Unit commitment problem in electrical power

production
The unit commitment problem (UC) in electrical power production is a large family of mathematical
optimization problems where the production of a set of electrical generators is coordinated in order to
achieve some common target, usually either match the energy demand at minimum cost or maximize
revenues from energy production. This is necessary because it is difficult to store electrical energy on a scale
comparable with normal consumption; hence, each (substantial) variation in the consumption must be
matched by a corresponding variation of the production.

Coordinating generation units is a difficult task for a number of reasons:

the number of units can be large (hundreds or thousands);


there are several types of units, with significantly different energy production costs and
constraints about how power can be produced;
generation is distributed across a vast geographical area (e.g., a country), and therefore the
response of the electrical grid, itself a highly complex system, has to be taken into account:
even if the production levels of all units are known, checking whether the load can be
sustained and what the losses are requires highly complex power flow computations.

Because the relevant details of the electrical system vary greatly worldwide, there are many variants of the
UC problem, which are often very difficult to solve. This is also because, since some units require quite a
long time (many hours) to start up or shut down, the decisions need be taken well in advance (usually, the
day before), which implies that these problems have to be solved within tight time limits (several minutes to
a few hours). UC is therefore one of the fundamental problems in power system management and
simulation. It has been studied for many years,[1][2] and still is one of the most significant energy
optimization problems. Recent surveys on the subject[3][4] count many hundreds of scientific articles
devoted to the problem. Furthermore, several commercial products comprise specific modules for solving
UC,[5] or are even entirely devoted to its solution.[6]

Contents
Elements of unit commitment problems
Management objectives
Types of production units
Electrical grid models
Uncertainty in unit commitment problems
See also
References
External links

Elements of unit commitment problems


There are many different UC problems, as the electrical system is structured and governed differently across
the world. Common elements are:

A time horizon along which the decisions have to be made, sampled at a finite number of time
instants. This is usually one or two days, up to a week, where instants are usually hours or
half-hours; less frequently, 15 or 5 minutes. Hence, time instants are typically between 24 and
around 2000.
A set of generating units with the corresponding energy production cost and/or emission
curves, and (complex) technical constraints.
A representation of the significant part of the grid network.
A (forecasted) load profile to be satisfied, i.e., the net amount of energy to be delivered to each
node of the grid network at each time instant.
Possibly, a set of reliability constraints[7] ensuring that demand will be satisfied even if some
unforeseen events occur.
Possibly, financial and/or regulatory conditions[8] (energy revenues, market operation
constraints, financial instruments, ...).

The decisions that have to be taken usually comprise:

commitment decisions: whether a unit is producing energy at any time instant;


production decisions: how much energy a unit is producing at any time instant;
network decisions: how much energy is flowing (and in which direction) on each branch of the
transmission and/or distribution grid at any given time instant.

While the above features are usually present, there are many combinations and many different cases. Among
these we mention:

whether the units and the grid are all handled by a Monopolistic Operator (MO),[9] or a
separate Transmission System Operator (TSO) manages the grid providing fair and not
discriminatory access to Generating Companies (GenCos) that compete to satisfy the
production on the (or, most often, several interconnected) energy market(s);
the different kinds of energy production units, such as thermal/nuclear ones, hydro-electric
ones, and renewable sources (wind, solar, ...);
which units can be modulated, i.e., their produced energy can be decided by the operator
(albeit subject to the technical constraints of the unit), as opposed to it being entirely dictated
by external factors such as weather conditions;
the level of detail at which the working of the electrical grid must be considered, ranging from
basically ignoring it to considering the possibility of dynamically opening (interrupting) a line in
order to optimally change the energy routing on the grid.[10]

Management objectives

The objectives of UC depend on the aims of the actor for which it is solved. For a MO, this is basically to
minimize energy production costs while satisfying the demand; reliability and emissions are usually treated
as constraints. In a free-market regime, the aim is rather to maximize energy production profits, i.e., the
difference between revenues (due to selling energy) and costs (due to producing it). If the GenCo is a price
maker, i.e., it has sufficient size to influence market prices, it may in principle perform strategic bidding[11]
in order to improve its profits. This means bidding its production at high cost so as to raise market prices,
losing market share but retaining some because, essentially, there is not enough generation capacity. For
some regions this may be due to the fact that there is not enough grid network capacity to import energy
from nearby regions with available generation capacity.[12] While the electrical markets are highly regulated
in order to, among other things, rule out such behavior, large producers can still benefit from simultaneously
optimizing the bids of all their units to take into account their combined effect on market prices.[13] On the
contrary, price takers can simply optimize each generator independently, as, not having a significant impact
on prices, the corresponding decisions are not correlated.[14]

Types of production units

In the context of UC, generating units are usually classified as:

Thermal units, which include nuclear ones, that burn some sort of fuel to produce electricity.
They are subject to numerous complex technical constraints, among which we mention
minimum up/down time, ramp up/down rate, modulation/stability (a unit cannot change its
production level too many times[15]), and start-up/shut-down ramp rate (when
starting/stopping, a unit must follow a specific power curve which may depend on how long the
plant has been offline/online[16]). Therefore, optimizing even a single unit is in principle already
a complex problem which requires specific techniques.[17]
Hydro units, that generate energy by harvesting water potential energy, are often organized
into systems of connected reservoirs called hydro valleys. Because water released by an
upstream reservoir reaches the downstream one (after some time), and therefore becomes
available to generate energy there, decisions on the optimal production must be taken for all
units simultaneously, which makes the problem rather difficult even if no (or little) thermal
production is involved,[18] even more so if the complete electrical system is considered.[19]
Hydro units may include pumped-storage units, where energy can be spent to pump water
uphill. This is the only current technology capable of storing enough (potential) energy to be
significant at the typical level of the UC problem. Hydro units are subject to complex technical
constraints. The amount of energy generated by turbining some amount of water is not
constant, but it depends on the water head which in turn depends on previous decisions. The
relationship is nonlinear and nonconvex, making the problem particularly difficult to solve.[20]
Renewable generation units, such as wind farms, solar plants, run-of-river hydro units (without
a dedicated reservoir, and therefore whose production is dictated by the flowing water), and
geothermal units. Most of these cannot be modulated, and several are also intermittent, i.e.,
their production is difficult to accurately forecast well in advance. In UC, these units do not
really correspond to decisions, since they cannot be influenced. Rather, their production is
considered fixed and added to that of the other sources. The substantial increase of
intermittent renewable generation in recent years has significantly increased uncertainty in the
net load (demand minus production that cannot be modulated), which has challenged the
traditional view that the forecasted load in UC is accurate enough.[21]

Electrical grid models

There are three different ways in which the energy grid is represented within a UC:

In the single bus approximation the grid is ignored: demand is considered to be satisfied
whenever total production equals total demand, irrespective of their geographical location.
In the DC approximation only Kirchhoff's current law is modeled; this corresponds to reactive
power flow being neglected, the voltage angles differences being considered small, and the
angle voltage profile being assumed constant;
In the full AC model the complete Kirchhoff laws are used: this results in highly nonlinear and
nonconvex constraints in the model.
When the full AC model is used, UC actually incorporates the optimal power flow problem, which is
already a nonconvex nonlinear problem.

Recently, the traditional "passive" view of the energy grid in UC has been challenged. In a fixed electrical
network currents cannot be routed, their behavior being entirely dictated by nodal power injection: the only
way to modify the network load is therefore to change nodal demand or production, for which there is
limited scope. However, a somewhat counter-intuitive consequence of Kirchhoff laws is that interrupting a
line (maybe even a congested one) causes a global re-routing of electrical energy and may therefore improve
grid performances. This has led to defining the Optimal Transmission Switching problem,[10] whereby some
of the lines of the grid can be dynamically opened and closed across the time horizon. Incorporating this
feature in the UC problem makes it difficult to solve even with the DC approximation, even more so with
the full AC model.[22]

Uncertainty in unit commitment problems


A troubling consequence of the fact that UC needs be solved well in advance to the actual operations is that
the future state of the system is not known exactly, and therefore needs be estimated. This used to be a
relatively minor problem when the uncertainty in the system was only due to variation of users' demand,
which on aggregate can be forecasted quite effectively,[23][24] and occurrence of lines or generators faults,
which can be dealt with by well established rules (spinning reserve). However, in recent years the
production from intermittent renewable production sources has significantly increased. This has, in turn,
very significantly increased the impact of uncertainty in the system, so that ignoring it (as traditionally done
by taking average point estimates) risks significant cost increases.[21] This had made it necessary to resort to
appropriate mathematical modeling techniques to properly take uncertainty into account, such as:

Robust optimization approaches;


Scenario optimization approaches;
Chance-constrained optimization approaches.

The combination of the (already, many) traditional forms of UC problems with the several (old and) new
forms of uncertainty gives rise to the even larger family of Uncertain Unit Commitment[4] (UUC) problems,
which are currently at the frontier of applied and methodological research.

See also
Electricity market

References
1. C.J. Baldwin, K.M. Dale, R.F. Dittrich. A study of the economic shutdown of generating units in
daily dispatch. Transactions of the American Institute of Electrical Engineers Power
Apparatus and Systems, Part III, 78(4):1272–1282, 1959.
2. J.F. Bard. Short-term scheduling of thermal-electric generators using Lagrangian relaxation.
Operations Research 1338 36(5):765–766, 1988.
3. N.P. Padhy. Unit commitment – a bibliographical survey, IEEE Transactions On Power
Systems 19(2):1196–1205, 2004.
4. M. Tahanan, W. van Ackooij, A. Frangioni, F. Lacalandra. Large-scale Unit Commitment under
uncertainty, 4OR 13(2), 115–171, 2015. (https://dx.doi.org/10.1007/s10288-014-0279-y)
5. PLEXOS® Integrated Energy Model (http://energyexemplar.com/software/plexos-desktop-editi
on)
6. Power optimization (http://www.powerop.co.uk)
7. M. Shahidehpour, H. Yamin, and Z. Li. Market Operations in Electric Power Systems:
Forecasting, Scheduling, and Risk Management, Wiley-IEEE Press, 2002.
8. C. Harris. Electricity markets: Pricing, structures and Economics, volume 565 of The Wiley
Finance Series. John Wiley and Sons, 2011.
9. A.J. Conejo and F.J. Prieto. Mathematical programming and electricity markets, TOP 9(1):1–
53, 2001.
10. E.B. Fisher, R.P. O'Neill, M.C. Ferris. Optimal transmission switching, IEEE Transactions on
Power Systems 23(3):1346–1355, 2008.
11. A.K. David, F. Wen. Strategic bidding in competitive electricity markets: a literature survey In
Proceedings IEEE PES Summer Meeting 4, 2168–2173, 2001.
12. T. Peng and K. Tomsovic. Congestion influence on bidding strategies in an electricity market,
IEEE Transactions on Power Systems 18(3):1054–1061, August 2003.
13. A.J. Conejo, J. Contreras, J.M. Arroyo, S. de la Torre. Optimal response of an oligopolistic
generating company to a competitive pool-based electric power market, IEEE Transactions
on Power Systems 17(2):424–430, 2002.
14. J.M. Arroyo, A.J. Conejo. Optimal response of a thermal unit to an electricity spot market, IEEE
Transactions on Power Systems 15(3):1098–1104, 2000.
15. J. Batut and A. Renaud. Daily scheduling with transmission constraints: A new class of
algorithms, IEEE Transactions on Power Systems 7(3):982–989, 1992.
16. G. Morales-España, J.M. Latorre, A. Ramos. Tight and Compact MILP Formulation of Start-Up
and Shut-Down Ramping in Unit Commitment, IEEE Transactions on Power Systems 28(2),
1288–1296, 2013.
17. A. Frangioni, C. Gentile. Solving Nonlinear Single-Unit Commitment Problems with Ramping
Constraints, Operations Research 54(4), 767–775, 2006.
18. E.C. Finardi and E.L. Da Silva. Solving the hydro unit commitment problem via dual
decomposition and sequential quadratic programming, IEEE Transactions on Power
Systems 21(2):835–844, 2006.
19. F.Y.K. Takigawa, E.L. da Silva, E.C. Finardi, and R.N. Rodrigues. Solving the hydrothermal
scheduling problem considering network constraints., Electric Power Systems Research
88:89–97, 2012.
20. A. Borghetti, C. D’Ambrosio, A. Lodi, S. Martello. A MILP approach for short-term hydro
scheduling and unit commitment with head-dependent reservoir, IEEE Transactions on
Power Systems 23(3):1115–1124, 2008.
21. A. Keyhani, M.N. Marwali, and M. Dai. Integration of Green and Renewable Energy in Electric
Power Systems, Wiley, 2010.
22. K.W. Hedman, M.C. Ferris, R.P. O’Neill, E.B. Fisher, S.S. Oren. Co-optimization of generation
unit commitment and transmission switching with n − 1 reliability, IEEE Transactions on
Power Systems 25(2):1052–1063, 2010.
23. E.A. Feinberg, D. Genethliou. Load Forecasting, in Applied Mathematics for Restructured
Electric Power Systems, J.H. Chow , F.F. Wu, and J. Momoh eds., Springer, 269–285, 2005
24. H. Hahn, S. Meyer-Nieberg, S. Pickl. Electric load forecasting methods: Tools for decision
making, European Journal of Operational Research 199(3), 902–907, 2009

External links
A description of the role of unit commitment problems in the overall context of power system
management can be found in the Energy Optimization Wiki (http://www.energy-opt.eu/wiki)
developed by the COST TD1207 project.
Retrieved from "https://en.wikipedia.org/w/index.php?
title=Unit_commitment_problem_in_electrical_power_production&oldid=953205561"

This page was last edited on 26 April 2020, at 06:21 (UTC).

Text is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply. By using this
site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia
Foundation, Inc., a non-profit organization.

You might also like