Sr.No.

Particular Detail
CONSTRUCTION OF RAJEGAON-KIRNAPUR-
LANJI-AMGAON ROAD
1 Name of Project (TOTAL LENGTH – 57.400 KM)
(AGREEMENT NO. 06/CRF/2019-20)
APPOINTMENT DATE – 09/12/2019
2 Total Length of Project 57.640

3 Total Cost of Project Rs. 63.91cr

CONSTRUCTION OF RAJEGAON-KIRNAPUR
4 Development of Roads
LANJI-AMGAON ROAD

5 Type of PPP EPC Mode


Administrative Madhya Pradesh Public Works Department
6
Ministry/Department (MPPWD)
7 Funded By C.R.F
LOA issued to
8 -
Concessionaire

9 Name of Contractor M/S RAJARAM CONSTRUCTION

10 Date of Agreement Dated 09/12/2020


11 Construction Period 24Months
Pavement surface condition is varying
location to location from fair to very poor.
Existing pavement
12 Earthen shoulders width 0.2 m to 2.0 m
surface condition
exists on the either side of the carriageway
in poor condition

13 Forest land There are no forest land

14 Exiting available ROW 24 meter in variable width

Additional land to be
15 NIL
acquired