Total Burden on CT = Lead Burden+ Relay Burden 12.8096
15 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 15 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
ii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 12 ohm for 12.7096
2000/1Amp
Total Burden on CT = Lead Burden+ Meter 15.9096
Burden+burden margin Consider for future use
20 VA, CL-0.5 As meter used is Multifunction type, hence
20 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
9 Unit Service Transformer-1A & 1B 2500 219.79 300/1 3C x 240 mm2
i. For O/C & E/F Protection
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Rct Assumed for CT Sec.1A is <=6 ohm 6.7096
Total Burden on CT = Lead Burden+ Relay Burden 6.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 15 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
ii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 6 ohm for 6.7096
2000/1Amp
Total Burden on CT = Lead Burden+ Meter 9.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
10 Spare motor feeder on all the Unit-1 buses 5400 590.47 600/1 CT Details same as Feedpump Motor feeder
11 Spare transformer feeder on all Unit-1 buses 2500 219.79 300/1 CT Details same as Unit service Trans.
12 ESP Service Transformer Feeder-1A & 1B feeder 2500 219.79 300/1 feeder
13 Tie to C1A & C1B 2000/1 CT Details same as I/C feeder from Unit
Transformer
Page 13 of 20
= 40*1*(Rct+2x0.7983+0.1) RL = 8.87X0.09 (Considering 90m Length
= 40Rct+67.864V from Motor terminal to Relay)=0.7983 R relay
= 0.1
Vk>= 40Rct+70V, Im<=30mA at Vk/2
ii. For O/C & E/F Protection
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 7 ohm 7.7096
Total Burden on CT = Lead Burden+ Relay Burden 7.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
iii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 7 ohm for 750/1Amp 7.7096
Total Burden on CT = Lead Burden+ Meter 10.9096
Burden+burden margin Consider for future use
15 VA, CL-0.5 As meter used is Multifunction type, hence
15 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
Page 14 of 20
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear. Also Rct is max typical
value for 750Amp Primary
Page 15 of 20
Total Burden on CT = Lead Burden+ Meter 7.9096
Burden+burden margin Consider for future use
10 VA, CL-0.5 As meter used is Multifunction type, hence
10 VA considered is more than Sufficient
also Lead burden is less than above
assumed buden as Meter & CT are at the
same Switchgear.
6 Coal Mill-2A, 2B, 2C, 2D, 2E, 2F 400 43.74 50/1 3C x 185 mm2
i. For O/C & E/F Protection
R relay in ohm (from relay catalogue of ABB model 0.1
SPAJ)
Total Burden on CT = Lead Burden+ Relay Burden
2 =Sqr(1)*(Rct+2Rl)
Lead Burden for lead length of 40M= I x(Rct+2RL)
=Rct+0.7096
Rct Assumed for CT Sec.1A is <=1 ohm 1.7096
Total Burden on CT = Lead Burden+ Relay Burden 1.8096
10 VA, CL5P20 As relay used is numerical(SPAJ-140C) type,
hence 10 VA considered is more than
Sufficient also Lead burden is less than
above assumed buden as relay & Ct are at
the same Switchgear.
ii. For Metering Core
Typical Meter burden in ohm (from catalogue of 0.2
Conzerv model)
Typical Anolgue Meter burden in ohm (from 1
catalogue of AE/Rishab) & Transducer
Burden margin Consider for future use 2
Total Burden on CT = Lead Burden+ Meter Burden
Lead Burden for lead length of 40M= I2x(Rct+2RL) =Sqr(1)*(Rct+2Rl)
=Rct+0.7096
Rct Assumed for CT Sec.1A is 5 ohm for 50/1Amp 1.7096
Page 16 of 20