1 Fixing & Providing temporary supports for existing damaged structure till the 9000 completion of work 2 Removing existing damaged floor tile & 2000 floor concrete 3 Earthwork excavation for new column foundation including the cost of removal 3000 of existing damaged foundation & plinth beam 4 Dewatering system for new foundation 1000 5 PCC 1:4:8 below new foundation 2000 6 M30 grade RCC foundation for new column including the cost of side 16000 shuttering & cost of reinforcement 7 Stub Column upto plinth beam level including the cost of shuttering & 3000 reinforcement 8 Earthwork in filling with selected earth above new foundation & below floor 2500 concrete 9 Casting of Plinth beam using M30 grade concrete including the cost of shuttering 7000 & reinforcement 10 Casting of new column with M30 grade concrete including the cost of shuttering, 15000 centering & reinforcement 11 Chipping of existing damaged roof beam 4000 12 Fixing of reinforcement for roof beam 5000 13 Casting of roof beam with M30 grade micro concrete including the cost of 27000 centering & shuttering 14 PCC 1:4:8 for floor concrete 4000 15 Plastering of Column & roof beam with 5000 cement mortar 1:4 16 Decorative work for Column 5000 17 Floor tile for damaged portion 5000 18 Painting works 4000 19 Shifting & Relaying of existing damaged 8200 Plumbing line 20 Structural Consultancy charges 17700 Total 145400