SREEGIRI CONSULTANTS REHABILITATION OF Rev-0

EDAPPALLY, COCHIN PALARIVATTOM FLYOVER

17.1 Moment of resistance at midspan,

2880 0.0035 22.30 Mpa


200 -0.0077 0.00 Mpa
700 150 -0.0134 0.00 Mpa
100 -0.0173 0.00 Mpa

280
1600 700

360 150 -0.0441


130 250 -0.0529 1408.04 Mpa
600 Strain Diagram Stress Diagram

Characteristic strength of concrete, Fck = 50 Mpa


Ultimate stress of cables, Fpk = 1861.2 Mpa
Stress @ 0.1% proof force = 1619.24 Mpa
f pd of cables = 1408.04 Mpa
ε pd of cables = 0.00722
Young's modulus of cables, Es = 195000 Mpa
Final force in group 1 cables after all losses = 3895.47 kN
Final force in group 2 cables after all losses = 0.00 kN
Area of group 1 cables = 3360.00 mm2
Area of group 2 cables = 0.00 mm2
Prestrain in group 1 cables = 0.00595
Prestrain in group 2 cables = 0
Therefore total strain at ULS in group 1 cables in
cluding prestrain are = 0.05882 > ε pd
Therefore total strain at ULS in group 2 cables in
cluding prestrain are = 0.04406 > ε pd
All strains are greater than ε pd, hence stresses in
cables are = fpd = 1408.04 Mpa
Thus total force in steel (Tu) = 4731.01 kN
Assumed Xu = 91.262 mm NA is in the slab
Total Compression in concrete (Cu) = 4731.02 kN Eqn. is Ok
CU = TU, Therefore section balances and N.A assumed is at correct level
=
Taking moment of all forces about NA level gives, Mrd 6773.24 kNM
Factored moment at midspan = 5880.00 kNM
Mrd is greater than the Factored moment. Hence it is safe

KERALA PWD DMRC KOCHI 1