Professional Documents
Culture Documents
Project
:CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-
UMRETH- KHIRSADOH ROAD EPC MODE.
Period Upto : 30-June, 2020 (Work Stopped Due To Covid-19 From 22/03/2020 To 30/05/2020)
B
Amounts reflecting adjustments in price for the aforesaid 17,742 17,742
claim;
C
The estimated amount of each Change of Scope Order - - -
executed subsequent to the last claim;
Amount in Words : Rs. One Crore Fifty Four Lakhs Twenty Three Thousand Eight Hundred Seventy Seven Only.
Submitted by
Authorized Signatory
For M/s Rajaram Construction
Ministry of Road Transport & Highways
Name of Road : CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-UMRETH- KHIRSADOH ROAD EPC MODE.
Client : CE MPPWD Jabalpur (M.P.)
EPC Contractor : M/S Rajaram Construction, Jalore (Raj.) Agreement No. 02/CRF/2019-2020. Date of Agreement-11.12.2019 Date of Completion-10.06.2021
Contract Amount : Rs. 269900000.00
Billing Schedule
Stage for Payment Executed Quantity Executed Amount in Rs.
Weightage in
Value of Works with
percentage to Payment
Sl No Item respect to Contract Remarks
the Contract Procedure Percentage Upto End of Upto Previous Upto Previous
Price UoM Total Units Cost per Unit Total Amount in Rs This Month Upto End of This Month This Month
Price weightage This Month Month Month
Unit of
A-Reconstruction/New 2-lane with Hard measurement is
Shoulder (Flexible Pavement) linea length
payment of each
(1) Earthwork up to top of the sub-grade stage shall be
Km 34.000 6.6933% 512,202 17,414,868.90 13.12 5.34 7.78 6,720,091 3,984,932
I/C&C&G made on prorata
basis on
(2) Earthwork in Hard Shoulder completion of a Km 34.000 3.500% 267,836 9,106,426.00 - - -
stage in full
length or 3 Km.
(3) Sub-Base-Course (CRM) length, Km 34.000 16.880% 1,291,735 43,918,991.68 10.84 3.38 7.46 14,002,408 9,636,343
whichever is
less.
(4) Non Bituminous Base Course (WMM) Km 34.000 23.140% 1,770,779 60,206,485.04 - - -
Unit of
B-Reconstruction/New-2-lane with Hard measurement is
Shoulder Realignment (Rigid Pavement linear length,
Widening) payment of each
stage shall be
made on prorata
(1) Earthwork up to top of subgrade basis on Km 1.00 0.0005% 1,300.92 1,300.92
completion of a
stage in full
(2) Sub-Base-Course (CRM) Km 1.00 0.0049% 12,749.00 12,749.00
length or 3 Km.
length whichever
(3) DLC Course is less. Km 1.00 0.0113% 29,400.75 29,400.75
(4) PQC Dowel & Tie Bar Km 1.00 2.990% 7,779,489.64 7,779,489.64
Billing Schedule
Stage for Payment Executed Quantity Executed Amount in Rs.
Weightage in
Value of Works with
percentage to Payment
Sl No Item respect to Contract Remarks
the Contract Procedure Percentage Upto End of Upto Previous Upto Previous
Price UoM Total Units Cost per Unit Total Amount in Rs This Month Upto End of This Month This Month
Price weightage This Month Month Month
Earthwork,Gran Culvert,minor
S.
No. Month IPC's ular work & Bituminous work bridges & other Total
other work structure
Price Adjustment for the works (As per Clause of 19.10 of the EPC Aggrement)
Earth Work,Granular work and Other Works Bituminous pavement Culverts Minor Bridges and Other Structures
Works 'VRW
Structures
Total Total VRW
PL= 20% PA= 15% PF = 10% PM = 50% PC = 5% PL= 20% PA = 15% PF = 10% PM = 40% PB = 15% PL= 15% PA = 15% PF = 10% PM = 30% PC = 15% PS = 15%
Earth Culverts
Work,Granular Bituminous Minor Bridges
work and Other Pavement and Other Lo LI Ao AI Fo FI Mo MI Co CI Lo LI Ao AI Fo FI Mo MI Co CI Lo LI Ao AI Fo FI Mo MI Co CI So SI
Works Structures
1 Jun-20 13,621,275 - 1,784,859 15,406,135 311.0 324.0 74.5 74.8 94.9 87.0 121.5 121.1 122.5 119.9 (23,940) 311.0 324.0 74.5 74.8 94.9 87.0 121.5 121.1 122.5 119.6 - 311.0 324.0 74.5 74.8 94.9 87.0 121.5 121.1 122.5 119.9 113.7 104.8 (26,342.21) (50,282) (50,282)
Total 13,621,275 - 1,784,859 15,406,135 (23,940) - Gross Bill Upto Date Rs. (26,342) (50,282) 17,742
Ministry of Road Transport & Highways
CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-
UMRETH- KHIRSADOH ROAD EPC MODE
A-Reconstruction/New Intermediate lane with hard shoulder
Unit of measurement is linear. Payment of each stage shall be made on pro-rata basis on completion of a
stage in full length or 3 Km length whichever is less.SG (Earth Work)
Chainage Quantity
S. No RFI No Date Side Length (M) Remarks
From (Km)To (Km.) (M)
Chainage
Quantity
S.No. RFI No Date From To Side Length (M) Remarks
(M)
(Km) (Km.)
Cost of Each completed culverts shall be determined prorata with respect to the total number
of culverts.
S. Type of
Chainage Row/ Size Construction Type Side Total
No Structure
New Construction
Total Nos. of Structure up to IPC - 01 (Nos.) 6.00
1Row X 1000 mm with
1 0+005 Pipe Culvert Encasing Reconstruction BHS 1.00
Four Laning of Hassan (Existing Km 189+700, Design Ch 184+912) to Maranahally (Existing Km 237+000, Design Ch 230+060)
section of NH-75 (Old NH No-48) under NHDP Phase-IV on EPC Mode in the state of Karnataka
Four Laning of Hassan (Existing Km 189+700, Design Ch 184+912) to Maranahally (Existing Km 237+000, Design Ch 230+060)
section of NH-75 (Old NH No-48) under NHDP Phase-IV on EPC Mode in the state of Karnataka
(xvi) Miscellaneous 45.15 Payment shall be made on pro rata basis for
items completed Items
(xviii) FOB
(xix) Site Clearance 198.61 Payment shall be made on pro rata basis for
completed Items
(xx) Rain water Payment shall be made on pro rata basis for
45.00
Harvesting completed Items
Sub Total IV
Price Adjustment for Labour
S.No RW Month PL LI Lo 0.85*RW*(PL*(LI-LO)/LO)
4 137844
Price Adjustment-Summary
S.No Description Month Amount Remarks
Submitted/
S.No. Particulars Remarks
Not Submitted
1 Work Programme
7 Photography -
Executive Engineer
PWD Div., Chhindwara
IPC-01 IPC-02
S.No. RFI Date S.No. RFI Date
In Lab
A Atterberg Limit 2 Test per 3000 Cum 16 15
AT Site
A Moisture Content Prior To Compaction 1 Set Test Per 500 Sqm 85113.20 Sqm. 170 225
AT Site
A Density of Compacted Layer 1 Set of 3 Test per 1000 sqm 82 71
In Lab
A Sieve Analysis for Coarse Aggregate 1 Test per Source / Per Day 2 20
B Sieve Analysis for Fine Aggregate 1 Test per Source / Per Day 2 9
Total 43 73
Grand Total 516 546
M/s. RAJARAM CONSTRUCTION, JALORE (RAJ.)
ABSTRACT OF QUALITY CONTROL TEST
Project :Amarwara - Ramgarh Road KM 20.22 Under CRF ( EPC Mode)
Bill No. : IPC-02
Executed No. of Test
S. No. Particular's Frequency
Quantity
Unit
Required
No. of Test Done Remark
In Lab
A Atterberg Limit 2 Test per 3000 Cum 4 4
AT Site
Field Density of Compacted Layers
B
Subgrade
10 Pit Every per 2000 Sqm 28000.00 Sqm. 16 16
Total 34 34
Cum
2 New Culverts :- Slab Culvert 1 No. 403.63 (About)
In Lab
Total 64 64
Cum
2 New Culverts :- HPC 10 No. Culverts 290.00 (About)
In Lab
A Sieve Analysis for Coarse Aggregate 1 Test per Source 12 12