Professional Documents
Culture Documents
CITY CLOUD
Hitachi COMMUNICATIONS
INDUSTRIAL
OT IoT IT ARTIFICIAL
105+ INSIGHT 55+ INTELLIGENCE
YEARS YEARS
BUSINESS
IT SYSTEMS
IOT
IT
OT
l*Systems
IR
m*Applications
Transform -ONE-
n*Actors
ICT
.
Hitachi Digital Rail Solutions – A comprehensive offering set
Truck = Bogie
3500
Accumulated operation times
designed value
Guideline standard for inspection
3000
measured value
2500
Connected Maintenance
Insight Action Improvement Equipment
Machine Costs Costs
Network Historical Predictive
Connected Reliability
Performance Maintenance
There are clear
Telemetric business benefits
Sensors Break/Fix Service
Availability of bringing RCM
Response Schedules
Centralized practices to
Monitoring smart train
Remote Spares and Cost Operational maintenance and
Data Analytics Diagnostic Consumables Reduction operations
Costs
HRE BACK OFFICE GROUND-SIDE SOLUTIONS (DATA CENTER) COMMUNICATIONS TRAIN-SIDE SOLUTIONS
Rail Rail
Applications Analytics
Wi-Fi Train
On-Board Mgt
SAP Comms
IaaS/PaaS Solutions Gateway Data System
Back-Office TMS (TMS)
Interfaces (UCP/HSP) Mgt Interface
3G / 4G
Machine Sensors Data Collection Data Communications Big Data & Analytics Asset Control & Maintenance
System & Sensor Data Management Reporting Dashboards Asset Management &
Integration & Transmission & Analytics Maintenance
CONFIDENTIAL – For use by Hitachi, Ltd. employees and other audiences under NDA only.
Digital Rail Solutions
Leveraging our IoT Platform ‘Lumada’ for Railways
OT Verified Blueprints
IT
Lumada
Intelligent Software
Big Data
OT IoT Infrastructure IT
The Journey Ahead
A New Digital Rail Services Platform enabled by Lumada
Usage Analytics
Ticketing / Stores, Parking,
Fare Vending M/c,
collection Traffic Analytics Event Planning
Data Acquisition
Asset Utilization
Route Analytics
Data
Last mile planning
Visualization Behavior Analytics
Facility Planning
Profile Analytics System Analytics
Data
Analytics Retail Analytics Fraud Analytics Fare Management
Timetable
395006 A XXX 0.0 1
Timetable
395007 C XXXXXX- XXX 140.0 3
395009 A XXX 0.0 4
395013 B XXX – XXX 120.0 1
395016 - Ashford Depot - 1
395018 B XXX 0.0 2
Work Authorization
395004 A XXX 0.0
395005 - Depot Ramsgate -
395008 A XXX 0.0
Engineering Work
395009 B 0.0
395010 - Depot Ashford -
Train Location
395011 A XXX – XXX 40.0
395012 B XXX 0.0
395014 A XXX 0.0
395015 B XXX XXX 0.0
395017 A XXX 0.0
Facility SCADA
Power SCADA Train Location
Running Result
© Hitachi, Ltd. 2017. All rights reserved. 20
Example of Monitoring using Sensors for data acquisition
There are 3 types of sensors in components as follows: *1 OTMR(On Train Monitoring Recorder)
A) Command/Operating information e.g. Door opening command) *2 ETCS(European Train Control System)
B) Measured value e.g. Train speed / Interior temperature) *3 BCU(Brake Control Unit)
*4 PDCU(Passenger Door Control Unit)
C) Failure information e.g. Out of service of toilet) *5 HVAC(Heating,Ventilating and Air-Conditioning system)