NO : BA4-BB-CS-E-CSC-002
SUB TITLE : ELECTRICAL CALCULATION OF CABLE SIZING ISSUED DATE : 07/02/2017
PACKAGE : ELECTRICAL & INSTRUMENT REVISION :-
SUB PACKAGE : ELECTRICAL PREP. BY : ARS
LOCATION : SOUTH SUMATERA CHECK. BY : AF
CLIENT : PT. BUKIT ASAM APP. BY : DN
400V AC THREE PHASE SUPPLY RL-LP
Installation Method:
LV cable on air/trench/ladder single core trefoil maximum 9 groups, touching, derating factor = 0.85
LV cable on air/trench/ladder multicore core maximum 9 groups, touching, derating factor = 0.78
PROJECT TITLE : EPC FASILITAS PENANGANAN BATUBARA TAHAP - IV DOC. NO : BA4-BB-CS-E-CSC-002
SUB TITLE : ELECTRICAL CALCULATION OF CABLE SIZING ISSUED DATE : 07/02/2017
PACKAGE : ELECTRICAL & INSTRUMENT REVISION :-
SUB PACKAGE : ELECTRICAL PREP. BY : ARS
LOCATION : SOUTH SUMATERA CHECK. BY : AF
CLIENT : PT. BUKIT ASAM APP. BY : DN
400V AC THREE PHASE SUPPLY RL-LP
Equipment BXB-RLLP-2X
(Cable No)
Installation Method:
LV cable on air/trench/ladder single core trefoil maximum 9 groups, touching, derating factor = 0.85
LV cable on air/trench/ladder multicore core maximum 9 groups, touching, derating factor = 0.78