Sub: Schedule of Rates as per Telangana Revised Standard Data for the year
2019-20 -Irrigation & CAD works(Part-1), Road & Bridge Works (Part-II),
Building Work Items(Part-III) and Public Health Items (Part-IV)-
approved-Printing & Communication of SoRs - Reg.
-::oOo::-
The Government have approved Revised Standard Data vide ref 1st cited. The
Schedule of Rates as per Telangana Revised Standard Data for the year 2019-20 is
approved based on the following.
The Engineer-in-Chief (IW), I&CAD Dept., has furnished the draft rates
proposed for Labour Rates and Basic data for Irrigation Items Part-I of Common SoR
for the·year 2019-20.
The Engineer-in-Chief (SR & CRN), R&B Dept has furnished the draft rates for
the Part-II of Common SoR for Roads & Bridge items for the year 2019-20.
The Engineer-in-Chief (NH & Bldgs), R&B Dept has furnished the draft rates for
the Part-III of Common SoR i.e., Buildings & Electrical items for the year 2019-20.
The procedure for the adoption of Irrigation work items, lead & lift charges
(Common to all departments) is incorporated in the Annexure-A of schedule of
rates (SoR).
The approved basic rates are applicable to the datas as per Revised Standard
Data approved by the Government vide G.O.l st cited.
The lead & lift charges are common to all Engineering Departments. The detailed
calculations are incorporated in the Lead & lift chapter in the I&CAD Works (Part-I) of
Telangana Revised Standard Data.
One hard copy & compact disc containing Schedule of Rates is here with
communicated.
No other items other than the items communicated by this office shall be
introduced in the SoR.
The Heads of Department and Officers mentioned below are authorized to print
the Schedule of Rates for the year 2019-20. The unauthorized printing & selling of the
SoR is strictly prohibited. The Schedule of Rates for 2019-20 will be in force until the
new SoR comes in to force.
The revised rates will come into force from 1st June of 2019.
The receipt of the proceedings may be ,wknowledged.
Encl: SoR 2019-20 containing Part-I (Irrigation & CAD works), Part-II (Road & Bridge
works) Part-III (Buildings works) and Part-IV (Public Health works)
I) Copy submitted to the Special Chief Secretary to Govt., I&CAD Dept., B-Block,
Secretariat Buildings, Hyderabad for favour of information.
II) Copy Communicated to the following Heads of Departments along with Enclosures
for information.
1) Engineer-in-Chief (NH & Buildings), Roads & Buildings Department.
2) Engineer-in-Chief (SR & CRN), Roads & Buildings Department
3) Engineer-in-Chief (P.H.), PH & ME Department.
4) Engineer-in-Chief (P.R.), Panchayat Raj Department.
5) Engineer-in-Chief (RWS) R W S & S, Department.
6) Copy of C.D containing Schedule of Rates 2019-20 & Standard data, Part-1 (Irrigation
& CAD works) to all Engineers-in-Chief, Chief Engineers of Irrigation & CAD
Department for favour of information and necessary action.
III) Copy to the Superintending Engineer, Irrigation Circle, Irrigation & CAD
Department, Red Hill, Hyderabad for necessary action.
IV) Copy communicated to the DEE (computers) with a request place the Proceedings
in I& CADD department website for wide publicity.
~or/of
for Engineer-in-Chief(A. W)
(
lmport,utl - Rc,1d the following
ANN E\ URE- A
1. The SPIU (Irrigation), Centre for Good Governnm:e (CGG), 1lyderabnd h,1:-;
developed sofh\·are package linking the bask input dnltt of lrrignlion with
approved data of Irrigation work it-ems.
2. The lead and lift charges are common to all Engineering Depa rtments. The
detailed calculations are incorporated in the Lead &Lift charges chapter in the
l&..~ AO works (Part-1) of Telangana Revised standard data.
3. The estimate sanctioning authority shall physically verify each and every
Irrigation work item data incorporated in the estimate with basic input data
before sanction of the estimate. Any lapses or arithmetic errors arising in the
sanction of data's / estimate due to adoption of the software package lies
entirely on the concerned estimate sanctioning authority only.
U,40~
for Engineer-in-Chief (A.W)
~ 1
Office of the Engineer-in-Chief (I.W)
l&CAD Dept., Errummanzil, Hyderabad
Sub: Telangana Revised Standard Data for I&CAD works(Part-1) for the year 2019-20
-approved-Printing & communication of Standard Data -Reg.,
I) Copy submitted to the Special Chief Secretary to Govt., I&CAD Dept., B-Block,
Telanga!1a Secretariat Buildings, Hyderabad for favour of information.
II) Copy Communicated to the following Heads of Departments along with Enclosures for
information.
1) Engineer-in-Chief (NH & Buildings), Roads & Buildings Department.
2) Engineer-in-Chief (SR & CRN), Roads & Buildings Department
3) Engineer-in-Chief (P.H.), PH & ME Department.
4) Engineer-in-Chief (P.R.), Panchayat Raj Department.
5) Engineer-in-Chief (RWS) R W S & S, Department.
6) Copy of C.D containing Schedule of Rates 2019-20 & Standard data, part-1 (Irrigation &
CAD works) communicated to all the Engineers-in-Chief, Chief Engineers of Irrigation &
CAD Department for information and necessary action.
_/
111) Copy of C.D containing Schedule of Rates 2019-20 & Standard data, part-1 (Irrigation
& CAD works) to the Superintending Engineer, Irrigation Circle, Irrigation & CAD
Department, Red Hill, Hyderabad for necessary action.