Bored hole BH-TN-1 GWL 1 m

Total stress
GWT 1.00 m *** edit effective stress above GWT (gh+g'h') Hydrostatic Pressure
BKK 0.4 0
Sugested by0 PI 50 100 150 200 250 300 350 400 450 Hydrostatic pressure
0 50 100 150 200 250
Soil for sand for sand 1 0 k L thick. g s s u s'
2 1
Select Hydrostatic Pressure below water table overburden effect Field Correlation Applied 0.2-0.5 3 clay
2 1.00E-06 0 0 0 0 0 0 0
4 3
Depth g g' Ds s' SPT n k k Analysis type Depth sand 1.00E-03 3.00 3.00 16 48 48 29.43 18.57
Thickness Su Su Su f' y' E Thickness PL w LL PI 5 4
(m.) Material name USCS ' Field N corr CN N1 Su/N E/ N clay type E/Su (m.) Material name LI s'vm s' v(avg) OCR Cc Cr e0 6 s' vm OCR CR RR 5 6.50 3.50 16 56 104 63.765 40.235
7 6
from to (m) kN/m3 kN/m3 kPa kPa N (blow/ft) kPa kPa kPa Degree Degree kPa cm/sec m/day from to (m) % % % % 8 7 10.00 3.50 18 63 167 98.1 68.9
9 8
0.00 3.00 3.00 Fill Material SM 18 8.19 34.38 34.38 6 6 1.359 8 0.00 0 0.0 30 0 7000 soft clay 500 19,987 0.3 1.00E-03 0.864 Undrained 0 3 3 Fill Material 0% 0% 0% 0% #DIV/0! #DIV/0! 17 #DIV/0! -0.07 -0.012 0.00

Depth (m)
10 0 0.00 -0.165 -0.016 USCS
9 N/Su 13.00 3.00 20 60 227 127.53 99.47

Depth (m)
11 10
3.00 6.50 3.50 Very Soft Clay CH 18 8.19 28.665 63.045 0 1.420 0 5.20 12.30 0 12.3 0 0 7000 stiff clay 500 6,150 0.3 1.00E-03 0.864 Undrained 3 6.5 3.5 Very Soft Clay 40% 85% 100% 60% 0.750 79 49 1.25 0.630 0.110 2.338 12
49 0.78 0.315 0.032 CH
11 5.2 22.00 9.00 20 180 407 215.82 191.18
6.50 10.00 3.50 Very Soft Clay CH 18 8.19 28.665 91.71 0 1.420 0 5.20 17.35 0 17.4 0 0 7000 soft clay 500 8,675 0.3 1.00E-03 0.864 Undrained 6.5 10 3.5 Very Soft Clay 30% 70% 85% 55% 0.727 85 77 0.93 0.525 0.092 1.925 13 69 0.76 0.195 0.020 CL
12 6.85
14 13
10.00 13.00 3.00 Medium stiff Clay CL 20 10.19 30.57 122.28 0 1.398 0 6.85 32.35 0 32.4 0 0 7000 stiff clay 500 16,175 0.3 1.00E-03 0.864 Undrained 10 13 3 Medium stiff Clay 30% 60% 80% 50% 0.600 137 107 1.12 0.490 0.086 1.650 15 129 1.06 0.195 0.020 SM
14 0
13.00 22.00 9.00 Stiff Clay CL 20 10.19 91.71 213.99 24.75 19.875 1.031 20 6.85 140 140.3 0 0 7000 medium clay 500 70,164 0.3 1.00E-03 0.864 Undrained 13 22 9 Stiff Clay 10% 20% 50% 40% 0.250 507 168 2.37 0.280 0.049 0.550 16 561 2.62 -0.045 -0.004 15
17 16
18 17
19 18
20 19
21 20 E/Su
22 21
23 soft
22 clay 500
23 clay
medium 500
Total Stress (kPa)
stiff clay 500 Pore pressure (kPa)
hard clay 1000

Effectivel stress
0 50 100 150 200 250
0
1
2
3
4
5
6
7
8
9

Depth (m)
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Effective Stress (kPa)


Sheet No. Ref
CALCULATION SHEET
1

. Date
Site ID: Bulk Substation-North Green Line MRT Project 26/5/63
Checked By Date
Subject: Analysis Settlement of Cable Trench

The Elastic Settlement of Shallow Foundation

Based on Theory of Elasticity

kPa

Structure Geometry
q0 20 kPa
B 1 m
B' 0.5 m
L 1 m
a 4
ms 0.3
H 22 m
m' 1.000
n' 44.00
A2 0.000516
A1 0.339793
A0 0.858654
F2 0.207141
F1 0.381478
Is 0.499844
Df 0.45 m
Df/B 0.45
B/L 1
If 0.78
Sheet No. Ref
CALCULATION SHEET
2
. Date
Site ID: Bulk Substation-North Green Line MRT Project 26/5/63
Checked By Date
Subject: Analysis Settlement of Cable Trench

Soil Parameter

Depth (m) Thickness g Su f E EDZ


Material Properties USCS
From To (m) kN/m 3
kPa Degree kPa
0.00 3.00 3.00 Fill Material SM 18 0 30 19,987 59,962
3.00 6.50 3.50 Very Soft Clay CH 18 12 0 6,150 21,525
6.50 10.00 3.50 Very Soft Clay CH 18 17 0 8,675 30,363
10.00 13.00 3.00 Medium stiff Clay CL 20 32 0 16,175 48,525
13.00 22.00 9.00 Stiff Clay CL 20 140 0 70,164 631,475
791,850
Weight Average of Elastic Modulus

Es 35,993 kPa

Settlement After Construction

Se 0.4 mm

Consolidation Settlement

For Normal Consolidation s'vo= s'vm

For Over Consolidation s'vo+ Ds'v ≥ s'vm

For Over Consolidation s'vo+ Ds'v ≥ s 'vm

Soil Parameter

Depth Thickness Material Properties s'v(avg) s'vm Sc


Cc Cr e0
From To (m) kPa kPa m
0.00 3.00 3.00 Fill Material 17 0 0 0 0.00 0.00
3.00 6.50 3.50 Very Soft Clay 49 79 0.63 0.11025 2.34 0.02
6.50 10.00 3.50 Very Soft Clay 77 85 0.525 0.09188 1.93 0.01
10.00 13.00 3.00 Medium stiff Clay 107 137 0.49 0.08575 1.65 0.01
13.00 22.00 9.00 Stiff Clay 168 507 0.28 0.049 0.55 0.01
0.04
Final Consolidation Settlement = 44 mm

Sheet No. Ref


CALCULATION SHEET
3
. Date
Site ID: Bulk Substation-North Green Line MRT Project 26/5/63
Checked By Date
Subject: Analysis Settlement of Cable Trench

Time Rate of Consolidation

For Bangkok clay, cv=2.5m2/year

t 50 year
cv 2.5 m2/year
Hd 22 m
Tv 0.2583
U 57 %

The Consolidation Settlement a 50 year 25 mm

Total Settlement 26 mm