BILL No. : IPC-02


''NAME OF PROJECT''

AMARWADA - RAMGARH ROAD WORK UNDER CRF (EPC Mode)

Agreement No. : 04/CRF/2019-20, Dated : 25.11.2019

Agency : M/s. RAJARAM CONSTRUCTION

Address : B-3, Arcon City, Khajari Road, Chhindwara

Appointed Date : 11.12.2019

Date of Completion : 10.06.2021


FLY SHEET

BILL No. : IPC-02


''NAME OF PROJECT''

AMARWADA - RAMGARH ROAD WORK UNDER CRF (EPC Mode)

Agreement No. : 04/CRF/2019-20, Dated : 25.11.2019

Agency : M/s. RAJARAM CONSTRUCTION

Address : B-3, Arcon City, Khajari Road, Chhindwara

Appointed Date : 11.12.2019

Date of Completion : 10.06.2021


Ministry of Road Transport & Highways

Project
:CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-
UMRETH- KHIRSADOH ROAD EPC MODE.

Client : CE ,MPPWD ,Jabalpur

EPC Contractor : M/s. RAJARAM CONSTRUCTION, BHINMAL, DISTT.-JALORE (Raj.)

Invoice No. : IPC - 02 Agreement No. : 02/CRF/2019-2020.

Period Upto : 30-June, 2020 (Work Stopped Due To Covid-19 From 22/03/2020 To 30/05/2020)

Cumulative Amount Paid Amount payable


S. No. Description Amount

payable up to this Up to previous Bill in this Bill


Bill
(Rs.) (Rs.) (Rs.)

The Estimated amount for the Works executed in


A
accordance with Clause 19.3 subsequent to the last claim; 23,846,003 8,439,868 15,406,135

B
Amounts reflecting adjustments in price for the aforesaid 17,742 17,742
claim;

C
The estimated amount of each Change of Scope Order - - -
executed subsequent to the last claim;

Amounts reflecting adjustment in price, if any, for (c)


D above in accordance with the provisions of Clause 13.2.3 - - -
(a);

E Total of (A+B+C+D) as above 23,863,745 8,439,868 15,423,877

Amount in Words : Rs. One Crore Fifty Four Lakhs Twenty Three Thousand Eight Hundred Seventy Seven Only.

Submitted by

Authorized Signatory
For M/s Rajaram Construction
Ministry of Road Transport & Highways
Name of Road : CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-UMRETH- KHIRSADOH ROAD EPC MODE.
Client : CE MPPWD Jabalpur (M.P.)
EPC Contractor : M/S Rajaram Construction, Jalore (Raj.) Agreement No. 02/CRF/2019-2020. Date of Agreement-11.12.2019 Date of Completion-10.06.2021
Contract Amount : Rs. 269900000.00

Billing Schedule
Stage for Payment Executed Quantity Executed Amount in Rs.
Weightage in
Value of Works with
percentage to Payment
Sl No Item respect to Contract Remarks
the Contract Procedure Percentage Upto End of Upto Previous Upto Previous
Price UoM Total Units Cost per Unit Total Amount in Rs This Month Upto End of This Month This Month
Price weightage This Month Month Month

Cost of each culvert


shall be determined on
Works including culverts, windening pro data basis with
I 0.40% 1,079,600 respect to the number of
andrepair of culvert culvert payment shall be
made on completion of
atleast five culverts.
(1) Windening & repair of existing
Nos. 15.00 100.00% 71,973 1,079,600
culverts

Sub Total I 100.00% 1,079,600 - - -

Road works including


II culverts,Widening and repair of 96.40% 260,183,600
culverts

Unit of
A-Reconstruction/New 2-lane with Hard measurement is
Shoulder (Flexible Pavement) linea length
payment of each
(1) Earthwork up to top of the sub-grade stage shall be
Km 34.000 6.6933% 512,202 17,414,868.90 13.12 5.34 7.78 6,720,091 3,984,932
I/C&C&G made on prorata
basis on
(2) Earthwork in Hard Shoulder completion of a Km 34.000 3.500% 267,836 9,106,426.00 - - -
stage in full
length or 3 Km.
(3) Sub-Base-Course (CRM) length, Km 34.000 16.880% 1,291,735 43,918,991.68 10.84 3.38 7.46 14,002,408 9,636,343
whichever is
less.
(4) Non Bituminous Base Course (WMM) Km 34.000 23.140% 1,770,779 60,206,485.04 - - -

(5) Bituminous Base Course (DBM) Km 34.000 26.380% 2,018,719 68,636,433.68 - - -

(6) Bituminous wearing Coat (BC) Km 34.000 16.900% 1,293,266 43,971,028.40 - - -

Unit of
B-Reconstruction/New-2-lane with Hard measurement is
Shoulder Realignment (Rigid Pavement linear length,
Widening) payment of each
stage shall be
made on prorata
(1) Earthwork up to top of subgrade basis on Km 1.00 0.0005% 1,300.92 1,300.92
completion of a
stage in full
(2) Sub-Base-Course (CRM) Km 1.00 0.0049% 12,749.00 12,749.00
length or 3 Km.
length whichever
(3) DLC Course is less. Km 1.00 0.0113% 29,400.75 29,400.75

(4) PQC Dowel & Tie Bar Km 1.00 2.990% 7,779,489.64 7,779,489.64

(5) Hard Shoulder Km 1.00 0.070% 182,128.52 182,128.52

For M/s Rajaram Construction


Ministry of Road Transport & Highways
Name of Road : CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-UMRETH- KHIRSADOH ROAD EPC MODE.
Client : CE MPPWD Jabalpur (M.P.)
EPC Contractor : M/S Rajaram Construction, Jalore (Raj.) Agreement No. 02/CRF/2019-2020. Date of Agreement-11.12.2019 Date of Completion-10.06.2021
Contract Amount : Rs. 269900000.00

Billing Schedule
Stage for Payment Executed Quantity Executed Amount in Rs.
Weightage in
Value of Works with
percentage to Payment
Sl No Item respect to Contract Remarks
the Contract Procedure Percentage Upto End of Upto Previous Upto Previous
Price UoM Total Units Cost per Unit Total Amount in Rs This Month Upto End of This Month This Month
Price weightage This Month Month Month

cost of each culvert


D- Reconstruction/New,Culverts on shall be determined on
prorata basis with -
existing Road: respect to the number of
culverts payment shall
be made on completion
of atleast five culvert.
(1) New Culverts HPC Nos 40.000 3.430% 223,107 8,924,297.48 14.00 6.00 8.00 3,123,504 1,784,859

Sub Total II 100.00% 260,183,600.00 23,846,003 - 15,406,135

Minor Bridge//Culverts (length>6M But


III 1.25% 3,373,750
less than 60M) Works
(1) Foundation + Sub-structure : on
completion of the foundation works
including foundations for return wall,
abutments, piers p to abutment/Pier cap. Nos. 1.00 63.05% 2,127,149 2,127,149 - -

(2) Super-structure : On completion of


the super-structure in all respect, including
wearing coat, expansion joint, hand rails,
crash barrier, signs & markings with all Nos. 1.00 31.10% 1,049,236 1,049,236 -
tests etc., complete in all respect.

(8) Approaches Nos 1.00 5.85% 197,364 197,364 -

Sub Total III 100.00% 3,373,750 - - - -

IV Other works 1.95% 5,263,050

(1) Road side drains, Lined Drain (CC


Km 0.00% - - - -
drains), unlink drain

(2) Road signs, safety Devices Road


furniture, rumble strip etc and road Km 75.85% 3,992,023 - - -
marking & studs.

(3) Service duct for cable Km 11.58% 609,461

(4) Crash Barrier Km 12.57% 661,565 - - -

Sub Total IV 100.00% 5,263,050 - - -

Grand Total 100.00% 269,900,000 269,900,000 23,846,003 - 15,406,135

For M/s Rajaram Construction


Ministry of Road Transport & Highways

NAME OF WORK : CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-


MORDONGRI-UMRETH- KHIRSADOH ROAD UNDER CRF (EPC MODE)

AGREEMENT No : 02/ CRF / 2019-20 , Dated : 25.11.2019


Agency : M/s. Rajarm Construction, Bhinmal, Distt.- Jalore (Raj.)

Billing Schedule Summary

Earthwork,Gran Culvert,minor
S.
No. Month IPC's ular work & Bituminous work bridges & other Total
other work structure

1 30.06.20 IPC 02 13,621,275 1,784,859 15,406,135

Total 13,621,275 - 1,784,859 15,406,135


Ministry of Road Transport & Highways

Project : CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-UMRETH- KHIRSADOH ROAD UNDER CRF (EPC MODE).

Price Adjustment for the works (As per Clause of 19.10 of the EPC Aggrement)

Bid Due date 30.06.2020.

Value of Work Done


Road Works
'VRW = 0.85 RW x [PL x (LI – LO)/LO + PA x (AI – AO)/AO + PF x (FI –FO)/FO + PM x (MI – MO)/MO + PC x (CI – CO)/CO+ PS x (SI – SO)/SO]

Earth Work,Granular work and Other Works Bituminous pavement Culverts Minor Bridges and Other Structures

VRW=Earth Work,Granular work and Other


Plant, Plant, Plant,

VRW=Culverts Minor Bridges and Other


Fuel and Other Fuel and Other Fuel and Other
Labour machinery Cement PC = Labour machinery Bitumen PB = Labour machinery Cement PC =
Road Works & Other Works PL=20% and spares lubricants PF Materials PM = 5% PL=20% and spares lubricants PF Materials PM = 15% PL=15% and spares lubricants PF Materials PM 15% Steel PS = 15%
= 10% 50% = 10% 40% = 10% = 30%

VRW= Bituminous pavement


PA=15% PA = 15% PA = 15%
S. Total Price
Month
No Adjustment

Works 'VRW

Structures
Total Total VRW
PL= 20% PA= 15% PF = 10% PM = 50% PC = 5% PL= 20% PA = 15% PF = 10% PM = 40% PB = 15% PL= 15% PA = 15% PF = 10% PM = 30% PC = 15% PS = 15%

Earth Culverts
Work,Granular Bituminous Minor Bridges
work and Other Pavement and Other Lo LI Ao AI Fo FI Mo MI Co CI Lo LI Ao AI Fo FI Mo MI Co CI Lo LI Ao AI Fo FI Mo MI Co CI So SI
Works Structures

1 Jun-20 13,621,275 - 1,784,859 15,406,135 311.0 324.0 74.5 74.8 94.9 87.0 121.5 121.1 122.5 119.9 (23,940) 311.0 324.0 74.5 74.8 94.9 87.0 121.5 121.1 122.5 119.6 - 311.0 324.0 74.5 74.8 94.9 87.0 121.5 121.1 122.5 119.9 113.7 104.8 (26,342.21) (50,282) (50,282)

IPC 01 Bill Due Rs. 68,025

Total 13,621,275 - 1,784,859 15,406,135 (23,940) - Gross Bill Upto Date Rs. (26,342) (50,282) 17,742
Ministry of Road Transport & Highways
CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-
UMRETH- KHIRSADOH ROAD EPC MODE
A-Reconstruction/New Intermediate lane with hard shoulder
Unit of measurement is linear. Payment of each stage shall be made on pro-rata basis on completion of a
stage in full length or 3 Km length whichever is less.SG (Earth Work)
Chainage Quantity
S. No RFI No Date Side Length (M) Remarks
From (Km)To (Km.) (M)

Quantity upto IPC 01 (Mtr.) 5340.00


Quantity upto IPC 01 (KM) 5.34
1 RRC/HWY/23 03.03.20 0 80 BHS 80.000 80.00 IPC-2
2 RRC/HWY/19 28.02.20 5350 5450 BHS 100.000 100.00 IPC-2
3 RRC/HWY/20 01.03.20 6000 6500 BHS 500.000 500.00 IPC-2
4 RRC/HWY/33 16.03.20 6500 7300 BHS 800.000 800.00 IPC-2
5 RRC/HWY/26 13.03.20 7300 8000 BHS 700.000 700.00 IPC-2
6 RRC/HWY/30 15.03.20 8000 8700 BHS 700.000 700.00 IPC-2
7 RRC/HWY/32 16.03.20 8700 9650 BHS 950.000 950.00 IPC-2
8 RRC/HWY/49 06.06.20 9650 10000 BHS 350.000 350.00 IPC-2
9 RRC/HWY/52 15.06.20 10000 10750 BHS 750.000 750.00 IPC-2
10 RRC/HWY/46 04.06.20 10750 11500 BHS 750.000 750.00 IPC-2
11 RRC/HWY/41 20.03.20 11500 12300 BHS 800.000 800.00 IPC-2
12 RRC/HWY/40 19.03.20 12300 12900 BHS 600.000 600.00 IPC-2
13 RRC/HWY/43 21.03.20 12900 13200 BHS 300.000 300.00 IPC-2
14 RRC/HWY/51 13.06.20 13600 14000 BHS 400.000 400.00 IPC-2
Total Quantity in M 13120.00
Total Quantity in KM 13.120
Paid in previous Bill 5.340
Balance to be paid in this bill 7.780
Ministry of Road Transport & Highways
CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-MORDONGRI-
UMRETH- KHIRSADOH ROAD EPC MODE

A-Reconstruction/New Intermediate lane with hard shoulder


Unit of measurement is linear. Payment of each stage shall be made on pro-rata basis on completion
of a stage in full length or 3 Km length whichever is less.(CRM)

Chainage
Quantity
S.No. RFI No Date From To Side Length (M) Remarks
(M)
(Km) (Km.)

Quantity upto IPC 01 (Mtr.) 3380.00

Quantity upto IPC 01 (KM) 3.38

1 RRC/HWY/27 13.03.20 0 640 BHS 640.000 640.00 IPC-2

2 RRC/HWY/21 01.03.20 1160 1600 BHS 440.000 440.00 IPC-2

3 RRC/HWY/22 03.03.20 4980 5380 BHS 400.000 400.00 IPC-2

4 RRC/HWY/24 11.03.20 5420 6150 BHS 730.000 730.00 IPC-2

5 RRC/HWY/35 17.03.20 6150 6780 BHS 630.000 630.00 IPC-2

6 RRC/HWY/29 14.03.20 6780 7350 BHS 570.000 570.00 IPC-2

7 RRC/HWY/31 15.03.20 7350 7900 BHS 550.000 550.00 IPC-2

8 RRC/HWY/39 19.03.20 9100 9500 BHS 400.000 400.00 IPC-2

9 RRC/HWY/50 10.06.20 9500 9850 BHS 350.000 350.00 IPC-2

10 RRC/HWY/54 21.06.20 9850 10300 BHS 450.000 450.00 IPC-2

11 RRC/HWY/55 24.06.20 10900 12500 BHS 1600.000 1600.00 IPC-2

12 RRC/HWY/45 01.06.20 12500 13200 BHS 700.000 700.00 IPC-2

Total Quantity in M 10840.00

Total Quantity in KM 10.84

Paid in previous Bill 3.38

Balance to be paid in this bill 7.46


Ministry of Road Transport & Highways
CONSTRUCTION OF UMRANALA-MOHKHED-SAWRI-MUJAWAR-
MORDONGRI-UMRETH- KHIRSADOH ROAD EPC MODE
Proposed Payment Mode
D- Reconstruction/New,Culverts on existing Road: HPC

Cost of Each completed culverts shall be determined prorata with respect to the total number
of culverts.
S. Type of
Chainage Row/ Size Construction Type Side Total
No Structure
New Construction
Total Nos. of Structure up to IPC - 01 (Nos.) 6.00
1Row X 1000 mm with
1 0+005 Pipe Culvert Encasing Reconstruction BHS 1.00

2 4+310 Pipe Culvert 1Row X 1000 mm Reconstruction BHS 1.00

3 6+230 Pipe Culvert 2Row X 1000 mm Skew Reconstruction BHS 1.00

4 6+600 Pipe Culvert 2Row X 1000 mm Skew Reconstruction BHS 1.00

5 7+300 Pipe Culvert 3Row X 1000 mm Reconstruction BHS 1.00

6 7+500 Pipe Culvert 1Row X 1000 mm Reconstruction BHS 1.00

7 9+860 Pipe Culvert 2Row X 1000 mm Reconstruction BHS 1.00

8 13+580 Pipe Culvert 2 Row X 1000 mm Reconstruction BHS 1.00

Grand Total 14.00

Paid in previous Bill 6.00

Done structure for this Bill 8.00


National Highways Authority of India

Four Laning of Hassan (Existing Km 189+700, Design Ch 184+912) to Maranahally (Existing Km 237+000, Design Ch 230+060)
section of NH-75 (Old NH No-48) under NHDP Phase-IV on EPC Mode in the state of Karnataka

Proposed Payment Mode


IV Other works
Scope for Billing Schedule
Sl No Particulars From To Length in Side Stage Payment
Km
(xiii) Retaining Wall
1 206.00 206.50 1.000 Both
2 217.00 219.50 5.000 Both
3 220.12 220.30 0.360 Both
4 220.52 221.53 1.010 LHS
5 221.53 221.64 0.220 Both
6 211.64 221.87 0.230 LHS
7 221.87 221.97 0.200 Both
8 221.97 222.80 0.830 LHS
9 222.93 222.98 0.050 LHS
10 222.98 223.14 0.310 Both Unit of measurement is linear length.
11 223.14 224.04 0.900 LHS Payment shall be made on pro rata basis on
completion of a stage in a length of not less
12 224.04 224.11 0.140 Both than 10% (ten per cent) of the total length.
13 224.11 224.74 0.635 LHS Stage Payment 1.665 Km
14 224.74 224.88 0.280 Both
15 224.88 225.88 0.995 LHS
16 226.05 226.32 0.270 LHS
17 226.32 226.52 0.400 Both
18 226.52 229.22 2.705 LHS
19 229.22 229.37 0.300 Both
20 229.37 229.85 0.480 LHS
21 229.85 229.98 0.260 Both
22 229.98 230.06 0.080 LHS
16.655 0.016655
(xiv)Breast Wall
1 219.50 220.12 1.240 Both
2 220.30 220.52 0.440 Both
3 220.52 221.53 1.010 Hill Side
4 221.64 221.87 0.230 Hill
5 221.97 222.80 0.830 Hill
6 222.80 222.93 0.260 Both Unit of measurement is linear length.
7 222.93 222.98 0.050 Hill Payment shall be made on pro rata basis on
8 223.14 224.04 0.900 Hill completion of a stage in a length of not less
than 10% (ten per cent) of the total
9 224.11 224.74 0.635 Hill length.Stage Payment 1.04Km
10 224.88 225.88 0.995 Hill
11 225.88 226.05 0.340 Both
12 226.05 226.32 0.270 Hill
13 226.52 229.22 2.705 Hill
14 229.37 229.85 0.480 Hill
15 229.98 230.06 0.080 Hill
10.465
National Highways Authority of India

Four Laning of Hassan (Existing Km 189+700, Design Ch 184+912) to Maranahally (Existing Km 237+000, Design Ch 230+060)
section of NH-75 (Old NH No-48) under NHDP Phase-IV on EPC Mode in the state of Karnataka

Proposed Payment Mode


IV Other works
Scope for Billing Schedule
Sl No Particulars From To Length in Side Stage Payment
Km

Payment shall be made on pro rata basis for


(xv)ATMS 1.000
completed Items

(xvi) Miscellaneous 45.15 Payment shall be made on pro rata basis for
items completed Items

Payment shall be made on pro rata basis for


(xvii) Electrical Works 1.40
completed Items

(xviii) FOB

(xix) Site Clearance 198.61 Payment shall be made on pro rata basis for
completed Items

(xx) Rain water Payment shall be made on pro rata basis for
45.00
Harvesting completed Items

Sub Total IV
Price Adjustment for Labour
S.No RW Month PL LI Lo 0.85*RW*(PL*(LI-LO)/LO)

1 15406134.73 Oct-17 20% 300 285 137844.363376175

4 137844
Price Adjustment-Summary
S.No Description Month Amount Remarks

1 Price Adjustment for Labour Oct-17 137844


2 Price Adjustment for Labour Nov-17 0
3 Price Adjustment for Cement Oct-17 #REF!
4 Price Adjustment for Cement Nov-17 #REF!
5 Price Adjustment for Fuel & Lubricants Oct-17
6 Price Adjustment for Fuel & Lubricants Nov-17
7 Price Adjustment for Other Materials Oct-17 #REF!
8 Price Adjustment for Other Materials Nov-17 #REF!
9 Price Adjustment for Plant & Machinary Oct-17 #REF!
10 Price Adjustment for Plant & Machinary Nov-17 #REF!
11 Price Adjustment for Steel -
12 Price Adjustment for Steel -
Total Amount= #REF!
CHECK LIST FOR IPC - 02
CONSTRUCTION OF AMARWARA - RAMGARH ROAD EPC MODE.

(Agreement No. - 04/CRF/2019-2020)


M/s. RAJARAM CONSTRUCTION, JALORE (RAJ.)

Submitted/
S.No. Particulars Remarks
Not Submitted

1 Work Programme

(i) Initial Submitted

(ii) Revised (90 Day) -

2 Approved Grade Line duly signed by sub Engg/SDO/EE/Contractor Yes

3 X-Section duly signed by Sub Engg./SDO Yes

4 CRC Origional Attested by SDO/Sub Engg. NA

5 Quality Control Register Yes

6 Quality Abstract Yes

7 Photography -

(i) Before Start of Work Yes

(ii) Midway in the Execution -

(iii) After Completion of the work NA

8 Mining Clearance Certificate of Mining Department -

9 Checking of SDO/EE Yes

10 All Expenditure with in A & F Yes


11 Prorata Progress :

Executive Engineer
PWD Div., Chhindwara
IPC-01 IPC-02
S.No. RFI Date S.No. RFI Date

1 RRC/HWY/20 20.02.2020 1 RRC/HWY/20 20.02.2020


2 RRC/HWY/16 15.02.2020 2 RRC/HWY/16 15.02.2020
3 RRC/HWY/15 13.02.2020 3 RRC/HWY/15 13.02.2020
4 RRC/HWY/13 12.02.2020 4 RRC/HWY/13 12.02.2020
5 RRC/HWY/11 12.02.2020 5 RRC/HWY/11 12.02.2020
6 RRC/HWY/03 08.02.2020 6 RRC/HWY/03 08.02.2020
7 RRC/HWY/02 06.02.2020 7 RRC/HWY/02 06.02.2020
8 RRC/HWY/01 05.02.2020 8 RRC/HWY/01 05.02.2020
9 RRC/HWY/06 10.02.2020 9 RRC/HWY/06 10.02.2020
10 RRC/HWY/08 11.02.2020 10 RRC/HWY/08 11.02.2020
11 RRC/HWY/09 11.02.2020 11 RRC/HWY/09 11.02.2020
12 RRC/HWY/18 17.02.2020 12 RRC/HWY/18 17.02.2020
13 RRC/HWY/21 22.02.2020 13 RRC/HWY/21 22.02.2020
14 RRC/HWY/17 18.02.2020 14 RRC/HWY/17 18.02.2020
15 RRC/HWY/14 13.02.2020 15 RRC/HWY/14 13.02.2020
16 RRC/HWY/12 14.02.2020 16 RRC/HWY/12 14.02.2020
17 RRC/HWY/05 11.02.2020 17 RRC/HWY/05 11.02.2020
18 RRC/HWY/04 09.02.2020 18 RRC/HWY/04 09.02.2020
19 RRC/HWY/07 12.02.2020 19 RRC/HWY/07 12.02.2020
20 RRC/HWY/10 13.02.2020 20 RRC/HWY/10 13.02.2020
21 RRC/HWY/19 20.02.2020 21 RRC/HWY/19 20.02.2020
PRICE ESCALATION DETAIL OF RATES SEARCH BY FOLLOWING SITES

S. No. Site Item P E Bill Name

1 Office of the economic advisor All Commodities Other Materials

2 Office of the economic advisor HSD Fuel & Lubricants

Angle, Channels,Sections, Steel


3 Office of the economic advisor (Coated/not) Steel

Manufacturer of mining quarrying and


4 Office of the economic advisor construction Plant & Machinery

5 Office of the economic advisor Ordinary Portland Cement Cement

6 Labour Bureau For Chhindwara Labour


M/s. RAJARAM CONSTRUCTION, JALORE (RAJ.)
ABSTRACT OF QUALITY CONTROL TEST
Project :Amarwara - Ramgarh Road KM 20.22 Under CRF ( EPC Mode)
Bill No. : IPC-02
Executed No. of Test
S. No. Particular's Frequency
Quantity
Unit
Required
No. of Test Done Remark

7.78 Km @3000 Cum Av, Qty


1 Earthwork up to top of the sub-grade
Per KM
23340.00 Cum.

In Lab
A Atterberg Limit 2 Test per 3000 Cum 16 15

B MDD 2 Test per 3000 Cum 16 15

C CBR 1 Test per 3000 Cum 8 8

D Free Swell Index As per required 0 9

E Grain size analysis 2 Test per 3000 Cum 16 16

AT Site
A Moisture Content Prior To Compaction 1 Set Test Per 500 Sqm 85113.20 Sqm. 170 225

Field Density of Compacted Layers


B
Embankment
10 Pit Every per 3000 Sqm 85113.20 Sqm. 28 45

Total 253 333

2 Sub-Base-Course (CRM) 10623.04 Cum.

In Lab 81612.40 Sqm.

A Sieve Analysis 1 Test per 200 Cum 53 50

B Aggregate Impact Value 1 Test per 1000 Cum 11 9

C Flakiness & Elongation Index 1 Test per 500 Cum 21


ABSTRACT OF QUALITY CONTROL TEST
Project :Amarwara - Ramgarh Road KM 20.22 Under CRF ( EPC Mode)
Bill No. : IPC-02
Executed No. of Test
S. No. Particular's Frequency
Quantity
Unit
Required
No. of Test Done Remark

D MDD As per required 0 0

E Water Absorption As per required 0 0

F Atterberg Limit 1 Test per 200 Cum 53 10

AT Site
A Density of Compacted Layer 1 Set of 3 Test per 1000 sqm 82 71

Total 220 140


Cum
3 New Culverts HPC 8 No. Culverts 340.00 (About)

In Lab

A Sieve Analysis for Coarse Aggregate 1 Test per Source / Per Day 2 20

B Sieve Analysis for Fine Aggregate 1 Test per Source / Per Day 2 9

C Water Absorption 1 Test per Source 1

D Aggregate Impact Value As per required 1 1

E Flakiness & Elongation Index As per required 1

F Fineness Modulus of Fine Aggregate 1 Test per Source 1 9

G Compressive Strength of Concrete 1 Set Test Per 10 Cum 35 34

Total 43 73
Grand Total 516 546
M/s. RAJARAM CONSTRUCTION, JALORE (RAJ.)
ABSTRACT OF QUALITY CONTROL TEST
Project :Amarwara - Ramgarh Road KM 20.22 Under CRF ( EPC Mode)
Bill No. : IPC-02
Executed No. of Test
S. No. Particular's Frequency
Quantity
Unit
Required
No. of Test Done Remark

1 Earthwork up to top of the sub-grade 6436.45 Cum.

In Lab
A Atterberg Limit 2 Test per 3000 Cum 4 4

B MDD 2 Test per 3000 Cum 4 4

C CBR 1 Test per 3000 Cum 2 2

D Free Swell Index As per required 4 4

E Grain size analysis 2 Test per 3000 Cum 4 4

AT Site
Field Density of Compacted Layers
B
Subgrade
10 Pit Every per 2000 Sqm 28000.00 Sqm. 16 16

Total 34 34
Cum
2 New Culverts :- Slab Culvert 1 No. 403.63 (About)

In Lab

A Sieve Analysis for Coarse Aggregate 1 Test per Source 10 10

B Sieve Analysis for Fine Aggregate 1 Test per Source 10 10

C Water Absorption 1 Test per Source 1 1


ABSTRACT OF QUALITY CONTROL TEST
Project :Amarwara - Ramgarh Road KM 20.22 Under CRF ( EPC Mode)
Bill No. : IPC-02
Executed No. of Test
S. No. Particular's Frequency
Quantity
Unit
Required
No. of Test Done Remark

D Aggregate Impact Value As per required 1 1

E Flakiness & Elongation Index As per required 1 1

G Compressive Strength of Concrete 1 Set Test Per 10 Cum


403.63
41 41

Total 64 64
Cum
2 New Culverts :- HPC 10 No. Culverts 290.00 (About)
In Lab
A Sieve Analysis for Coarse Aggregate 1 Test per Source 12 12

B Sieve Analysis for Fine Aggregate 1 Test per Source 12 12


C Water Absorption 1 Test per Source 1 1
D Aggregate Impact Value As per required 1 1
E Flakiness & Elongation Index As per required 1 1
G Compressive Strength of Concrete 1 Set Test Per 10 Cum 403.63 41 41
Total 68 68