building by creating a
Ing stock In the city They set lied on a double-height mansard roof and added a Architect
building at the corner of Arlington and bay to the Newbury Street Side ThiS plan, Bruner. Cott & ASSOCiates Inc
Newbury Streets, In Boston's Back Bay. adopted With the approval of the Back Bay Cambridge , Massachusetts
Originally deSigned by William Preston In Archilectural CommiSSion, IS In keeping
Structural Engineer
the late 1800's, the building had been the With the histOriC quality of the Back Bay
Wayne L Weaver & AsSOCiates
focus of tragic attention as a result of a Hlstonc District Boston, Massachusetts
fire which took the lives of two Boston Fast-tracking the deSign and construc-
firefighters In January t981 tion was IneVitable, given the October General Contractor
With ItS Interior damaged , and even ItS 1982 opening deadline Bruner/Cott & As- Barkan Construction Company
outer walls structurally unstable, It posed SOCiates, Inc . worked closely With the gen- Chestnut HIli, Massachusetts


an archilectural and engineering chal- eral contractors to organize the complicat-
Steel Fabricator
lenge The archilect, working with the con- ed scheduling of construction , ordering of
A 0 Wilson Structural Co Inc
sulting engineer, deVised an approach to long-lead Items, and the search for and
Cambridge. Massachusetts
rebuilding the structure based on the Idea selection of appropriate materials to be
of a "building Within a bUilding ." used to resu rface the building exterior Owner
Several challenges confronted the de- The badly damaged brownstone on the Burberrys Limited
sign team early on. The building IS located building was patched and restored With a Boston, Massachusetts

14 MODERN STEEL CONSTRUCTION


• When it comes to constructional plate steels,


we wrote the book. This current edition features
plate 10 applications such as fabricated bridge
girders. Produced in lengths from 120" to 1080;'
Lukens' capabilities with regard to: widths 12" to 48" and thicknesses '1'." to 12:'
Sizes. Standard specification plates available in Lukens-Conshohocken. A roll ing mill and ship-
widths to 195;' lengths to 1080" (longer in certain ping complex designed to meet your needs for
sizes) and thicknesses to 25:' A size card shows light-to-medium thickness carbon plate and our
details. Sure-Foot· safety floor plate.
Specifications. Mechanical properties and Lukens Fineline: A family of low-sulfur construc-
chemistry of the various grades of steel most tional steels particularly effective when used in
frequently found in bridges and buildings. fracture critica l applications.
Displayed in chart form . For your copy of this brochure, illus-
Heat Treating. Many types of treatment offered trated with photos of our facilities and our
on plates up to 600" long. Even longer by special products in use, just fill out the coupon below.
arrangement.
Stripped plate. An alternative to universal mill I.UKENSSTEEl.

Write r------------------,
I
I
LUKENS STEEl CO MPAN Y
586 ServiCes BUilding
I
I
right
Coa lesvlllo. PA 19320
I I


Please send me a copy of your brochure. LUK ENS CONST RUCT IONAL
I PLATE STEELS I
I ~ I
now. I
I
TITLE
COMPANY
I
I
CITY ---= I
IL __________________
ADDRE SS

STATE ZIP
~
Copley Place:
Complex is the Word for It!
by Michael J.A.H. Jolliffe

n the heart of Boston's Back Bay busi- The Central Area construction compris- nal temperature on the upper levels but

I ness district, Copley Place represents a
$460-million development. The site for this
es over 1,600,000 sq ft of floor area ,
including 845,000 sq It of offices, 386,000
exposed to external temperature at the
Turnpike, parking and service levels
largest mixed-use development in Bos- sq ft of retail , restaurant and theater, park- below. The undertaking was extremely
ton's history was originally cleared during ing lor over 600 cars, a central mechani- comptex, bolh structurally and geometri-
the construction of the Massachusetts cal facility and a service area. The com- cally.
Turnpike Extension Into Boston-and sub- plex is built above part of the eastbound These constraints, along with the need
sequently occupied by the Turnpike inter- lane and a major exit ramp of the Turnpike to erect rapidly the structure, both to pro-
change, two railroad lines and the city and a railroad line. vide early completion and to minimize
street network. Interruption of normal Turnpike circulation ,
Many attempts were made over a 15- Extremely Complex Constraints led to the selection of a structural steel
year period to develop plans for the air- The project was complicated by the se- frame for the major portion of the building.
rights use of the area, one which would vere physical constraints of building Advantages of this selection were numer-
produce a financially feasible project. The above a number of tunnel-like easements ous: the light weight of the floors limited
final plan for Copley Place was developed of complex three-dimensional geometry loads which had to be transferred above
by the master planners for the project- on filled land . In addition, it was further the transportation corridors, requ iring
The Architects Collaborative (TAG) and restrained by the massing and siting of fewer piles; the ability to provide transfer
Zaldastani Associates, Inc. Both were also components required by the Boston Re- systems which carried dramatically differ-
responsible for the design of the Central development Authority and the Communi- ent levels of loadings at spans varying
Area, which differed from previous plans ty Review Committee. from 23 ft to 102 It: the ability to erect the
in that it proposed relocation of portions of The structural design had to consider a main floor of the mall 50 ft above the
the Turnpike ramps and the city street large number of unusual and demanding foundation prior to erection of the flat-slab
network. The plan produced sites of suffi- constraints : the need for a deep pile foun- garage below: and the ability to provide a •
cient area for two major hotels, which dation; occupancy of the site by the Turn- method of resisting lateral loads which
were not penalized by air-rights consider- pike and its ramps, the railroad and the interfered least with the fac ility's function.
ations, and concentrated the air-rights trucking portions of the service area; the Upper portions of the central area struc-
portion of the construction into the Central need to transler seismic and Wind loads to ture are relatively conventional. The office
Area. This approach reduced the overall the ground ; and the differential thermal floors , with an area of over 100,000 sq It
cost premium for the work. effects of a structure maintained at inter- per floor, are framed on 3D-It sq bays

Half·billion "clams" are going into


construction of complex One Copley
Place-a literal male of buildings ,
ramps and underpasses, Steel framing
played vital role in solVing complicated
constramts.

Michael Jolliffe is vice president and principal·


in·charge for Zaldastani Associates , Consult-
Ing Engineers, Boston, Massachusetts.

16 MOOERN STEEL CONSTRUCTION
These floors will be exposed to the city-
scape at the outside perimeter and to a


high, Interior atrium Lateral loads are re-
Sisted by a perimeter moment resisting
frame , with columns at 15 ft oc , which
extends around the entire building . The
510-ft long bUilding IS diVided into two
sections by an expansion joint capable of
accommodating over seven inches of
movement from seismic loading at the
upper levels
Floor-to-floor height of office floors IS
12' -6" At the retail mall floors below, that
height Increases up to 20' For economi-
cal reasons, and the severe restraint on
locations at which lateral load reslsling
elements may be Introduced, lateral loads
below the office level are resisted by
braced frames or shear walls.

Greatest Constraint at Lower Levels


At the lower retail mall floor , and below,
the greatest structural constraints occur
ThiS level represents the lowest level at
which a complete floor can be established associated site lines, the railroad and the Aeoai view of Copley Place portrays
over the enlire site. At thiS level, the major- large clear spans for truck circulation at complexilles of site and underground
Ity of the floor IS subject to external tem- the service area occur. The geometry, easements
perature which habitually may reach -10· complex not only In the hOrizontal plane
F, while the structure above is maintained but also in the vertical plane, limits the
at 60-70· F Below this level, the tubular depth of potential transfer systems above


easements of the Turnpike ramps and their the transportation rights of way.

SHOP TNEMEC
For Innovation in Shop-Applied Coatings Systems

Sixty years ago, Tnemec Company, Inc. was founded to manufacture primers for steel. We slill do.
We are, and always have been, a leader in coatings technology.


Tnemec's shop-applied systems bear the mark of both our long experience and the latest in
systems development. Ask your Tnemec representative to explain how our shop-applied primers
allow for fast recoat, how those systems save time and money.
Innovat ion in shop-applied systems from Tnemec. To know us is to expect no less. Find out why.

POSI OHlce 80)( 1749 Manufaclurlng Planls:


K.C., Mo. 6-414' ~ 1749 Kansas City. Missouri
(816) 483- 3.400 Baltimo re, Maryland
(Ke) Telex ..3- 4208 Complon. Cal ifornia
Cross section (I.) shows numerous
levels to be accommodated_ Huge
girders (r and below) transfer loads
ovef ramps

The effects of temperature required in-
troduction of an added expansion JOint at
the towest mall flocr and below. To elimi-
nate the need for an expansion JOint
above, the tateral loads from the upper
flocrs of the structure on one side of that
expansion JOint are transferred through a
horizontal truss on the upper mall flocr to a
braced frame on the other side of that
expansion jOint. The structural system be-
tween the upper and lower mall flocrs IS
designed with sufficient flexibility so that the magnitude of end reaction (up to columns as cap plates. They provide mini-
unacceptable stresses are not Intro- 2,000'), and because of the deflection and mum eccentricity and easy erection. A
duced . The " released " structure below IS rotation of the girders which occurred as total of 101 bearings were used, with
independently braced to the foundation each flocr was added , framing angle con- capacity varying from soaKto 3,600'. •
level. nections could not be used In most cases The site IS located on land filled in the
Below the office towers, 66 of the col- After a thorough examination, two types latter part of the 19th century. The nature
umn loads had to be transferred above of connections were selected by the de- of subsoil required Installation of deep
the transportation corridors Elsewhere, signers Where plate girders are support- piles to reach bedrock. Where density of
32 of the column loads had to be trans- ed on long , slender columns, the girder is the plies and the proximity to existing
ferred , despite extreme care in arranging bolted to a column cap plate, creating a bridge piers required , piles were pre-
the building grid to minimIZe Interference moment connection. Moments up to 2,100 augered to reduce disturbance to the
Sixty four plate girders were used to trans- ft kips are developed In the connections underlYing clay stratum prior to the instal-
fer 86 columns The rest were transferrred Where plate girders are resting on shear lation of 14- and 16-in. prestressed
by trusses, which usually were also part of walls or very short and stiff column stubs , piles 0
the bracing system. Plate girders varied a spherical bearing was selected.
from 23 ft to 102 ft long and weighed up to Spherical bearings were also used
120 tons Approximately 2,000 tons of below columns supported on plate gird- Architect/Office and Retail
ASTM A572 and A588 steel were used to ers In locations where plate girder rotation The Arch.tects CollaboratIVe, Inc (TAC)
fabricate these girders , none of which would result in a very large moment in the Cambridge, Massachusetts
were Identical In design. Most girders column and large additional unbalanced
Prlncfpal DeslgnerslGarage, Service
were restricted In depth by the vertical horizontal forces , which would have to and Turnpike Levels
clearance required from the roadway have been resisted by the bUilding's brac- Zaldaslanl Associates, Inc
ramps or future railroad or truck dock, so ing system. The spherical bearing con- Boston, Massachusetts
that girders varied In depth from 3 ft-l 0 ft . sists of two parts, the lower part is a
convex plate with polished stainless steel Structural Engineer
Two Types of Connections Setected spherical surface and a concave plate on Zatdastani Associates , Inc
A majOr Issue related to the design of top with woven Teflon. But, where horizon- Civil Engineer
plate girders was selection of a method of tal mcvement was required, an additional Parsons. Bnnckerhoff Quade & Douglas, Inc
connection of plate girders to supporting sole plate with a sliding surface is added Boston. Massachusetts
columns, and connection of columns The bearings are small In SIZe, the largest,
being transferred at girders Because of of 3,600' capacity, IS 25" x 25" and fit on Steel Fabricator
Owen Steel Company, Inc •
Columbia, South Carolina

Owner
Urban Investment and Development Co
Boston, Massachusetts

18 MODERN STEEL CONSTRUCTION


The Transportation Building:
• Designed for a Perfect "Fit"
by Spir~s G. Pantazi

recent editoriat in the Boston Sunday evaluated by the architect, the Common- maximums were established to prevent
A Globe. referring to the many buildings
under construction in the Boston area.
wealth selected a site for the new Trans-
portation Building which would reVitalize
the new construction from overwhelming
the scale of the histOriC bUildings In the
stated: " Hard hats are at work allover an important downtown area and stimu- immediate area. The Irregular site was
Boston. attering the skyline, changing the late public and private development and shaped to preserve many older struc-
streetscape. They are knocking down old construction. The site, in the Park Plaza tures
buildings and pultlng up new ones. Urban Renewal Area, is near the historic
Some of It. like the new Transportation Boston Common and Public Garden , and Steel Plays Role in Design Decisions
Building in Park Square . .. fits the city " in the heart of Boston's famed theater An early deCISion was made to design the
It IS gratifying that this unique govern- district. Itself in need of revitalization structure around a steel frame . Precast
ment building should already receive and prestressed concrete frames for the
such favorable reviews, even before com· Close Community Cooperation bUilding were conSidered by the architect
pletlon . The building was planned in close coop- and structural engineer, but were deemed
Since 1974, when the first feasibility eration with the surrounding community- inappropriate for a number of reasons :
studies were commissioned by the Com- business. cultural and neighborhood earthquake design requirements are such
monwealth of Massachusetts concerning groups-through their participation in a that needed speCial 10lnts would be diffi-
the scattered locations and poor working Civic Advisory Committee. cult and costly to construct; there would
conditions of many transportation agen- The Commonwealth passed special be limited competition for publiC bidding:
Cies (with the possibility of bringing them legislation to allow commercial uses on site restrictions would make field erection
together under one roof). Boston Archi- the street level so that rather than the difficult: future modlficalions would be dif-
tects Goody, Clancy & Associates. Inc . somber "9-to-5" facade usually associat- ficult ; and , Iinally, there appeared to be no
(GC&A) committed their resources not ed with government buildings. a retail particular advantage In cost or construc-


only to architectural design, but also to an arcade with shops and restaurants would tion time.
awareness of the effect such a building enliven the area day and night.
would have on the surrounding neighbor- The Boston Redevelopment Authority,
hood From the 20 sites investigated and the Civic Advisory Committee and com- Giant Transporratlon Building (I.) "(,ts "
munity groups assisted In the preparation surroundings in historic theater distflct .
of the final Environmental Impact Report, Bird's-eye view and slle plan (below) show
SpltOS G Pantazl, AlA, IS the Transportation
a document which imposed a number of how massive steel-framed bUlldmg was
BUilding project architect for Goody, Clancy
& AssOCiates . Inc , Boston , Massachusetts
limitations on the building's design Height designed to match area needs


1st Quarter 1983 19
Of the remaining two systems consid- electrified cellular steel deck with 2-'12 in.
ered , a steel frame was deemed to be topping.
superior to concrete in earthquake- Due to its lOO-ft length, the 880,00Q-sq
resistant detailing and control of construc- ft building is divided by expansion joints •
tion. It offered a considerable cost advan- into four structurally independent build-
tage and, with an early award of the ings The need for double columns at
structural steel subcontract, also provided these expansion jOints was eliminated by
substantial savings in time. slide bearings mounted on column brack-
The architect wanted an "open, airy" ets. These bearings allow movement per-
building . This was achieved by utilizing pendicular to the joint, but restrain move-
triangular pipe-framed trusses to span a ment parallel to the joint. Restraint parallel
MANGANARO multi-story atrium. The atrium marks the to the joint is required to keep the build-
COR PO RA T I O N . NE 'W' E N GL AN D
intersection of a pedestrian way (once a ings in tune with each other and to prevent
p 0 BO)( 36.
dead-end theater street) and a diagonal damage to the brick cladding .
35 GREEN STREET
MAlOEN , MASSACHUSETTS 021.a path to nearby hotels. This space, over-
(617 ) J22-7929 looked by the transportation agencies' Erection Handfed From Curbside
offices and common facilities, creates a Structural steel (5,800 tons of it) was
meeting place for workers, shoppers and shipped from the fabricator to a Boston
theater-goers. area marshalling yard, and from there the
job was supplied on an as-needed basis.
Basic Steef Frame The bulk of the steel erection was han-
The basic structural system is a two-way dled from curbside by truck-mounted
ductile moment frame chosen for its re- cranes, including one rrgged with a 3 t 0-11
dundancy and economy in Irregular lay- boom. Even with that board ing house
outs. reach, a Kodiak climber was needed to rrg
Schemes involving bracing were ruled the atrium trusses, to handle the center
out because of architectural requirements section of the sprawling build ing . The five
DRYIO.LL • LATHING ' PLA STERING ' MA SONRY
for open planning Moment connections 13-ton, 126-ft long trusses were hoisted
and column splices in the design which from streetside and swung over the roof of
evolved are field welded . Standard con- the eighth floor by the Kodiak in their final
nections are bolted with tension control inclined posture-one end positioned to
bolts for "automatic" torquing . bear at the third floor level and the upper •
Floor framing is typically uncambered tips at the ninth floor.
partial-composite A36 steel, which meets The width of each truss tapers to fit the
stringent floor vibration criteria. Support- radial geometry of the atrium, but the
ing girders are raised 3 In. into the slab to layout enabled all five trusses to be geo-
permit Increased space for mechanical metrically identical, which slmplrfred fabri-
ductwork. The slab is a blended 3-in cation. BUilding movement between the

20
3rd and 9th floors is accommodated by ceiling space uncluttered . As noted previ- Energy Conservation Sets Standards
attaching the trusses at the 3rd floor, but ously, the system is designed to enable One of the mandated goals for the prolect


allowing the other three sides to float shop fabrication of C-shaped panels with was to set standards for energy conserva-
freely on slide bearings. All wind shear is rigid connections at points "A" (see Fig lion. A healing syslem was designed
thus delivered to the 3rd-floor supports. 1). Field-applied studs at B were not re- which reqUires no purchase of outSide
qUifed to furnish moment capacity. heat or steam. It IS based on recovery and
Light Metal Framing to New Level storage of ambient and process heat- the
Over the years, the steel and construction former derived from the 2,000 occupants
Industries have combined their expertise
A
In developing structural light metal fram-
Ing (LMF) techniques and applications ~.
I and 15,000 lighting fIXtures, the latter
drawn primarily from three-heat recovery
chillers . The heart of the heat recovery
These were refined and brought to a new system IS a 750,000-galion water storage
?
level In the Transportation BUilding. tank consisting of three two-story
Most, If not all, earlier LMF applications, ~B 250,000-gallon cells. DUring the peak
With which deSigners were familiar, used healing season, all three cells will provide
lB- , 16-, or 14-ga. C-sectlon steel studs as
., . 1 heat when the building IS unoccupied
infill framing between floors at a bUilding's , .,- .~~ ~ :- ..-;'.7r:;.!:'--7 Proportionately, they Will unload to chilled
edge. USing LMF, the weight Imposed on water storage to prOVide cooling dunng
~
building edges IS reduced drastically > the peak season.
when compared to the weight of the usual
- A 4,OOO-sq It array of solar collectors

\.- -- --
concrete block backup wall. The LMF ...................... generates B5% of the building's annual
system lends itself admirably to panelized domestic hot water reqUifements
shop prefabrication for additional cost
savings In thiS Instance, the LMF pro-
I By the close of 19B3, Boston's resI-
dents, downtown shoppers, theater goars
vides not only backup but also actually I and tOUrists will have discovered and wel -
supports the brick masonry skin.
~B comed the remarkable renaissance of the
In the Transportation Building , the prin-
Cipal plane of LMF Iramlng is placed
Ii theater district brought about by thiS malar
new construction.
outboard of, but still anchored to, the slab The value of thiS effort IS eVidenced by
edges Secondary LMF members are
II I the present spurt of major new construc-


used to frame the rather deep recesses tion and rehabilitation 1n the area Inspired
deslfed for solar control and architectural A by thiS lirst bold step--a bUilding that "fits
articulation at Windows All LMF connec- the city" 0
tions are welded
DeSign of the LMF panels IS akin to the For the most part, flfeproofing of struc-
Vierendeel truss In which there is no diag- tural steel IS accomplished with sprayed-
onal bracing Notable in the design IS Ihe on , non-asbestos mineral fiber/cementl-
absence of '· k,cker" braces, leaving the 1I0us material Steel IS not primed , but has
Architect
been permitted to OXidize to a "sugar" GODOY, Cfancy & ASSOCiates , Inc
coating to achieve a good bond With Boston , Massachusetts
fireproofing. In the garage areas, steel
columns vulnerable to auto traffic are en- Structural Engineer
Soaring atrium lends airy feeling to meet- cased . In the water tank construction re- LeMessurier Associates 'SCI
Ing pface for shoppers, employees and qUifed as part of the unique energy sys- Cambridge, Massachusetts
theater-goers. Plan and open steel frame- tem, columns are both bitumen-coated Generaf Contractor
work be/ow show intflcate deSIgn and concrete-encased . Volpe, Dimeo, O'Connell & Gutierrez (Iolnt
venture)
Malden, Massachusetts
.,
Geotechnical Consultant
., Haley & AldriCh, Inc

..
.,
Cambndge, Massachusetts
Construction Consultant
Falk ASSOCiates
., Boston Massachusetts

.. Steel Fabricator
Bnstol Steel & Iron Works, Inc


., Richmond , Virginia
.,~

•• Steet Erector
Daniel Marr & Son Co
" Boston , Massachusetts

Owner
Commonwealth of Massachusetts

21
Bostonian Hotel:
Posh Amongst the Pushcarts
by Pat Kolber •
he problem was how 10 bUild a mod- colorful pushcart vendors preserve Ihe Blackstone Block remain Intact, as does
T ern luxury 15S-room European-slyle
hotel on a small slte-and preserve the
colomal flavor which pervades the h,stonc
locale The umque efforts of the develop-
the ambiance of the entire area
The structure of the new atnum-style
hlsloncal Integnty of Ihe Slle Creative er. the archliect and members of Boston's BostOnian Hotel combines the traditional
planmng design and development com- Landmarks Commission and the Massa- With the modern In a bnck facade With
bined to solve the problem In a umque chusetts H,stoncal Commission culminat- glass and steel beams The bnck. With ItS
way ed In a flne blend of old and new The gramte ground floor, matches the maten-
The SIB-million Bostoman Hotel occu- archltect Incorporated the h,stonc bUild- als of the old bUildings that surround the
pies the Blackstone Block the heart of Ings Into the predominantly modern struc- hotel The seven-story structure reduces
17th-century Boston's commercial center ture The developer contnbuled $5.000 to to four where the hotel approaches these
Hlstonc red-bnck bUildings adjacent to an archeological dig that produced rare old bUildings. A glass-enclosed graOile
the hotel. nelghbcnng FaneUlI Hall Market- artifacts now on display In the hotel lobby bndge spans a narrow bnck alley to JOin
place and the presence of Haymarkets The Winding alleys and tiny courtyards of 40 rooms housed In the Intact 19th-
century Harkness BUilding Small balco-
nies and bnght awnings at each hotel
Window reheve the larger scale of the
bUilding and match the festIVIty of FaneUlI
Hall Marketplace. ThiS modern 2Oth-
century hotel captures and reflects the
city's hentage and expresses Ihe commit-
ment of developer and archltect to Bos- •
ton's hlstoncal Integnty

20th-Century Constructlon-with Steef


The constructIon of the BoSlonlan, howev-
er reflects 20th-century conSiderations of
time. cost and fleXibility
A steel frame was selected to supply
fleXibility and clear spans reqUired by the
architectural deSign. said DaVid Berg
structural engineer of the project, 'keep-
Ing In mind economy of matenals and time
of construction" The rela\ively small sIZe
of the site and ItS very unstable subSOil
were also factored Into Ihe deCISion to use
steel.
Ease of adaptability was another major
consideration The constncted site was a
factor In our deCISion to use steel. said
Berg, plus adaptations for future expan-

Pat Kolber IS account execuhve With Aveni


Lashley Company, Boston Massachusetts

Central atrium IS highlight deSign


feature of new luxury Bostontan Hotel

22 MODERN STEEL CONSTRUCTION
We invite you to join more than 9,000 of your associates who are now ...J
regularly receiving the AISC Engineering Journal. ... The cost is
<{
z
a:

only $8.00 for one year or $18.00 for three years; single issue $3.00;


~

::J
"
. ~z
(Foreign rates: $11.00 for one year, $24 for three years; single issue
$4.00). Simply fill out the attached form and send your check or
money order to begin your subscription . Payment must be enclosed ~
with this order. Make checks payable to AISC. Foreign subscriptions UJ
UJ
are payable in U.S. funds only. ~ =
2
(!) ~;t
zUJ -2
oz;'gc
~~

0 ~~
en
;( I'!

"
:; ::
"
~ ~
~

-5
£ ~ 0
r:
0 ~
"
5 0
§. "0
~
-
" ~
(; o
To enter your subscription to the
0

'"
<J .:.: !!? ~~
"'"
c.>
"
~ -
~

~ ~
w
'"
AISC ENGINEERING JOURNAL detach and E

"
J
r:
~
.D
>-
u
i0
"'0
.,
~
<{
0 U
0

return the attached envelope TODAY


U)

"
a: a; ~ .52-
.... gQ)
c;~
o~
0 "88~«S ~~
-g"08
~ . .!! . . o~
Q)J5
fV ~ g- ct
Cii C Q) ~ !: ..... ~ (/jC/J .D to ~ ~ 0
C ftI to') ff') C 61') ~:):::) .. Q. ~ 0
U (I)::S ~
UJ
.........
.... o ........ cc
o(Oco
(I)

- o E"*...(I)
-
::;

~
>-
°
C~
t
0 "CQ)Q)
C >- >- _ >- >- -
Q)Q)Q)
c
_(I)
c.£;
'"
c ";; O!
oC:

."'" CQ cu ..o~Q)O o
2 .... ;:c
::


MtO~EQ) ~ ~ _w


• <'?,J:!
UlOO-OO>-->..liI:
. 0 t:. TJ (0 to '"
z
~ ~
...,
,:: e o
0 Q..
:::l. 0.. ~
• •
---dZ----A~lNnOO/31VlS-----AlIO

----------------SS3~OOY

-----------------WO~~

IIIIII
NO POSTAGE
NECESSARY
IF MAILED
INTHE
UNITED STATES

~,~s~C~~SE ~E~M'T ~O~l!:.; YCH'C~G~ ,IL L


- POSTAGE WILL BE PAID BY-

AMERICAN INSTITUTE
OF STEEL CONSTRUCTION
P.O. Box 4588
Chicago, Illinois 60680

Unique S18·mllllon Bostonian Hoeel (I.)


occupies heart of histone commerCial
d,stnct. fme blend of old and new Top
photo defmes of/gmal structure of new
stsel-framed hotel

• sian were bUilt In hall-way through the


prolect We decided to use a steel skele-
ton because 01 ease 01 adaptability "
Story-height trusses create the central
Moment connections In the rigid Irames
and hinged arches were tYPically made
with end-plate connections shop-welded
to the beams and bolted to the columns
Architect
Mintz ASSOCiates Architects Planners
BoSlon. Massachusetts
atrium, the Important design leature 01 the with high strength bolts Shear connec-
Structural Engineer
Bostonian structure One truss supports tions were normally one sided "slap
DaVid M Berg Inc
the seven-story wing two others support plate"
Needham. Massachusetls
the glass-enclosed Seasons Restaurant The BostOnian is protected by a highly
housed atop the lour-story seclion 01 the sophisticated fire alarm system, with General Contractor
bUilding smoke detectors and three separate Permi CorporatIOn
The steel Irame used Grade A36 steel spnnkler heads In each room. In addition, Framingham Massachusells
tor the malorlty 01 the beams In Ihe slruc- the holel's highest pOint (70 It) IS well
within the range of lire-flghling equipment Steel Fabricator
ture and steel conlormlng to ASTM Grade
General Iron & Steel Works , Inc
A572 lor the story-height trusses that cre- The cost-eHlclent "energy management
Lawrence, Massachusetts
ate the atrium, as well as lor columns To system" IS a part 01 the hotel's heaVpump
reduce depth at construction, yet maintain system. As guests enter their rooms, the Owner Developer
sound attenuation and reduce vibration In system monitors body temperature and Wlnn Development Company
the lloors. a composite steel 10lst and turns on or off to consistently maintain Boslon, Massachusetts
concrete slab system was used lor lloor comfort and conserve energy
Iramlng. Gravity and lateral lorces are The Bostonian Hotel IS a unique exam-
carned by Intersecling steel Irames--ln ple 01 Innovalive planning and deSign
the longitudinal direction 01 the wings are rellectlng the dedication ot developer and
ngld frames, In the transverse directron architect to construct a bUilding In concert
three hinged arches with the needs 01 a hlstonc city 0


15t Quarter 1983 23
SUB ARC
WELDING,
DE OFFERS
YO MORE.
lfyrNre not IhIr*Jng Uncle for
your., arc opeiMlcii .. yrNre
missing out.
Missing out on an..-.y of
exclusive products. MIssIng out
on exclusive services. MIssIng
out on a chance to mIIke your \IINt'....... Wloft'wlhe
job faster and easier. boIlded ft-.rau ..... ,..
-'dIngOVW ..........
and light Mt ttwt lua IiiOI'I
HIGH toltrUctur. . . . . ~
OUALITY WELDS- fllbrlcRlon.
COMPETITIVE PRICES
As developers of the sub-
merged arc welding process.
we offer you more of what
you want sub arc for - from
semi-automatic to mUlti-wire
equipment systems with either
tractor or manipulator mount- And we offer the fused
Ing for higher productivity. We fluxes you need to meet the
also offer a full range of pow- special mechanical property
er supplies. up to 1.500 amps. requlremenu of vessels. pipe.
Each Is equipped with the lat-
est solid state controls and ad-
vanced features you need to
assure consistent. high qual-
FREE CATALOG
Itywelds-all at competitive Send for our Submerged An:
prices. Process. Equlpmellt and ____
rials catalog. It·s)'OUn FREEl
critical bridge members. ma- IXIrlte J. M. BIlderbKk. Union
chine parts. and ships. Their Carbide Corporation. Unde
special resistance to moisture DiviSion. Section R2. Old
piCk-Up Is added Insurance Rldgebury Road. Danbury.
against craCking. Connecticut 06817. In Canada


In addition. we offer you a contact Union Carbide canada.
choice of 19 carbon steel and 123 Egllnton Ave .• East Toronto•
low alloy sub arc wires to Ontario M4P/1J3. Or contact
match our 15 fluxes. your local Linde distributor.
155 Federal Street:
• Molding Today to Yesterday
by Jonathan Buhl

rom the beginning , and all through the what. due to varying span conditions and
F design penod, the 155 Federal Street
project reqUIred a tremendous amount of
a lack of continuity The dead load of a
concrete structure would have been over
communication and coordination between double that of a steel structure, which
owner, architect and consultants. There would have had two malor impacts on
had to be a lot of give and take on deSign:
everyone's part to get this building de- First, the seismiC reqUIrements for a
signed and In the ground concrete structure would be far greater
On a number of occasions, the architect than for a steel structure Since shear
and owner met with the Boston Redevel- walls and braCing could not be tolerated
opment Authonty to develop a building In the floor plan or facade , moment frames
which IS harmonious With the eXisting ones would be reqUIted for either steel Or con-
In the Immediate South Station area The crete systems In the concrete structure,
Authonty wanted the new 155 Federal the resulting beams would have created
Street BUilding to be compatible With the an unacceptable depth of structure Sec-
adlacent 10 High Street Building The new ondly the heaVier concrete structure
office building was to connect With the would have reqUired an expensive mat
existing bUilding at 10 High Street Thus, foundation , as opposed to the Spread
the sill and Window head condition of the foollngs which were adequate for the
new 155 Federal Street was to line up With structural steel . Other factors , mOte con-
10 High Street. This was achieved In struction related , made reinforced con-


addition, the arcade design apparent on crete a less attracllve solUlion Among
the eXisting High Street Building is repeat- these were the complexities Involved In
ed , thus the 28 it-high column at street the service core construction, the ex-
level Also, the rhythm of the facade of the tremely tight bUilding site and schedule
new office bUilding IS Similar to 10 High conslderallons , whiCh are always critical.
The 18-story 155 Federal Street Building
Street. The team also studied a number of
had to "match" existing 10 High Street In
histone area Unusual steel framing details structural steel schemes Initially Among
Design Constraints did jOb while tenants remamed In bUlldmg these were bar fOiStS With steel beams, the
The 155 Federal Street BUilding IS 18 stub glfder system, precast plank On steel
stones, With an overall height of 210 It floor levels at the new tower to match beams and non-composite steel beams
above grade The aspect ratiO, or height- those of 10 High Street ThiS resulted In a With steel deck These systems were all
to-Width ratiO, averages slightly over 2:1 tYPical floor-to-floor height of only 10 1t-9 eliminated due to Inability to accommo-
The bUilding site Includes about 10,000 sq in for the first 11 floors . Further complicat- date mechanical requirements . or be-
ft of bUilding area, with the western limit Ing matters, architectural requirements re- cause of excessive structural depth How-
abutting on an eXisting 11 -story bUilding qUired 7-ft high punched Window open- ever, through a collective effort, they
(10 High Street), Ings at the tower pen meter The head and arrived at a structural solution which rea-
The first design constraint faced was sill elevations matched those at 10 High sonably sallsfled everyone s deSign re-
that VIrtually 100% of the building site had Street. The owner's requirement for an qUirements Structural steel was the an ..
to be Included as rentable space in the 8 1t-6 In ceiling lelt only a 2 1t-3 In . swer to all the problems
tower floor plan . ThiS meant that the sandWich to accommodate the structure,
service core-which contained elevators, HVAC ducts , spnnklers, fireproofing , light- Unusual Framing Details
stairways and tOilet rooms-had to be ing fixtures and the ceiling gnd The baSIC floor structure IS a 3V, -ln light-
located elsewhere weight concrete slab on a 11'2-ln. compos-
Secondly Since the final occupants of Atternate Schemes Considered Ite steel deck All floor beams and glfders
the building were unknown at the lime of When the deSign team first looked at the are 16-ln . deep composite steel wlde-
deSign, the facade and floor plan had to 10 ft-9 In floor-to-floor height requirement flange members, resu lting In a total struc-
have a maximum degree of flexibility. The and the complex building geometry, a tural depth of 21 In The typical glfder
building had to be structured to cause concrete flat-plate structure looked like a span IS 23 11-9 In . while beams generally


minimal Interference from columns and a very clean structural solullon But when span 28 1t-6 In or more The eXisting
lateral support system. they took a closer look at thiS and other floor-to-floor height , to be matched In the
A third major deSign constraint required concrete systems, some problems be- new construction, was only 10 fl-9 In The
came eVident from a deSign standpoint owner wanted 8 1t-6 In . for rental purpos-
Jonathan Buh/ls a principal in the The two-way flat plate solution does es Another 21 In for the structure left a
structural englneenng firm of Souza and prOVide a relatively shallow floor structure, 6-ln. space In which everyone else had to
True , Inc , Cambridge, Massachusetts But here the system broke down some- work. What ultimately happened was that
1st Quarter 1983 25
r------------------------------------------------------------------------

almost every beam was penetrated for cated closer together, on an Irregular grid. transferred all loads to four 8-ln. steel
HVAC ducts and sprinkler pIping The BraCing bents at the north and soum core columns. These columns were In turn sup-


6-ln. space was adequately taken care of walls resist east-west lateral loads. Also at ported by heavy 14-ln. deep girders
by conduit, fireproofing, lighting fixtures these lines, support has been provided for which sat slightly up off the first floor, and
and ceiling grid . At the upper 1I0ors, the remaining sections of the 10 High transferred the loads to the eXisting col-
above 10 High Street, the floor-to-lloor Street floor slabs at levels one to 12. umns. When the shoring system was com-
height was increased to 11 ft-4 in. to give Above that, there is all new construction. pletely in place, all of the demolilion could
everyone seven more Inches of breathing The core IS structurally separated from then be completed, with the exception of
room lhe tower by a movement Joint that is 2 In the first floor . By transferring all the loads
To provide complete lIexlbility within the wide at lower levels, Increasing to 4 in. at at the first floor, the contractor kept the
tower floor area, moment frames were the 12th floor and above area free directly below, so new founda-
located around the building perimeter to Below the tower perimeter moment tion work could begin.
resisl laleral loads. The plan view of lhe frames, a continuous spread footing was After the foundation work along the
moment frames was generated by com- provided to minimize differential settle- shoring lines was completed. three col-
puter The frames are discontinuous at the ments A full basement level was provid- umns on each line were delivered to the
north and south extremes of the Federal ed, which matches the elevation of the 10 site to be erected Each column was low-
Street Side, Since the architectural feature High Street basement A cantilevered sol- ered through a hole cut in the first floor
is rounded corners In these locations dier pile and wood lagging system, which and bolted Into place on a new foundation
Also, at the west frame, a gap was provid- braced the excavation, was located di- pier After they were installed, the first lier
ed to allow passage of mechanical ser- rectly on the property line. In fact, the frame was completed. The 24-ln. deep
vices from the mechanical room in the lagging was used as the outside founda- header at the second floor was connected
core to each floor tion wall form. to the frame, and cut loose from the four
As mentioned before, one of the Initial steel columns The first 1I00r structure was
design constraints was for the rentable Complex Service Core Geometry then removed, and work started on the
tower area to envelop virtually 100% of the Demolition began with removal of exterior balance of the foundations,
building This constraint was satisfied by walls All walls and concrete floor slabs The steel was erected up to the roof
constructing the core completely within were removed to a point about 15 ft away level, and then, starting at the roof level,
the limits of the eXisting bUilding. A from each edge of the light wetl. The the 10-ln. headers were picked up by the
60-ft x 35-ft by 11 story high section of 10 owner had previously provided temporary new framing and shOring removed, one
High Street was demolished to accommo- closure walls In anliclpating thiS work. floor at a time. At each of three columns on


date the new core construction. The Origi- Since the eXisting floor slab was not cut off the north and south core walls, the head-
nal building remained occupied Just be- at a column line , the remaining section ers were supported by a 12-in. stub beam
yond the limits of thiS work, all through had to be supported by the new structure. off the column The header was rigidly
demolition and .construct ion phases For- The first step was to bring in 10-in. deep connected to the eXisting slab rib, but was
tunately, an eXisting 30-ft square light well steel header beams and place them on free to slide hOrizontally on a Tellon bear-
from the third lloor to the roof helped to the lloors. These headers were then hoist- ing below A 2-in separation accommo-
reduce the amount of demolition neces- ed up and attached to the underside of dates the expected differential lateral
sary. the eXisting slab movements between the new 18-story
A larger scale typical structural plan of Once all the header beams were in core and 10 High Street
the service core area Will show that the place, they were shored with 8-ln. x 14-ln.
floor structure IS essentially the same as In timbers, from the roof to the second floor
the tower, but columns are generally 10- At the second floor, a 24-in deep girder Handsome lobby/arcade ties old and new
together archlfecluraffy.

26 MODERN STEEL CONSTRUCTION


Most Difficult Analysis limestone between the openings. Also,
The moment Irames in the tower, provided the spandrel beams were restncted to


" to reSist wind and earthquake lateral load- 18 In. deep . Instead of Simply providIng
ing, represented a signilicant portion of lalse columns between wIndows, the de-
the structural design work They represent signer had to make these so-called Inter-
probably one 01 the most difficult analysis med,ate columns an integral part of the
problems In the structure Earthquake moment frames , to satisfy stIffness re-
loading generally governed the design at qUirements Even wIth the added ngldlty
the upper stones of the tower. Wind forces provIded all of the spandrel beams at the
became cntlcal at the lower levels, and first 11 lloors had to be 21 In. deep, and
were based on a Type A exposure The raised up Into the floor slab
design of the moment frame was based The same cond,trons hold at the south
on stiffness considerations, with the lateral elevatIon MaIn columns are typIcally
dnft being limited to Ll600 Due to time spaced at 17 1t-4 In oc., with one Inter-
constraints, a very ngorous hand analysis mediate column midway in between.
on the moment frames was done, and ThIngs really get rough for the moment
draWings Issued on the baSIS of these frame on the Federal Street side Because
calculations A simultaneous computer of the maIn entrance In the center, there IS
analYSIS was performed to check and a double-bay conditIon, With a 34 1t-8 In
refine the design as necessary. There column spacing The first beam at th,s
were over 1,000 members and 600 jOints section of the moment frame IS at the
in the frames , and the computer analysIs fourth floor The western frames , adlacent
combined all elements, uSing a three- to the service core, needed no IntermedI-
dimenSional approach. ate columns Since there was no limestone
The computer generated an Isometnc to support, and main columns had a
view of the moment frames . In a gap In the smaller average spacIng of about 14 ~ It.
west frame , mechanical services pass The computer modeled each floor dIa-
from core to tower ThiS frame begins at phragm WIth a gnd of liOile elements, and
the basement level and has beams at combined these With the elevations Into
every floor level above Frames on the one easy-to-understand picture Both the


other three sides start at the flfst floor , and main and Intermediate columns were fab-
have no beams until the third floor For ncated In three-story hIgh tree sectrons, to
architectural reasons, the second lloor cut down the number of pieces and fIeld
penmeter was pulled back and hung from connections Beam stubs were groove-
the third floor , resulting In a 26-ft un- welded to the main columns at each floor
braced length for the lower moment frame level At intermedIate columns, the beam
columns sectIon was conllnuous through the jOint,
Elevations perhaps would show these with column sections fillet-welded above
things a little more clearly Plenty of and below Flange and web stIffener
beams and columns for stiffness are at the plates were provIded only where reqUired
upper levels After the third floor, one hall by calculatIon . In fact. many flange strffen-
of the columns are lost, and the second ers at the main columns were eliminated
floor is nowhere in sight The preliminary because of the heavy column sections
deSIgn had only these main columns, requrred
which extend to the base, in the frames . The upper halves of a main tree column
Original slle condition (top) exposes area
When there were stnp windows, the span· 01 30-lr sq. IIghr well whIch became and an IntermedIate column were spliced
drel moment frame beams could be rela- service core. Bird's eye view (bolt. photo) ,n the lield. Typically, when a tree column
tIvely deep When a requirement for 7-1t midway rhrough steel erection shows approach is used on a bUilding , the maIn
hIgh punched wIndow openings was moment frame trees to 12th floor, core columns are spaced closer together, and
added, a new member had to pick up the framing in background the spandrel beam spliced at mIdspan . In

Dunean Industria.
Consultants to Structural (Dune.n O.lv.nl:r:lng)
Steel Fabricating Industry, 119 Norman Str.a.
also Appraisals & Liquidations p_o. Box 323
Ev.rett, Mas •. 02149

• ~DERBY, DRYLIE & ASSOCIATES, INC.


(617 ) 389 -8440
(203) 529 -6898
P. o. BOX B8 . DOY LESTOWN , PA. 18901 . 215-345-7585 DUNCAN (212) 509 -2200

15t Quarter 1983 27


this case, because there are intermediate have been reqUired was used, had not
columns, the spandrel beam is spliced at composite action been considered .


the quarter-point of the span, in a region One final area to be considered is the
of higher stress As a result, the connec- rounded corner framing along the Federal
tions are somewhal heavier than usually Street side. To frame the corners, an 18-in.
expected . If the intermediate columns had deep girder cantilevered from the moment
not been a part of the moment frame , the frame at each end of the curve A simply
tree approach would have been more connected straight beam was provided in
difficult, and perhaps abandoned. USing between Tie columns Insured compatible
tree columns made It possible for the Speakers at breakfast display 35 -Ib . deflections of the cantilevers and provid-
welding to be done in the shop, and for plaque, sflce of W14 x 730 (730 Ibs.lh) ed support for limestone panels Typically,
field connections to be bolted. Most all steel column used on buildmg. L. to (,: the limestone panels were picked up by
connections on the job, mcludlng Ihe tree "Ibert 0. Wilson, Jr., Ao. Wi/son seat angles at the floor level. Continuous
splices, used snap-off l'a-in. tension- Structural Co .. Charles Kenny, C. W. head and sill angles supported the panels
control bolts. Whlwer Co" George Macomber, laterally against wind pressures. The de-
The most massive connection In the Macomber Builders, Eugene Racek. FR sign of the limestone supports was based
building occurs at a W36x260 beam on Racek Associates; and Jonathan Buhl. on exposure Type 8 Wind pressures. On
the third floor. Here, one of two portal the completed limestone work at a round-
frames supports the entire Federal Street ed corner, the deck edge had to be very
side of the building at the third floor. The pected. In this case, the flange of a major carefully layed out so It would not Interfere
36-ln . deep beam spans to columns which girder had to be coped in the field to allow with panel installation.
weigh 730 psf, the heaviest rolled sections the hanger to pass . A cover plate with a The building was a most enjoyable proj-
available. The third floor is the only level hole for the hanger was provided to rein- ect for the design team to take part
where spandrel beam depth could ex- force the flange . The most senous Impact in-not only because it IS an exciting
ceed 18 in. the 10 ft-9 in . floor-to-floo r height had on building , but also because of all the other
There IS a very good reason for all the the structure was that nearly all beams people who were Involved with the job
heavy beams and columns in the moment had to be penetrated for HVAC ducts and The several "design" sessions held With
frames at the first to third floors . It has a lot sprinkler piping . At the break In the mo- the 8RA to see that their criteria were
to do with the fact that the second floor ment frame , the floor beams were restrict- included In the design of 155 Federal
has been pulled back , creating a 26-ft ed to an 8-in. maximum depth, to allow Street paid off. Their impact, along with


high un braced length condition for the t 1-ln. deep main supply ducts to pass what the owner wanted to achieve In this
columns The same drift index at these below A shallow structure here was also new bUilding , came to fruition in a new
high bays that are present at the upper deSired, so as not to restnct the flow of and exciting office building for 80ston. 0
levels had to be maintained The engineer return air from ceiling plenum to mechani-
did not want a very stiff structure Irom the cal room.
18th floor all the way down, and then have In the transition from the moment frame
a flexible , so-called "soft story" at the third to one of 8-ln. deep beams at the gap, the
floor This was difficult to overcome, par- situation was so tight that even the 8-in.
ticularly at the main entrance on the Fed- beams had to be raised up Into the floor
eral Street side. slab to provide enough room for ducts . Architect
A typical base detail at a moment frame Once the ducts passed under this area of E R. Racek AssoCiates
column called for a 4 V2-in. thick base plate shallow structure they split into slightly Boston, Massachusetts
with 20 1V. -in. dia. anchor bolts. The detail smaller ducts which penetrated the typi- Structural Engineer
provided a degree of moment fixity lor the cal 16-in. deep floor beams. The maxi- Souza & True
columns, and resisted uplift forces In mum size opening was 31 in. x 8 in. deep, Watertown. Massachusetts
some cases . centered on beam depth and beam span,
where possible. Construction Manager
Floor-to-Floor Height Considerations The steel fabncator's suggestion, Macomber Builders
Boston . Massachusetts
The building geometry and the 10 ft-9 in. square bar reinforcing , was used on one
floor-to-floor height had great impact on side of the beam web to reduce shop Steel Fabricator
the structure. A good place to start is at handling. Design of the reinforcing was A. 0 Wilson Structural Co., Inc
the recessed, hung second-floor perime- based on the composite properties of the Cambridge , Massachusetts
ter. The 6-in. wide by 1'h-in. thick plate steel beam. Using a Vierendeel truss anal-
hangers extend to the third floor. They are ogy, the designer found consideration of Steel Erector
aligned with , and concealed by the win- Daniel Marr & Son Co
the concrete flange helped In two ways:
Boston, Massachusetts
dow mullions in the finished building . This first , compressive stress at the steel top
would have been more difficult to do In flange was greatly reduced. Secondly, Owner/Developer
concrete Some redundancy was de- buckling resistance of the top flange was Boston Federal ASSOCiates


signed into each element of the hanging greatly reduced . Secondly, buckling re- Boston , Massachusetts
system, to provide an additional safety sistance of the top flange was significantly
factor . Increased The final result was that only
Sometimes, things did not go as ex- about 50% of the reinforcing that would

28
• Using Coronet Load Indicators
saves over $75,000
on PPG Building.
Comparing the bolt inspection Why spend twice as much for
costs of two buildings recently inspection using a system that is
erected in Pittsburgh , Pennsyl- unreliable? Save costs and know
vania , shows how using Coronet your bolts have been properly
Load Indicators can mean signifi- tensioned . Specify Coronet Load
cant cost savings. Indicators. Write or call today
for an up-to-date fact file.
The high-strength bolts on the
Dravo Building were installed
usmg the "turn-of-nut" method .
Bolt inspection required an
inspector and two ironworkers •
with a torque wrench at a cost of
$9.95 per ton of steel.
The bolts on the PPG Building,
however, were installed with
Coronet Load Indicators. Bolt
inspection required only half of a


man's time at a cost of $1 .75 per
ton of steel plus the cost of load
indicators at $4 .00 per ton , or
a total of $5.75 per ton .
That's a savings of $4.20 per ton
over the Dravo Building . With
18,000 tons of steel used to erect
the PPG Building , the total sav-
ings in bolt inspection is $75 ,600.
What's more. with Coronet Load
Indicators, 100 percent of the
bolts were inspected , whereas
only 25 percent of the bolts in-
stalled by the "turn-of-nut" method
were inspected . And because a
calibrated torque wrench does not
prove that the bolts have been
properly tightened , the proper
tensioning of even these bolts is
not assured .

PPG BUllcling Pntsburgh, Pennsylvama Owner.


Pittsburgh Ptale Glass Co , Architect. Johnson!
Burpee Enpmeer SllIlImo , Helle . Chrlstl8nsen,
Robertson Fabncafor U S S FabllcatJOn. DIVISIOn
01Umled Slates Steel Carpora llon . Erector'
AmerICan Bfldge, O,VISlon Of Umled Stales Steel
CotporatlOfl

Gb ~~!fO~d~~~~ner Inc
• 522 Parkway View Drive
Pittsburgh, PA 15205
Telephone (412) 787·2253 ' Telex 812381

1st Quarter/1983 29
Steel Erection and Ornamental Iron Advancement Fund
148 State Street, Boston, Massachusetts 02109

AffIhated With the Steel Erectors Association of the BTEA and the International AssOCiation of Bndge. Structural
and Ornamentallron Workers Local?, Boston Local 57. Worcester Local 351, Lawrence

30 MODERN STeEL CONSTRUCTION
Designs in Steel
• by Hugh Stubbins

Hugh Stubb,ns FA/A. IS president of the archi-


tectural firm of Hugh Stubbins and AssocI-
ates Cambndge, Massachusetts

ur firm IS expenenced In a wide range tural organization A system of statically


O of bUilding types and planning solu-
tions From beginnings In residential and
determinate Irusses 10 Ihe extenor facade
diverts bUilding weight around the open
school architecture In the New England space at the base. concentrates bUilding
area we have expanded to Include office weight for caisson effiCiency and moblliz
bUildings. theaters. research facilities. h0- es extenor wall weight to resist wlnd -
tels IIbranes and recreation and transpor- overturning moments
tation facIlities throughout the U.S and
overseas ThiS broadenlOg of architectural Boston and Cambridge
scope enlarges our responsibilities as de- W,thlO Boston and Cambndge. our expen
signers and bnngs us heightened aware- ence With steet -framed bUildings has
ness of sound bUilding techniques and been diverse Beginning In 1966 With the
matenals Our strong relationship With a AISC award-Winning State Street Bank a
structural engineer William J LeMes- JOint venture between Hugh Stubbins and
suner of LeMessuner ASSOCiates SCI, has ASSOCiates . F A Stahl and ASSOCiates and
resulted In a successful union of architec- William J LeMessuner steel again offered


tural and structural deSign Among the new deSign opportunities The 34 -story
most notable and Innovative of our collab- office tower. With offset corners and 15 II
orations have been those bUildings With Tower Designs deep canulevers on four sides IS dlstln-
steel frames Later. combinations of steel and concrete
Introduced new poSSibilities for tower de
Beginnings sign At MITs Tang Hall. married-student
Stare Street Bank BUIlding
Even In 1946. we used steel framlOg for a housing. we used steel for the Intenor
small house In Newtown. Conn Located structure connected to a precast concrete
atop a granite hili . and surrounded by extenor wall system By contrast our 54
cornfields. thiS bnck veneer house was story Singapore Treasury BUilding cur
constructed In steel. With a concrete foun- renlly under constructlon _ has a SliP-
dation and floor as a fire precaution and fonmed concrete core from which steel -
to alleViate anxieties of the owner From framed fioors are cantilevered 38 ft
thiS small structure. we moved on to uSing Cltlcorp Center represents one of the
steel In elementary school bUildings such most Interesting steel framing concepts
as the Country School In Weston. Mass deVised to date and one of the mosl
which received the Harleston Parker Gold economical steel buildings for ItS 915-11
Medel In t 955 for liS Innovative deSign In height. The structure uses a senes of
nestling IOta the undulating land forms In a chevrons for Wind-braCing and the trans
reSidential community As our practice fer of loads to four large mast columns
and the scale of work grew. further oppor- located at the midpoint of each Side of the
tunities arose for steel structures. and our square tower These " supercolumns " nse
close relationship With LeMessuner began 114 II from street level 10 the flfst tower
to evolve College and university bUildings fioor. permitting the siting of Saint Peter's
were among the first building types we Church at the corner of 53rd and LexlOg -
worked on together For example at Jad- ton Avenue . . under' the Cltlcorp tower
win PhYSical Laboratory an AISC award- The main sanctuary of the steel-Iramed
winning bUilding at Pnnceton University. free-standing church IS one level below


steel was used to better accommodate grade To minimIZe adjacent subway
large cantilevers and aVOid creep com- noise Within the church. the frame rests on
monly expenenced In concrete structures neoprene pads to absorb Vibration
Also. It prOVided ultimate fleXibility for cut- Close to completion IS the 30-story
ting openings In floors to add equipment Medical Mutual Center In Cleveland . a At
necessary for different types of research less than 17'12 psf of structural steel. the
prolects office tower represents an effiCient struc-

t st Ouarter 1983 3'



Boston City Hospital Outpatient Dept

terlor surface area ThiS and other


energy-conscious deSign features result
In the very low projected annual energy
budget of 37,000 BTUs per sq It.
Based on the geotechnical deSign pa-
rameters, pile foundations were reqUired
to support the bUilding With a view to-
ward minimizing the weight of the struc-
ture, structural steel framing uSing either a
30' x 30' or 30' x 25' bay was selected .
Vertical-plane diagonal braCing was posi-
tioned systematically throughout the plan
to prOVide resistance to lateral loads Only
three-quarters of the number of plies re-
qUIred for an eqUivalent reinforced con-
gUished from Its four-story base which L-shaped volumes, one eleven stories and crete framing system were necessary
relates to the scale of older neighboring the other, five . The Interlocking configura- Another Implication of a lightweight
buildings tion of these forms encloses a central building IS the attendant reduction In de-
Spanning Massachusetts Avenue IS the atrium and lobby and creates two dls- sign seismic forces for which the building
Boston City Hospital Outpatient Building hnct types of flexible office space within was planned The lower the design seis-
which we designed In partnership with Ihe building The large public-servlce- mic forces , directly re lated to the weight of
Rex Allen . The structural system consists Oriented agencies are housed on the
of a steel frame and precast, prestressed lower five floors which each contain
concrete plank The basIc structural ele- 86,500 gross sq It of space surrounding
ment IS an 8'-8" deep tong-span steel the atrium . Smaller, less frequented agen-


truss , The basic structural bay is a 60-1t cies are located on the SIX levels above
square, with secondary trusses located the atrium, on floors prOViding 42,500
20 It o.c to receive the precast floor gross sq ft. A street-level arcade provides
planks ThiS system makes the most effi- a covered walkway adlacent to retail
cient use of the depth of the required space between the two main bUilding
mechanical space for moment-resisting entries
efficiency and prOVides maximum free The polychrome exter,or 01 the building
area In thiS Interstitial space for supply IS composed 01 hOrizontal granite span-
systems, mechanical and electrical eqUip- drels and striP Windows 01 reflective glass
ment and personnel The flush lacade IS articulated by a narrow
At the Federal Reserve Bank of Boston band 01 polished dark red granite des'g-
near South Station, the building's steel natlng floor levels Warm grey unpolished
frame IS organized so that column loads granite IS used for the eleven-story portion
for 30 floors of the tower are transferred of the bUilding and light red granite for the
across the large opening near the tower five-story portion, remln scent of the brick
base by massive 36-1t deep tWin trusses used In neighboring buildings. A deSign
Transverse lateral forces are resisted by amenity In Itself,-the skylighted atrium IS
efficient X-braced ·supertrusses" In the also a passive solar collector and contrib-
end service cores TYPical floor girders utes to the energy effiCiency of the bUild-
and beams are made composite with Ing by substantially redUCing exposed ex-
lightweight concrete deck-supported slab
for rigidity Federal Reserve Bank Buildmg

Federat Building
Initiating the reVitalization of Boston's
North Station area the new Federal BUild-
Ing Will prOVide a new Image and consoli-
dated quarters for government agency


offices previously dispersed throughout
the city In addition to office space, the
bUilding offers commercial and retail
space at ground level and parking for 260
cars In a one-level underground garage
Scheduled for construction in early
spring , the building IS organized In two

32 MODERN STEEL CONSTRUCTION


• RiverSide Place. Cambfldge. office building

consists of 3V4-ln lightweight concrete


topping composite With 1'h-In deep steel
deck spanning 7' -6" to composite struc-
tural steel filler beams. Lateral deSign
loads aSSOCiated With Wind and seismic
forces are resisted by a combinatIon of
two moment-resisting exterior frames and
four planes of diagonal core bracing In the
short dlfectlon of the bUilding , and by two
planes of diagonal core braCing In the
long direction . Code requirements for
dead-load resistance to overturning due
to wind and economics dictated the use of
moment frames In lieu of tie-down anchors
the building, the less the amount of struc- concrete topping on 2-in . deep steel deck under the core columns
tural material required to sustain these used as stay-in-place forming . Moment- The examples presented here prOVide a
forces Thus the lower the design seismic resisting frames of A572, Grade 50 col- small inSight to the versatility and econo-
forces , the lower the structural system umns, and A36 girders are deSigned to my of steel construction We remain com-
cost accommodate the deSign lateral loads milled to investIgating mnovatlve deSign
down to the third level, i.e., first office solutions and to explOring techniques of
Riverside Place level. Below this level lateral loads are building with steel. 0
In Cambridge, we have designed a new transmitted through a diagonal braCing
speculative office building to provide system In each principal direction.
maximum rental space to the developer
Wlthout sacrificing tenant amenities . Prom- 260 Franklin Street
• Inently located along the Charles River, Construction of a new 23·story office
the 485,000-sq It complex, part of the East building , "260 Franklin Street," is sched-
Cambridge Riverfront Development Pro- uled to begin this year Offering 350,000
gram, borders extensive river-edge park sq It of office space, the building will also
improvements. have a 5,ooO-sq ft retail arcade and a
Above four levels of parking , the bUild- sidewalk cafe at ground level. A two-level
ing rises in two perpendicular wings to underground garage accommodates 80
focus Intenor spaces on views of the nver cars . The bUilding deSign comprises two
and toward Cambridge and Boston. The forms with curved corners, one oriented to
seven-story east wing encloses an aver- the south and one to the north . The differ-
age of 20,000 sq It per lloor, and the ent volumes are articulated by vertical
nine-story west wing , 14,000. These wings slots whiCh run the full height of the build-
are connected by a glazed central core ing . The building exterior is planned as
and a four-story entry lobby. Along the mUlti-toned , beige-pink polished granite
riverfront side, the bUilding scale IS re- and insulating glass
duced to two-story "townhouse" office In response to the surrounding context.
space totaling 20,000 sq It to complement the lower levels of the facades on Franklin
marina and residential development and Oliver Streets Will be recessed with
planned for the area. Exterior materials the column structure articulated . Set-
Include colored precast concrete span- backs of the glazing at the street - and
drels and brick infill with bronze Insulating second-floor levels create the pedestrian
glass arcade opening to the lobby and to retail
260 Franklin Street Building
The structure is a steel frame for the and cafe uses Surrounding sidewalks
office building and the garage For the and historic alleys Will be provided With
office portion of the bUilding , above and appropriate paving materials, lighting and
adlacent to the garage , the lloor slab signage.
construction conSI'sts of 3!14·in , lightweight Structural steel was selected as being
concrete topping compOSite with 3-in. the most cost-effective for this particular
• deep, 21-ga. steel deck spanning 10 It to building configuration . Thirty-three col-
composite A36 structural steel filler umns are spaced at approximately 15 It
beams The corresponding lloor construc- around the building perimeter, and eight
tion In the garage is a reinforced concrete columns are positioned at the perimeter of
slab comprised of 4-ln. normal weight the service core. TYP,callioor construction

1SI Quarter 1983 33



Constitution Quarters:
Architectural Integrity
Restored
mmobillare New England was desIgnat- National Landmark a Challenge
I ed by the Boston Redevelopment Au-
thonty as the redeveloper for a large part
Since the enllre 1DO-acre Navy Yard IS a
National Hlstonc Landmark, building ex-
of the histonc former Navy Yard . Their teriors were carefully renovated to respect
Interest was in adaptively reusing a num- their historic and architectural integrity.
ber of existing buildings, while preserving Brick and granite surfaces were gently
their historic and architectural Integrity. cleaned Major mullion patterns were re-
The master plan for the revitalization of the tained to preserve the scale and propor-
Navy Yard , also prepared by Architect tion of the Industrial windows. New street-
Anderson Notter Finegold Inc., suggested scape and courtyard treatments, In-
a mixed use reSidential/commercial and cluding retention of a steel truss as an
cultural development. outdoor canopyltrellis, blend the site's In-
An economic study confirmed that a dustrial heritage with a new reSidential.
complex of existing buildings could be ambience.
c: preserved and rehabilitated into condo- The original full-height space has been
o miniums and rental apartments. An imagi- preserved and transformed into a spec-

.-en
native financing program was developed tacular atrium as the Internal focal pOint of
by taking advantage of the tax Incentives the deSign The sheer size of thiS skylit
.~ under the hlstonc provisions of the Tax atrium, 60 ft high and nearly 700 ft long,
c Reform Act. Key to redevelopment and
preservation of the Navy Yard was to
creates a breathtaking enVIronment. The
original steel truss/monitor roof is pre-
en establish a neighborhood , Initially through
housing , With later addition of commercial
served to provide natural lighting .
Glass-enclosed elevator towers and
C1>
and cultural facilities . Immobiliare New open circulation bndges divide the atrium
CO
en England established a limited partnership
to execute thiS first stage
Into smaller bays . A resldenllal scale is
achieved With extensive interior plantings,
-
co
.-
The SIte at the inner end of Boston
Harbor compnses an entire block of about
quarry tile 1I00rs and wooden entrance
platforms and railings. Colorful fabric mo-
seven acres of the Navy Yard It IS bound- biles, the result of a local artists' competi -
ed by a number of old industnal shipyard tion , float within the atnum bays. Machin-
structures , a new city park and part of the ery patterns salvaged from the buildings
waterfront rehabilitated into a marina. The have been creatively redesigned as
enllre block was covered With a structure sculptures and wall murals
the Navy had designated BUilding 42---a A courtyard was created between the
complex of a foundry and machine shop two most historically significant buildings
to produce major components needed for which were linked by an arcade that ech-
ship construction oes their most appealing features . ReSI-
The task was to recycle the histonc dential development of the first group of
foundry and machine shop structures, bUildings will be the initiative to develop
dating from the 1850's to 1940's, into the remainder of the shipyard into a neigh-
rental apartments. In the future , these borhood community. •
could be sold as condominiums In a price
range making them available to buyers of Structural Details
vanous Income levels The space In the Prolect feaSibility was based on a structu-
bUildings allowed for 367 apartments, in- ral design which capitalizes on the heavy
cluding duplex and triplex units load capacity of eXisting gallenes, and
34 MODERN STEEL CONSTRUCTION
steel columns with concrete footings to signed to support a traveling crane and Unique Parking Structure
support new construction. Three new floor very heavy gallery floor loads They were Also Included ,n thiS project IS a 360-car
Ievels created a total. of six reside. ntial not suited for their new use, since the top parking garage bUilt Within the limits of a
evels. The gallery levels were widened flange was located above the finished masonry facade from an onglnal histone

and open cOrridors bUilt along their Inner floor and the bottom flange projected Into bUilding The structural system finally cho-
edges to overlook the atnum. the new apartment areas sen for the garage was precast pre-
The primary structural consideration for These girders were modified by welding stressed plank supported on W24 girders
thiS project was to develop a floor system continuous angles to the webs to form a and W12 columns Girders on both park-
that would eCQnomlcally extend the exist- much shallower beam and then removing Ing levels are cantilevered beyond sup-
Ing gallery floors by approximately 14 It, the original top and bottom flanges This porting columns to reduce midspan bend-
and at the same time have a minimum procedure allowed the contractor to per- Ing moments-and to eliminate interfer-
floor depth so new floors could be added form his work Without shonng the eXisting ence between the new and onglnal foun-
between the eXisting gallenes which had a galleries and permitted other work to dations The steel framing was ngldly
minimum floor-to-floor height of 17 11-6 in. progress simultaneously With the excep- framed With end-plate connections to re-
The design chosen consisted of tion of a few severely corroded roof level SiSt both gravity and seismiC Induced m0-
structural steel framing and light gauge spandrels and a fatigue failure of two ments
metal floor joists The new floor areas girder connections which supported the ThiS unusual project represents an Im-
beyond the limits of the eXisting galleries traveling crane, the structural steel was In portant commitment by the city and pn-
were framed with we beams extending excellent condition. vate developers to revitalize a local com-
out from existing floor girders. These can- The bUilding uses incremental gas heat- mUnity Neighborhood reSidents were
tilever over new posts to form a continu- Ing, with separate systems for each unit. given pnonty for jobs in construction and
ous walkway around the atrium at each Air-conditioning IS also prOVided The me- management as a measure to boost the
floor level. chanical system relies on a system of local economy and to make the project a
The walkways on either side of the 30-ft Incremental condenser ventilation. care- part of the community Most Importantly
atnum are connected With several steel- fully designed to be integrated With the the project sparks new VItality to the area
framed bndges and a glass-enclosed ele- fenestration system of the malor eleva- Without causing any displacement of ex-
vator It was necessary to modify the tions. To preserve the original masonry isting reSidents Truly , It transforms obso-
eXisting floor girders along the interior facades and historic roofllnes, many Units lete Industrial structures to new reSidential
edge of the galleries These built-up have remole condensers located In allic use, yet preserves the Integrity of a Na-
and/or rolled girders were originally de- spaces that are mechanically ventilated tional H,stonc Landmark 0
Histone Charlestown Navy Yard building (I. pg.) were transformed
mto handsome apartments be/ow Stee//rammg (/) permitted exten-
s/ve structural renovations reqUired

"

"f' "" .'"


.' ....
"

Architect Steel Fabricator


Anderson Notter Finegold Inc L Antonelh Iron Works Inc
Boston. Massachusetts QUIncy, Massachusetts

Structural Engineer Owner:


Brown , Rona Inc Building 42 ASSOCiates
Boston Massachusetts Charlestow'1. Massachusetts

General Contractor 35
Sydney/Solimando
Newton Highlands, Massachusetts
Design for Ma~imum Flexibility
Northeastern University: The basic structural frame consists of 650
tons of A36 steel Design IS compOSite.
beam/composite deck uSing '%-In. x
Engineered in Steel 3-'h in. long shear studs approximately
1 11-6 In. on center. Total floor slab thick-
ness is 5'h in" with 3'h in. of lightweight
ortheastern University is known project is complete, this will form an im- concrete fill on 2-in. galvanized metal floor
N throughout the U S and the world for
its College of Engineering . A top-quality
portant new gateway to the central cam-
pus, via an extension of the underground
forms , giving a 2-hr. fire rating . Columns
and beams are sprayed-on aller erection
education in engineering disciplines is pedestrian movement system. to achieve the same rating . To Insure
available through both full-time and part- The structural engineers considered al- better bonding of the fireproofing material ,
time programs, as well as the well-known ternative framing systems, including steel , the structural steel was left unpainted ,
cooperative education program. Over the reinforced concrete and a precast combi- which also resulted in savings of several
years, tens of thousands of students have nation. However, a steel system was se- thousand dollars. Within the overall struc-
participated in these programs, with cur- lected in the early stages of design devel- tural grid , a rigid frame with moment con-
rent enrollment at 5,600. Considering this opment for three principal reasons: light nections resists wind and seismic loads.
success, It is incongruous that many of the weight, speed of deSign and construction, In lieu of bracing , this design allows great-
college 's activities are housed in the old- and adaptability to changes in deSign er freedom of unobstructed window
est, most starkly utilitarian quarters on even if it were reqUired dunng construc- placement and imposes no constraints on
campus. However, this situation will be tion. Northeastern's campus IS In Boston's future retocation of interior partitions.
remedied in September 1983 when the Back Bay, a filled marsh where the water The College of Engineering's program
Engineering Center, rising with a grid of table rises and falls with harbor tides. The includes a wide range of uses-from of-
steel and precast concrete from the South steel framing system yields significantly fice space to laboratories to lecture halls.
parking lot, opens its doors. lighter dead loads, translating Into smaller All requ ire maximum flexibility to remain
The Engineering Center will contain footing requirements on this marginal viable during the life of the facility. Steel
80,000 sq II on five main floors , plus a bearing . Smaller footings in turn mean framing provides the least restrictive en-
roof-top penthouse/teaching unit and ob- less excavation and dewatering , lower velope. Walls, except at stairs and shall-
servation deck for solar. Wind and envi·
ronmental experiments. Level One, half
below grade, includes the "heavy" labs-
concrete, structural analysis and hydrau-
lics. Level Two will house classrooms, two
slope-floor lecture halls each seating 200
and administrative offices. Levels Three,
cost and faster construction .
Speed of construction is a critical factor.
From the ground breaking in May 1982,
the contractor was given only 14 months
to complete the project for occupancy.
Any overrun of this schedule would result
in a full semester delay to the facil-
ways, are non-toad bearing Utilities are
clustered in four centralized chases for
easy access and modification. Class-
room, laboratory and office space can
interchanged as program requirements
change.
Because the Center abuts the existing
b.
Four and Five are a mix of administration ity's planned opening , posing Significant Dana Research Center and is connected
and facully offices and laboratory space scheduling problems to the university. to it on four levels, floor-to-floor heights are
for the structural , civil, chemical and envi- Steel's relatively short design lime and set by Dana's restricted 12 ft-6 in. Added
ronmental engineering departments. Con- speed of erection have allowed the con- to this constraint are required spans of 52
struction funding is principally from corpo- tractor to close in a significant portion of 11-6 in. over the new lecture halls, plus
rate foundation and individual alumni the building prior to severe winter weather unusual ceiling plenum space require-
contributions. -and remain on track with interior parti- ments for utility services to laboratories.
tions, utililles, finishes and equipment Depth of structural members therefore be-
Structural Response to Environment Another method to speed the design
The exterior design , which departs from and construction process involved the ,-.,.
Northeastern's traditional white brick, fea- steel to precast cladding connections, r
tures precast panels with a finish of ex· which were designed in concept, but not
posed '%-in. screen Mount Airy (S.C.)
granite. The north facade is composed of
in detail, for the bidding phases of the
project. Steel's flexibility allowed the final .'
1 _
...... .....".
(
flush alternating horizontal bands of solar design of clips and supports to be worked .... ,..
f:~<ntJ,..,

.~:
gray glass and precast. In response to out effiCiently to the specific needs of the !
solar orientation, the south facade pre- selected precast and steel subcontractors ....6·f:A . .
-~'I~
,
sents a very different aspect Here, office during the shop drawings phase. "-I.se '"
1;,,·.,.·4·~ ..... _
"'O"""T~"
Windows are protected from solar gain by , -~- .,.
~c

deep overhangs, while a four-story glass -;r:;'~I~


atrium marks the building 's entrance. ..".,..."._.
CO<.CO-OIV.cr_.
When the MBTA's Orange Line relocation ~·",,'I-
~. cc.. .... _

"' 1"" ""


"";:-~ C".i'
-I ,
Noted Northeastern UniverSity School of
Engineering building (/.) was framed In
steel. Section details connections and facade

MODERN STEEL CONSTRUCTION
f '''lml!''F1*''*' ~
!ADMIT
~ ONE ~ First World Series game
was played on present
site 01 engmeenng school
-1903 game between
Boston Pilgrims and Phil-
adelphia Athletics .
Boston won.
,.

comes severely limited The engineers


deSigned a structural framing system for
this area consisting of W18x71 sections,
5 ft 0 C and precambered to reduce
dead-load deflection. For the basic build-
Ing frame , connections are bolted with
A325 load Indicator bolts. Moment frame
connections are welded with E70XX elec-
trodes
The Englneenng Center is deSigned not
only to house College of Engineering ac-

e ivilies, but also to serve itself as a teach-


Ing laboratory Mechanical, electrical and
environmental engineering course materi-
al will be augmented by the theory, design
and operation of actual building systems.
As an example, provisions are Included to
First is Arbed's new rolled 40" beam . .. available in 16
monitor and adapt the functions of the
HVAC system as It responds to changing sections from 149 to 328 Ibs. It gives high section moduli,
conditions of exterior and interior envi- great lateral buckling resistance, and competes economically
ronment Also, Northeastern's Office of with both fabricated sections, as well as reinforced precast
Learning Resources, under a grant from and prestressed concrete.
The Steel Erection and Ornamental Iron Then there's Arbed's rolled ''taIl0Ml18de '' series (up to
Advancement Fund , IS photographing 42.45" x 18.13" x 848Ibs,)... that lets you specify the beam
and videotaping the entire construction weight you need, other than what is normally available.
process of this bUilding , with an emphasIs Result? Big savings: in fabrication costs and weight.
on foundations , steel, and steel erection, Why not get all the facts? Send the coupon now for
with plans to deSign curriculum resource
information including complete specifications.

rI ----------------nI
material for courses in structural englneer-
109 and general construction practices·D TradeARBED Inc. 825 Third Avenue, 24th floor New York, N.Y. 10022
(212) 486-9890. Domestic Telex: (W.U.) 125159, Inl'l Telex (ITT) 421180.
In Canada: TradeARBED Canada, Inc., 1176 Blair Road, Burlington,
Architect/Structural Engineer
Keyes Associales
I OntariO, Canada L7M 1K9. (416) 335-5710, Telex 0618258 I
Waltham. Massachusells Please send complete Information on TradeARBED's 40 ' beams and I
General Contractor I "TAILOR-MADE" beams.
Vappl and Company, Inc I Name Title I
Cambridge, Massachusetts
I Firm
Address, ___________________________________________
I
e steel Fabricator
General Steel Fabncators, Inc
Latham , New York
L.s ~ ________s.!!!.e__ ...!I~ __ J
Owner
Northeastern UniverSIty
Boston, Massachusetts ••, Inc .
151 Quarter 1983 INNOVATORS OF STEEL CONSTRUCTION PRODUCTS
Seal Harbor Condominiums:
Luxury in Panorama
by Dianne M. Ludman

he view IS spectacular-a 2700 unpar- and hobby rooms and health club. Individ-
T alleled panorama of the Boston water-
front stretching from Nahant and Marble-
ualliving units range in sIZe from 1-bed/ 1-
bath flats to 3-bedroom/2-Y2 bath duplex
head in the north to the Boston Harbor penthouses .
Islands In the south The nine-acre Site,
less than 10 miles from downtown Boston, Low Cost Steel for Luxury Living
IS a peninsular bluff 20-30 It above sea Steel was selected for Seal Harbor be-
level With over 1,800 It of ocean front. cause of ItS low cost , and ItS ease and
The marketing vision of the developer/ speed of construction. Because of open-
contractor, With 23 years of experience in ness required by the unit plans and the
the housing industry, led him to Seal Har- need to offset columns over the garage
bor, an abandoned U.S. military com- and at upper floor setbacks, the structural
pound originally known as Fort Heath. The architect met this challenge by engineer selected a multi-story ngld frame
Early in 1979, the development team- grouping the Units Into two large build- fo r the basic framing system. The infill
architect, broker and lender- began an ings, each bent at 450 around a central floor system chosen was a regular, mass-
analysis of the site. The eventual program, core. These 'chevrons ' were then )uxtapo- produced , composite-steel bar-joist sys-
product of a lengthy study of architectural sitioned so that no face of the fo~r wings tem that neatly incorporales the forms for
and marketing options, called for a 246- or the existing structure is parallel to any the floor. ThiS system installs quickly and
unit luxury condominium complex with a other. The resultant massing creates a allows the slabs to be poured closely
strong accent on the uniqueness of its lively interplay of forms and surfaces to behind the steel erection so that framing
harbor location. emphasize the visual expansiveness of precedes slabs by less than three floors ,
the site and the open sea beyond The Forms for the underside of the slab are
Room, and What a View! seashore's special quality of light and air held between the jOists by temporary SUb- .
" Siting the project was the key," feels the is thus invited into every corner of the joists which are removed afterwards from
developer, Sanford Kaplan. " It was impor- complex, in spite of the density dictated beneath, a method which affords impor-
tant to give a direct view of the ocean to by economic limitations tant time savings which translate Into cost
every unit, and the architects achieved The two Seal Harbor buildings are con - savings . It is one of the lightest systems
that. " The task was more difficult because, nected by a 270-car underground parking available and allows a reduction of 2-4 in .
In 1973. Kaplan had built 150 units of garage, with additional parking on grade of construction depth per floor , yet pro-
rental housing on the landward edge of above. Each building is constructed in vides good airborne and impact sound
the site Providing an ocean view with two phases of 60-70 units, separated by reduction floor-to-floor.
balcony for each Unit of the new develop- the central greenhouse-a glazed stack Flexibility of the Joist locations to avoid
ment had to be accomplished without of elevator lobbies. The first phase is plumbing/duct conflicts was another im-
disturbing the views and sense of open- stepped from SIX to eight to ten stones; the portant factor. This was accomplished by
ness of thiS earlier project . second is nine stories. Common areas adjusting the location of the first jOist with-
Include an outdoor swimming pool and out disturbing the fixed joist spacing . Col-
Dianne Ludman IS marketing director for AOD cabana with kitchen and showers at each umn and beam framing was primafl'Y
Inc, an architecture/design/development firm done with qUick, simple high-strength bolt
building , tennis courts and meeting , game
In Cambridge , Massachusetts
connections. Moment connections, an In-
tegral part of the rigid frame , were welded
connections. Wind and seismic lateral
forces are resisted by a system of orthog -
onal bents arranged so that bending oc -
curs only on the strong axis of the wide-
flange columns.

Combination of Cantilevers
The architect's design for the building
facade employs a combination of two


types of cantilevers. Three-It deep canti-

Seal Harbor Condominiums (I.) on luxury


sile of Boston Waterfront, once an
abandoned army base. Aertal (top) shows
magmficent harbor panorama .

38 MODERN STEEL CONSTRUCTION


levered bays are clad In lightweight syn- The hlgh-nse bUilding IS fully spnn-
thetic stucco. with a cantilevered slab at klered and, classified as type 2B con-

• each floor Seven-ft deep cantilevered


bays, clad In bnck cavity wall construc-
tIOn. are much heavier due to the depth of
canlilever and weight of the extenor clad-
ding These bnck-sheathed bays are not
supported at each floor, Instead, each
floor bears on the floor beneath, and the
struction, has fire-resistant ratings of 2-hr
enclosure for stairways, elevator shafts
and duct shafts: 1-hr proteclion for col-
umns, beams and exltway COrridors. 1-hr
vertical separation of tenant spaces. and
1-hr. demiSing partitions between sepa-
rate dwelling Units All these ralings were
lowest floor of the bay IS supported by met by the chosen system In combination
24 to 33-ln . deep steel cantilevered With minimal thicknesses of gypsum wall-
beams of 36 or 50 kSI steel To accommo- board, a particularly clean and economic Mufti-story flQld frame prOVided low cost
date the depth of the cantilevered beams approach and ease of construclton for luxury condos
above the ceiling of the first floor. the All Massachusetts state energy codes
first-floor height has been Increased to 11 limlling of fenestration and reqUlnng mini-
Architect
ft, 16 In greater than the tYPical 9 ft-8 In mum R values at walls and roofing have ADD Inc
floor-to-floor dimenSion been met. Energy conservalion features Cambridge Massachusetts
An adlacent government radar dome Within the project deSign Include UnitiZed
limited the maximum height of the struc- heating and cooling supplied by heat Structural Engineer
ture The composite JOiSt and deck Ham- pumps ThiS system prOVides the resI- DaVid M Berg Inc
bro system helped reduce the overall dents With individual control of all HVAC Needham. Massachusetls
bUilding height enough to allow 10 stones. In addition, a carefully detailed, well- General Contractor
while stili accommodating the elevator Insulated skin minimizes energy loss Santord ConstructIOn Co Inc
overrun at the top Seal Harbor Condominiums rose qUick- Needham Massachusetts
Also affecling structural deSign was the ly and gracefully on ItS promontory In
extremely corrOSive salt atmosphere of the Boston's fabled outer harbor 0 Steel Fabricator
ocean Side Galvanized steel was used for Isaacson Sleel
all relieVing angles, which are the most Berlin. New Hampshire
exposed elements of the steel frame. All OwneriDeveloper
other steel IS painted With a rusl-inhlbitor


Seal Harbor CorporatIOn
Needham. Massachusetts

turns dreams
into beams-fast!

ADSTEEL automated drafting system Costs you less The ADSTEEL system
r-------------...,
Sun Information Services Company
saves time, so you and your people IS priced at a Iraclion of the cost of 280 King 01 Prussia Rd
can dream more productively. Our manual processes Radnor, PA t9087
comprehenSive software package Best ot all. ADSTEEL IS Simple
gives you Please send me more Inlormalloo
to learn with logiC Similar to manual
Please call
• clean. CriSp. eaSily reproduced processes
shop fabncalion draWings. With JOin the many US and International
results comparable to tediOUS firms now uSing the ADSTEEL auto- Name
hand detailing mated drafling system
• conformity to AISC bUilding
speCIfications as well as local For more Information. mall thiS III
coupon today, before you waste


codes All connecllons are
deSigned In accordance With another hour With manual drafllng ComPliny
AISC for the allowable beam ASK ADSTEEL Contact Earl Stelgerwal1
loading and the most economical al Sun lnformallon Services Company
connection size Headquarlers-2t 5-293-8247
Add ••
• time saving reports, such as
shop and field bolt counts,
welding quanlilies, total weight
of steel. and piece work
summaries
Sun INFORMATION
SERVICES
COMPANY
CoP'Irlghl 1983. SIS CorporatiOn
L _____________
Zop AlSC 383 ...J
Sial"
Tufts Research Center on Aging:
A Challenge in Site and Search •
by Or. Othar Zaldastani
and
Lloyd P. Acton , Jr.

he well·ordered . polite presence of the nutrition kitchen . Research laboratones on systems. It is more appropnate in a build-
T new 16·story bUltdlng on the corner of
Boston's Washington and Stuart Streets
the fifth to eighth floors are adaptable for
biochemical , physiological , pathological
ing that requires Installation and mainte-
nance of elaborate, constantly changing
belies the extreme complexity and techni- and behavioral studies. On the ninth floor equipment and services. In addition, be-
cal sophistication of the programs. equip· are the administrative offices and a com· cause of the soft blue clay below the site.
ment and activities It houses. puter center, which IS linked to terminals in costly foundations dictated the choice of a
Dedicated In November 1982. the U S each lab. light, economical superstructure Founda-
Department of Agriculture 's $32·million The 10th-floor mechanical space marks tions uSing 120-ton step-tapered steel
Human Nutnllon Research Center on the transition from the laboratory to liVing pipe piles had to be dnven to a depth of
Aging at Tufts University IS the first clinical space It is strategically located to effi- 120 ft. The buildings structural floors are
research unit In the world devoted entirely ciently service both the research areas 5'12-ln. lightweight concrete slabs on 2-ln
to the effects of nutntlon on the aging below and the clinical center above metal deck. spanning 10 feet between
process The Center Includes laboratories To take best advantage of the views and steel beams supported by steel girders
for 53 sCientists and 200 support abundant natural light. volunteers live The construction IS composite throughout.
personnel, extensive animal quarters on the top four floors of the bUilding . The shape of the bUilding led to rectangu-
and adm,n,strat,ve/exh,b,t,on/aud,tonum Here they have access to a recreation- lar Intenor bays of 20-40 ft. and trapezoI-
space-as well as comfortable living al roof deck which adloins a tubular steel- dal extenor bays
quarters for 28 volunteers who will live in framed skylit exercise/swimming pool
for testmg periods of up to 12 months . Dming rooms , exerCIse rooms , a music
The building occupies a tightly defined. room and library provide volunteers with a
19.700·sq ft site within the Unlverslty's vanety of stimulating activilies A metabol-
downtown campus. Its slx·sided rhom· ic kitchen , a human physiology and exer-
bold form responds to the main campus cise laboratory, and a complete nutrition
axiS and acknowledges the angles of ad· evaluallon lab complete the facilities
lacent streets At the same time. It creates These remind one that the purpose of
a dramatic new entrance to the campus these pleasant surroundings IS to Invesll-
and the adlolnlng New England Medical gate the relationship of body functions to
Center The bnck·red precast concrete different kinds of nutntlon.
panels provide a distinctive architec·
tural expression that Identifies the Center A Flexible/Economical Steet Structure
amidst surrounding white buildings The difficult and vaned program require-
ments posed a unique challenge for the
The Challenge of a Pioneering Center architects, engineers and construction
To accommodate the different program team. Close collaboration among all team
functions within a unl"ed solution. a sys- members and the client was necessary to
tem of zoning was designed to create fullil a fast-track schedule Considerable
distinct functional layers that are separat- effort was made from the very start of the
ed by the mechanical floor at the 1Oth deSign process to coordinate the struc-
level Above the building lobby and mez· ture With highly complicated mechanical
zanlne audltonum. a service floor buffers systems
public spaces from the next two floors. Several factors contnbuted to the
which are animal quarters The third and chOice of steel for the structure Since
fourth floors contain enVIronmentally con· steel provides greater flexlbiltty than other
trolled and Independently air· handled ani·
mal hOUSing for approximately 20.000 ro-
dents and some larger animals. as well as
a surgical sUite and a special animal

Dr Orhar Zaldastam, FASCE, is presIdent of


Zaldaslanl Assoc iates. a Boston-based engi-
neering firm
Uoyd P Acton, Jr., AlA, IS a pnnclpal of the
::;:=-"
Boston architectural firm of Shepley Sullinch
Richardson and Abboll

40
Lateral loading resistance IS provided A Special Vision
by rigid , moment-resisting steel frames in Downtown Boston was selected as an


the longltudmal direction, and transverse
K·braced frames (vertical trusses) to take
ideal location for the Center because of Its
large population of older cItizens who
Don't
-
wind and seismic loadings. represent a broad SOClo-economlC spec-
trum. It also provides an excellent regional
Computer Analysis Governs Design
AnalysIs of the structure employed the
STRUDL computer program, because of
the variety of special conditions from with-
In and without that Influenced framing. The
base for the public outreach educational
programs on food , nutrition and aging that
the Center plans to Initiate
On dedication day, viSitors were im-
pressed with the humanity and thoughtful-
miss
bracing systems engage the Interior coi-
umns to take full advantage of gravity
resistance In counteracting uplift forces .
ness of the plan, the friendliness of the
space and the quality of the detaillng-
unusual , they seemed to feel , In govern-
The
.-
The design of the ngld frames was gov- menl architecture Moreover, Terry Brad-
erned by wind-drift criteria. Locating the ford, administrative director of the Center,
exerCise pool at the top of the building reports the bUilding works well for the
required sophisticated analysIs to ensure research teams and programs in prog-
framing to withstand seismic forces . More- ress
over, the location of an electron micro- Dr Jean Mayer, renowned nutritionist
scope on the fifth floor demanded particu- and president of Tufts, authored the origi-
lar attention to Vibration criteria nal proposal for the U.S.D A Human Nutri-
Four single-story high transfer trusses tion Center, the first partnership between
within the second floor pick up the exterior U S 0 A and a private univerSity Drs
columns along the west Side of the build- Robert McGandy, Stanley Gershoff and If you supply construction
Ing and extend the span to permit a Hamish Munro, director of the Center, materials or servICes this Is your 0p-
loading dock and traffic access beneath. special apPOintees In charge of the pro- portunity 10 show and demonstrate
your company and its products to
The 10 ft-6 In transfer trusses also create gram, worked most closely With the de-
thousands of key Bu ilding, Industrial
space for a storage and mechanical floor sign team on the evolution of a research and Government buyers
above the public spaces. The principal center One which reinforces the vision of Sponsored by Slater Publications'


mechanical floor IS at the 10th level, where Dr. Mayer, who believes, with Hippocra- BIG BOOK ... New England's ONLY
It IS clearly expressed on the building tes, "the purpose of medicine IS to help Complete Construction Directory
This show Will draw your most im-
exterior In the lobby, diagonal members one's patients die young-as late as portant customers and prospects
of transverse K-braclng , exposed as ar- possible." 0 leading contractors, architects, engi-
chitectural elements, are encased In stain- neers, owners, plant and malnte·
less steel nance executIVes major industrial
and commercial users of construc-
tion services and government
agencies
Architect In adchtlon, influential
Shepley Butflnch Richardson and Abbott members of over forty
Boston, Massachusetts trade associaUons
"" and societies who
Structuraf Engineer regularly use THE
BIG BOOK
Zaldastanl ASSOCiates will also
Boslon, Massachusetts be Inal-
tendance.
General Contractor
Gllbane BUilding Company
PrOVidence , Rhode Island
THE BIG BOOK '. 1983
Steel Fabricator Northe.at Conltructlon Expolltlon
West End Iron Works June 15, 16, 17
Cambridge, Massachusetts Blyalde Expolltlon Center, BOlton
This Is your chance to meet and
Owner establish firm conlacts With hundreds
US Depanment 01 Agnculture of potential prospects who are other·
Tufts Universtty wise unavailable.
Don 't miSS out . Gall today for
complete Information
(617) 449·3916


USDA Human NutritIOn Research Produced by
Center, Tufts University (far I.) S Slater
meets challenge of tight site, Ugh!
steel frame permits constant chang- Publications Inc.
1&3 Highland A'ienu.
es In eqUipment/services areas NMdh.lm Height .. MA 02tlW
(811) .... ~le
ERECTORS SINCE 1898
. ,I STEPPING
DANIEL MARR & SON
"
OUT ON
THE TOWN

STEEL & PRECAST ERECTORS

A 165 Ton American and a Kodiak 250 worked together to Macomber, A.D. Wilson and Marr with the help of a climb-
set over 6000 tons of steel for Volpe. Dimeo, O'Connell & ing Kodiak set 1800 ton of steel at 155 Federal Street ,
Gutierrez at the Department of Transportation . Boston.

,
out ot ,.own . ~

, *

"
?

!
l •

·l,

Another Kodiak 250 was needed to set five (5) levels of


Montague-Betts steel atop an existing Beth Israel Hospital
building for Jackson Construction Co.
Many booms were used to set over 13,000 tons of steela.
Seabrook StaUon for United Engineers and Constructors,
Inc.

~ MAKE YOUR TOWN . . . MARR TOWN


DANIEL MARR & SON CO. CALL 617
One D Stre et. South Boston . MA 02127
269-7200
Pick the Profile that's right for you I
Need Some Help?
Manufacturing Plants:
Epic Metals Corporation is involved daily • Piltsburgh. Pa • Chicago. III
in engineering and manufacturing • Toledo. Ohio • Lakeland. Fla
Composite Decks, EPC Cellular Raceway Contact us today for Prompt Domestic
and International Shipments
System, Cellular Decks, Roof Decks, Form
Decks, Roofing and Siding.
Our staff is ready to serve your needs . EPIC
• A f
• Architects, Engineers, Contractors ... Eleven Talbot Avenue. Rankin PA 15104
give us a call .. . write . . . telex ... or PHONE: 412/351-3913
TWX: 710-664-4424
come and visit. EPICMETAL BOOK
We also manufacture some of the above profiles In aluminum
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
BULK RATE
The Wrigley Building, 400 North Michigan Avenue US. POSTAGE
Chicago, IL 60611 PAID


WHEATON. ILL.
Address CorrectIon Requested Perm it No. 1786

Squares, rectangles, rounds

Our product makes yours.


TASCOA is one of North America's leading suppliers of
square (through 12" ), rectangular (through 16" x 8"),
and round (through 15" ) cold-formed, welded structural
steel tubing (thicknesses through 5/8 " ). We're com-
mitted to providing customers a wide range of quality
products at a competitive price ; to providing a higher
strength to weight ratio, better dimensional tolerances,
superior surface finish and lower maintenance than
tubing produced by other processes. For more infor-
mation, or a detailed spec sheet, give us a call at (800)
223-6549 or in New York (212) 421-6700 .


TASCOA_ _
1\Ibe and Steel Company of America
A Division of The Titan Industrial Corporation
745 Fifth Avenue, New York City 10151

~-.-

You might also like