Professional Documents
Culture Documents
Bernie Clairmont
Sr. Project Manager
Electric Power Research Institute (EPRI)
bclairmo@epri.com / 413-499-5708
California Energy Commission
P=IV
California Energy Commission
WHY?
Fear of losing
Fear of exceeding
conductor strength
clearance limits
(Thermally Limited)
(Clearance Limited)
California Energy Commission
• Reduced resistance.
Manufacturers
Southwire: ACSS (Aluminum Conductor, Steel
Supported)
J-Power: Gap
LS Cable: Invar
Conventional versus
HTLS Conductors
Conventional HTLS
ACSS/TW Conductor
Installed at
CenterPoint
California Energy Commission
Installed
at SDGE
California Energy Commission
Gap Invar
Installed at HydroOne
California Energy Commission
Installed at APS
California Energy Commission
Main Tasks
Laboratory tests and Field trials
Reports and training materials
Participants
15 US, 2 Canadian, UK, Spain & France i.e. ATC, AEP, CNP, Duke, TVA,
Southern, Exelon, Hawaii Electric, Xcel, KeySpan/LIPA, California Energy
Commission, SDG&E, SCE, PG&E, Arizona Public Services, National Grid
(UK), Hydro One & BCTC (Canadian), REE (Spain), EDF
California Energy Commission
Table of Installations
Where Conductor Size (in.) Voltage # Spans Total # Splices
Type Length (ft.)
Gap
J-Power Oct. 24, 2004 Ottawa
Invar
LS Cable Oct. 24, 2004 Ottawa
ACCC
CTC June 17, 2005 Phoenix
ACCR
3M July 21, 2005 Oceanside
California Energy Commission
Cost
California Energy Commission
CenterPoint Installation
138 kV, double circuit, vertical
After Installation
California Energy Commission
Parameters Measured
Parameter Frequency of Instrumentation
Measurements
Weather Instruments
Solar
Sensors Rain Temperature Wind
California Energy Commission
Internet
Wireless IP
Network
CDMA
California Energy Commission
Infrared for
Component Temperature Measurements
California Energy Commission
Corona Detection
Corona observations
using DayCor camera
California Energy Commission
Corona
California Energy Commission
EMF Measurements
California Energy Commission
Vibration Measurements
California Energy Commission
Visual
California Energy Commission
Deliverables
• General Report: “Demonstration of Advanced Conductors for
Overhead Transmission Lines”, PID 1017448 available on
August 1, 2008
Compression Fittings
Starting
in 2008
Design & performance
California Energy Commission