Voltage at + 5% 19.95
FL current at +5% of rated Voltage= 8682.2
(Considering 100 m of 2.5 sq.mm Cu cond. cable between busduct CT & 8.87
GRP the resistance of 2.5 sq.mm Cu cond cable at 70oC in W / km (from
KEI catalogue)
Fault Current in KA Taking higher value of the fault contribution from i.e. 108.52
fault contribution from system / fault contribution from gen
Vk = 20RCT + 37
Im 15 mA at Vk/2
Page 1 of 20
CT with group-1/group-2 protection
= VK 40 RCT+200V
CT ratio 600/1A
CLPS , VK 40 RCT+200V
Im 30 mA at VK/2
Page 2 of 20
iii) Core –3 (metering)
600/1A
Typical Meter burden in ohm (from catalogue of Conzerv model) 0.4
Typical Anolgue Meter burden in ohm (from catalogue of AE/Rishab) & 4.5 Total 5Nos
Transducer Analogue meter
connected & max
4 nos of
transducer per CT
Max. Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 270M= I x(Rct+2RL)
=Rct+4.79
Rct Assumed for CT Sec.1A is 6 ohm for 600/1Amp 10.79
Total Burden on CT = Lead Burden+ Meter Burden+burden margin 17.69
Consider for future use
20 VA, CL-0.2 20 VA arrived at considering all the
meter connected
v) Core –5
VK 40 RCT + 150V
Im 15 mA at VK/2
A GT Bushing CTs
% Impedence of GT is 14.50%
GT full load current on HV side = Considering SPAE 10 relay with
512.40 Setting relay burden =5.4 VA
Considering the Source impedance based on 40kA, max. earth fault current
3457.15
= 3607.70 as GT impedance Zt = 14.5%
Page 3 of 20
CT parameters chosen
CT ratio 600/1A
ii) Core - 2 Neutral CT-GT inverse time ground O/C relay (51NGT)
Base-MVA 355
System contribution
= Base MVA / (Zspu+Zgt) 2499.49
= 2499.49 MVA
Page 4 of 20
Total fault MVA(Contribution from Generator & GT system) = 6701.17
3252.91+2499.49
= 5752.40 MVA
However the ratio of rated burden of CT & the connected burden is about Vdesin=BurdenxALF/CT Secondary
10 times. Therefore the voltage, developed by the CT (200V) will be
increased by that ratio, therefore the CT does not saturate and hence CT
chosen is ok.
CT chosen – 800/1A
10VA, CL 5P20
Typical Relay burden in ohm (from ABB catlogue) 0.1
Total Burden on CT = Lead Burden+ Relay Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 125M= I x(Rct+2RL)
=Rct+2.2175
Rct Assumed for CT Sec.1A is 7 ohm for 600/1Amp 9.2175
Total Burden on CT = Lead Burden+ Meter Burden+burden margin 9.3175
Consider for future use
10 VA, CL-5P20 As relay used is Numerical type,
hence 10 VA considered is more
than Sufficient.
Current on 20 kV side =
577.35
VK >40RCT+92.7
VK 40RCT+92.7V 2x8.87x100/1000
Im 15mA AT VK/2
Total running load in KVA on the 6.6 kV bus ( higher of the two buses U1A 18451
and U1B taken from UAT sizing calculation)
Total running load in Amp on the 6.6 kV bus ( higher of the two buses U1A 1614.04
and U1B taken from UAT sizing calculation)
2 RL = 2 x 8.87 x 0.1 (1 run 2.5 mm2 cable / phase, L = 100 meters) = 1.774
2.661W
Page 5 of 20
VK selected is 40RCT+80V
Im 15 mA at Vk/2
VK = 9.21x(Rct+2x0.887+0.1)
v) 51 N – UAT- LV.
Earth Fault current to be restricted to 300Amp.
For neutral CT to be located in NGR.
300/1A, 15VA, CL 5P20
100
100 X 100
D ST LV side CTs
i) Core –1 ( metering)
Total running load in KVA on the 6.6 kV bus ( higher of the two buses C1A 22292
and C1B taken from ST sizing calculation)
Page 6 of 20
Total running load in Amp on the 6.6 kV bus ( higher of the two buses C1A 1950.04
and C1B taken from ST sizing calculation)
25 MVA , 220/6.9 KV
2 RL = 2 x 8.87 x 0.20 (1 run 2.5 mm2 cable / phase, L = 250 meters) = 4.435
4.435W
Vk = 10.29x(Rct+4.435+0.1) 46.67
= 11RCT+46.67 V
i.e. CTR chosen - 2500/1A, 11RCT+50V, Im 15mA at Vk/2
2 RL = 2 x 8.87 x 0.15 (1 run 2.5 mm2 cable / phase, L = 250 meters) = 4.435
2.661W
Page 7 of 20
VK = 40x1(RCT + 4.435 + 0.1) = 40RCT+181.4
VK selected is 40RCT+200V
Im 15 mA at Vk/2
0
X
%
1
2
1
I
R
1
1
M
9
5
1
K
40
0
.
0
8
1
1
0
0
4
2
1
.
2
2
Z
0
2
V
0
3
0
V
.
4
2
0
5
1
X
x
x
R
x
A
8
2
6
1
x
1
x
1
1
0
6
0
1
. 6
x
2
3
3
2
0
1
. 5
.
9
6
4
Page 8 of 20
CT sizing for 6.6 kV System
Page 9 of 20
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
iii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 6 ohm for 750/1Amp 6.7096
Total Burden on CT = Lead Burden+ Meter 9.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear. Also Rct is max typical
value for 750Amp Primary
Page 10 of 20
Rct Assumed for CT Sec.1A is <=4 ohm 6.7096
Total Burden on CT = Lead Burden+ Relay Burden 6.7096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
ii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 4 ohm for 100/1Amp 4.7096
Total Burden on CT = Lead Burden+ Meter 7.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
6 Coal Mill-1A, 1B, 1C, 1D, 1E, 1F 400 43.74 50/1 3C x 185 mm2
i. For O/C & E/F Protection
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Page 11 of 20
Rct Assumed for CT Sec.1A is <=1 ohm 1.7096
Total Burden on CT = Lead Burden+ Relay Burden 1.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
ii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 5 ohm for 50/1Amp 1.7096
Total Burden on CT = Lead Burden+ Meter 4.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
Page 12 of 20
Rct Assumed for CT Sec.1A is <=12 ohm 12.7096
Total Burden on CT = Lead Burden+ Relay Burden 12.8096
15 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 15 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
ii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 12 ohm for 12.7096
2000/1Amp
Total Burden on CT = Lead Burden+ Meter 15.9096
Burden+burden margin Consider for future use
20 VA, CL-0.5 As meter used is Multifunction type, hence
20 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
9 Unit Service Transformer-1A & 1B 2500 219.79 300/1 3C x 240 mm2
i. For O/C & E/F Protection
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Rct Assumed for CT Sec.1A is <=6 ohm 6.7096
Total Burden on CT = Lead Burden+ Relay Burden 6.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 15 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
ii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 6 ohm for 6.7096
2000/1Amp
Total Burden on CT = Lead Burden+ Meter 9.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
10 Spare motor feeder on all the Unit-1 buses 5400 590.47 600/1 CT Details same as Feedpump Motor feeder
11 Spare transformer feeder on all Unit-1 buses 2500 219.79 300/1 CT Details same as Unit service Trans.
12 ESP Service Transformer Feeder-1A & 1B feeder 2500 219.79 300/1 feeder
13 Tie to C1A & C1B 2000/1 CT Details same as I/C feeder from Unit
Transformer
Page 13 of 20
= 40*1*(Rct+2x0.7983+0.1) RL = 8.87X0.09 (Considering 90m Length
= 40Rct+67.864V from Motor terminal to Relay)=0.7983 R relay
= 0.1
Vk>= 40Rct+70V, Im<=30mA at Vk/2
ii. For O/C & E/F Protection
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 7 ohm 7.7096
Total Burden on CT = Lead Burden+ Relay Burden 7.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
iii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 7 ohm for 750/1Amp 7.7096
Total Burden on CT = Lead Burden+ Meter 10.9096
Burden+burden margin Consider for future use
15 VA, CL-0.5 As meter used is Multifunction type, hence
15 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
Page 14 of 20
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear. Also Rct is max typical
value for 750Amp Primary
Page 15 of 20
Total Burden on CT = Lead Burden+ Meter 7.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
6 Coal Mill-2A, 2B, 2C, 2D, 2E, 2F 400 43.74 50/1 3C x 185 mm2
i. For O/C & E/F Protection
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is <=1 ohm 1.7096
Total Burden on CT = Lead Burden+ Relay Burden 1.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
ii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 5 ohm for 50/1Amp 1.7096
Page 16 of 20
Total Burden on CT = Lead Burden+ Meter 4.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
8 Main Incomer from Unit Aux transformer 2000/1 CT Details same as I/C feeder from Unit
Transformer
9 Unit Service Transformer-2A & 2B 2500 219.79 300/1 CT Details same as Station Service
transformer feeder to SST Transformer
10 Spare motor feeder on Unit-2 buses 5400 590.47 600/1 CT Details same as Feedpump Motor feeder
11 Spare transformer feeder on Unit-2 buses 2500 219.79 300/1 CT Details same as Unit service Trans.
12 ESP Service Transformer Feeder-2A & 2B feeder 2500 219.79 300/1 feeder
Page 17 of 20
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 7 ohm 7.7096
Total Burden on CT = Lead Burden+ Relay Burden 7.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
iii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 7 ohm for 750/1Amp 7.7096
Total Burden on CT = Lead Burden+ Meter 10.9096
Burden+burden margin Consider for future use
15 VA, CL-0.5 As meter used is Multifunction type, hence
15 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
Page 18 of 20
= 40*1*(Rct+2x3.548+0.1) RL = 8.87X0.4 (Considering 400m Length
= 40Rct+287.84V from Motor terminal to Relay)=3.548 R relay
= 0.1
Vk>= 40Rct+290V, Im<=30mA at Vk/2
ii. For O/C & E/F Protection
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Rct Assumed for CT Sec.1A is <=5 ohm 5.7096
Total Burden on CT = Lead Burden+ Relay Burden 5.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
iii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 5 ohm for 200/1Amp 5.7096
Total Burden on CT = Lead Burden+ Meter 8.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
Page 19 of 20
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
iii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 7 ohm for 750/1Amp 7.7096
Page 20 of 20