Professional Documents
Culture Documents
New Limitation Change: Unclassified
New Limitation Change: Unclassified
AD NUMBER
AD872101
FROM
Distribution authorized to U.S. Gov't.
agencies and their contractors;
Administrative/Operational Use; 1 Jun
1970. Other requests shall be referred to
U.S. Army Test and Evaluation Cmd.,
Aberdeen Proving Ground, MD 21005. REL TO:
Australia, Canada, and the United Kingdom.
AUTHORITY
.,.-$ 1. OBJECTIVE
2. BACKGROUND
3. REQUIRED EQUIPMENT
j. Stop Watches
k. Appropriate Standard Ammunition
4. REFERENCE S
5. SCOPE
5.1 SUMMARY
This MTP describes the preparation for, and the test firing for
determining the first and subsequent round hit capability of vehicle mounted
large caliber weapon systems in a direct fire role.
5.2 LIMITATIONS
6. PROCEDURES
-2-
MTP 3-3-513
1 June 1970
6.1.1 Safety
The test officer shall ensure that a Safety Release has been received
from HQ, USATECOM in accordance with reference 4A and that is is understood
prior to commencing testing.
6.1.2 Personnel
6.1.3 Inspection
6.1.4 Ammunition
-3-
MTP 3-3-513
1 June 1970
around the zeroing range. Targets will be placed at random distance within
each of the brackets. Number and survey the distance to each target. Make a
plot of the target area showing the range and azimuth to and the number of each
type and size of target for use as a reference in recording test results.
NOTE: 1. Testing should begin within one hour after the system has
been zeroed unless firing is to be done at night with 9
-4-
MTP 3-3-513
1 June 1970
a. Rotate the weapon away from the target as specified in the QMR or,
if not specified, 540 mils to the right or left prior to engaging each target.
b. Set the range scale on the prescribed battle sight setting.
c. Index appropriate ammunition on computer.
-5-
MTP 3-3-513
1 June 1970
NOTE: If first round strikes target, exercise ends and time stops
with target strike. If the sensing of the first round is
"miss" exercise continues as described below.
NOTE: If second round strikes target exercise ends and time stops
with target strike. If sensing of second round is "miss"
continue exercise as described below.
"-6-
MTP 3-3-513
1 June 1970
Repeat Phase I firing against one mid-range target with the weapon
canted up to 15 degrees to the right and the left.
Repeat portions of Phase I, II and III near the halfway point and
0 near the end of the service test.
6.3.1.1 Personnel
a. Name
b. Rank or grade
c. Military Occupational Specialty (MOS)
d. Training time in MOS
e. Experience in MOS
6.3.1.2 Inspection
-
-7-
MTP 3-3-513
1 June 1970
6.3.1.3 Ammunition
a. Type of ammunition
b. Lot number
c. Number of rounds recorded
Summarize test data showing the percentage of first, second and third
round hits and the time required to obtain the hits on each different target
under each phase of firing and a consolidation of all firing phases.
0
-9-
MTP 3-3-513
1 June 1970
-10-
MTP 3-3-513
1 June 1970
. UNCLASSIFIED
Security Clagsification
3 REPORT TITLE
U. S. Army Test and Evaluation Command Materiel Test Procedure 3-3-513, Common
Service Test Procedure, - "First and Subsequent Round Hitting."
Final
5 AU T•RCO ,S (First name, mtddle ,ritial, last name)
1 June 1970 12 8
Sa CONTRACT OR GRAN4T NO 98. ORIGINATOR'S REPORT NUMBER(S)
DA-18-001-AMC-1045 (R)
5.PPCECT NO MTP 3-3-513
AMCR 310-6
9b. OTHER REPORT NO(S) (Any other numbers that may be assigned
this report)
* d.
O
CIST'-BUTION STATEMENT
This Army Service Test Procedure describes test methods and techniques for
evaluating the capability of direct-fire Artillery Class weapons, in first and
subsequent round hitting on vertical targets. This procedure is intended for
combat vehicle-mounted large caliber weapons systems. The evaluation is related
to criteria expressed in applicable Qualitative Materiel Requirements (QMR),
Small Development Requirements (SDR), Technical Characteristics (TC), or other
appropriate design requirements and specifications.
DFORM 1473
NDD
OV
(PAGE 1)
UNCLASSIFIED
S/N 0101-807-6811 Security Classification A- 31408
A-1
MTP 3-3-513
1 June 1970
UNCLASSIFIED
St, urirv ChlIsifi'ation
14 LINK A LINK B LINK C
KEY WORDS
ROLE WT ROLE WT RO0L.E WT
Test Procedures
iS
A-2