PT PLN (PERSERO)

UNIT INDUK PENYALURAN DAN PUSAT PENGATUR BEBAN SULAWESI


DATA SETELAN RELAI LINE CURRENT DIFFERENTIAL
SUBSISTEM 150 KV - UIP3B SULAWESI

Data Teknis :
LOKASI/GI : GI Sawangan Ukuran Konduktor : ACSR 213
PROTEKSI : Line #2 Tanggari Unit #1 Ukuran Kawat Tanah : -
Panjang L1 : 5.90 Km Panjang L3 : 28.85 Km
Panjang L2 : 3.80 Km Panjang L4 : 22.73 Km
Z Ur. Pos. (Primer) : 0.9257 + j 2.2228 W (line impedance) Z Ur. Nol (Primer) : 2.394 +j 5.1649 W
Z Ur. Pos. (Sekunder) : 0.2645 + j 0.6351 W (line impedance) Z Ur. Nol (Sekunder) : 0.684 +j 1.4757 W
Merek : ABB Rasio CT : 200 / 1 A
Tipe : RED 670 Rasio PT : 70 kV / 100 V

DATA SETTING SKEMA : PUTT SKEMA : PUTT

NO. GRUP SETTING PARAMETER SETTING PROPOSAL SETTING UNIT APPROVAL SETTING UNIT KET.

1 CT Starpoint To Object
Ct Sec 1 A A
Ct prim 200 A A
IED Configuration / HW
Configuration / TRM Vt Sec (Line) 100 V V
Vt prim (Line) 70 kV kV

Vt Sec (Bus) 100 V V


Vt prim (Bus) 70 kV kV
2 R1A 0.002 ohm ohm
X1A 0.009 ohm ohm
R1B 0.003 ohm ohm
X1B 0.018 ohm ohm
R1L 0.926 ohm ohm
Aplication Configuration / Monitoring X1L 2.223 ohm ohm
/ Fault Locator R0L 2.394 ohm ohm
X0L 0.876 ohm ohm
R0M 0.000 ohm ohm
X0M 0.000 ohm ohm
LineLengthUnit 2.408
LineLength 5.896 km km
3 Operation On
IdMin 1.2 IB IB
EndSection1 1.25 IB IB
EndSection2 3.00 IB IB
SlopeSection2 30 % %
SlopeSection3 80 % %
IdMinHigh 0.8 IB IB
tldMinHigh 1 s s
IdUnre 20 IB IB
NegSeqDiffEn Off
Aplication Configuration / NegSeqROA 60 deg deg
DIF_PROT / Differential protection / IMinNegSeg 0.04 IB IB
(87L.3Id/I>) CrossBlockEn No
I2/I1Ratio 15 % %
I5/I1Ratio 25 % %
ChargCurEnable On
AddDelay Off
IdiffAlarm 0.15 IB IB
tAlarmdelay 1 s s
OpenCTEnable Off
tOCTAlarmDelay 3 s s
tOCTResetDelay 0.25 s s
OCTBlockEn On
4 Operation / OpModeZ1 On (Z1 on if LCD comm. fail)
RLdFw 46.475
RLdRv 46.475
XLd 55.039
ArgLd 30
ZoneLinkStart Phase Selection
CVTType Any
Operation / OpModeZ1 ON / Enable
PH-E PHPH
X1PPZ1 1.78 ohm/p ohm/p
R1PPZ1 0.74 ohm/p ohm/p
Aplication Configuration / X1PEZ1 1.78 ohm/p ohm/p
IMP_PROT / DISTANCE IMP
R1PEZ1 0.74 ohm/p ohm/p
(ZONE - 1)
Zona Impedansi 1 X0Z1 4.13 ohm/p ohm/p
(ZMQPDIS:1) R0Z1 1.92 ohm/p ohm/p
RFPPZ1 14.06 ohm/l ohm/l
RFPEZ1 37.18 ohm/l ohm/l
OperationPP On
OpeModetPP On
TimerModeZ1 Enable Ph-E PhPh s s
TimerLinkZ1 Loop Link & Zone Link
tPPZ1 0.0
tPEZ1 0.0 s s
IminOpPP Z1 10 %IB %IB
IminOpPE Z1 10 %IB %IB

Hal Proteksi PHT 150 kV Dibuat Oleh: Dievaluasi oleh: Disetujui oleh: Tanggal:
1/6 GI SAWANGAN LINE #2 TANGGARI U #1
1) A Yusril Asrida 1) Arista Rahmanu Wicaksono 1) Hanif Al Islami
07 MARET 2024
2) Dimas Angga Putra 2) Taufik Wisnu Wardhana 2) Suhandi
PT PLN (PERSERO)
UNIT INDUK PENYALURAN DAN PUSAT PENGATUR BEBAN SULAWESI
DATA SETELAN RELAI LINE CURRENT DIFFERENTIAL
SUBSISTEM 150 KV - UIP3B SULAWESI

Data Teknis :
LOKASI/GI : GI Sawangan Ukuran Konduktor : ACSR 213
PROTEKSI : Line #2 Tanggari Unit #1 Ukuran Kawat Tanah : -
Panjang L1 : 5.90 Km Panjang L3 : 28.85 Km
Panjang L2 : 3.80 Km Panjang L4 : 22.73 Km
Z Ur. Pos. (Primer) : 0.9257 + j 2.2228 W (line impedance) Z Ur. Nol (Primer) : 2.394 +j 5.1649 W
Z Ur. Pos. (Sekunder) : 0.2645 + j 0.6351 W (line impedance) Z Ur. Nol (Sekunder) : 0.684 +j 1.4757 W
Merek : ABB Rasio CT : 200 / 1 A
Tipe : RED 670 Rasio PT : 70 kV / 100 V

NO. GRUP SETTING PARAMETER SETTING PROPOSAL SETTING UNIT APPROVAL SETTING UNIT KET.

Zone Distance
5 Operation / OpModeZ2 ON / Enable PH-E PHPH
OperationDir Forward
X1Z2 2.741 ohm/p ohm/p
R1Z2 1.363 ohm/p ohm/p
X0Z2 6.805 ohm/p ohm/p
Aplication Configuration / R0Z2 3.292 ohm/p ohm/p
IMP_PROT / DISTANCE RFPPZ2 14.055 ohm/l ohm/l
(ZONE - 2) RFPEZ2 37.180 ohm/l ohm/l
Zona Impedansi 2 TimerModeZ1 Enable Ph-E PhPh
(ZMQAPDIS:2) TimerLinkZ1 Loop Link & Zone Link
tPPZ2 0.40 s s
tPEZ2 0.40 s s
Imin OpPP Z2 10 %IB %IB
Imin OpPE Z2 10 %IB %IB
Imin OpIn Z2 5 %IB %IB
6 Operation / OpModeZ3 ON / Enable PH-E PHPH
OperationDir Forward
X1Z3 16.90 ohm/p ohm/p
R1Z3 7.90 ohm/p ohm/p
X0Z3 48.88 ohm/p ohm/p
R0Z3 14.85 ohm/p ohm/p
Aplication Configuration / RFPPZ3 14.06 ohm/l ohm/l
IMP_PROT / DISTANCE RFPEZ3 37.18 ohm/l ohm/l
(ZONE - 3) TimerModeZ1 Enable Ph-E PhPh
Zona Impedansi 3 TimerLinkZ1 Loop Link & Zone Link
(ZMQAPDIS:3) tPPZ3 1.20 s s
tPEZ3 1.20 s s
OpeModetPE On
tPE 1.20 s s
Imin OpPP Z3 10 %IB %IB
Imin OpPE Z3 10 %IB %IB
Imin OpIn Z3 5 %IB %IB
Aplication Configuration /
7 IMP_PROT / DISTANCE (ZONE - Operation / OpModeZ4&Z5 OFF / Disable Zone
4,ZONE - 5)
PHASE SELECTION
8 OperationZ< On
OperationI> Off
IN Block PP 40 %IB %IB
IN Release PE 20 %IB %IB
RldFw 37.18 ohm ohm
RldRv 37.18 ohm ohm
ArgLd 30 Deg Deg
X1 / XLd 20.28 ohm ohm
X0 58.66 ohm ohm
Aplication Configuration /
RFFwPP 17.57 ohm ohm
IMP_PROT / Phase Selection
RFRvPP 17.57 ohm ohm
RFFwPE 46.48 ohm ohm
RFRvPE 46.48 ohm ohm
TimerPP Off
tPP 3.00 s s
TimerPE Off s s
tPE 3.00
IminOpPP 20 %IB %IB
IminOpPE 20 %IB %IB

Hal Proteksi PHT 150 kV Dibuat Oleh: Dievaluasi oleh: Disetujui oleh: Tanggal:
2/6 GI SAWANGAN LINE #2 TANGGARI U #1
1) A Yusril Asrida 1) Arista Rahmanu Wicaksono 1) Hanif Al Islami
07 MARET 2024
2) Dimas Angga Putra 2) Taufik Wisnu Wardhana 2) Suhandi
PT PLN (PERSERO)
UNIT INDUK PENYALURAN DAN PUSAT PENGATUR BEBAN SULAWESI
DATA SETELAN RELAI LINE CURRENT DIFFERENTIAL
SUBSISTEM 150 KV - UIP3B SULAWESI

Data Teknis :
LOKASI/GI : GI Sawangan Ukuran Konduktor : ACSR 213
PROTEKSI : Line #2 Tanggari Unit #1 Ukuran Kawat Tanah : -
Panjang L1 : 5.90 Km Panjang L3 : 28.85 Km
Panjang L2 : 3.80 Km Panjang L4 : 22.73 Km
Z Ur. Pos. (Primer) : 0.9257 + j 2.2228 W (line impedance) Z Ur. Nol (Primer) : 2.394 +j 5.1649 W
Z Ur. Pos. (Sekunder) : 0.2645 + j 0.6351 W (line impedance) Z Ur. Nol (Sekunder) : 0.684 +j 1.4757 W
Merek : ABB Rasio CT : 200 / 1 A
Tipe : RED 670 Rasio PT : 70 kV / 100 V

NO. GRUP SETTING PARAMETER SETTING PROPOSAL SETTING UNIT APPROVAL SETTING UNIT KET.

DIRECTIONAL IMPEDANCE
9 GlobalBaseSel 1
IMinOpPP 20 %IB %IB
Aplication Configuration /
IMinOpPE 20 %IB %IB
IMP_PROT / Directional Impedance
ArgNegRes 115 Deg Deg
ArgDir 15 Deg Deg
SOTF
10 Operation On
Autoinit DLD Disabled A A
Mode Impedance kV kV
Iph< 20 %IB %IB
Aplication Configuration /
Uph< 40 %UB %UB
IMP_PROT / SOTF
t Duration 0.02 s s
t Sotf 0.20 s s
t Dld 0.20 s s
t Operate 0.15 s s
POWER SWING
11 Operation On
X1InFw 18.59 ohm/p ohm/p 1.1*X1Z3
R1Lln 7.90 ohm/p ohm/p = R1Z3
R1FlnFw 15.46 ohm/l ohm/l 1.1*RFPPZ3
X1InRv 18.59 ohm/p ohm/p = X1lnFw
R1FlnRv 15.46 ohm/l ohm/l = R1FlnFw
Operation LdCh ON
RldOutFw 46.48 ohm/p ohm/p
ArgLd 30 Deg Deg
Aplication Configuration / RldOutRv 46.48 ohm/p ohm/p
IMP_PROT / Power Swing Detection kldRfw 0.80 Mult Mult
kldRrv 0.80 Mult Mult
tP1 0.031 s s
tP2 0.011 s s
tW 0.250 s s
tH 0.50 s s
tEF 2.00 s s
tR1 0.30 s s
tR2 2.00 s s
IMinOp 20.00 %IB %IB
Scheme Communication
12 Operation On
Scheme Type Perm UR (PUR)
Aplication Configuration / IMP_COM tCoord 0.00 s s
/ Scheme Communication tSendMin 0.1 s s
Unblock Off
tSecurity 0.035 s s
Trip Logic
Operation / Operasi On
13 Program 3 Ph PMT Three Pole
TripLockout Off
Aplication Configuration / CB_TR
Autolock Off
/ Trip Logic
0.150 Must be < tTrip in AR
tTripMin s s in order not to inhibit AR
tWaitForPHS 0.05 s s
Autorecloser
14 Operation / Operasi Off
External Ctrl On, If used Sw. AR On Mode
NoOfShot Rekomendasi AR: SPAR, (Kajian ITB 2022)
AR Mode In order enable of reclose 1 Ph or 3 Ph
StartbyCBOpen TPAR tetap diuji
Aplication Configuration / CB_AR
CBAuxConType
/ AutoReclose
CB ReadyType
t1 1Ph s s
t1 2Ph s s
t1 3Ph s s
t1 3Phs s s
Hal Proteksi PHT 150 kV Dibuat Oleh: Dievaluasi oleh: Disetujui oleh: Tanggal:
GI SAWANGAN LINE #2 TANGGARI U #1
1) A Yusril Asrida
1) Arista Rahmanu Wicaksono 1) Hanif Al Islami
3/6
07 MARET 2024
2) Dimas Angga Putra 2) Taufik Wisnu Wardhana 2) Suhandi
PT PLN (PERSERO)
UNIT INDUK PENYALURAN DAN PUSAT PENGATUR BEBAN SULAWESI
DATA SETELAN RELAI LINE CURRENT DIFFERENTIAL
SUBSISTEM 150 KV - UIP3B SULAWESI

Data Teknis :
LOKASI/GI : GI Sawangan Ukuran Konduktor : ACSR 213
PROTEKSI : Line #2 Tanggari Unit #1 Ukuran Kawat Tanah : -
Panjang L1 : 5.90 Km Panjang L3 : 28.85 Km
Panjang L2 : 3.80 Km Panjang L4 : 22.73 Km
Z Ur. Pos. (Primer) : 0.9257 + j 2.2228 W (line impedance) Z Ur. Nol (Primer) : 2.394 +j 5.1649 W
Z Ur. Pos. (Sekunder) : 0.2645 + j 0.6351 W (line impedance) Z Ur. Nol (Sekunder) : 0.684 +j 1.4757 W
Merek : ABB Rasio CT : 200 / 1 A
Tipe : RED 670 Rasio PT : 70 kV / 100 V

NO. GRUP SETTING PARAMETER SETTING PROPOSAL SETTING UNIT APPROVAL SETTING UNIT KET.

t2 3Ph s s
t3 3Ph s s
t4 3Ph s s
t5 3Ph s s
T Reclaim s s
T Sync s s
Extended T1
tExtended T1
tInhibit s s
Must be > tTripMin in trip logic
tTrip s s in order not to inhibit AR
Aplication Configuration / CB_AR
Cut Pulse
/ AutoReclose
t Pulse s s
Follow Cb
tcbCloseMin s s
AutoCont
tAutoContWait s s
UnsucClByCBChk
BlockByUnsucCl
tUnsucCl s s
Priority
tWaitForMaster
ZoneSeqCoord
15 SESRSYN: 1 On
General
GblBaseSelBus 1
GblBaseSelLine 1
SelPhaseBus1 Phase L2
SelPhaseBus2 Phase L2
SelPhaseLine1 Phase L2
CBConfig Double Bus
Setting Group1
Operation On
Synchronizing
OperationSynch Off
Synchrocheck
Setting Grup1
OperationSC On
UHighBusSC 80 %UBB %UBB
UHighLineSC 80 %UBL %UBL
Aplication Configuration / CB_AR UDiffSC 0.1 pu pu
/ synchronizing Freq DiffA 0.11 Hz Hz
Freq DiffM 0.11 Hz Hz
Phase DiffA 15 Deg Deg
Phase DiffM 15 Deg Deg
tSCA 0.1 s s
tSCM 0.1 s s
Energizingcheck
Setting Grup1
AutoEnerg DLLB
ManEnerg Both
ManEnergDBDL On
UHighBusEnerg 80 %UBB %UBB
UHighLineEnerg 80 %UBL %UBL
ULowBusEnerg 40 %UBB %UBB
ULowLineEnerg 40 %UBL %UBL
UMaxEnerg 115 %UB %UB
tAutoEnerg 0.1 s s
tManEnerg 0.1 s s
Fuse Failure / VT Fail
16 Operation / Operasi On
OpMode UZsIZs
3U0> 30 %UB %UB
3I0< 10 %IB %IB
3U2> 20 %UB %UB
3I2< 10 %IB %IB
Aplication Configuration /
OpDUDI On
U_PROT/Secondary Sistem
DU> 60 %UB %UB
Supervision/SDDRFUF
VT Fail Supervisi DI< 15 %IB %IB
UPh> 70 %UB %UB
IPh> 10 %IB %IB
SealIn On
USealln< 70 %UB %UB
IDLD< 5 %IB %IB
UDLD< 40 %UB %UB
Hal Proteksi PHT 150 kV Dibuat Oleh: Dievaluasi oleh: Disetujui oleh: Tanggal:
GI SAWANGAN LINE #2 TANGGARI U #1 1) A Yusril Asrida 1) Arista Rahmanu Wicaksono 1) Hanif Al Islami
4/6
07 MARET 2024
2) Dimas Angga Putra 2) Taufik Wisnu Wardhana 2) Suhandi
PT PLN (PERSERO)
UNIT INDUK PENYALURAN DAN PUSAT PENGATUR BEBAN SULAWESI
DATA SETELAN RELAI LINE CURRENT DIFFERENTIAL
SUBSISTEM 150 KV - UIP3B SULAWESI

Data Teknis :
LOKASI/GI : GI Sawangan Ukuran Konduktor : ACSR 213
PROTEKSI : Line #2 Tanggari Unit #1 Ukuran Kawat Tanah : -
Panjang L1 : 5.90 Km Panjang L3 : 28.85 Km
Panjang L2 : 3.80 Km Panjang L4 : 22.73 Km
Z Ur. Pos. (Primer) : 0.9257 + j 2.2228 W (line impedance) Z Ur. Nol (Primer) : 2.394 +j 5.1649 W
Z Ur. Pos. (Sekunder) : 0.2645 + j 0.6351 W (line impedance) Z Ur. Nol (Sekunder) : 0.684 +j 1.4757 W
Merek : ABB Rasio CT : 200 / 1 A
Tipe : RED 670 Rasio PT : 70 kV / 100 V

Disturbance Record
Operation On
PreFaultRecT 1s In order to set, prefault 1s
PostFaultRecT 2s In order to set, postfault 2s
TimeLimit 3s
PostRetrig Off
MaxNoStoreRec 100
ZeroAngleRef 1
OpModeTest Off
Trigger Input Extended/Saturation
1. Any Start
2. Any Trip
3. Vn < 80%
4. Vn > 110%
5. In > 110%
6. F < 48,2 Hz
7. F > 51 Hz
Analog Signal 1. IA
2. IB
3. IC
4. IN
5. VA
6. VB
7. VC
8. VN
9. V Bus
10. Frequency
Digital Signal 1. Status CB Fasa R In order to set, disturbance record
2. Status CB Fasa S according signal function needed
3. Status CB Fasa T minimum analog & digital signals are
4. CB Ready noted here
5. AR Ready (including)
6. Relay Fail (Watch Dog)
7. VT Fail
8. Check Shync
9. Any Start
10. Any Trip
11. Diff. Trip
12. Diff. Trip S
13. Diff. Trip T
14. Dist. Trip Fasa R
15. Dist. Trip Fasa S
16. Dist. Trip Fasa T
17. Z1
18. Z2
19. Z3
20. Zone 1 Pick up
21. Zone 2 Pick up
22. Zone 3 Pick up
23. DEF Trip A
24. DEF Trip B
25. DEF Trip C
26. Dist. Send Signal
27. Dist. Receive Signal
28. DEF Send Signal
29. DEF Receive Signal
30. DEF Forward
31. DEF
32. DEF
33. Power Swing
34. AR 1P in Progress
35. AR 3P in Progress
36. AR Lockout
37. SOTF/TOR Trip
38. Shync. Cek

Note: Approval setting ini sudah menggunakan data line impedance konduktor, sehingga sudah dapat digunakan untuk keperluan energize bay line

Hal Proteksi PHT 150 kV Dibuat Oleh: Dievaluasi oleh: Disetujui oleh: Tanggal:
GI SAWANGAN LINE #2 TANGGARI U #1
1) A Yusril Asrida 1) Arista Rahmanu Wicaksono 1) Hanif Al Islami
5/6
07 MARET 2024
2) Dimas Angga Putra 2) Taufik Wisnu Wardhana 2) Suhandi
PT PLN (PERSERO)
UNIT INDUK PENYALURAN DAN PUSAT PENGATUR BEBAN SULAWESI
DATA SETELAN RELAI LINE CURRENT DIFFERENTIAL
SUBSISTEM 150 KV - UIP3B SULAWESI

Data Teknis :
LOKASI/GI : GI Sawangan Ukuran Konduktor : ACSR 213
PROTEKSI : Line #2 Tanggari Unit #1 Ukuran Kawat Tanah : -
Panjang L1 : 5.90 Km Panjang L3 : 28.85 Km
Panjang L2 : 3.80 Km Panjang L4 : 22.73 Km
Z Ur. Pos. (Primer) : 0.9257 + j 2.2228 W (line impedance) Z Ur. Nol (Primer) : 2.394 +j 5.1649 W
Z Ur. Pos. (Sekunder) : 0.2645 + j 0.6351 W (line impedance) Z Ur. Nol (Sekunder) : 0.684 +j 1.4757 W
Merek : ABB Rasio CT : 200 / 1 A
Tipe : RED 670 Rasio PT : 70 kV / 100 V

Note: Agar dipastikan logic SOTF sudah memenuhi standar sebagai berikut, agar tidak mempengaruhi kehandalan Autoreclose
serta tetap bisa trip jika pada siklus Autoreclose masih terdeteksi gangguan

Hal Proteksi PHT 150 kV Dibuat Oleh: Disetujui oleh: Disetujui oleh: Tanggal:
GI SAWANGAN LINE #2 TANGGARI U #1
1) A Yusril Asrida 1) Arista Rahmanu Wicaksono 1) Hanif Al Islami
6/6
07 MARET 2024
2) Dimas Angga Putra 2) Taufik Wisnu Wardhana 2) Suhandi