You are on page 1of 11

55'-2"

1 2 3
27'-1112"
8'-00" 25'-812"
8'-00"

8'-00"
A
8'-00"

3'-6"

DOWN
9"

4'
6'-9"
ENGINE HALL
3'-3"
FFL ±0.00 mm

Double Glazed Window


Power Cable Trench

15'
1"
8'-92 11'-1012"

22'-6"
9'
7'

Double Glazed Window


23'-6"
Lube oil
Tank

1"
42'-02 PIT-1 4' 3'-6"
F.F.L +0',00"
5'-1"
6'-612"

7'-3"
8 No's.Ø75 mm UPVC
PIPE Class E (Type)

UP

6'
F.F.L -2'-00" Engineer
Double Sliding Door
Room
B 4'
13'

9"
Ramp

UP
1'-8" 2

7'-11"
Stair For Ventilation Room And
Roof Of Power House
(Diamentions Will Be Required At Site)
3'-5"
Pump Pad EL +300 mm
PLINTH BEAM
RC COLUMN RC COLUMN
RC COLUMN
F.F.L
2'3"
#6@6"
F.F.L 0+00 #6@6"
RC COLUMN
N.S.L -(1'-6")
2'-1"

8'-212"
5'-012"

Compacted Soil
3" PCC (1:4:8)
#6@5"
2'-212" 6"

3" PCC (1:4:8) #6@5"


FOOTING F2 8'x8' 8" Gravel (35:70)
6" SAND FILLING
8" Gravel (35:70) FOOTING F1 8'x8'
6" SAND FILLING FOOTING F1 8'x8'
FOOTING F1 8'x8'
SCHEDULE OF COLUMNS
2'-3"
2'-3"

2'-3"

2'-3"
F.F.L +0'-00" #6 @8" c/c #4 @6" c/c
2'3"
RC COLUMN

6"
#6 @6" c/c

1'-9"
F.F.L 0+00

2'-2"
N.S.L -(1'-6") #6 @7" c/c
N.S.L -(2'-2")
2'-1"
2'

3'
2'-2"

8'-212"
E.L = -(3'00")
5'-012"

Compacted Soil
6"
2"
2'-21 3" PCC (1:4:8) 1' SAND FILLING
8" Gravel (35:70)
6" SAND FILLING EXCAVATE SOIL 4'-6" BELOW EXISTING N.S.L AND BACKFILL WITH
SUB-BASE MATERIAL HAVING (30 : 70) (SAND : AGGREGATE) RATIO,
UPTO FOUNDATION LEVEL.
COLUMNS FOUNDATIONS
GENSET FOUNDATION
As Per Site Compacted Material
1 2 3
55'-2"
1'-6"
A

DOWN
1'-6"

Double Glazed Window


Power Cable Trench

22'-6"
Double Glazed Window
RCC Walls
6"
Lube oil
Tank

PIT-1
8 No's.Ø75 mm UPVC
PIPE Class E (Type)

UP
Engineer
Room
B
Ramp
Stair For Ventilation Room And
Roof Of Power House
(Diamentions Will Be Required At Site)
Structure Plan
1 2 3
55'-2"
A
1'-6"

22'-6"
1'-6"
B
2.25'
2.25'
2.25'

2.25'
B

A
1'-6"

1
1'-6"

1'-6"
1'-6"

1'-6"
55'-2"
1'-6"

2
22'-6"
3
#4@8" c/c
F.F.L F.F.L
#3@6" c/c #3@6" c/c
#4@6" c/c
2'-6"
F.F.L
COMPACTED BACKFILL #4@7" c/c

3'
#4@6" c/c #4@7" c/c
#3@6" c/c
#4@8" c/c 3" PCC (1:4:8) 3'
#3@6" c/c
Lap 1' Both side #4@7" c/c
2'
#4@7" c/c
TYPICAL STAIR SECTION POWER CABLE TRENCH ELECTRIC PIT
A
B
1'-1"
STRUCTURE PLAN SLAB

1
#4@7"c/c

#4@7"c/c
#4@6"c/c

1'-6"

#4@7"c/c
#4@7" c/c

55'-2"

#4@7" c/c 2
#4@6"c/c

#4@8" c/c in every slab


3

22'-6"
SCHEDULE OF ROOF SLAB BEAMS REINFORCEMENT
REINFORCEMENT SECTIONS
BEAM NO SIZE X Y Z
TOP END DISCONTINUOUS TOP MID TOP CONTINUOUS BOTTOM H J K L
(B x H) END END
(A) (B) (C) (D) (E) (F) (G) (RINGS) (RINGS) (RINGS) SIDE BARS MID
DISCONTINUOUS CONTINUOUS

18"

18"

18"
B-1 ---- 2-#4 3-#6 ---- 3-#6 ---- #3@6"c/c #3@7"c/c #3@6"c/c ----
12"x18" 3-#6
(L) 12" 12" 12"
(A) (B) (C) (D) (E) (F) (G)
B-2

24"

24"
24"
12"x24" 3-#6 2-#6 2-#6 3-#6 3-#6 4-#6 2-#6 #3@6"c/c #3@8"c/c #3@6"c/c 2-#4
(A) (B) (C) (D) (E) (F) (G) (L)
12" 12" 12"
B-3

24"

24"
12"x24" 4-#6 ---- 2-#6 ---- ---- 4-#6 ---- #3@6"c/c #3@8"c/c #3@6"c/c 2-#4
(A) (B) (C) (D) (E) (F) (G) (L)
12" 12"
X Y Z
X Y Z
TYP. BEAM ELEVATION
Over Head Tank
Foundation

10'-2"
Cooling tower
Foundation
Parapet wall 1"
6'-102 1"
8'-102
F.L +25'-00"
Ventilators

8'-8"
Louvered Panel
Fix Louver Concrete Pad F.L +16'-4"
2"

Wall Fare Face


25'-01
24'-4"

11'-1"
9"
55'-2"
Double Glazed Window
F.L +5'-4"
Genset
F.F.L 0+00 Pad Concrete Wall

4'-7"
9" F.F.L +0',00"

6'-1"
F.F.L -1'-6"
N.S.L -(1'-2")

6"
6'
N.S.L -(2'-2")

3'

1'-6"
Genset Foundation
Section Detail
Architectural
Drawing
Section Detail
Architectural
Drawing
Over Head Tank
Cooling tower Foundation
Foundation
Parapet wall
Slab Beam Ventilators
12'-2"

10'

Fix Louver
B3-Stitch

24'-4"
Beam 2'-3"
2'-3"
12'-112"

11'-3"
Genset
Plinth Beam F.F.L 0+00 Pad
9"
N.S.L -(1'-6") N.S.L -(1'-6")
2'-3"

2"

1'-6"
1'-31
2"
111
Compacted Soil
Genset Foundation

42"
3" PCC (1:4:8)

10"1

9"
8" Gravel (35:70)
6" SAND FILLING