CONTRACTORS BILL ABSTRACT

Company Hubtown Limited.

Name of the Contractor JRD Enterprises.

Nature of work Construction of residential bldg no. 2 at chunabhatti.

Name of the project PWD Printing Press

Name of the Block / Bldg. Building No. 2

Work order reference HTL/80193(Contracts)/PWD-CBT/CA/05/2018 Contract Value : 98,864,464

Amended work order ref (if


any)

R.A. Bill no. : RA-09 % Complete 84% Dated 05.08.2023

MATERIAL LABOUR Extra Item Total

Amount (Rs.) Amount (Rs.) Amount (Rs.) Amount (Rs.)

Actual Bill Value (A) 82,561,789

Add: SGST 9% 7,430,561

Add: CGST 9% 7,430,561

Add: Service Tax @

Gross Bill Amount (B) 97,422,911


Deductions
Percentage
Retention @ 5%

TDS & Surchage @ on (B)

VAT deduction on (A)

Advance / previous payment made vide RAR

Other deductions (if any)

Total Deductions

Balance due Rs.


(B-C)
Amount certified for payment Rs.
Amount in words Rupees:

Bill Certified by (Name) Rupali Sawant. Sign


Advance Checked by
Sign
(Name)
Payment Sanctioned by
Sign
(Name)
Notes:

Bill must be raised only on the letter head which must boldly display PAN no., VAT no., Service Tax no., PF no. Labour license no.
Please note if the Bill is composite ie. Inclusive of material and labour then VAT and Service tax figure must be shown in last
column.
Ackruti Trade Centre, Road No.7, Marol MIDC, Andheri (E), Mumbai - 400 093
Tel.: 6677 2301 Fax : 2821 8230 Email: hubtown@hubtown.co.in
BILL MOVEMENT SHEET
SITE:- Chunabhatti PWD BILL NO :- Ra-09 DATE :- 05/08/2023
Construction of residential bldg no. 2 at
WORK/LOCATION :-
CONTRACTOR :- JRD Enterprises. chunabhatti.
Targeted Progress Achieved Progress as
W.O Value (A) (Costwise) as per on contractor bill date Difference D= (B-C) % Difference
schedule (B) (C)

SITE DATA POST NAME SIGN


DATE OF BILL (AS PER CONTRACTOR) 19.07.2023 SITE ENGG Rupali Sawant.
CUMULATIVE AMOUNT CLAIMED BY CONTRACTOR WITHOUT TAXES
INCLUDING ADVANCES & DEDUCTING HOLD/DEBITS 84,426,900
Site Remarks :-
CURRENT BILL AMOUNT AS PER CONTRACTOR WITHOUT TAXES
INCLUDING CURRENT ADVANCES & DEDUCTING CURRENT
HOLD/DEBITS 21,371,990
DATE OF BILL RECEIVED AT SITE 19.07.2023
SITE CERTIFIED CUMULATIVE AMOUNT WITHOUT TAXES INCLUDING
ADVANCES & DEDUCTING HOLD/DEBITS 82,561,789
SITE CERTIFIED CURRENT AMOUNT INCLUDING CURRENT ADVANCES &
DEDUCTING CURRENT HOLD/DEBITS 19,506,878
DATE OF BILL FORWARDED FROM SITE 05.08.2023
H.O/NODAL BILLING DATA POST NAME SIGN
DATE OF BILL RECEIVED BILLING ENGG

H.O/NODAL CERTIFIED CUMULATIVE AMOUNT WITHOUT TAXES SR BILLING ENGG/


INCLUDING ADVANCES & DEDUCTING HOLD/DEBITS NODAL INCHARGE

H.O/NODAL CERTIFIED CURRENT AMOUNT WITHOUT TAXES


INCLUDING CURRENT ADVANCES & DEDUCTING CURRENT
HOLD/DEBITS
DATE OF BILL FORWARDED TO ACCOUNTS
ACCOUNTS DATA POST NAME SIGN
DATE OF BILL RECEIVED ACCOUNTS OFFICER
CERTIFIED AMOUNT INCLUDING TAXES ACCOUNTS MANAGER
PAYABLE AMOUNT Accounts Remarks :-
CHEQUE PREPARED/PUT UP FOR SIGNING DATE
Accounts Remarks :-

CHEQUE DELIVERED TO PARTY DATE


To,
The Project in Charge ###
Hubtown Limited.
Chunabhatti

Project Name PWD Residential Building at Chunabhatti GST No.


Building Building-II Pan No
Bill No. R.A. 9th
W.O.No. HTL/80191/E-8 (Contracts)/PWD-CBT/CA/5/2018
Nature of work Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai

Dear Sir,
Please find enclosed here with RA Bill 9th Amounting Rs. 2,52,18,948/- ( Including Tax.) for above
mentioned work for early passing and payment.

Thanking You,

(Authorized Signatury & Stamp)

Bill Recived By Bill Certified By


Name Name
Date Date

Remark :
Note :

" I / We hereby certify that my/our regestration certificate under the Maharashrta Value Added Tax Act,2002
is in force on the date on which sale of the goods specified in this Tax invoice is made by me/us and that
trasaction of sale covered by Tax invoice has been effected by me/us and it shall be accounted for in the
turnover of sale while filling of returns and the due tax, if any, payable on the sale has been paid or shall be
unpaid.
JRD ENTERPRISES
PROFORMA INVOICE

NAME OF CompanyHubtown Ltd. INVOICE NO :


Plaza Panchsheel, "A" wing, 5th Floor, INVOICE DATE :
ADDRESS : 501 Hughes Road, Behind Dharam Palace, STATE LOCATION : Maharashtra
Grant Road (W), Mumbai - 400 007 STATE CODE : 27
GSTIN : 27AAACA6101D1ZE State Code 27 PLACE OF SUPPLY / Maharashtra
service :

PROJECT NAME : PWD Rsidential buildig at Chunabhatti.


W.O. No. / Date : HTL/80191/E-8 (Contracts)/PWD-CBT/CA/5/2018
W.O. Value : 98,864,464.00 Rs.
Nature of Work : Construction of Bldg. No. 2 (Stilt + 10 Floor) at Chunabhatti, Mumbai

Name of Block/Bldg :Building No. 2

R.A. Bill No : 9th

% completed 84%

Sr. No. Name of Services HSN/SAC Code Cummulative Present Value


Value Previous Value
Construction services of single
1 dwelling or multi dewlling or multi- 995411 82,561,789 63,054,911 19,506,878
storied residential buildings
Construction of Building no. 2
Less : Discount / Abatement -

Taxable Value 19,506,878.41

Add : CGST @9% 1,755,619.06

add : SGST @ 9% 1,755,619.06

Total Amount 23,018,117

Two Crore Fifty Two Lakh Eighteen Thousand Nine Hundred Forty Eight rupees Only

PAN NO : APFPJ4321M For JRD ENTERPRISES


GSTIN : 27APFPJ4321M
PF No. : THTHA1049810
ESIC No. : 34000309930001009
Labour Licence No. Authorised Signatory
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Bill No: 9th RA 19,506,878.41
Residential Quarters BLDG -II
Drawing No- II-03

Abstract
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
SUB STRUCTURE
Backfilling with available excavated earth in regular horizontal layers not
exceeding 200 mm in depth.  Each layer shall be watered, rammed and
consolidated including neat dressing of top & sides of the filling complete
to the satisfaction of Engineer-in-charge approved drg. shall be
1 considered for the area of excvation and vertical depth as per the level 910 910.00 910.00 Cum 150 136,500 136,500.00 - 136,500
shall be considered. For depth 0.00 - 4.00 m,
Royalty will be born by Contractor

Backfilling with material brought from outside in regular horizontal


layers not exceeding 200 mm in depth.  Each layer shall be watered,
2 rammed and consolidated including neat dressing of top & sides of the 773 772.80 772.80 Cum 350 270,480 270,480.00 - 270,480
filling complete to the satisfaction of Engineer-in-charge.

Providing & laying in position approved RMC including vibrating,


compaction, curing etc. excluding cost of centering, shuttering and
reinforcement but including pumping arrangement for all the elements
3 where reinforced cement concrete is proposed to be used up to all level - 0 0.00 0.00 Cum 6,500 - - - -
depths /  heights etc. complete upto plinth level . For M15 GradeRMC -
Basic rate - Rs. 4525 cum + GST

Providing & laying in position approved RMC including vibrating,


compaction, curing etc. excluding cost of centering, shuttering and
reinforcement but including pumping arrangement for all the elements
4 where reinforced cement concrete is proposed to be used up to all level - 136 135.83 135.83 Cum 6,700 910,061 910,061.00 - 910,061
depths /  heights etc. complete upto plinth level.For M20 Grade
Concrete Basic Rate - 4700 / cum

5 Coat of Coal tar for exposed surface of pile caps. Make Tiki tar. 926 926.24 926.24 Sqm 90 83,362 83,361.60 - 83,362
Providing and injecting pre-constructional anti-termite treatment as per
IS:6313 (Part-II) to the RCC members in immediate contact with soil
upto a min depth of 500 mm measured from made up ground level by
treating all four sides at the rate of 7 Lit/Sqm of an emulsion in water of
0.5 % Chloripyrofos 20 EC or equivalent, treating the top surface of
plinth filling and the external peripheri of the building by drilling the
holes up to 75 mm deep at 150 mm c/c distance bothways using 12 mm
6 396 396.47 396.47 Sqm 75 29,735 29,735.25 - 29,735
diams rod on the surface to facilitate saturation of the soil with the
chemical emulsion at the rate of 5 Lit/Sqm of surface area of an emulsion
in water of 0.5 % Chloripyrofos 20 EC or equivalent. The contractor shall
furnish 10 years guarantee for termite free structure. (Plan area at ground
floor level shall be measured for payment.)
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
Providing & doing 230mm thick dry rubble stone soling, voids filled with
stone chips and with screened murrum / sand shingles including hand
7 packing and compaction with mechanical vibratory compactor complete 140 140.00 140.00 Cum 1,425 199,500 199,495.73 - 199,496
as per the direction of Engineer-in-charge.

Providing, centering, shuttering and strutting using 12mm thick plastic


coated plywood of  approved quality, shuttering, propping, edging,
bracing, including applying of shuttering oil, nails, tie rods and any other
material required for formwork for reinforcement cement concrete work
8 as per specification at all locations and levels with conventional 1500 1500 1500.00 Sqm 500 750,000 750,000.00 - 750,000
formwork system &deshuttering after completion of curing period of
concrete & cleaning the entire surface etc complete. (Upto a height of
3.05 mtr.)

Providing, straightening, cutting, bending, reinforcement steel of grade


Fe-500 conforming to IS 1786 to correct shape and size required for
piling work, binding with 18 gauge annealed GI binding wire and placing
9 in position including providing and fixing PVC cover block or approved 97 97.28 97.28 MT 65,000 6,323,200 6,323,200.00 - 6,323,200
concrete cover blocks of same grade as of concrete etc. complete as
directed by Engineer-in-charge. Basic Rate of Steel Rs. 42 / kg

Providing & applying CPCC ( Cement Polymer Composite coating)


treatment   to MS/HYSD  Reinforcement Bar with properly brushing the
10 rust  & applying the necessary Coat. ( Considering temporary shed & 97 97.28 97.28 MT 6,250 608,000 608,000.00 - 608,000
shifting of steel )

SUPER STRUCTURE 0.00 - - - -


Providing & laying in position approved RMC M-30 grade including
vibrating, compaction, curing etc. excluding cost of centering, shuttering
and reinforcement for all the elements where reinforced cement concrete 0
1 2395 0.00 Cum. 7,150 - - - -
is proposed to be used up to all level heights etc. complete
Basic rate of M-30 - Rs. 5050 / cum. Stilt to OHT & LMR

Providing, centering, shuttering and strutting using 12mm thick plastic


coated plywood of approved quality, shuttering, propping, edging,
2 bracing, including applying of shuttering oil, nails, tie rods and any other 18148 9821 6450.97 16271.97 Sqm 510 9,255,480 5,008,710.00 3,289,996.87 8,298,707
material required for form work for reinforcement cement concrete work
as per specification at all locations and levels with conventional
formwork system &deshuttering after completion of curing period of 3289996.8675
Providing,
concrete &straightening,
cleaning the cutting, bending,
entire surface etc reinforcement
complete. Stiltsteel
to of
OHTgrade
&
Fe-500
LMR conforming to IS 1786 to correct shape and size required for all
RCC work, binding with 18 gauge annealed GI binding wire and placing
in position including providing and fixing PVC cover block or approved
3 concrete cover blocks of same grade as of concrete etc. complete as 510 393 42.14 435.1378 MT. 65,500 33,405,000 25,741,500.00 2,760,023.33 28,501,523
directed by Engineer In Charge. Note: Scrap material shall be the
property of contractor and credit / discount for the same to be considered
in the quoted rate. (Basic Rate Rs. 42 Per Kg) Stilt to OHT & LMR
2760023.330524
Providing & applying CPCC ( Cement Polymer Composite coating)
treatment   to MS/HYSD  Reinforcement Bar with properly brushing the
4 rust  & applying the necessary Coat. ( Considering temporary shed & 510 393 42.14 435.14 MT. 6,250 3,187,500 2,456,250.00 263,361.00 2,719,611
shifting of steel )
263361.0048209
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
Providing and constructing half brick 115mm thick masonry with brick
having minimum compressive strength 35kg /cm2 in cement mortar 1:4,
10 mm thick joints including 100 mm thick small concrete beam of M-20
grade with 2 Nos. 8 mm dia bars longitudinally along the length of the
5 wall, one at the floor level and the other at 1.50 m from the floor level 0 0 0.00 Sqm 735 - - - -
including striking out joints, scaffolding, watering. No additional
payments for the Concrete bands but paid as brick work. Stilt to OHT &
LMR

Providing and constructing 150 mm thick masonry with brick having


minimum compressive strength 35kg /cm2 in cement mortar 1:4, 10 mm
thick joints including 100 mm thick small concrete beam of M-20 grade
with 2 Nos. 8 mm dia bars longitudinally along the length of the wall at
6 633 633.48 633.48 Sqm 875 554,295 554,291.62 - 554,292
floor level including striking out joints, scaffolding, watering. No
additional payments for the Concrete bands but paid as brick work. Stilt
to Terrace

Providing & Constructing brick work 230 mm in CM 1:6 using standard


bricks locally available with  compressive strength not less than 35 kg /
cm2  well soaked in water, in true line, level, plumb, with all courses laid
truly horizontal in English bond having fully filled 10mm mortar joints,
and also laying 100 mm thick small concrete beam of M - 20 grade with 2
nos. 8 mm dia. bars longitudinally along the length of the walls at the
7 floor level and all vertical joints shall be truly vertical (in alternate 108 107.84 107.84 Cum 5,700 614,677 614,674.74 - 614,675
course)  including raking of joints,  necessary scaffolding, finishing,
curing, etc. at all heights complete as per the direction of the Engineer in
charge. For 230 mm or more thick brick work. Stilt to Terrace

Providing and Fixing of CP teak wood door frames of different sizes and
profiles as per drawings with 3 nos. on each side M.S. hold fast made of 3
mm x 30 mm flat iron and 400 mm long black paint coated, fixed to
frame with 10 mm dia. bolts, nuts and wooden plugs and embedded in
PCC 1:3:6 block of size 300x 115 x150 mm in position or fixing with 100
mm long and 10 mm dia. dash through bolts on sides abutting of RCC
8 column including applying coal tar on concealed surfaces and primer coat 8 0 0.00 Cum 142,000 1,136,000 - - -
on frame, smooth finished as per requirement of developer, including cost
of shuttering and deshuttering,curing of concrete block etc. complete.
Basic Rate - Rs. 2600.00 per cft. Stilt to 10th Floor

Providing and applying 12mm-15mm thick single coat internal cement


plaster with Neeru finish in cm 1:4 in true line, level and plumb,
including surface cleaning and dampening, including providing & fixing
of fiber mesh 300mm wide at the junctions of RCC & masonry structure
9 with minimum 75mm overlaps all the necessary scaffolding, curing, 12488 406.74 406.74 Sqm 350 4,370,800 142,359.00 - 142,359
cleaning of floor from mortar dropouts etc. complete to the satisfaction of
the Engineer-in-charge. Stilt to 10th Floor
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
Providing & applying 20 mm thk sand faced cement plaster in two coats
on external surfaces under layer 12mm cement plaster in cm (1:4) and top
layer 8 mm thk cement plaster in cement mortar (1:3) including providing
& mixing of water-proofing compound in base coat @ 2 % on cement
content or as pecified by the manufacture with all necessary scaffolding,
10 curing making band, grooves, curves, drip moulding, edge including 12741 0 0.00 Sqm. 650 8,281,650 - - -
providing & fixing of fiber mesh at the junctions of RCC & masonry
structure after filling the joints properly etc complete at all heights levels
& location to the satisfaction of the Engineer-in-charge.

Providing waterproofing plaster internally on top of bottom slab, walls,


soffits of roof?s slab and hunching including cement grouting at pressure
0.2 kg/cm2 , in water proof cement mortar(1:3) (1 part cement : 3 part
sand) 20 mm thick with water proofing compound such as CICO,
11 IMPRMO or equivalent in proportions as specified by manufacturer 53 0 0.00 Sqm 2,250 119,250 - - -
including curing, and IPS 40 mm at bottom, testing for water tightness by
filling the tank with water, etc. complete for over head water tank. (For
OHT)

(Treatment to carry 10 years guarantee on Rs. 200 stamp paper.Security


deposit of 10% of waterproofing works amount will be kept FD for 10
years in the joint name of the contractor and the developer and the same 0 0.00 - - - -
will be released after satisfactory completion of guarantee period).

(Mode of measurement : Plan area in between walls shall be measured for


0 0.00 - - - -
payment)
Providing and laying integral cement based waterproofing treatment
12 including preparation of surface as required for treatment of 475 0 0.00 Sqmt 1,250 593,750 - - -
roofs,balconies,terraces etc. consisting of following operations:
a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement
admixed with waterproofing compound conforming to IS 2645 and
approved by Engineer-in-charge over the RCC slab including adjoining 0 0.00 - - - -
walls upto 300mm height including cleaning the surface before treatment.

b) Laying brick bats with mortar using broken bricks/brick bats 25mm to
115mm size with 50% of cement mortar 1:5 ( 1 cement : 5 coarse sand)
admixed with water proofing compound conforming to IS :2645 and
approved by Engineer-in-charge over 20mm thick layer of cement mortar
of mix 1:5 ( 1 cement : 5 coarse sand) admixed with water proofing
compound conforming to IS : 2645 and approved by Engineer-in-charge 0 0.00 - - - -
to required slope and treating similarly the adjoining walls upto 300 mm
height including rounding of junctions of walls and slabs. 

c) After two days of proper curing applying a second coat of cement


slurry using 2.75kg/Sqm of cement admixed with waterproofing
compound conforming to IS:2645 and approved by Engineer-in-charge. 0 0.00 - - - -
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
d) Finishing the surface with 20 mm thick jointless cement mortar of mix
1:4  admixed with waterproofing compound conforming to IS:2645 and
approved by Engineer-in-charge including laying glass fibre cloth of
approved quality in top layer of plaster and finally finishing the surface 0 0.00 - - - -
with trowel with neat cement slurry and making pattern of 300x300 mm
square 3mm deep.

e) Providing & laying the flooring of broken china-mosaic (broken pieces


of china glazed tiles) of approved colour set in 25mm, average bed of
cement mortar 1:3 with waterproofing compound to correct level and
slope (1:100) well compacted and finished; such that minimum coverage
of china mosaic chips is about 90% of the total area of slab.  the above
treatment shall continue along the inner side of parapet or the adjoining 0 0.00 - - - -
wall upto 30cm. high as per the above specifications regarding cement
mortar in shape of round vata with necessary groove etc. complete. Plan
area shall be measured for the payment.

f) The whole terrace so finished shall be flooded with water for a


minimum period of two weeks for curing and for final test. All above
operations to be done in order and as directed and specified by the 0 0.00 - - - -
Engineer-in-charge with average thickness of 120mm and minimum
thickness at khurra as 65 mm.

(Mode of measurement shall be plane area of terrace inside the parapet


0 0.00 - - - -
walls)
(Treatment to carry 10 years guarantee on Rs. 200 stamp paper.Security
deposit of 10% of waterproofing works amount will be kept FD for 10
years in the joint name of the contractor and the developer and the same 0 0.00 - - - -
will be released after satisfactory completion of guarantee period).

Pile Chipping more including removal of material obtained from


chipping& disposal at the authorised municipal dumping ground etc. all
13 complete as per the direction & to the satisfaction of Engineer-In-charge. 140 139.66 139.66 Cum 2,500 349,155 349,155.00 - 349,155

Contractor's Order Sheet - 2 (Qty Deviation & Extra Items) 0.00 - - - -


1 Sub-structure - Providing & laying in position approved RMC including
vibrating, compaction, curing etc. excluding cost of centering, shuttering
and reinforcement but including pumping arrangement for all the
elements where reinforced cement concrete is proposed to be used up to 740 740.42 740.42 Cum 8,160 6,041,827 6,041,827.20 - 6,041,827
all level - depths /  heights etc. complete upto plinth level. M-30 Grade

2 Super-structure - Providing & laying in position approved RMC


including vibrating, compaction, curing etc. excluding cost of centering,
shuttering and reinforcement but including pumping arrangement for all
the elements where reinforced cement concrete is proposed to be used up 2491 1339.06 695.25 2034.31 Cum 8,600 21,426,178 11,515,937.63 5,979,144.39 17,495,082
to all level - depths /  heights etc. complete upto plinth level. M-40
Grade
5979144.3885
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
3 Excavation in all types of soil except hard rock (Gravel, sand, soft and
hard murrum, soft rock and boulders) by manual means over the areas
for Pile cap and plinth beams including dressing of sides, getting out the
excavated soil and disposal at authorised Municipal ground, including
necessary shoring, de-watering as required etc complete as directed by
Engineer-in-charge. The quantity of earth required for backfilling should
be stacked at site as per the direction of Engineer-in-charge.  (Mode of 910 839.24 839.24 Cum 750 682,500 629,430.00 - 629,430
measurement: Actual area of excavation shall be considered). The
earthwork required for the backfilling should be stacked at site as per the
directions of Engineer-in-charge.

4 Carting away debris / muck out of premises to approved BMC dumping


yard etc. all complete as per direction & to the satisfaction of Engineer 964 220.28 220.28 Cum 685 660,340 150,891.80 - 150,892
In-charge including royalty charges.
5 Hiring Charges of Submersible water Pump for dewatering in basement
of sale building. (Initially used 20 HP later on 10 HP till from June 18 to
December 18) (Maintenance, any part replacement breakdown etc. of 7 7 7.00 Month 15,000 105,000 105,000.00 - 105,000
motor is in scope of contactor.)
6 Providing Box type cement based Waterproofing treatment for
underground structures at any depth with the followings: For Horizontal
surfaces: a) Providing and laying 25 mm thick Cement Mortar bedding
with CM 1:3 mixed with waterproofing compound confirming to IS 2645.
b)  Providing and laying 18 to 20mm thick rough Shahabad Stone Slab
over the above bed.c) Joints sealed and grouted with Cement Slurry
mixed with Water Proofing Compound  and d) Top Layer  with 25mm 
thick cement Mortar 1:3 mixed with Waterproofing Compound finishing
top with 10-12 mm nominal size Stone Aggregate spreading @ 0.086
Cum/Sqm thoroughly embedded in the Cement  Mortar Testing the water
proofing surface with born dry condition after completion of the 245 210.17 210.17 Sqm 1,206 295,470 253,465.02 - 253,465
structure. Necessary de-watering should be done during the work and
kept dry for 6 hours (minimum) after this work. (Treatment to carry 10
years guarantee on Rs. 200 stamp paper.Security deposit of 10% of
waterproofing works amount will be kept FD for 10 years in the joint
name of the contractor and the developer and the same will be released
after satisfactory completion of guarantee period).

7 Providing Box type cement based Waterproofing treatment for


underground structures at any depth with the followings: For Vertical
Surfaces: a. Providing and fixing 20 mm thick Shahabad Stone Slab on
vertical surface of the structure with Cement Mortar 1:4 with a gap of
min 20mm between the stone slab and receiving surface and joints sealed
with Cement Mortar 1:4. b. Filling the gaps with rich cement slurry. c.
Finishing the exterior surface with cement mortar 1:4 with neat cement 181.24
207 181.24 Sqm 1,200 248,400 217,488.00 - 217,488
punning. Testing the water proofing surface with born dry condition after
completion of the structure.Necessary de-watering should be done during
the work and kept dry for 6 hours    (minimum) after this work.
(Treatment to carry 10 years guarantee on Rs. 200 stamp paper.)
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
Security deposit of 10% of waterproofing works amount will be kept FD
for 10 years in the joint name of the contractor and the developer and the
same will be released after satisfactory completion of guarantee period). 0.00 - - - -

8 Providing & Constructing brick work in CM 1:6 using standard bricks


locally available with  compressive strength not less than 35 kg / cm2 
well soaked in water, in true line, level, plumb, with all courses laid truly
horizontal in English bond having fully filled 10mm mortar joints, and
also laying 100 mm thick small concrete beam of M - 20 grade with 2
nos. 8 mm dia. bars longitudinally along the length of the walls at the 50
50 50.00 Cum 6,200 310,000 310,000.00 - 310,000
floor level and all vertical joints shall be truly vertical (in alternate
course)  including raking of joints,  necessary scaffolding, finishing,
curing, etc. at all heights complete as per the direction of the Engineer in
charge. For 230 mm or more thick brick work.

Negative line - M30 Grade of Superstructure concrete quantity claim in


M40 Grade of Superstruture item , Hence difference of rate between M30
to M40 has been deducted by considering rate as follows; 8160 (for 788.42 695.25 1483.67 Cum -440 - -346903.04 -305909.71 (652,813)
superstructure rate of M30 grade) - 8600 (for superstructure rate of
M40 grade ) Note : Rate approved from Contract team.
-305909.7129
Contractor's Order Sheet - 3 (Qty Deviation & Extra Items) 0.00 - - - -
Providing and Constructing 100 mm thick Light Weight Block
Masonry in proper line, level and plumb at all lifts, heights and leads
having minimum strength of 35 Kg/Sq.cm & water absorption shall not
be more than 10% of its weight, bonded together with glue
(Buildtech/Ultratech/Saint Gobin or equivalent make) in specified
courses complete with all lifts,surface preparation, erecting and
dismantling double legged scaffolding, staging, hacking of concrete
surface in contact with masonry, cement sand mortar of 1:1 ratio on
concrete surface in contact with blockwork, mixing of ingredients in said
1 proportion by volume metric basis in tray, setting and laying of first layer 750 66.71 66.71 SQM 1102.6467 826,985 - 73,562.52 73,563
of blockwork for approval, racking of joints, injection grouting of cement
slurry, non shrinkable chemical compound at the junction of RCC and
blockwork, curing, cleaning, disposal of debris to suitable location
outside of site premises, all kinds of labour, tools & tackles, wastages,
consumables etc. complete as per specification and instruction of Clients
Representative.

73562.52126572
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
Providing and Constructing 150 mm thick Light Weight Block
Masonry in proper line, level and plumb at all lifts, heights and leads
having minimum strength of 35 Kg/Sq.cm & water absorption shall not
be more than 10% of its weight, bonded together with glue
(Buildtech/Ultratech/Saint Gobin or equivalent make) in specified
courses complete with all lifts,surface preparation, erecting and
dismantling double legged scaffolding, staging, hacking of concrete
surface in contact with masonry, cement sand mortar of 1:1 ratio on
concrete surface in contact with blockwork, mixing of ingredients in said
2 proportion by volume metric basis in tray, setting and laying of first layer 3000 1302.497 1302.50 SQM 1,374 4,123,326 - 1,790,207.13 1,790,207
of blockwork for approval, racking of joints, injection grouting of cement
slurry, non shrinkable chemical compound at the junction of RCC and
blockwork, curing, cleaning, disposal of debris to suitable location
outside of site premises, all kinds of labour, tools & tackles, wastages,
consumables etc. complete as per specification and instruction of Clients
Representative.

1790207.131451
Providing and Constructing 230 mm thick Light Weight Block
Masonry in proper line, level and plumb at all lifts, heights and leads
having minimum strength of 35 Kg/Sq.cm & water absorption shall not
be more than 10% of its weight, bonded together with glue
(Buildtech/Ultratech/Saint Gobin or equivalent make) in specified
courses complete with all lifts,surface preparation, erecting and
dismantling double legged scaffolding, staging, hacking of concrete
surface in contact with masonry, cement sand mortar of 1:1 ratio on
concrete surface in contact with blockwork, mixing of ingredients in said
3 proportion by volume metric basis in tray, setting and laying of first layer 700 307.7505 307.75 Cum 7,256 5,079,480 - 2,233,160.79 2,233,161
of blockwork for approval, racking of joints, injection grouting of cement
slurry, non shrinkable chemical compound at the junction of RCC and
blockwork, curing, cleaning, disposal of debris to suitable location
outside of site premises, all kinds of labour, tools & tackles, wastages,
consumables etc. complete as per specification and instruction of Clients
Representative.

2233160.786251
Loss of shuttering material - Work was stopped during pandemic period
and then resumed again after 18 months. During this period shuttering
4 material got damaged hence certifying against loss of shuttering material 1 0.00 LS 1,127,062 1,127,062 - 1,127,062.00 1,127,062
1,127,062.00
Extra Over and above 0.00 - - - -
Superstructure : Providing & laying in position approved RMC M-40
grade including vibrating, compaction, curing etc. excluding cost of
1 centering, shuttering and reinforcement for all the elements where 1497 1037.90 1037.90 CUM 701 1,049,696 - 727,773.90 727,774
reinforced cement concrete is proposed to be used up to all level heights
etc. complete.
727773.900547
Providing, centering, shuttering and strutting using 12mm thick plastic
coated plywood of approved quality, shuttering, propping, edging,
bracing, including applying of shuttering oil, nails, tie rods and any other
2 material required for form work for reinforcement cementconcrete work 9386 7509.91 7509.91 SQMT 190 1,783,340 - 1,426,883.71 1,426,884
as per specification at all locations and levels with conventional
formwork system .
1426883.7075
Sl. W.O Previous Rate
Particular of Item This Qty Total Qty Unit WO Amount Previous Amount This Amount Total Amount
No. Qty. QTY (Rs.)
Providing, straightening, cutting, bending, reinforcement steel of grade
Fe-500 conforming to IS 1786 to correct shape and size required for all
RCC work, binding with 18 gauge annealed GI binding wire and placing
in position including providing and fixing PVC cover block or approved
3 concrete cover blocks of same grade as of concrete etc. complete as 328 203.41 203.41 MT 696.20 228,354 - 141,612.48 141,612
directed by Engineer In Charge. Note: Scrap material shall be the
property of contractor and credit / discount for the same to be considered
in the quoted rate. (Basic Rate Rs. 42 Per Kg)
141612.483049
Providing and Fixing of CP teak of developer, including cost of
shuttering and deshuttering,curing of concrete block etc. complete. Basic
Rate - Rs. 2600.00 per cft Stilt to 10th Floor wood door frames of
different sizes and profiles as per drawings with 3 nos. on each side M.S.
hold fast made of 3 mm x 30 mm flat iron and 400 mm long black paint
coated, fixed to frame with 10 mm dia. bolts, nuts and wooden plugs and
4 embedded in PCC 1:3:6 block of size 300x 115 x150 mm in position or 8 0.00 CUM 10,000 80,000 - - -
fixing with 100 mm long and 10 mm dia. dash through bolts on sides
abutting of RCC column including applying coal tar on concealed
surfaces and primer coat on frame, smooth finished as per requirement

Providing and applying 12mm- 15mm thick single coat internal cement
plaster with Neeru finish in cm 1:4 in true line, level and plumb,
5 including surface cleaning and dampening, including providing & fixing 12081 0.00 SQMT 173 2,093,632 - - -
of fiber mesh 300mm wide at the junctions of RCC & masonry structure
0
with minimum 75mm overlaps all the necessary scaffolding, curing,
Providing
cleaning of&floor
applying
from 20 mm dropouts
mortar thk sand etc.
faced cement to
complete plaster in two coats
the satisfaction of
on
the external
Engineersurfaces under layer 12mm cement plaster in cm (1:4) and top
In-charge.
layer 8 mm thk cement plaster in cement mortar (1:3) including providing
& mixing of water-proofing compound in base coat @ 2 % on cement
content or as pecified by the manufacture with all necessary scaffolding,
6 curing making band, grooves, curves, drip moulding, edge including 12741 0.00 SQMT 101.80 1,297,034 - - -
providing & fixing of fiber mesh at the junctions of RCC & masonry
structure after filling the joints properly etc complete at all heights levels
& location to the satisfaction of the Engineer In-charge.

-
Amount :- 118,637,018 63,054,910.54 19,506,878 82,561,789 19506878.40851
JRD ENTERPRISES
STEEL RECONCILATION

Sr.no Date Received from Challan No Unit 8mm 10mm 12mm 16mm 20mm 25mm Total
1 8/21/2015 Nitin Steel Corporation 379 MT 7.92 0.99 2.04 1.57 0.98 1.53 15.03
2 1/10/2016 Nitin Steel Corporation 317 MT 5.89 6.26 3.22 0.72 16.09
3 5/27/2019 Nitin Steel Corporation 101 MT 4.04 2.91 5.89 12.84
4 6/3/2019 Bhavani Implex 10 MT 1.49 2.43 8.53 12.45
5 6/14/2019 Nitin Steel Corporation 131 MT 1.97 6.81 3.08 11.86
6 6/23/2019 Nitin Steel Corporation 142 MT 3.05 4.95 5.01 13.01
7 9/6/2019 Nitin Steel Corporation 283 MT 2.02 2.01 5.0 9.03
8 9/12/2019 Nitin Steel Corporation 290 MT 7.45 2.07 9.52
9 9/23/2019 Bhavani Implex 84 MT 4.03 4.03 8.06
10 9/25/2019 Bhavani Implex 86 MT 1.76 4.14 5.9
11 10/5/2019 Nitin Steel Corporation 334 MT 1.96 2.02 3.88 4.12 11.98
12 10/12/2019 Bhavani Implex 91 MT 4.04 5.91 2.07 12.02
13 10/23/2019 Bhavani Implex 100 MT 4.11 6.01 1.9 12.02
14 11/4/2019 Nitin Steel Corporation 389 MT 3.95 4.02 2.0 2.02 11.99
15 11/9/2019 Nitin Steel Corporation 409 MT 3.81 1.98 2.95 3.13 11.87
16 11/14/2019 Nitin Steel Corporation 418 MT 2.57 0.96 4.95 4.14 12.62
17 11/23/2019 Nitin Steel Corporation 444 MT 1.96 5.92 4.09 11.97
18 11/27/2019 Nitin Steel Corporation 457 MT 4.98 2.08 4.92 11.98
19 12/13/2019 Nitin Steel Corporation 493 MT 4.86 3.98 3.1 11.94
20 12/18/2019 Nitin Steel Corporation 515 MT 1.96 2 7.15 1.04 12.15
21 12/28/2019 Nitin Steel Corporation 539 MT 3.03 1.03 2.01 3.97 2.01 12.05
22 1/5/2020 mahipat rai MT 3.05 1.03 4.08
23 1/15/2020 Nitin Steel Corporation 571 MT 2.96 0.99 3.99 2.06 10
24 1/30/2020 mahipat rai MT 5.96 4.97 1.98 12.91
25 2/6/2020 hitesh MT 1.99 1.99 7.03 1.04 12.05
26 2/12/2020 mahipat rai MT 5.12 0.98 1.02 3.99 1 12.11
27 2/19/2020 Satnam steel traders 1 MT 4.01 2.02 1.02 0.98 3.97 1 13
28 3/7/2020 mahipat rai MT 1.96 3.11 5.07
29 1/3/2022 Universal Enterprises 14822 MT 1.26 1.26
30 Gopani Iron & power (India) PVT LTD MT 10.04 5.06 2.95 1.99 10.05 3.08 33.17
31 Gopani Iron & power (India) PVT LTD MT 6.74 9.23 3.21 3.26 17.34 5.84 45.62
32 Gopani Iron & power (India) PVT LTD MT 2.94 0.89 3 1.95 5.79 18.17 32.74
33 Gopani Iron & power (India) PVT LTD MT 3 1.97 2 5.02 10.02 11.01 33.02
34 Gopani Iron & power (India) PVT LTD MT 8.05 2.03 9.21 1.51 8.03 4.47 33.3
35 Gopani Iron & power (India) PVT LTD MT 4.15 14.64 5.51 8.83 33.13
36 Gopani Iron & power (India) PVT LTD MT 5.06 28.09 33.15
37 Gopani Iron & power (India) PVT LTD MT 5.08 3.03 15.18 10.05 33.34
38 Bhakti steel MT 8.02 4.95 0.51 5.02 9 3.49 30.99
39 Steel transferred to Chembur. MT 15.061 5.133 1.6 2.73 10.043 6.712 41.279
Total MT 125.18 72.28 39.33 47.02 186.31 155.2 625.32
Safety / Housekeeping
Safety : Standard safety rules followed for the work executed since previous bill

Remarks :a)Satisfactory
b)Average
c)Not followed
d)Liable for penalty
e)Suggested Penalty Amupto Previous bill :
This bill :
Up to date :

House KeeStandard housekeeping procedure followed for the work executed since previous bill

Remarks :a)Satisfactory
b)Average
c)Not followed
d)Liable for penalty
e)Suggested Penalty Amupto Previous bill :
This bill :
Up to date :

Insurance 3rd party Insurance & Workmen Compensation policy :

Remarks :a) Applied :


b) Copy Attached :
c) Copy Submitted :
d) Not applied:
e) Not required:

Signature of site engineer Signature of site incharge

Contractors signature
HUBTOWN LIMITED
Contractor : JRD ENTERPRISES
Site : PWD Residential Building at Chunabhatti.
Work : Construction of Bldg. No. 2 (Stilt + 10 Floor) at Chunabhatti, Mumbai
Bill no. RA9th

Schedule - A
Material issued by HTL free of cost with remarks.

Description of Qty issued upto Qty issued


Sr. No Unit Total Qty 4 + 5 Remarks
Materials last bill since bill
1 2 3 4 5 6 7

Contractor Project Manager / Construction Manager Site Engineer


HUBTOWN LIMITED
Contractor : JRD ENTERPRISES
Site : PWD Residential Building at Chunabhatti.
Work : Construction of Bldg. No. 2 (Stilt + 10 Floor) at Chunabhatti, Mumbai
Bill No. RA 9th
Schedule - B
Material issued by HTL and chargable

Description of Qty issued upto Qty issued since


Sr. No Unit Total Qty 4 + 5 Rate Amount Remarks
Materials last bill previous bill
1 2 3 4 5 6 7 8 9

Contractor Project Manager / Construction Manager Site Engineer


HUBTOWN LIMITED
Contractor : JRD ENTERPRISES
Site : PWD Residential Building at Chunabhatti.
Work : Construction of Bldg. No. 2 (Stilt + 10 Floor) at Chunabhatti, Mumbai
Bill No: RA 9th

Schedule - C
Material issued by HTL for which basic rates are fixed as per contract.

Qty to be
paid
Description of
Sr. No Unit Qty paid till last bill since Total Qty Basic Rate Amount Remarks
Materials
previous
Bill
1 2 3 4 5 6 7 8 9

Contractor Project Manager / Construction Manager Site Engineer


Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Shuttering

Shuttering Summary

Sr.no. Description Quantity Unit


1 Ground Floor
Ground Floor Column 473.26 sqmt
1st Floor Beam 653.62 sqmt
1st Floor Slab 465.64 sqmt

2 1st Floor
1st Floor Column 473.258 sqmt
2nd Floor Beam 653.6153 sqmt
2nd Floor Slab 465.64035 sqmt

3 2nd Floor
2nd Floor Column 473.258 sqmt
3rd Floor Beam 653.6153 sqmt
3rd Floor Slab 465.64035 sqmt

4 3rd Floor
3rd Floor Column 473.258 sqmt
4th Floor Beam 653.6153 sqmt
4th Floor Slab 465.64035 sqmt

5 4th Floor
4th Floor Column 473.26 Sqmt
5th Floor Beam 573.46 Sqmt
5th Floor Slab 478.10 Sqmt

6 5th Floor
5th Floor Column 439.46 Sqmt
6th Floor Beam 612.37 Sqmt
6th Floor Slab 447.77 Sqmt

7 6th Floor
6th Floor Column 439.46 Sqmt
7th Floor Beam 612.37 Sqmt
7th Floor Slab 449.72 Sqmt

8 7th Floor
7th Floor Column 439.46 Sqmt
8th Floor Beam 612.37 Sqmt
8th Floor Slab 451.09 Sqmt

9 8th Floor
8th Floor Column 439.46 Sqmt
9th Floor Beam 612.37 Sqmt
9th floor Slab 451.09 Sqmt

10 9th Floor
9th Floor Column 439.46 Sqmt
10th Floor Beam 612.37 Sqmt
10th Floor Slab 451.09 Sqmt

Total Qty 16271.97 SQMT


RA 07 CERTIFYED BILL 8762.06
RA 08 CERTIFYED BILL 1058.94
This Bill Qty 6450.97 SQMT

7509.91
tti, Mumbai
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Shuttering for Columns beams and slab

Shuttering Summary

Sr.no. Description Quantity Unit


1 5th to 6th Floor Column 439.46 SQMT
6th Floor Beam 612.37 SQMT
6th Floor Slab 447.77 SQMT
2 6th to 7th Floor Column 439.46 SQMT
7th Floor Beam 612.37 SQMT
7th Floor Slab 449.72 SQMT
3 7th to 8th Floor Column 439.46 SQMT
8th Floor Beam 612.37 SQMT
8th Floor Slab 451.09 SQMT
4 8th to 9th Floor Column 439.46 SQMT
9th Floor Beam 612.37 SQMT
9th Floor Slab 451.09 SQMT
5 9th to 10th 439.46 SQMT
10th Floor Beam 612.37 SQMT
10th Floor Slab 451.09 SQMT
Total= 7509.91 SQMT
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Shuttering for Columns

Column

Sr. No Description Nos Length

C1,2,3,4,5,7,8,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,C2
1 7,C28,29,30,31,32,33,36,37,38,39,40,41,42,43,44,,45,,46,47,49, 52 0.9
50,51,52,54,55,56,57,58,59,60
2 C6,9,48,53 4 0.9
3 C25,C26 2 1
4 C34,C35 2 1
5 lift l1,l3,l4,l6,l7,l9,l10,l12 outer Face 8 2.46
lift l1,l3,l4,l6,l7,l9,l10,l12 inner Face 8 2.23
6 lift L8,l11 outer Face 2 2.36
lift L8,l11 inner Face 2 1.9
7 lift L5 And L2 outer Face 2 2.96
lift L5 And L2 inner Face 2 2.5
8 Lift Vertical Face 8 0.23
Total
Breadth Height Unit Remark
Qty.

0.3 2.15 268.32 Sqm 2.15

0.4 2.15 22.36 Sqm


0.3 2.15 11.18 Sqm
0.3 2.15 11.18 Sqm
2.15 42.31 Sqm
2.15 38.36 Sqm
2.15 10.15 Sqm
2.15 8.17 Sqm
2.15 12.73 Sqm
2.15 10.75 Sqm
2.15 3.96 Sqm
Total= 439.46 Sqm
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Shuttering beam

6th flooor Beam

Sr. No Description Nos Length Breadth Height


X Direction Beam
1 3.1,59.1, 1.1,57.1 4 2.86 0.23 0.675
2 18.1,44.1,15.1,45.1 4 2.86 0.23 0.675
3 22.03,40.3, 15.3, 45.03 4 1.87 0.23 0.45
4 22.1,40.1,23.1,37.1 4 3.23 0.23 0.675
5 32.1,29.01 2 2.7 0.23 0.675
6 31.1, 29.1 2 3.68 0.23 0.675
7 20.1,42.1,17.1,43.1, 4 3.15 0.23 0.675
8 20.3,42.3,43.3,2.3 4 3.15 0.23 0.675
9 9.3 1 2.5 0.23 0.675
10 36.3,19.3,30.3 3 2.5 0.23 0.675
10 9.1,5.1,53.3.47.3 4 2.23 0.23 0.675
11 8.1,52.1,6.1,48.1 4 2.47 0.23 0.675
12 8.3,8.5,8.7,35.3,35.5,35.7,6.3,6.5,6.7,33.3,33.5,33.7 12 2.54 0.23 0.45
13 35.1 1 2.14 0.23 0.675
14 26.1,27.1,33.1 3 2.21 0.23 0.675
15 14.3,14.4 2 3.07 0.23 0.675
16 L6.1,51.1,7.3,7.4,25.1,34.3,49.1,51.03 8 3.15 0.23 0.675
17 L12.1, 1 4.24 0.23 0.675
18 34.1 1 4.17 0.23 0.675
19 L11.1, L8.01 2 0.87 0.23 0.675
20 L4.1, L1.1 2 2.5 0.23 0.675
21 55.03 1 3 0.23 0.675
22 55.1, 1 2.86 0.23 0.675
23 11.1 1 2.93 0.23 0.675
24 L10.1,L7.1 2 1.9 0.23 0.675
25 50.1 1 2.86 0.23 0.675
26 13.1 1 2.93 0.23 0.675
27 L9.1 1 3.1 0.23 0.675
28 L3.3 1 3.94 0.23 0.675
29 L3.1 1 3.94 0.23 0.675
28 L12.1ML 1 2.96 0.23 0.675
Y Direction Beam
1 24.2,23.2 2 4.45 0.23 0.675
2 4.2,46.2, 1.2, 45.2 4 1.93 0.23 0.675
3 16.2,46.02,45.02,15.2 4 2.35 0.23 0.675
4 22.04,40.4,45.04,15.4 4 1.05 0.23 0.45
5 22.02,40.2,21.02,39.2 4 1.68 0.23 0.675
6 22.2,32.2,21.2,29.2 4 2.745 0.23 0.675
7 3.2,44.2, 2.2,43.2 4 2.45 0.23 0.675
8 20.2,31.2,19.2,30.2 4 4.135 0.23 0.675
9 9.2,6.2 2 5.27 0.4 0.675
10 36.2,33.2 2 5.745 0.4 0.675
11 8.4,35.8,6.4,33.8 4 0.84 0.23 0.45
12 8.6,35.6,6.6,33.6 4 1.23 0.23 0.45
13 8.8,35.4,6.8,33.4 4 0.89 0.23 0.45
14 8.2 1 2.84 0.23 0.675
15 35.2 1 5.05 0.23 0.675
16 34.2 1 4.57 0.23 0.675
17 7.2 1 4.57 0.23 0.675
18 28.2,26.2,L6.2,25.2,L1.2,27.2 6 1.5 0.23 0.675
19 10.2,5.2,41.2 3 1.135 0.23 0.675
20 42.2 1 1.61 0.23 0.675
21 13.2,12.2 2 3.3 0.23 0.675
22 14.2,11.2 2 2.68 0.23 0.675
23 L10.2 1 3.63 0.23 0.675
24 L9.2 1 4.03 0.23 0.675
25 51.02 1 5.86 0.23 0.675
26 55.02 1 6.23 0.23 0.675
27 50.2 1 1 0.23 0.675
28 56.2 1 0.6 0.23 0.675
153 Total=
Total=
Bottom Sides Unit

2.63 15.44 Sqmt.


2.63 15.44 Sqmt.
1.72 6.73 Sqmt.
2.97 17.44 Sqmt.
1.24 7.29 Sqmt.
1.69 9.94 Sqmt.
2.90 17.01 Sqmt.
2.90 17.01 Sqmt.
0.58 3.38 Sqmt.
1.73 10.13 Sqmt.
2.05 12.04 Sqmt.
2.27 13.34 Sqmt.
7.01 27.43 Sqmt.
0.49 2.89 Sqmt.
1.52 8.95 Sqmt.
1.41 8.29 Sqmt.
5.80 34.02 Sqmt.
0.98 5.72 Sqmt.
0.96 5.63 Sqmt.
0.40 2.35 Sqmt.
1.15 6.75 Sqmt.
0.69 4.05 Sqmt.
0.66 3.86 Sqmt.
0.67 3.96 Sqmt.
0.87 5.13 Sqmt.
0.66 3.86 Sqmt.
0.67 3.96 Sqmt.
0.71 4.19 Sqmt.
0.91 5.32 Sqmt.
0.91 5.32 Sqmt.
0.68 4.00 Sqmt.

2.05 12.02 Sqmt.


1.78 10.42 Sqmt.
2.16 12.69 Sqmt.
0.97 3.78 Sqmt.
1.55 9.07 Sqmt.
2.53 14.82 Sqmt.
2.25 13.23 Sqmt.
3.80 22.33 Sqmt.
4.22 14.23 Sqmt.
4.60 15.51 Sqmt.
0.77 3.02 Sqmt.
1.13 4.43 Sqmt.
0.82 3.20 Sqmt.
0.65 3.83 Sqmt.
1.16 6.82 Sqmt.
1.05 6.17 Sqmt.
1.05 6.17 Sqmt.
2.07 12.15 Sqmt.
0.78 4.60 Sqmt.
0.37 2.17 Sqmt.
1.52 8.91 Sqmt.
1.23 7.24 Sqmt.
0.83 4.90 Sqmt.
0.93 5.44 Sqmt.
1.35 7.91 Sqmt.
1.43 8.41 Sqmt.
0.23 1.35 Sqmt.
0.14 0.81 Sqmt.
95.88 516.49 Sqmt.
612.37 Sqm. Sqmt.
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Shuttering of 6th and 7th floor beam

Total
Sr. No Location Slab no. Nos Length Breadth Unit
Qty.
Bedroom
1 Flat. No. 2,3,6,7 200S2.1 4 3 3.28 39.36 SQM

Deduct Column Area


C59,C60,C46,C16,C4,C3,C1,C -12 0.67 0.07 -0.56 SQM
2,C15,C45,C57,C58
Deduct Column Area -4 0.15 0.07 -0.04 SQM
C18,C44,C43,C17
Flat. No. 1 200S2.6 1 4.3 3 12.90 SQM
Deduct Column Area -2 0.67 0.07 -0.09 SQM
C50,C51
Flat. No.4 ,5,8 200S2.1 3 3.35 3 30.15 SQM
Deduct Flat 8 Column -3 0.67 0.07 -0.14 SQM
C55,C56,C14
0.00 SQM
2 Kitchen 0.00 SQM
Flat. No. 2,3,6,7 200S2.5 4 3.37 2.78 37.47 SQM
Deduction Column Area -4 0.67 0.07 -0.19 SQM
C38,C24,C23,C37
Deduction Column Area -2 0.67 0.035 -0.05 SQM
C32,C29
Flat. No. 1 200S2.2 1 2.83 2.47 6.99 SQM
Flat. No. 4,5,8 200S2.2 3 2.36 2.54 17.98 SQM
Deduction Of Column -3 0.67 0.07 -0.14 SQM
c8,c7,c49
0.00 SQM
0.00 SQM
3 Living room 0.00 SQM
Flat. No. 2,3,6,7 200S2.3 4 4.35 4.84 84.22 SQM
offset 4 0.83 0.52 1.73 SQM
infront of WC 200S1.1 4 1 0.67 2.68 SQM
Deduct Column Area -4 0.67 0.07 -0.19 SQM
c42,c20,c19,c41
Flat. No. 1 200S2.7 1 3.14 5.32 16.70 SQM
Flat. No. 8 200S2.6 1 4.48 3.14 14.07 SQM
Deduct Column C34 -1 0.67 0.07 -0.05 SQM
Flat. No. 4,5 200S2.4 2 3.2 3.62 23.17 SQM
deduct Column C26 c25 -2 0.67 0.07 -0.09 SQM
0.00 SQM
Balcony 0.00 SQM
Flat. No. 2,3,6,7 300S1.1 4 3.22 0.84 10.82 SQM
Flat. No. 1,4,5,8 300S1.1 4 3.21 0.84 10.79 SQM
0.00 SQM
4 Bathroom Sunk 0.00 SQM
Flat. No. 2,3,6,7 200S1.2 4 1.87 1.07 8.00 SQM
Deduct Column Area
-4 0.67 0.07 -0.19 SQM
C22,C40,C21,C39
Flat. No. 1,4 200S1.1 2 1.31 1.23 3.22 SQM
Flat. No. 5,8 200S1.1 2 1.31 1.23 3.22 SQM
0.00 SQM
5 Toilet Sunk 0.00 SQM
Flat. No. 2,3,6,7 200S1.1 4 0.97 1.05 4.07 SQM
Flat. No. 1,4 200S1.1 2 1.12 0.89 1.99 SQM
Flat. No. 5,8 200S1.1 2 1.12 0.89 1.99 SQM
0.00 SQM
6 Passage 300S1.2 2 2.4 2.465 11.83 SQM
Column Deduction -4 0.35 0.3 -0.42 SQM
c28,c36,c33,c27
300S1.3 2 2.54 1.5 7.62 SQM
300S1.3 2 3.15 1.5 9.45 SQM
300S1.3 1 9.4 1.5 14.10 SQM
Passage near kitchen 200S1.2 4 1.71 0.84 5.75 SQM
Flat no. 1,4,5,8. 4 1.18 1 4.72 SQM
0.00 SQM
Slab near staircasee 300S1.4 1 3.94 1.42 5.59 SQM
0.00 SQM
7 Chajja 0.00 SQM
Bedroom flat no. 2,3,6,7 200SC1.1 4 2.1 0.6 5.04 SQM
Toilet Flat no. 2,3,6,7 200 S1.3 4 2.58 0.45 4.64 SQM
200SC1.1 4 1.05 0.6 2.52 SQM

Living room Flat no. 2,3,6,7 75SC1.1 4 3.22 0.45 5.80 SQM
Living room Flat no. 1,8 75SC1.1 2 3.14 0.45 2.83 SQM
Living room Flat no. 4,5 75SC1.1 2 3.21 0.45 2.89 SQM
Chajja in ducts 200S1.3 4 2.6 0.45 4.68 SQM
200S1.3 4 2.3 0.45 4.14 SQM
Kitchen at no. 1,4,5,8 200SC1.1 4 1.5 0.6 3.60 SQM

Staircase Concrete SQM

Flight from floor to


2 3.08 1.6 9.86 SQM
Midlanding
Midlanding 1 3.1 1.6 4.96 SQM
Steps 18 3.1 0.15 8.37 SQM
SQM
SQM

447.77 SQM

Total
Sr. No Location Slab no. Nos Length Breadth Unit
Qty.
Bedroom
1 Flat. No. 2,3,6 200S2.1 3 3 3.28 29.52 SQM

Deduct Column Area


C59,C60,C46,C1,C2,C15,C45, -9 0.67 0.07 -0.42 SQM
C57,C58
Deduct Column Area -3 0.15 0.07 -0.03 SQM
C44,C43,C17
Flat. No. 1 200S2.6 1 4.3 3 12.90 SQM
Deduct Column Area -2 0.67 0.07 -0.09 SQM
C50,C51
Flat. No.4 ,5,8 200S2.1 3 3.35 3 30.15 SQM
Deduct Flat 8 Column -3 0.67 0.07 -0.14 SQM
C55,C56,C14
Flat. No. 7 300S2.1 1 3 3.27 9.81 SQM
Deduct Column Area C4,C3, -3 0.67 0.07 -0.14 SQM
C16
Deduct Column Area C18 -1 0.15 0.07 -0.01 SQM

0.00 SQM
2 Kitchen 0.00 SQM
Flat. No. 2,3,6,7 200S2.5 4 3.37 2.78 37.47 SQM
Deduction Column Area -4 0.67 0.07 -0.19 SQM
C38,C24,C23,C37
Deduction Column Area -2 0.67 0.035 -0.05 SQM
C32,C29
Flat. No. 1 200S2.2 1 2.83 2.54 7.19 SQM
DEDUCTION Column 52 -1 0.67 0.07 -0.05 SQM
Flat. No. 4,5,8 200S2.2 3 2.36 2.54 17.98 SQM
Deduction Of Column -3 0.67 0.07 -0.14 SQM
c8,c7,c49
0.00 SQM
0.00 SQM
3 Living room 0.00 SQM
Flat. No. 2,3,6,7 200S2.3 4 4.35 4.84 84.22 SQM
offset 4 0.83 0.52 1.73 SQM
infront of WC 200S1.1 4 1 0.67 2.68 SQM
Deduct Column Area -4 0.67 0.07 -0.19 SQM
c42,c20,c19,c41
Flat. No. 1 200S2.7 1 3.14 5.32 16.70 SQM
Flat. No. 8 200S2.6 1 4.48 3.14 14.07 SQM
Deduct Column C34 -1 0.67 0.07 -0.05 SQM
Flat. No. 4,5 200S2.4 2 3.2 3.62 23.17 SQM
deduct Column C26 c25 -2 0.67 0.07 -0.09 SQM
0.00 SQM
Balcony 0.00 SQM
Flat. No. 2,3,6,7 300S1.1 4 3.22 0.84 10.82 SQM
Flat. No. 1,4,5,8 300S1.1 4 3.21 0.84 10.79 SQM
0.00 SQM
4 Bathroom Sunk 0.00 SQM
Flat. No. 2,3,6 200S1.2 3 1.87 1.07 6.00 SQM
Deduct Column Area -3 0.67 -0.14 SQM
C40,C21,C39 0.07
Flat. No. 1,4 200S1.1 2 1.31 1.23 3.22 SQM
Flat. No. 5,8 200S1.1 2 1.31 1.23 3.22 SQM
Refuge area 300S2.3 1 1.975 2.43 4.80 SQM

5 Toilet Sunk 0.00 SQM


Flat. No. 2,3,6 200S1.1 3 0.97 1.05 3.06 SQM
Flat. No. 1,4 200S1.1 2 1.12 0.89 1.99 SQM
Flat. No. 5,8 200S1.1 2 1.12 0.89 1.99 SQM
0.00 SQM
6 Passage 300S1.2 2 2.4 2.465 11.83 SQM
Column Deduction
-4 0.35 -0.42 SQM
c28,c36,c33,c27 0.3
300S1.3 2 2.54 1.5 7.62 SQM
300S1.3 2 3.15 1.5 9.45 SQM
300S1.3 1 9.4 1.5 14.10 SQM
Passage near kitchen 200S1.2 4 1.71 0.84 5.75 SQM
Flat no. 1,4,5,8. 4 1.18 1 4.72 SQM
0.00 SQM
Slab near staircasee 300S1.4 1 3.94 1.42 5.59 SQM
0.00 SQM
7 Chajja 0.00 SQM
Bedroom flat no. 2,3,6,7 200SC1.1 4 2.1 5.04 SQM
0.6
Toilet Flat no. 2,3,6,7 200 S1.3 4 2.58 0.45 4.64 SQM
200SC1.1 4 1.05 2.52 SQM
0.6
Living room Flat no. 2,3,6,7 75SC1.1 4 3.22 5.80 SQM
0.45
Living room Flat no. 1,8 75SC1.1 2 3.14 0.45 2.83 SQM
Living room Flat no. 4,5 75SC1.1 2 3.21 0.45 2.89 SQM
Chajja in ducts 200S1.3 4 2.6 0.45 4.68 SQM
200S1.3 4 2.3 0.45 4.14 SQM
Kitchen at no. 1,4,5,8 200SC1.1 4 1.5 3.60 SQM
0.6

Staircase Concrete SQM

Flight from floor to


Midlanding 2 3.08 1.6 9.86 SQM
Midlanding 1 3.1 1.6 4.96 SQM
Steps 18 3.1 0.15 8.37 SQM
SQM
SQM
449.72 SQM

8th to 10th floor


Total
Sr. No Location Slab no. Nos Length Breadth Unit
Qty.
Bedroom
1 Flat. No. 2,3,6 200S2.1 3 3 3.28 29.52 SQM

Deduct Column Area


C59,C60,C46,C1,C2,C15,C45, -9 0.67 0.07 -0.42 SQM
C57,C58
Deduct Column Area -3 0.15 0.07 -0.03 SQM
C44,C43,C17
Flat. No. 1 200S2.6 1 4.3 3 12.90 SQM
Deduct Column Area -2 0.9 0.07 -0.13 SQM
C50,C51
Flat. No.4 ,5,8 200S2.1 3 3.35 3 30.15 SQM
Deduct Flat 8 Column -2 0.67 0.07 -0.09 SQM
C55,C56
Flat. No. 7 200S2.1 1 3 3.27 9.81 SQM
Deduct Column Area C4,C3, -3 0.67 0.07 -0.14 SQM
C16
Deduct Column Area C18 -1 0.15 0.07 -0.01 SQM

0.00 SQM
2 Kitchen 0.00 SQM
Flat. No. 2,3,6,7 200S2.5 4 3.37 2.78 37.47 SQM
Deduction Column Area -4 0.67 0.07 -0.19 SQM
C38,C24,C23,C37
Deduction Column Area -2 0.67 0.035 -0.05 SQM
C32,C29
Flat. No. 1 200S2.2 1 2.83 2.54 7.19 SQM
DEDUCTION Column 52 -1 0.67 0.07 -0.05 SQM
Flat. No. 4,5,8 200S2.2 3 2.36 2.54 17.98 SQM
Deduction Of Column -3 0.67 0.07 -0.14 SQM
c8,c7,c49
0.00 SQM
0.00 SQM
3 Living room 0.00 SQM
Flat. No. 2,3,6,7 200S2.3 4 4.35 4.84 84.22 SQM
offset 4 0.83 0.52 1.73 SQM
infront of WC 200S1.1 4 1 0.67 2.68 SQM
Deduct Column Area -4 0.67 0.07 -0.19 SQM
c42,c20,c19,c41
Flat. No. 1 200S2.7 1 3.15 5.32 16.76 SQM
Flat. No. 8 200S2.6 1 4.48 3.14 14.07 SQM
Deduct Column C34 -1 0.67 0.07 -0.05 SQM
Flat. No. 4,5 200S2.4 2 3.2 3.63 23.23 SQM
deduct Column C26 c25 -2 0.67 0.07 -0.09 SQM
0.00 SQM
Balcony 0.00 SQM
Flat. No. 2,3,6,7 300S1.1 4 3.22 0.84 10.82 SQM
Flat. No. 1,4,5,8 300S1.1 4 3.21 0.84 10.79 SQM
0.00 SQM
4 Bathroom Sunk 0.00 SQM
Flat. No. 2,3,6 200S1.2 3 1.87 1.07 6.00 SQM
Deduct Column Area -3 0.67 -0.14 SQM
C40,C21,C39 0.07
Flat. No. 1,4 200S1.1 2 1.31 1.23 3.22 SQM
Flat. No. 5,8 200S1.1 2 1.31 1.23 3.22 SQM

5 Toilet Sunk 0.00 SQM


Flat. No. 2,3,6 200S1.1 3 0.97 1.05 3.06 SQM
Flat. No. 1,4 200S1.1 2 1.12 0.89 1.99 SQM
Flat. No. 5,8 200S1.1 2 1.12 0.89 1.99 SQM
0.00 SQM
6 Passage 300S1.2 2 2.4 2.465 11.83 SQM
Column Deduction -4 0.35 -0.42 SQM
c28,c36,c33,c27 0.3
300S1.3 2 2.54 1.5 7.62 SQM
300S1.3 2 3.15 1.5 9.45 SQM
300S1.3 1 9.4 1.5 14.10 SQM
Passage near kitchen 200S1.2 4 1.71 0.84 5.75 SQM
Flat no. 1,4,5,8. 4 1.18 1 4.72 SQM
0.00 SQM
Slab near staircasee 300S1.4 1 3.94 1.42 5.59 SQM
0.00 SQM
7 Chajja 0.00 SQM
Bedroom flat no. 2,3,6,7 200SC1.1 4 2.1 5.04 SQM
0.6
Toilet Flat no. 2,3,6,7 200 S1.3 4 2.59 0.45 4.66 SQM
200SC1.1 4 1.05 2.52 SQM
0.6
Living room Flat no. 2,3,6,7 75SC1.1 4 3.22 5.80 SQM
0.45
Living room Flat no. 1,8 75SC1.1 2 3.14 0.45 2.83 SQM
Living room Flat no. 4,5 75SC1.1 2 3.21 0.45 2.89 SQM
Chajja in ducts 200S1.3 4 2.6 0.45 4.68 SQM
200S1.3 4 2.3 0.45 4.14 SQM
Kitchen at no. 1,4,5,8 200SC1.1 4 1.5 3.60 SQM
0.6

Staircase Concrete SQM

Flight from floor to


Midlanding 2 3.07 1.6 9.82 SQM
Midlanding 1 3.1 1.6 4.96 SQM
Steps 18 3.1 0.15 8.37 SQM
SQM

8 front duct outer slab 200SC1.1 1 10.1 0.6 6.06 SQM

SQM
451.09 SQM
Bar Bending Schedule
Name of Work :Hubtown PWD Chunabhatti Building
Name of Agency : JRD Enterprises
Name of Client : Hubtown.

Summary of Steel
Sr. no. Descreption Dia
8mm 10mm 12mm 16mm 20mm 25mm
1 Ground Floor
Stilt Floor Column 6.508001 0 0.023567 0 8.59313 6.95156
1st floor beam 2.140904 1.33882 1.565064 1.086806 6.430301 3.584648
1st floor Slab 3.657736 1.78474
1st floor Staircase 0.049787 0.301229

2 1 st Floor
1st Floor column 7.611762 0 0.023567 0 8.59313 6.95156
2nd Floor Beam 2.140904 1.33882 1.565064 1.086806 6.430301 3.584648
2nd Floor slab 3.657736 1.78474
2nd floor staircase 0.049787 0.301229
Total
3 2nd Floor
2nd to 3rd floor Column 7.669 0.000 0.024 0.000 8.593 6.952
3rd floor Beam 2.141 1.339 1.565 1.087 6.430 3.585
3rd floorSlab 3.658 1.785
3rd floor Staircase 0.050 0.301

4 3rd Floor
3rd To 4th Floor column 4.377 5.011 0.024 0.000 11.083 2.906
4th Floor Beam 2.138 1.339 1.655 1.002 6.177 3.207
4th Floor slab 3.658 1.785 0.000 0.000 0.000 0.000
4th Floor Staircase 0.050 0.301

5 4 Floor
4 to 5 Slab Column 4.340 4.830 0.024 0.000 11.083 2.906
5 th Floor Beam 1.845 1.307 1.527 0.708 5.634 3.702
5th Floor Slab 3.664 1.784 0.000 0.000 0.000 0.000
5th Floor Staircase 0.050 0.301

6 5th Floor
5th to 6th floor Column 2.550 4.825 0.024 0.000 10.969 2.906
6th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
6th Floor Slab 3.632 1.649 0.000 0.000 0.000 0.000
6th Floor Staircase 0.050 0.301
7 6th Floor
6th to 7th floor Column 2.526 4.816 0.024 1.366 9.180 2.222
7th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
7th Floor Slab 3.632 1.649 0.000 0.000 0.000 0.000
7th Floor Staircase 0.050 0.301

8 7th Floor
7th to 8th floor Column 2.526 4.816 0.024 1.366 9.180 2.222
8th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
8th Floor Slab 3.632 1.649 0.000 0.000 0.000 0.000
8th Floor Staircase 0.050 0.301

9 8th Floor
8th to 9th floor Column 2.526 4.816 0.024 2.406 7.707 1.880
9th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
9th Floor Slab 3.632 1.649 0.000 0.000 0.000 0.000
9th Floor Staircase 0.050 0.301

10 9th Floor
9th to 10th floor Column 2.526 4.816 0.024 2.406 7.707 1.880
10th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
10th Floor Slab 3.632 1.649 0.000 0.000 0.000 0.000
10th Floor Staircase 0.050 0.301

Total-
RA 07 CERTIFYED BILL
RA 08 CERTIFYED BILL
This Bill-

203.41
Total

22.0762582
16.15
5.44
0.35
44.02

23.2
16.15
5.44
0.35
45.120053

23.24
16.15
5.44
0.35
45.177

23.40
15.52
5.44
0.35
44.712

23.182
14.723
5.448
0.351
43.704 222.730

21.273
14.998
5.281
0.351
41.903

20.133
14.998
5.281
0.351
40.763

20.133
14.998
5.281
0.351
40.763

19.359
14.998
5.281
0.351
39.989

19.359
14.998
5.281
0.351
39.989

435.13776
231.73
161.27
42.14
Bar Bending Schedule
Name of Work :Hubtown PWD Chunabhatti Building
Name of Agency : JRD Enterprises
Name of Client : Hubtown.
Quantity Analysis for 5th floor slab

Summary of Steel for 5th Slab


Sr. no. Descreption Dia
8mm 10mm 12mm 16mm 20mm 25mm
1 5th To 6th Floor column 2.550 4.825 0.024 0.000 10.969 2.906
2 6th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
3 6th Floor slab 3.632 1.649 0.000 0.000 0.000 0.000
4 6th Floor Staircase 0.050 0.301

Total
1 6th To 7th Floor column 2.526 4.816 0.024 1.366 9.180 2.222
2 7th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
3 7th Floor slab 3.632 1.649 0.000 0.000 0.000 0.000
4 7th Floor Staircase 0.050 0.301

Total
1 7th To 8th Floor column 2.526 4.816 0.024 1.366 9.180 2.222
2 8th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
3 8th Floor slab 3.632 1.649 0.000 0.000 0.000 0.000
4 8th Floor Staircase 0.050 0.301

1 8th To 9th Floor column 2.526 4.816 0.024 2.406 7.707 1.880
2 9th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
3 9th Floor slab 3.632 1.649 0.000 0.000 0.000 0.000
4 9th Floor Staircase 0.050 0.301

1 9th To 10th Floor column 2.526 4.816 0.024 2.406 7.707 1.880
2 10th Floor Beam 1.830 1.199 2.254 0.733 5.575 3.407
3 10th Floor slab 3.632 1.649 0.000 0.000 0.000 0.000
4 10th Floor Staircase 0.050 0.301

Total-
b

Total=
21.273
14.998
5.281
0.351

0.000
41.903
20.133
14.998
5.281
0.351

40.763
20.133
14.998
5.281
0.351
40.763
19.359
14.998
5.281
0.351
39.989
19.359
14.998
5.281
0.351
39.989

203.408
Bar Bending Schedule
Name of Work :Hubtown PWD Chunabhatti Building
Name of Agency : JRD Enterprises
Name of Client : Hubtown.
Quantity Analysis for Steel of Columns
Rsidential Quarters II

SR.
PARTICULARS DIA. Size
NO.

Drawings Used:-
Column Reinforcement-

L
0.9
1 C27, C28, C30, C31, C33, C36
25
Main Bar Length= Flr to Flr Height +Lap length 20

L
0.9
2 C1,C2,C3,C4,C5,C7,C8,C10, C15-C24,C29,C32,C37,C38,C39, C40,
C41-C47, C49,C50,C51,C52,C54-60
Main Bar Length= Flr to Flr Height +Lap length 20

L
0.9
3 C11,C12,C13,C14
25
Main Bar 12

L
1
4 C25,C26
25
20

L
0.9
5 C6,C9,C48,C53
25
20

L
6 C34,C35 1
25
20

0.9
STIRRUPS

1 C11,14 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
273 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

1
C,12,13,

0.9 0.3 2.95 0.9

Master Ring 10

175 220
2.95 Triangular ring 10
275 175
220 2.95 Rectangular Ring 10

2.95 Cross Tie 10


220
2 C1,2,3,4,5.7,8,10,15,16,17,118,19,20,21,22,23,24,29,32,37,38,39,40,
41,42,43,44,45,46,47,49,50,51,52,54,55,56,57.58,59,60

0.9 0.3 2.95 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8

220 1.8 Rectangular Ring 10


1.15 8

1.8 Cross Tie 10


220 1.15 8

3 C6,9,48,53 0.9

1.8 Master Ring 10


1.15 8

210 320
1.8 Triangular ring 10
275 210 1.15 8
0.32 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

4 C25,C26,C34,C35 1

1.8 Master Ring 10


1.15 10

188 220
1.8 Triangular ring 10
306 188 1.15 10
220 1.8 Rectangular Ring 10
1.15 10
1.8 Cross Tie 10
220 1.15 10
0.9
5 C27,C28,C30,C31,C33,C36
1.8 Master Ring 10

1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

7 Lift Shear wall 2.46


L7/L10,L9/L12 2.46 0.23 2.95 20
L1/L4/L3/L6

Stirrups
Master ring 2.38 0.15 2.95 8

Stirrups Type2 0.238 0.15 2.95 8


0.238 0.15 2.95 8

Cross tie 0.15 2.95 8

L8/L11 1.9 0.23 2.95 20

Master ring 2.28 0.23 2.95


8
Stirrups Type2 0.238 0.15 2.95 8
Stirrups Type3 0.12 0.15 8

1
Cross tie 0.15 2.95 8

L2/L5 2.46 0.23 2.95 20

Master ring 2.38 0.23 2.95


8

Stirrups Type2 0.198 0.15 2.95 8

Cross tie 0.15 2.95 8

SR.
PARTICULARS DIA. Size
NO.
Drawings Used:-
Column Reinforcement-
GES/5081/SCH-COL-3RD to 6TH FL LvL-1/1/REINF-01

L
0.9
1 C27, C28, C30, C31, C33, C36
25
Main Bar Length= Flr to Flr Height +Lap length 20

L
0.9
2 C1,C2,C3,C4,C5,C7,C8,C10, C15-C24,C29,C32,C37,C38,C39, C40,
C41-C47, C49,C50,C51,C52,C54-60
Main Bar Length= Flr to Flr Height +Lap length 20
16

L
0.9
3 C11,C12,C13,C14
25
Main Bar 12

L
1
4 C25,C26
25
20

L
0.9
5 C6,C9,C48,C53
20

L
6 C34,C35 1
25
20

0.9
STIRRUPS

1 C11,14 0.9
1.8 Master Ring 10
1.15 8

175 220
1.8 Triangular ring 10
273 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

1
C,12,13,

0.9 0.3 2.95 0.9

Master Ring 10

175 220
2.95 Triangular ring 10
275 175
220 2.95 Rectangular Ring 10

2.95 Cross Tie 10


220

2 C1,2,3,4,5.7,8,10,15,16,17,118,19,20,21,22,23,24,29,32,37,38,39,40,
41,42,43,44,45,46,47,49,50,51,52,54,55,56,57.58,59,60
0.9 0.3 2.95 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8

220 1.8 Rectangular Ring 10


1.15 8
1.8 Cross Tie 10
220 1.15 8

3 C6,9,48,53 0.9

1.8 Master Ring 10


1.15 8

210 320
1.8 Triangular ring 10
275 210 1.15 8
0.32 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

4 C25,C26,C34,C35 1

1.8 Master Ring 10


1.15 10

188 220
1.8 Triangular ring 10
306 188 1.15 10
220 1.8 Rectangular Ring 10
1.15 10

1.8 Cross Tie 10


220 1.15 10
0.9
5 C27,C28,C30,C31,C33,C36
1.8 Master Ring 10

1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

7 Lift Shear wall 2.46


L7/L10,L9/L12 2.46 0.23 2.95 20
L1/L4/L3/L6

Stirrups
Master ring 2.38 0.15 2.95 8

Stirrups Type2 0.238 0.15 2.95 8

Cross tie 0.15 2.95 8

L8/L11 1.9 0.23 2.95 20

Master ring 2.28 0.23 2.95


8

Stirrups Type2 0.238 0.15 2.95 8


Stirrups Type3 0.12 0.15 8

1
Cross tie 0.15 2.95 8

L2/L5 2.46 0.23 2.95 20

Master ring 2.38 0.23 2.95


8

Stirrups Type2 0.198 0.15 2.95 8


Cross tie 0.15 2.95 8

SR.
PARTICULARS DIA. Size
NO.

Drawings Used:-
Column Reinforcement-
GES/5081/SCH-COL-3RD to 6TH FL LvL-1/1/REINF-01

L
0.9
1 C27, C28, C30, C31, C33, C36
25
Main Bar Length= Flr to Flr Height +Lap length 20

L
0.9
2 C1,C2,C3,C4,C5,C7,C8,C10, C15-C24,C29,C32,C37,C38,C39, C40,
C41-C47, C49,C50,C51,C52,C54-60
Main Bar Length= Flr to Flr Height +Lap length 20
16

L
0.9
3 C11,C12,C13,C14
25
Main Bar 12

L
1
4 C25,C26
25
20

L
0.9
5 C6,C9,C48,C53
20

L
6 C34,C35 1
25
20

0.9
STIRRUPS

1 C11,14 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
273 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

1
C,12,13,

0.9 0.3 2.95 0.9

Master Ring 10
175 220
2.95 Triangular ring 10
275 175
220 2.95 Rectangular Ring 10

2.95 Cross Tie 10


220

2 C1,2,3,4,5.7,8,10,15,16,17,118,19,20,21,22,23,24,29,32,37,38,39,40,
41,42,43,44,45,46,47,49,50,51,52,54,55,56,57.58,59,60
0.9 0.3 2.95 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8

220 1.8 Rectangular Ring 10


1.15 8

1.8 Cross Tie 10


220 1.15 8

3 C6,9,48,53 0.9

1.8 Master Ring 10


1.15 8

210 320
1.8 Triangular ring 10
275 210 1.15 8
0.32 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

4 C25,C26,C34,C35 1
1.8 Master Ring 10
1.15 10

188 220
1.8 Triangular ring 10
306 188 1.15 10
220 1.8 Rectangular Ring 10
1.15 10

1.8 Cross Tie 10


220 1.15 10
0.9
5 C27,C28,C30,C31,C33,C36
1.8 Master Ring 10

1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

7 Lift Shear wall 2.46


L7/L10,L9/L12 2.46 0.23 2.95 20
L1/L4/L3/L6

Stirrups
Master ring 2.38 0.15 2.95 8

Stirrups Type2 0.238 0.15 2.95 8

Cross tie 0.15 2.95 8


L8/L11 1.9 0.23 2.95 20

Master ring 2.28 0.23 2.95


8

Stirrups Type2 0.238 0.15 2.95 8


Stirrups Type3 0.12 0.15 8

1
Cross tie 0.15 2.95 8

L2/L5 2.46 0.23 2.95 20

Master ring 2.38 0.23 2.95


8

Stirrups Type2 0.198 0.15 2.95 8

Cross tie 0.15 2.95 8


SR.
PARTICULARS DIA. Size
NO.

Drawings Used:-
Column Reinforcement-
GES/5081/SCH-COL-3RD to 6TH FL LvL-1/1/REINF-01

L
0.9
1 C27, C28, C30, C31, C33, C36
25
Main Bar Length= Flr to Flr Height +Lap length 20

L
0.9
2 C1,C2,C3,C4,C5,C7,C8,C10, C15-C24,C29,C32,C37,C38,C39, C40,
C41-C47, C49,C50,C51,C52,C54-60
Main Bar Length= Flr to Flr Height +Lap length 20
16

L
0.9
3 C11,C12,C13,C14
25
Main Bar 12

L
1
4 C25,C26
25
20

L
0.9
5 C6,C9,C48,C53
20
16

L
6 C34,C35 1
25
20
0.9
STIRRUPS

1 C11,14 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
273 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

1
C,12,13,

0.9 0.3 2.95 0.9

Master Ring 10

175 220
2.95 Triangular ring 10
275 175
220 2.95 Rectangular Ring 10

2.95 Cross Tie 10


220

2 C1,2,3,4,5.7,8,10,15,16,17,118,19,20,21,22,23,24,29,32,37,38,39,40,
41,42,43,44,45,46,47,49,50,51,52,54,55,56,57.58,59,60
0.9 0.3 2.95 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8

220 1.8 Rectangular Ring 10


1.15 8

1.8 Cross Tie 10


220 1.15 8

3 C6,9,48,53 0.9

1.8 Master Ring 10


1.15 8

210 320
1.8 Triangular ring 10
275 210 1.15 8
0.32 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

4 C25,C26,C34,C35 1

1.8 Master Ring 10


1.15 10

188 220
1.8 Triangular ring 10
306 188 1.15 10
220 1.8 Rectangular Ring 10
1.15 10

1.8 Cross Tie 10


220 1.15 10
0.9
5 C27,C28,C30,C31,C33,C36
1.8 Master Ring 10

1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

7 Lift Shear wall 2.46


L7/L10,L9/L12 2.46 0.23 2.95 20
L1/L4/L3/L6

Stirrups
Master ring 2.38 0.15 2.95 8

Stirrups Type2 0.238 0.15 2.95 8

Cross tie 0.15 2.95 8

L8/L11 1.9 0.23 2.95 20

Master ring 2.28 0.23 2.95


8

Stirrups Type2 0.238 0.15 2.95 8


Stirrups Type3 0.12 0.15 8

1
Cross tie 0.15 2.95 8

L2/L5 2.46 0.23 2.95 20


Master ring 2.38 0.23 2.95
8

Stirrups Type2 0.198 0.15 2.95 8

Cross tie 0.15 2.95 8

9th to terrace lvl columns

SR.
PARTICULARS DIA. Size
NO.

Drawings Used:-
Column Reinforcement-
GES/5081/SCH-COL-3RD to 6TH FL LvL-1/1/REINF-01

L
0.9
1 C27, C28, C30, C31, C33, C36
25
Main Bar Length= Flr to Flr Height +Lap length 20

L
0.9
2 C1,C2,C3,C4,C5,C7,C8,C10, C15-C24,C29,C32,C37,C38,C39, C40,
C41-C47, C49,C50,C51,C52,C54-60
Main Bar Length= Flr to Flr Height +Lap length 20
16
L
0.9
3 C11,C12,C13,C14
25
Main Bar 12

L
1
4 C25,C26
25
20

L
0.9
5 C6,C9,C48,C53
20
16

L
6 C34,C35 1
25
20

0.9
STIRRUPS

1 C11,14 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
273 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

1
C,12,13,
0.9 0.3 2.95 0.9

Master Ring 10

175 220
2.95 Triangular ring 10
275 175
220 2.95 Rectangular Ring 10

2.95 Cross Tie 10


220

2 C1,2,3,4,5.7,8,10,15,16,17,118,19,20,21,22,23,24,29,32,37,38,39,40,
41,42,43,44,45,46,47,49,50,51,52,54,55,56,57.58,59,60
0.9 0.3 2.95 0.9

1.8 Master Ring 10


1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8

220 1.8 Rectangular Ring 10


1.15 8

1.8 Cross Tie 10


220 1.15 8

3 C6,9,48,53 0.9

1.8 Master Ring 10


1.15 8

210 320
1.8 Triangular ring 10
275 210 1.15 8
0.32 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

4 C25,C26,C34,C35 1

1.8 Master Ring 10


1.15 10

188 220
1.8 Triangular ring 10
306 188 1.15 10
220 1.8 Rectangular Ring 10
1.15 10

1.8 Cross Tie 10


220 1.15 10
0.9
5 C27,C28,C30,C31,C33,C36
1.8 Master Ring 10

1.15 8

175 220
1.8 Triangular ring 10
275 175 1.15 8
220 1.8 Rectangular Ring 10
1.15 8

1.8 Cross Tie 10


220 1.15 8

7 Lift Shear wall 2.46


L7/L10,L9/L12 2.46 0.23 2.95 20
L1/L4/L3/L6

Stirrups
Master ring 2.38 0.15 2.95 8

Stirrups Type2 0.238 0.15 2.95 8


Cross tie 0.15 2.95 8

L8/L11 1.9 0.23 2.95 20

Master ring 2.28 0.23 2.95


8

Stirrups Type2 0.238 0.15 2.95 8


Stirrups Type3 0.12 0.15 8

1
Cross tie 0.15 2.95 8

L2/L5 2.46 0.23 2.95 20

Master ring 2.38 0.23 2.95


8

Stirrups Type2 0.198 0.15 2.95 8

Cross tie 0.15 2.95 8


5th to 6th lvl columns

NO. OF
Spacing NO. OF
Size cover SIMILAR Nos of set LENGTH 8MM
of Bar BARS
MEMBERS

B H
0.3 2.95

6 1 14 3.7
6 1 2 3.55

B H
0.3 2.95

42 1 16 3.55

B H
0.3 2.95

4 1 14 3.7
4 1 2 3.31

B H
0.3 2.95

2 1 14 3.7
2 1 2 3.55

B H
0.4 2.95

4 1 6 3.7
4 1 10 3.55

B H
0.3 2.95
2 1 6 3.7
2 1 10 3.55

0.3

0.3 2.95

2 0.075 1 25 2.18
2 0.175 1 7 2.16 30.24

2 0.075 2 25 0.67
2 0.175 2 7 0.65 18.2
2 0.075 1 25 1.07
2 0.175 1 7 1.05 14.7

2 0.075 1 25 0.38
2 0.175 1 7 0.348 4.872

0.3

2 0.075 1 40 2.16

2 0.075 2 40 0.67

2 0.075 1 40 1.07

2 0.075 1 40 0.38
0.3

42 0.075 1 25 2.16
42 0.175 1 7 2.14 630.336

42 0.075 2 25 0.67
42 0.175 2 7 0.65 382.2

42 0.075 1 25 1.07
42 0.175 1 7 1.054 309.876

42 0.075 1 25 0.38
42 0.175 1 7 0.348 102.312

0.4 2.95

4 0.1 1 19 2.38
4 0.2 1 6 2.36 56.64

4 0.1 2 19 0.84
4 0.2 2 6 0.82 39.36
4 0.1 1 19 0.63
4 0.2 1 6 0.61464 14.75136

4 0.1 1 19 0.38
4 0.2 1 6 0.348 8.352

0.3 2.95

4 0.075 1 25 2.36
4 0.075 1 15 2.36

4 0.075 2 25 0.696
4 0.075 2 15 0.696
4 0.075 1 25 1.132
4 0.075 1 15 1.132
2 0.075 1 25 0.38
2 0.075 1 15 0.38
0.3 3

6 0.075 1 25 2.16

6 0.15 1 8 2.144 102.912

6 0.075 2 25 0.67
6 0.15 2 8 0.65 62.4
6 0.075 1 25 1.07
6 0.15 1 8 1.054 50.592

6 0.075 1 25 0.38
6 0.15 1 8 0.348 16.704

0.2 2.95
8 1 38 3.95

8 0.1 1 30 5.14 1233.6

4 0.1 7 30 0.856 719.04


4 0.1 6 30 0.856 616.32

8 0.1 8 30 0.278 533.76

2 1 32 3.95

2 1 30 5.084 305.04
2 6 30 0.84 302.4
2 1 30 0.604 36.24

2 4 30 0.278 66.72

2 1 42 3.95

2 1 30 5.284 317.04

2 8 30 0.761 365.12

2 7 30 0.278 116.76

8MM
6,456
UNIT WT 0.395
KG 2,550
MT 2.550
Total=

Bar Bending Schedule

6th to 7th lvl columns

NO. OF
Spacing NO. OF
Size cover SIMILAR Nos of set LENGTH 8MM
of Bar BARS
MEMBERS
B H
0.3 2.95

6 1 10 3.7
6 1 6 3.55

B H
0.3 2.95

42 1 10 3.55
42 1 6 3.43

B H
0.3 2.95

4 1 14 3.7
4 1 2 3.31

B H
0.3 2.95

2 1 14 3.7
2 1 2 3.55

B H
0.4 2.95

4 1 16 3.55

B H
0.3 2.95
2 1 6 3.7
2 1 10 3.55

0.3

0.3 2.95
2 0.075 1 25 2.16
2 0.175 1 7 2.14 30.016

2 0.075 2 25 0.67
2 0.175 2 7 0.65 18.2
2 0.075 1 25 1.07
2 0.175 1 7 1.05 14.7

2 0.075 1 25 0.16
2 0.175 1 7 0.348 4.872

0.3

2 0.075 1 40 2.16

2 0.075 2 40 0.67

2 0.075 1 40 1.07

2 0.075 1 40 0.38

0.3

42 0.075 1 25 2.16
42 0.175 1 7 2.14 630.336

42 0.075 2 25 0.67
42 0.175 2 7 0.65 382.2

42 0.075 1 25 1.07
42 0.175 1 7 1.054 309.876
42 0.075 1 25 0.38
42 0.175 1 7 0.348 102.312

0.4 2.95

4 0.1 1 19 2.36
4 0.2 1 6 2.34 56.256

4 0.1 2 19 0.84
4 0.2 2 6 0.82 39.36
4 0.1 1 19 0.63
4 0.2 1 6 0.61464 14.75136

4 0.1 1 19 0.38
4 0.2 1 6 0.348 8.352

0.3 2.95

4 0.075 1 25 2.36
4 0.075 1 15 2.36

4 0.075 2 25 0.696
4 0.075 2 15 0.696
4 0.075 1 25 1.132
4 0.075 1 15 1.132

2 0.075 1 25 0.38
2 0.075 1 15 0.38
0.3 3

6 0.075 1 25 2.16

6 0.15 1 8 2.144 102.912

6 0.075 2 25 0.67
6 0.15 2 8 0.65 62.4
6 0.075 1 25 1.07
6 0.15 1 8 1.054 50.592

6 0.075 1 25 0.38
6 0.15 1 8 0.348 16.704

0.2 2.95
8 1 38 3.95

8 0.1 1 30 5.124 1229.76

8 0.1 7 30 0.84 1411.2

8 0.1 6 30 0.278 400.32

2 1 32 3.95

2 1 30 5.084 305.04

2 6 30 0.84 302.4
2 1 30 0.604 36.24

2 4 30 0.278 66.72

2 1 42 3.95

2 1 30 5.284 317.04

2 8 30 0.761 365.12
2 7 30 0.278 116.76

8MM
6,394
UNIT WT 0.395
KG 2,526
MT 2.526
Total=

Bar Bending Schedule

7th to 8th lvl columns

NO. OF
Spacing NO. OF
Size cover SIMILAR Nos of set LENGTH 8MM
of Bar BARS
MEMBERS

B H
0.3 2.95

6 1 10 3.7
6 1 6 3.55

B H
0.3 2.95

42 1 10 3.55
42 1 6 3.43

B H
0.3 2.95
4 1 14 3.7
4 1 2 3.31

B H
0.3 2.95

2 1 14 3.7
2 1 2 3.55

B H
0.4 2.95

4 1 16 3.55

B H
0.3 2.95
2 1 6 3.7
2 1 10 3.55

0.3

0.3 2.95

2 0.075 1 25 2.16
2 0.175 1 7 2.14 30.016

2 0.075 2 25 0.67
2 0.175 2 7 0.65 18.2
2 0.075 1 25 1.07
2 0.175 1 7 1.05 14.7

2 0.075 1 25 0.16
2 0.175 1 7 0.348 4.872

0.3

2 0.075 1 40 2.16
2 0.075 2 40 0.67

2 0.075 1 40 1.07

2 0.075 1 40 0.38

0.3

42 0.075 1 25 2.16
42 0.175 1 7 2.14 630.336

42 0.075 2 25 0.67
42 0.175 2 7 0.65 382.2

42 0.075 1 25 1.07
42 0.175 1 7 1.054 309.876

42 0.075 1 25 0.38
42 0.175 1 7 0.348 102.312

0.4 2.95

4 0.1 1 19 2.36
4 0.2 1 6 2.34 56.256

4 0.1 2 19 0.84
4 0.2 2 6 0.82 39.36
4 0.1 1 19 0.63
4 0.2 1 6 0.61464 14.75136

4 0.1 1 19 0.38
4 0.2 1 6 0.348 8.352

0.3 2.95
4 0.075 1 25 2.36
4 0.075 1 15 2.36

4 0.075 2 25 0.696
4 0.075 2 15 0.696
4 0.075 1 25 1.132
4 0.075 1 15 1.132

2 0.075 1 25 0.38
2 0.075 1 15 0.38
0.3 3

6 0.075 1 25 2.16

6 0.15 1 8 2.144 102.912

6 0.075 2 25 0.67
6 0.15 2 8 0.65 62.4
6 0.075 1 25 1.07
6 0.15 1 8 1.054 50.592

6 0.075 1 25 0.38
6 0.15 1 8 0.348 16.704

0.2 2.95
8 1 38 3.95

8 0.1 1 30 5.124 1229.76

8 0.1 7 30 0.84 1411.2

8 0.1 6 30 0.278 400.32


2 1 32 3.95

2 1 30 5.084 305.04

2 6 30 0.84 302.4
2 1 30 0.604 36.24

2 4 30 0.278 66.72

2 1 42 3.95

2 1 30 5.284 317.04

2 8 30 0.761 365.12

2 7 30 0.278 116.76

8MM
6,394
UNIT WT 0.395
KG 2,526
MT 2.526
Total=

8th to 9th lvl columns


NO. OF
Spacing NO. OF
Size cover SIMILAR Nos of set LENGTH 8MM
of Bar BARS
MEMBERS

B H
0.3 2.95

6 1 6 3.7
6 1 10 3.55

B H
0.3 2.95

42 1 6 3.55
42 1 10 3.43

B H
0.3 2.95

4 1 14 3.7
4 1 2 3.31

B H
0.3 2.95

2 1 14 3.7
2 1 2 3.55

B H
0.4 2.95

4 1 10 3.55
4 1 6 3.43

B H
0.3 2.95
2 1 6 3.7
2 1 10 3.55
0.3

0.3 2.95

2 0.075 1 25 2.16
2 0.175 1 7 2.14 30.016

2 0.075 2 25 0.67
2 0.175 2 7 0.65 18.2
2 0.075 1 25 1.07
2 0.175 1 7 1.05 14.7

2 0.075 1 25 0.16
2 0.175 1 7 0.348 4.872

0.3

2 0.075 1 40 2.16

2 0.075 2 40 0.67

2 0.075 1 40 1.07

2 0.075 1 40 0.38

0.3

42 0.075 1 25 2.16
42 0.175 1 7 2.14 630.336
42 0.075 2 25 0.67
42 0.175 2 7 0.65 382.2

42 0.075 1 25 1.07
42 0.175 1 7 1.054 309.876

42 0.075 1 25 0.38
42 0.175 1 7 0.348 102.312

0.4 2.95

4 0.1 1 19 2.36
4 0.2 1 6 2.34 56.256

4 0.1 2 19 0.84
4 0.2 2 6 0.82 39.36
4 0.1 1 19 0.63
4 0.2 1 6 0.61464 14.75136

4 0.1 1 19 0.38
4 0.2 1 6 0.348 8.352

0.3 2.95

4 0.075 1 25 2.36
4 0.075 1 15 2.36

4 0.075 2 25 0.696
4 0.075 2 15 0.696
4 0.075 1 25 1.132
4 0.075 1 15 1.132

2 0.075 1 25 0.38
2 0.075 1 15 0.38
0.3 3

6 0.075 1 25 2.16

6 0.15 1 8 2.144 102.912


6 0.075 2 25 0.67
6 0.15 2 8 0.65 62.4
6 0.075 1 25 1.07
6 0.15 1 8 1.054 50.592

6 0.075 1 25 0.38
6 0.15 1 8 0.348 16.704

0.2 2.95
8 1 38 3.95

8 0.1 1 30 5.124 1229.76

8 0.1 7 30 0.84 1411.2

8 0.1 6 30 0.278 400.32

2 1 32 3.95

2 1 30 5.084 305.04

2 6 30 0.84 302.4
2 1 30 0.604 36.24

2 4 30 0.278 66.72

2 1 42 3.95
2 1 30 5.284 317.04

2 8 30 0.761 365.12

2 7 30 0.278 116.76

8MM
6,394
UNIT WT 0.395
KG 2,526
MT 2.526
Total=

NO. OF
Spacing NO. OF
Size cover SIMILAR Nos of set LENGTH 8MM
of Bar BARS
MEMBERS

B H
0.3 2.95

6 1 6 3.7
6 1 10 3.55

B H
0.3 2.95

42 1 6 3.55
42 1 10 3.43
B H
0.3 2.95

4 1 14 3.7
4 1 2 3.31

B H
0.3 2.95

2 1 14 3.7
2 1 2 3.55

B H
0.4 2.95

4 1 10 3.55
4 1 6 3.43

B H
0.3 2.95
2 1 6 3.7
2 1 10 3.55

0.3

0.3 2.95

2 0.075 1 25 2.16
2 0.175 1 7 2.14 30.016

2 0.075 2 25 0.67
2 0.175 2 7 0.65 18.2
2 0.075 1 25 1.07
2 0.175 1 7 1.05 14.7

2 0.075 1 25 0.16
2 0.175 1 7 0.348 4.872
0.3

2 0.075 1 40 2.16

2 0.075 2 40 0.67

2 0.075 1 40 1.07

2 0.075 1 40 0.38

0.3

42 0.075 1 25 2.16
42 0.175 1 7 2.14 630.336

42 0.075 2 25 0.67
42 0.175 2 7 0.65 382.2

42 0.075 1 25 1.07
42 0.175 1 7 1.054 309.876

42 0.075 1 25 0.38
42 0.175 1 7 0.348 102.312

0.4 2.95

4 0.1 1 19 2.36
4 0.2 1 6 2.34 56.256

4 0.1 2 19 0.84
4 0.2 2 6 0.82 39.36
4 0.1 1 19 0.63
4 0.2 1 6 0.61464 14.75136

4 0.1 1 19 0.38
4 0.2 1 6 0.348 8.352

0.3 2.95

4 0.075 1 25 2.36
4 0.075 1 15 2.36

4 0.075 2 25 0.696
4 0.075 2 15 0.696
4 0.075 1 25 1.132
4 0.075 1 15 1.132

2 0.075 1 25 0.38
2 0.075 1 15 0.38
0.3 3

6 0.075 1 25 2.16

6 0.15 1 8 2.144 102.912

6 0.075 2 25 0.67
6 0.15 2 8 0.65 62.4
6 0.075 1 25 1.07
6 0.15 1 8 1.054 50.592

6 0.075 1 25 0.38
6 0.15 1 8 0.348 16.704

0.2 2.95
8 1 38 3.95

8 0.1 1 30 5.124 1229.76

8 0.1 7 30 0.84 1411.2


8 0.1 6 30 0.278 400.32

2 1 32 3.95

2 1 30 5.084 305.04

2 6 30 0.84 302.4
2 1 30 0.604 36.24

2 4 30 0.278 66.72

2 1 42 3.95

2 1 30 5.284 317.04

2 8 30 0.761 365.12

2 7 30 0.278 116.76

8MM
6,394
UNIT WT 0.395
KG 2,526
MT 2.526
Total=
10MM 12MM 16MM 20MM 25MM
Remark
87

310.8
42.6

2385.6

207.2
26.48

103.6
14.2
88.8
142

44.4
71

109 2.16
Confined
Zone
Height
Take As
67 1.8 m
175=SQRT(110^2+136^2)
53.3

19

172.8

107.2

85.6

30.4
2268

1407

1123.5

399

180.88

210=SQRT(160^2+136^2)

127.68 209.9905

47.92864

28.88

236
141.6

188=SQRT(110^2+153^2)
139.2
83.52
113.2
67.92
19
11.4

324

201

160.5

57

1200.8

252.8
0.24
0.12

331.8

10MM 12MM 16MM 20MM 25MM


7,781.51 26.48 - 4,440.80 754.80
0.62 0.89 1.58 2.47 3.85
4,824.54 23.57 - 10,969 2,905.98
4.825 0.024 - 10.969 2.906
21.273 MT

10MM 12MM 16MM 20MM 25MM


Remark
87
222 lap Length =Dia*30 For Fe500 Steel
127.8

1491
864.36

207.2
26.48

103.6
14.2

227.2

44.4
71
108 2.16
Confined
Zone
Height
Take As
67 1.8 m
175=SQRT(110^2+136^2)
53.3

172.8

107.2

85.6

30.4

2268

1407

1123.5
399

179.36

210=SQRT(160^2+136^2)

127.68 209.9905

47.92864

28.88

236
141.6

188=SQRT(110^2+153^2)
139.2
83.52
113.2
67.92

19
11.4

324

201

160.5

57
1200.8

252.8

0.24
0.12

331.8
10MM 12MM 16MM 20MM 25MM
7,767.99 26.48 864.36 3,716.60 577.20
0.62 0.89 1.58 2.47 3.85
4,816.15 23.57 1,365.7 9,180 2,222.22
4.816 0.024 1.366 9.180 2.222
20.133 MT

10MM 12MM 16MM 20MM 25MM

222
127.8

1491
864.36
207.2
26.48

103.6
14.2

227.2

44.4
71

108

67

53.3

172.8
107.2

85.6

30.4

2268

1407

1123.5

399

179.36

127.68

47.92864

28.88
236
141.6

139.2
83.52
113.2
67.92

19
11.4

324

201

160.5

57

1200.8
252.8

331.8

10MM 12MM 16MM 20MM 25MM


7,767.99 26.48 864.36 3,716.60 577.20
0.62 0.89 1.58 2.47 3.85
4,816.15 23.57 1,365.7 9,180 2,222.22
4.816 0.024 1.366 9.180 2.222
20.133 MT
10MM 12MM 16MM 20MM 25MM

133.2
213

894.6
1440.6

207.2
26.48

103.6
14.2

142
82.32

44.4
71
108

67

53.3

172.8

107.2

85.6

30.4

2268
1407

1123.5

399

179.36

127.68

47.92864

28.88

236
141.6

139.2
83.52
113.2
67.92

19
11.4

324
201

160.5

57

1200.8

252.8

331.8
10MM 12MM 16MM 20MM 25MM
7,767.99 26.48 1,522.92 3,120.20 488.40
0.62 0.89 1.58 2.47 3.85
4,816.15 23.57 2,406.2 7,707 1,880.34
4.816 0.024 2.406 7.707 1.880
19.359 MT

10MM 12MM 16MM 20MM 25MM

133.2
213

894.6
1440.6
207.2
26.48

103.6
14.2

142
82.32

44.4
71

108

67

53.3

8
172.8

107.2

85.6

30.4

2268

1407

1123.5

399

179.36

127.68

47.92864

28.88
236
141.6

139.2
83.52
113.2
67.92

19
11.4

324

201

160.5

57

1200.8
252.8

331.8

10MM 12MM 16MM 20MM 25MM


7,767.99 26.48 1,522.92 3,120.20 488.40
0.62 0.89 1.58 2.47 3.85
4,816.15 23.57 2,406.2 7,707 1,880.34
4.816 0.024 2.406 7.707 1.880
19.359 MT
Bar Bending Schedule
Name of Work :Hubtown PWD Chunabhatti Building
Name of Agency : JRD Enterprises
Name of Client : Hubtown.
Quantity Analysis for Steel of 6th floor Beam
Drawing NO GES/5081/SCH-BEAM 6th LVL-I/2
SR.
Beam No Bar Details
NO.
x Direction Beam
1 1.1, 57.1,15.1,45.1 Top Steel
3.1,18.1,44.1,59.1
Bottom steel

Extra top

Stirrups
Face bar

2 15.3,45.03,40.3,22.03 Top Steel

Bottom steel

Stirrups for 0 to 2D
at 150 cc Stirrups for center
Face bar

3 17.1,43.1,20.1,42.1 Top Steel

Bottom steel

Extra top

at 100 cc Stirrups for 0 to 2 D


at 200 cc Stirrups for center
Face bar
3 20.3,42.3, 2.3,43.3 Top Steel

Bottom steel

Stirrups
Face bar

4 22.1,40.1,23.1,37.1 Top Steel

Bottom steel

Extra top

Stirrups
Face bar

5 31.1-32.1, 29.01-29.1 Top Steel

Bottom steel

Extra top

Stirrups
Face bar

6 53.3,36.3 Top Steel


5.1,47.3,30.3,19.3
Bottom steel
bottom steel 16 mm Only 53.3 And
47.3
53.3 and 47.3 Stirrups
Stirrups
Face bar

8 8.1, 52.1,6.1,48.1 Top Steel


Bottom steel

Extra Steel

Stirrups
Face bar

9 8.3,8.5,8.7,35.3,35.5,35.7 Top Steel


6.3,6.5,6.7,33.3,33.5,33.7
Bottom steel

Stirrups
Face bar

10 34.3,7.4,14.4,51.03 Top Steel

Bottom steel

Stirrups
Face bar

11 55.1, 11.1,13.1,50.1 Top Steel


55.1,50.1 Top Steel
Bottom steel

Extra top

Stirrups
Face bar
12 7.3,49.1,14.3,51.1 Top Steel

Bottom steel

Stirrups
Face bar
13 26.1-L6.1-L4.1-L3.3-L1.1 Top Steel
25.1-27.1
Bottom steel

27.1,26.1 Extra top


27.1-25.1, 26.1-L6.1
25.1-L1.1,L6.1-L4.1
C25, C26

27.1,26.1 Stirrups
25.1,L6.1
L1.1,L4.1
L3.3 length 3.940 0 to 2D 100mm c/c
Remaning 200c/c

Face bar
27.1,26.1
25.1,L6.1
L1.1,L4.1
L3.3 length 3.940

14 L3.1 Top Steel

Bottom steel

Extra top

4 legged Stirrups Stirrups


106mm = (230-0.035-
0.035)=160/3=53.22*2=107 Face bar
15 33.1-34.1-L7.1-L9.1,L10.1 Top Steel
L12.1
Bottom steel

C34,35 Extra top

L7
L9
L10
L12
33.1,35.1 Stirrups
34.1,L12.1 4.170 0 to 2D
Remaning
L7.1-L10.1
L9.1

33.1,35.1 Face bar


34.1,L12.1 4.170
L7.1-L10.1
L9.1

16 55.03 Top Steel

Bottom steel

Stirrups
Face bar

17 L8.01 ,L11.1 Top Steel

Bottom steel

Stirrups
Face bar
19 12.1ML Top Steel

Bottom steel

Extra Steel

Stirrups
Face bar

Y Direction Beam
1 23.2,24.2 Top Steel

Bottom steel

Extra top

Stirrups 0 to 2D

Face bar

2 1.2-15.2, 45.02-45.2 Top Steel


4.2-16.2,46.02-46.2
Bottom steel

Extra top C1
1.2,45.2,4.2,46.2 Stirrups
16.2,15.2,46.02,46.2
Face bar

3 15.4,45.04,22.04,40.4 Top Steel

Bottom steel

Stirrups
4 21.02,21.2,29.2,39.2 Top Steel
22.02,22.2,32.2,40.2
Bottom steel

Extra top C21


C29
C39
Stirrups 21.02,39.2,22.02,40.2
21.2,29.2, 22.2,32.2
Face bar
21.02,39.2,22.02,40.2
21.2,29.2, 22.2,32.2

5 2.2, 43.2,3.2,44.2 Top Steel

Bottom steel

Extra top

Stirrups
Face bar

6 5.2,41.2 Top Steel


10.2,42.2
Bottom steel

Stirrups
Face bar

7 19.2-30.2, 20.2-31.2 Top Steel

Bottom steel

Extra top C19,C41


C30
Stirrups 19.2 And 20.2

Stirrups For 30.2 and 31.2


Face bar

8 6.2,33.2,9.2 Top Steel

Bottom steel

Extra top C19,C41

Stirrups0 To 2D
Remaning
Face bar

9 36.2 Top Steel

Bottom steel

Extra top C19,C41

Stirrups0 To 2D
Remaning
Face bar

10 27.2,28.2 Top Steel

Bottom steel

Stirrups
Face bar

11 33.6,6.6,35.6,8.6 Top Steel

Bottom steel
Stirrups

12 Top Steel
33.8,6.4,6.8,33.4,8.4,35.8,35.4,8.8
Bottom steel

Stirrups

13 Top Steel
7.2-25.2-34.2, 8.2-26.2-35.2 25.2

Bottom steel

Stirrups 7.2
25.2

Extra bar

Face bar

14 11.2,14.2 Top Steel

Bottom steel

Extra top

Stirrups
Face bar

15 55.02 Top Steel

Bottom steel

Extra top
Stirrups

Face bar

16 51.02 Top Steel

Bottom steel

Extra top

Stirrups

Face bar

17 L9.2 Top Steel

Bottom steel

Extra top

Stirrups 0 to 2D

Face bar

18 L10.2 Top Steel

Bottom steel

Extra top

Stirrups 0 to 2D

Face bar
19 12.2,13.2 Top Steel

Bottom steel

Extra top at C12

Stirrups
Face bar

20 L1.2, L6.2 Top Steel

Bottom steel

Stirrups
Face bar

21 50.2 Top Steel

Bottom steel

Stirrups

Face bar

22 56.2 Top Steel

Bottom steel

Stirrups

Face bar
6th FLOOR BEAM BBS
Size Of Beam Total
Bar
Cutting length Dia Nos of
L B D Nos
beam

2.860 0.230 0.80 5.060 25 2 8

2.860 0.230 0.80 4.620 20 2 8


2.860 0.230 0.80 4.268 16 1 8
2 20 4 8

0.160 0.730 1.860 8 30 8


2.860 12 4 8

1.870 0.230 0.60 2.926 12 2 4

1.870 0.230 0.60 3.278 16 2 4

1.600 0.160 0.530 1.444 8 22 4


0.430 0.160 0.530 1.444 8 3 4
1.870 12 4 4

3.150 0.230 0.80 4.910 20 2 4

3.150 0.230 0.80 4.910 20 2 4


3.150 0.230 0.80 4.558 16 1 4
1.8 20 2 4

1.600 0.160 0.730 1.844 8 33 4


0.550 0.160 0.730 1.844 8 3 4
3.150 12 4 4
3.150 0.230 0.80 4.910 20 2 4

3.150 0.230 0.80 4.910 20 2 4

0.160 0.730 1.844 8 16 4


3.150 12 4 4

3.230 0.230 0.80 4.990 20 2 4

3.230 0.230 0.80 4.990 20 2 4


3.230 0.230 0.80 4.638 16 1 4
1.5 16 4 4

0.160 0.730 1.860 8 33 4


3.230 12 4 4

7.280 0.230 0.80 9.480 25 2 2

7.280 0.230 0.80 9.040 20 2 2


3.680 0.230 0.80 4.907 20 4 2
1.840 1.840 20 2 2
2.740 2.740 20 2 2
0.160 0.730 1.860 8 64 2
7.280 12 4 2

2.500 0.230 0.80 4.260 20 2 6

2.500 0.230 0.80 4.300 20 2 6


2.500 0.230 0.80 3.908 16 1 2
0.160 0.730 1.844 8 26 3
0.160 0.730 1.844 8 14 3
2.500 12 4 6

2.470 0.230 0.80 4.230 20 2 4


2.470 0.230 0.80 4.230 20 2 4
2.470 0.230 0.80 3.878 16 1 4
1.472 16 2 4

0.160 0.730 1.860 8 26 4


2.470 12 4 4

2.540 0.230 0.80 4.300 20 2 12

2.540 0.230 0.80 4.300 20 2 12

0.160 0.730 1.860 8 14 12


2.540 12 4 12

3.140 0.230 0.80 4.900 20 2 4

3.140 0.230 0.80 4.900 20 2 4

0.160 0.730 1.860 8 17 4


3.140 12 4 4

2.860 0.230 0.80 4.620 20 2 2


2.860 0.230 0.80 5.060 25 2 2
2.860 0.230 0.80 4.620 20 2 4
2.860 0.230 0.80 4.268 16 1 4
1.47 16 2 4

0.160 0.730 1.860 8 30 4


2.860 12 4 4
3.140 0.230 0.80 4.900 20 2 4

3.140 0.230 0.80 4.900 20 2 4

0.160 0.730 1.860 8 17 4


3.140 12 4 4
21.180 0.230 0.80 27.980 25 2 1

21.180 0.230 0.80 27.980 25 2 1


16.160 0.230 0.80 19.760 20 2 1

1.84 20 2 2
2.14 20 2 2
2.53 25 2 2
1.25 25 2 2

2.210 0.160 0.730 1.860 8 23 2


3.150 0.160 0.730 1.880 10 33 2
2.500 0.160 0.730 1.880 10 25 2
1.600 0.160 0.730 1.880 10 33 1
0.740 0.160 0.730 1.890 11 4 2

2.210 2.210 12 4 1
3.150 3.150 12 4 1
2.500 2.500 12 4 1
3.940 3.940 12 4 1

3.940 0.230 0.90 5.700 20 4 1

3.940 0.230 0.90 6.140 25 4 1

2.30 25 2 1

0.107 0.830 1.974 10 40 2

3.940 12 4 1
21.180 0.230 0.80 25.680 25 2 1

21.180 0.230 0.80 25.680 25 2 1


16.160 0.230 0.80 18.840 20 2 1

1.84 20 2 2
2.30 25 2 2
2.53 25 2 1
2.53 25 2 1
2.53 25 2 1
2.53 25 2 1
2.210 0.160 0.730 1.860 8 23 2
1.600 0.160 0.730 1.880 10 33 2
0.970 0.160 0.730 1.880 10 5 2
2.000 0.160 0.730 1.880 10 21 2
3.100 0.160 0.730 1.880 10 32 1

2.210 2.210 12 4 1
4.170 4.170 12 4 1
2.000 2.000 12 4 1
3.100 3.100 12 4 1

3.000 0.230 0.80 4.760 20 2 1

3.000 0.230 0.80 4.760 20 2 1

3.000 0.160 0.730 1.860 8 16 1


3.000 12 4 1

0.870 0.230 0.80 2.690 20 4 2

0.870 0.230 0.80 3.145 25 2 2

0.870 0.160 0.730 1.880 10 9 2


0.870 12 4 2
2.960 0.300 0.80 5.160 25 2 1

2.960 0.300 0.80 5.160 25 2 1

2.960 1.840 20 2 1

0.870 0.230 0.730 2.000 8 31 1


2.960 12 4 1

4.450 0.230 0.80 6.210 20 2 2

4.450 0.230 0.80 6.370 20 4 2

1.84 20 2 2

1.600 0.160 0.730 1.880 10 33 2


1.250 0.160 0.730 1.880 10 8 2
4.450 12 4 2

5.180 0.230 0.80 6.940 20 2 8

5.180 0.230 0.80 6.940 20 2 4


1.930 3.338 16 2 4

1.84 20 2 8
1.930 0.160 0.730 1.860 8 20 4
2.350 0.160 0.73 1.860 8 25 4
4.280 12 4 4

1.050 0.230 0.60 2.106 12 2 4

1.050 0.230 0.60 2.458 16 2 4

0.160 0.530 1.444 8 6 4


10.950 0.230 0.80 12.710 20 2 2

10.950 0.230 0.80 12.710 20 2 2


10.950 12.358 16 2 2
2.74 20 2 2
2.14 20 2 2
2.74 20 2 2
1.680 0.160 0.730 1.860 8 17 4
2.740 0.160 0.730 1.860 8 27 4

1.680 1.680 12 4 4
2.740 2.740 12 4 4

2.450 0.230 0.80 4.210 20 2 4

2.450 0.230 0.80 4.210 20 2 4


2.450 0.230 0.80 3.858 16 2 4
1.84 20 2 4
1.47 16 2 4
0.160 0.730 1.860 8 30 4
2.450 12 4 4

1.135 0.230 0.80 1.975 20 4 4

1.135 0.230 0.80 2.185 25 2 4

0.160 0.730 1.880 10 12 4


1.135 12 4 4

8.570 0.230 0.80 10.330 20 2 2

8.570 0.230 0.80 10.770 25 2 2

1.84 20 2 2
2.14 20 2 1
4.135 0.160 0.730 1.860 8 47 2

4.135 0.160 0.730 1.860 8 47 2


6.770 12 4 2

5.270 0.400 1.00 7.030 20 4 3

5.270 0.400 1.00 7.030 20 2 3


5.270 0.400 1.00 7.470 25 2 3
2.30 25 2 3
1.84 20 2 3

1.600 0.220 0.930 2.400 10 32 3


2.070 0.220 0.930 2.400 10 14 3
5.270 12 6 3

5.745 0.400 1.00 7.665 20 4 1

5.745 0.400 1.00 7.665 20 2 1


5.745 0.400 1.00 8.145 25 2 1
2.30 25 2 1
1.84 20 2 1

1.600 0.220 0.930 2.400 10 32 1


2.545 0.220 0.930 2.400 10 17 1
5.745 12 6 1

1.500 0.230 0.80 3.260 20 4 2

1.500 0.230 0.80 3.700 25 2 2

0.160 0.730 1.860 8 15 2


1.500 12 4 2

1.230 0.230 0.60 2.286 12 2 4

1.230 0.230 0.60 2.638 16 2 4


0.160 0.530 1.460 8 9 4

0.840 0.230 0.60 1.656 12 2 8

0.840 0.230 0.60 1.928 16 2 8

0.160 0.530 1.460 8 7 1

12.640 0.230 0.80 15.490 25 2 2


1.500 0.230 0.8 3.260 20 2 2

12.640 0.230 0.80 15.490 25 2 2


12.640 0.230 0.80 14.920 20 2 2
4.570 0.160 0.730 1.880 10 41 4
1.500 0.160 0.730 1.880 10 16 2

1.840 20 2 2
1.840 20 2 2
10.840 12 4 2

2.680 0.230 0.80 4.440 20 2 2

2.680 0.230 0.80 4.440 20 2 2


2.680 0.230 0.80 4.088 16 1 2
1.60 16 4 2

2.680 0.160 0.730 1.860 8 28 2


2.680 12 4 2

6.230 0.230 0.80 8.430 25 2 1

6.230 0.230 0.80 8.430 25 2 1

2.30 25 4 1
6.260 0.160 0.730 1.880 10 64 1

6.260 6.260 12 4 1

5.860 0.230 0.80 8.060 25 2 1

5.860 0.230 0.80 8.060 25 2 1

2.30 25 4 1

5.860 0.160 0.730 1.880 10 60 1

5.860 5.860 12 4 1

4.030 0.230 0.80 5.790 20 2 1

4.030 0.230 0.80 5.790 20 2 1


4.030 0.230 0.80 5.438 16 2 1
1.60 16 4 1

1.600 0.160 0.730 1.860 8 33 1


2.430 0.160 0.730 1.860 8 12 1

4.030 4.030 12 4 1

3.630 0.230 0.80 5.390 20 2 1

3.630 0.230 0.80 5.390 20 2 1


3.630 0.230 0.80 5.038 16 2 1
1.60 16 4 1

1.600 0.160 0.730 1.860 8 33 1


2.030 0.160 0.730 1.860 8 10 1
3.630 3.630 12 4 1
3.300 0.230 0.80 5.060 20 2 2

3.300 0.230 0.80 5.060 20 2 2


3.300 0.230 0.80 4.708 16 2 2
1.47 16 2 2

3.300 0.160 0.730 1.860 8 33 2


3.300 3.300 12 4 2

1.500 0.230 0.80 3.700 25 4 2

1.500 0.230 0.80 3.700 25 4 2

1.500 0.160 0.730 1.880 10 15 2


1.500 1.500 12 4 2

1.000 0.230 0.80 2.820 20 2 1


1.000 0.230 0.80 2.836 16 2 1
1.000 0.230 0.80 2.820 20 2 1

1.000 0.160 0.730 1.860 8 10 1

1.000 1.000 12 4 1

0.600 0.230 0.80 1.820 20 2 1


0.600 0.230 0.80 1.836 16 2 1
0.600 0.230 0.80 1.820 20 2 1

0.600 0.160 0.730 1.860 8 6 1

0.600 0.600 12 4 1
TOTAL LENGTH
UNIT WEIGHT
WT IN MT
TOTAL WT IN MT
Total Qty
8 10 12 16 20

80.96

73.92 73.92
34.14 34.14
64.00 64.00

440.45 440.45
91.52 91.52

23.41 23.41

26.22 26.22

129.00 129.00
16.56 16.56
29.92 29.92

39.28 39.28

39.28 39.28
18.23 18.23
14.72 14.72

243.41 243.41
20.28 20.28
50.40 50.40
39.28 39.28

39.28 39.28

116.17 116.17
50.40 50.40

39.92 39.92

39.92 39.92
18.55 18.55
23.55 23.55

247.75 247.75
51.68 51.68

37.92

36.16 36.16
39.25 39.25
7.36 7.36
10.96 10.96
237.34 237.34
58.24 58.24

51.12 51.12

51.60 51.60
7.82
7.82
143.83 143.83
74.68
60.00 60.00

33.84 33.84
33.84 33.84
15.51 15.51
11.78 11.78

191.21 191.21
39.52 39.52

103.20 103.20

103.20 103.20

305.78 305.78
121.92 121.92

39.20 39.20

39.20 39.20

124.25 124.25
50.24 50.24

18.48 18.48
20.24
36.96 36.96
17.07 17.07
11.78 11.78

220.22 220.22
45.76 45.76
39.20 39.20

39.20 39.20

126.48 126.48
50.24 50.24
55.96

55.96
39.52 39.52

7.36 7.36
8.56 8.56
10.12
5.00

85.93 85.93
122.20 122.20
94.00 94.00
62.04 62.04
13.99

8.84 8.84
12.60 12.60
10.00 10.00
15.76 15.76

22.80 22.80

24.56

4.60

159.50 159.50

15.76 15.76
51.36

51.36
37.68 37.68

7.36 7.36
9.20
5.06
5.06
5.06
5.06
85.93 85.93
124.08 124.08
18.24
78.96 78.96
60.16 60.16

8.84 8.84
16.68 16.68
8.00 8.00
12.40 12.40

9.52 9.52

9.52 9.52

29.76 29.76
12.00 12.00

21.52 21.52

12.58

32.71 32.71
6.96 6.96
10.32

10.32

3.68 3.68

61.20 61.20
11.84 11.84

24.84 24.84

50.96 50.96

7.36 7.36

124.08 124.08
31.33 31.33
35.60 35.60

111.04 111.04

55.52 55.52
26.70 26.70

29.44 29.44
151.03 151.03
182.28 182.28
68.48 68.48

16.85 16.85

19.66 19.66

36.10 36.10
50.84 50.84

50.84 50.84
49.43 49.43
10.96 10.96
8.56 8.56
10.96 10.96
124.99 124.99
203.86 203.86

26.88 26.88
43.84 43.84

33.68 33.68

33.68 33.68
30.86 30.86
14.72 14.72
11.78 11.78
223.20 223.20
39.20 39.20

31.60 31.60

17.48

92.87 92.87
18.16 18.16

41.32 41.32

43.08

7.36 7.36
4.28 4.28
173.63 173.63

173.63 173.63
54.16 54.16

84.36 84.36

42.18 42.18
44.82
13.80
11.04 11.04

230.40 230.40
99.36
94.86 94.86

30.66 30.66

15.33 15.33
16.29
4.60
3.68 3.68

76.80 76.80
40.72
34.47 34.47

26.08 26.08

14.80

55.80 55.80
12.00 12.00

18.29 18.29

21.10 21.10
53.73 53.73

26.50 26.50

30.85 30.85

9.64 9.64

61.96
13.04 13.04

61.96
59.68 59.68
306.44 306.44
60.16 60.16

7.36 7.36
7.36 7.36
1040.64 1,040.64

17.76 17.76

17.76 17.76
8.18 8.18
12.80 12.80

103.42 103.42
21.44 21.44

16.86

16.86

9.20
119.57 119.57

25.04 25.04

16.12

16.12

9.20

112.05 112.05

23.44 23.44

11.58 11.58

11.58 11.58
10.88 10.88
6.40 6.40

61.38 61.38
22.60 22.60

16.12 16.12

10.78 10.78

10.78 10.78
10.08 10.08
6.40 6.40

61.38 61.38
18.88 18.88
14.52 14.52
20.24 20.24

20.24 20.24
18.83 18.83
5.89 5.89

122.76 122.76
26.40 26.40

29.60

29.60

56.40 56.40
12.00 12.00

5.64 5.64
5.67 5.67
5.64 5.64

18.60 18.60

4.00 4.00

3.64 3.64
3.67 3.67
3.64 3.64

11.16 11.16

2.40 2.40
TH 4,633.62 1,943.75 2,538.21 463.84 2,257.90
0.395 0.617 0.888 1.58 2.47
1.830 1.199 2.254 0.733 5.575
N MT 14.998
25

80.96
37.92
20.24
55.96

55.96

10.12
5.00

24.56

4.60
51.36

51.36

9.20
5.06
5.06
5.06
5.06

12.58
10.32

10.32
17.48

43.08
44.82
13.80

16.29
4.60

14.80
61.96

61.96

16.86

16.86

9.20
16.12

16.12

9.20
29.60

29.60
883.05
3.86
3.407
Bar Bending Schedule
Name of Work :Hubtown PWD Chunabhatti Building
Name of Agency : M/S JRD Enterprises
Name of Client : Hubtown.
Quantity Analysis for Steel of 6th Slab Building No.2
Bill No. : R.A. - 9TH
Drawing No-GES/5081/SCH-SLAB 4TH 5TH 6TH 8TH 9TH
Sr. No. Slab No. Description

1 200 S2.1 C1,4,57,60


Main Bar Along Short Span

lx=3.0m
ly=3.27m 3.39

0.08
3.39
Main Bar Along Long Span

3.66

0.08
3.66

0
4.12

Dist. Bent up Along Short Span Top(L7)


3.39
Dist. Bent up Along Short Span Top(L5)
3.39
Dist. Bent up Along Long Span Top(L7)
3.66
Dist. Bent up Along Long Span Top(L7)
3.66

2 200 S2.5 C37,38,23,24


Main Bar Along Short Span

lx=2.78m
ly=3.37m 3.205

0.08
3.17
Main Bar Along Long Span

3.76
1.088

3.795
Dist. Bent up Along Short Span Top(L7)
3.205
Dist. Bent up Along Short Span Top(L5)
3.205
Dist. Bent up Along Long Span Top(L5)
3.76
Dist. Bent up Along Long Span Top(L5)
3.76

3 200 S2.3 C41,42,19,20


Main Bar Along Short Span

lx=4.35m
ly=4.8m 4.775

0.1
4.740
Main Bar Along Long Span

5.225
1.200

5.225
Dist. Bent up Along Short Span Top(L5)
4.775
Dist. Bent up Along Short Span Top(L5)
4.775
Dist. Bent up Along Long Span Top(L5)
5.225
Dist. Bent up Along Long Span Top(L5)
5.225

4 200 S2.2 C56,53,6,9


Main Bar Along Short Span

lx=2.36m
ly=2.54m 2.785

2.750
Main Bar Along Long Span

3.205
0.768

3.205
Dist. Bent up Along Short Span Top(L7)
2.785
Dist. Bent up Along Short Span Top(L5)
2.785
Dist. Bent up Along Long Span Top(L7)
3.205
Dist. Bent up Along Long Span Top(L5)
3.205

5 200 S2.4 C25,26


Main Bar Along Short Span
lx=3.204m
ly=3.62m 3.664

3.664

0.7325

3.664

Main Bar Along Long Span

4.045
0.375

4.045
Dist. Bent up Along Short Span Top(L5)
3.664
Dist. Bent up Along Short Span Top(L5)
3.664
Dist. Bent up Along Long Span Top(L5)
4.045
Dist. Bent up Along Long Span Top(L5)
4.045

6 200 S2.7 C35


Main Bar Along Short Span

lx=3.15m
ly=5.32m 3.610

3.610
3.610
Main Bar Along Long Span

5.745
0.375

5.745
Dist. Bent up Along Short Span Top(L5)
3.61
Dist. Bent up Along Short Span Top(L5)
3.61
Dist. Bent up Along Long Span Top(L5)
5.745
Dist. Bent up Along Long Span Top(L5)
5.745

7 200 S2.6 C34


Main Bar Along Short Span

lx=3.15m
ly=4.48m 3.610

3.610

3.610
Main Bar Along Long Span

4.905
0.375

4.905
Dist. Bent up Along Short Span Top(L5)
3.61
Dist. Bent up Along Short Span Top(L5)
3.61
Dist. Bent up Along Long Span Top(L5)
4.905
Dist. Bent up Along Long Span Top(L5)
4.905

8 200 S2.1 C12,13,56


Main Bar Along Short Span

lx=3.0m
ly=3.35m 3.39
0.788

3.39

Main Bar Along Long Span

3.74

0.08
3.74
Dist. Bent up Along Short Span Top(L7)
3.39
Dist. Bent up Along Short Span Top(L5)
3.39
Dist. Bent up Along Long Span Top(L7)
3.74
Dist. Bent up Along Long Span Top(L7)
3.74

9 200 S2.6 C51


Main Bar Along Short Span

lx=3.0m
ly=4.3m 3.39
0.788

3.39
Main Bar Along Long Span

4.69

0.08
4.69
Dist. Bent up Along Short Span Top(L7)
3.39
Dist. Bent up Along Short Span Top(L5)
3.39
Dist. Bent up Along Long Span Top(L7)
4.69
Dist. Bent up Along Long Span Top(L7)
4.69

10 300 S1.3 Center Passage


Main Bar Along Short Span

lx=1.5m
ly=21.176m 1.890

1.890
Dist. Bent up Along Long Span Top(L5)
22.116
Dist. Bent up Along Long Span Top(L5)
22.116

11 300 S1.2 C30,31 Passage


Main Bar Along Short Span

lx=2.4m
ly=2.465m 2.825
0.168

2.890
Dist. Bent up Along Long Span Top(L5)
3.04
Dist. Bent up Along Long Span Top(L5)
3.04

12 200 S1.1 C43,44,17,18(Toilet Front Passage)

Main Bar Along Short Span Bottom


lx=.75m 0.08
ly=1.05m 1.140
Main Bar Along Short Span Top
0.08 1.140

Main Bar Along Long Span Bottom


0.08
1.440
Main Bar Along Long Span Top
0.08 1.440

13 200 S1.1 C34,35,25,26(Toilet Front Passage)

Main Bar Along Short Span Bottom


lx=.93m 0.08
ly=1.345m 1.320
Main Bar Along Short Span Top
0.08 1.320

Main Bar Along Long Span Bottom


0.08
1.735
Main Bar Along Long Span Top
0.08 1.735

14 200 S1.2 C34,35,25,26(Toilet Front Passage)


Main Bar Along Short Span Bottom
lx=.85m 0.08
ly=1.64m 1.240
Main Bar Along Short Span Top
0.08 1.240

Main Bar Along Long Span Bottom


0.08
2.030
Main Bar Along Long Span Top
0.08 2.030

15 200 S1.1 C45,46,15,16(Toilet Sunk Slab)

Main Bar Along Short Span Bottom


lx=.97m 0.08
ly=1.05m 1.360
Main Bar Along Short Span Top
0.08 1.360

Main Bar Along Long Span Bottom


0.08
1.440
Main Bar Along Long Span Top
0.08 1.440

16 200 S1.2 C39, 40,21,22 (Toilet Sunk Slab)

Main Bar Along Short Span Bottom


lx=.89m 0.08
ly=1.2m 1.280
Main Bar Along Short Span Top
0.08 1.280

Main Bar Along Long Span Bottom


0.08
1.590
Main Bar Along Long Span Top
0.08 1.590

17 200 S1.1 C34, 35,25,26 (Toilet Sunk Slab)

Main Bar Along Short Span Bottom


lx=.89m 0.08
ly=1.12m 1.280
Main Bar Along Short Span Top
0.08 1.280

Main Bar Along Long Span Bottom


0.08
1.510
Main Bar Along Long Span Top
0.08 1.510

18 200 S1.1 C34, 35,25,26 (Toilet Sunk Slab)

Main Bar Along Short Span Bottom


lx=1.23m 0.08
ly=1.31m 1.620
Main Bar Along Short Span Top
0.08 1.620

Main Bar Along Long Span Bottom


0.08
1.700
Main Bar Along Long Span Top
0.08 1.700

19 200 SC1.1 C37,38,23,24 Elevation Chhajja


Main Bar Along Short Span
0.16
lx=.60m
ly=.82m
0.73

0.53
0.16

0.73
0.53
Dist. Along Long Span Bottom
1.21
Dist. Along Long Span Top
1.21

20 200 SC1.1 C58,59,2,3 Elevation Chhajja


Main Bar Along Short Span
lx=(0.8+0.450+0.450)/3 0.16
lx=.567m
ly=3m 0.73

0.50
0.16
0.73

0.50
Dist. Along Long Span Bottom
2.93
Dist. Along Long Span Top
2.93

21 300 S1.1 C43,44,17,18 Elevation Chhajja


Main Bar Along Short Span
0.16
lx=.97m
ly=3.15m
0.73

0.90
0.16

0.73
0.90
Dist. Along Long Span Bottom
3.54
Dist. Along Long Span Top
3.54

22 200 SC1.1 C6,9,48,53 Elevation Chhajja


Main Bar Along Short Span
lx=(0.6+0.450+0.450)/3 0.16
lx=.5m
ly=1.9m 0.73

0.53
0.16
0.73

0.53
Dist. Along Long Span Bottom
1.83
Dist. Along Long Span Top
1.83

23 300 S1.1 C55,51,12,14 Elevation Chhajja


Main Bar Along Short Span
0.16
lx=1.02m
ly=3.07m
0.73

0.95
0.16

0.73
0.95
Dist. Along Long Span Bottom
3.46
Dist. Along Long Span Top
3.46

24 200 SC1.1 C 11 to 14 Elevation Chhajja


Main Bar Along Short Span
0.16
lx=.65m
ly=9.56m 0.73

0.58
0.16
0.73

0.58
Dist. Along Long Span Bottom
9.95
Dist. Along Long Span Top
9.95

25 200 SC1.1 C55 to 56 Elevation Chhajja


Main Bar Along Short Span
0.16
lx=.72m
ly=3.0m
0.73

0.65
0.16

0.73
0.65
Dist. Along Long Span Bottom
3.39
Dist. Along Long Span Top
3.39

26 200 SC1.1 C50 to 51 Elevation Chhajja


Main Bar Along Short Span
0.16
lx=.9m
ly=3.0m 0.73

0.83
0.16
0.73

0.83
Dist. Along Long Span Bottom
3.39
Dist. Along Long Span Top
3.39

27 200 SC1.3 C33,36,27,28 Toilet Duct Service Slab


Main Bar Along Short Span
0.16
lx=.65m
ly=2.47m
0.73

0.58
0.16

0.73
0.58
Dist. Along Long Span Bottom
2.86
Dist. Along Long Span Top
2.86

28 200 SC1.1 C33,36,27,28 Toilet Duct Service Slab


Main Bar Along Short Span
0.16
lx=.45m
ly=1.15m 0.73

0.38
0.16
0.73

0.38
Dist. Along Long Span Bottom
1.345
Dist. Along Long Span Top
1.345

29 200 S1.3 C45,46,15,16 Toilet Duct Service Slab


Main Bar Along Short Span
0.16
lx=.45m
ly=2.35m
0.73

0.38
0.16

0.73
0.38
Dist. Along Long Span Bottom
1.54
Dist. Along Long Span Top
1.54

Prepared By:-
H 5TH 6TH 8TH 9TH 10TH LVL
Ф
Description Spacing Item Nos
(mm)

0.08 8 0.10 4 17
3.39

8 0.10 4 17
3.39

0.08 8 0.15 4 11
3.66

8 0.15 4 8
3.66

8 0.15 4 4
4.12

3.39 8 0.10 4 5

3.39 8 0.10 4 7

3.66 8 0.15 4 3
3.66 8 0.15 4 3

0.695
8 0.10 4 18
3.205

8 0.10 4 17
3.17

0.08 8 0.15 4 10
3.76

8 0.15 4 10
3.795

3.205 8 0.10 4 5

3.205 8 0.10 4 7

3.76 8 0.15 4 4

3.76 8 0.15 4 4

0.843
10 0.10 4 25
4.775

10 0.10 4 24
4.740

0.239
10 0.10 4 23
5.225
10 0.10 4 23
5.225

4.775 10 0.10 4 10

4.775 10 0.10 4 10

5.225 10 0.10 4 9

5.225 10 0.10 4 9

0.08 8 0.20 4 7
2.785

8 0.20 4 6
2.750

0.08 8 0.20 4 7
3.205

8 0.20 4 6
3.205

2.785 8 0.20 4 2

2.785 8 0.20 4 3

3.205 8 0.20 4 2

3.205 8 0.20 4 2
8 0.10 2 19
3.664

8 0.10 2 11
3.664

8 0.10 2 7
3.664

0.255
8 0.15 2 12
4.045

8 0.15 2 11
4.045

3.664 8 0.10 2 7

3.664 8 0.10 2 7

4.045 8 0.15 2 4

4.045 8 0.15 2 4

0.750
8 0.10 1 16
3.610

8 0.10 1 12
3.610

8 0.10 1 27
3.610

0.255
8 0.15 1 12
5.745

8 0.15 1 11
5.745

3.61 8 0.10 1 11

3.61 8 0.10 1 11

5.745 8 0.15 1 4

5.745 8 0.15 1 4

0.750
8 0.10 1 6
3.610
0.750
8 0.10 1 19
3.610

8 0.10 1 22
3.610

0.255
8 0.15 1 12
4.905

8 0.15 1 11
4.905
3.61 8 0.10 1 9

3.61 8 0.10 1 9

4.905 8 0.15 1 4

4.905 8 0.15 1 4

0.08 8 0.10 3 18
3.39

8 0.10 3 17
3.39

0.08 8 0.15 3 11
3.74

8 0.15 3 11
3.74

3.39 8 0.10 3 5

3.39 8 0.10 3 7

3.74 8 0.15 3 3

3.74 8 0.15 3 3

0.08 8 0.10 1 22
3.39

8 0.10 1 22
3.39

0.08 8 0.15 1 11
4.69

8 0.15 1 10
4.69

3.39 8 0.10 1 6

3.39 8 0.10 1 9

4.69 8 0.15 1 3

4.69 8 0.15 1 3

8 0.15 1 72
1.890

8 0.15 1 71
1.890

22.116 8 0.2 1 2

22.116 8 0.2 1 2

0.168
8 0.15 2 10
2.825
8 0.15 2 9
2.890

3.04 8 0.2 2 2

3.04 8 0.2 2 2

0.08 8 0.20 4 6
1.140

1.140 0.08 8 0.20 4 5

0.08 8 0.20 4 5
1.440

1.440 0.08 8 0.20 4 4

0.08 8 0.20 4 8
1.320

1.320 0.08 8 0.20 4 7

0.08 8 0.20 4 6
1.735

1.735 0.08 8 0.20 4 5


0.08 8 0.20 4 9
1.240

1.240 0.08 8 0.20 4 8

0.08 8 0.20 4 5
2.030

2.030 0.08 8 0.20 4 4

0.08 8 0.20 4 6
1.360

1.360 0.08 8 0.20 4 5

0.08 8 0.20 4 6
1.440

1.440 0.08 8 0.20 4 5

0.08 8 0.20 4 7
1.280

1.280 0.08 8 0.20 4 6

0.08 8 0.20 4 5
1.590
1.590 0.08 8 0.20 4 4

0.08 8 0.20 4 7
1.280

1.280 0.08 8 0.20 4 6

0.08 8 0.20 4 5
1.510

1.510 0.08 8 0.20 4 4

0.08 8 0.20 4 8
1.620

1.620 0.08 8 0.20 4 7

0.08 8 0.20 4 7
1.700

1.700 0.08 8 0.20 4 6

8 0.10 4 5

0.065
0.53
8 0.10 4 4

0.065
0.53

1.21 8 0.2 4 4

1.21 8 0.2 4 4

8 0.10 4 13

0.065
0.50

8 0.10 4 12

0.065
0.50

2.93 8 0.2 4 4

2.93 8 0.2 4 4

8 0.15 4 12

0.065
0.90
8 0.15 4 11

0.065
0.90

3.54 8 0.2 4 6

3.54 8 0.2 4 6

8 0.10 4 10

0.065
0.53

8 0.10 4 9

0.065
0.53

1.83 8 0.2 4 4

1.83 8 0.2 4 4

8 0.15 4 11

0.065
0.95
8 0.15 4 10

0.065
0.95

3.46 8 0.2 4 6

3.46 8 0.2 4 6

8 0.10 1 48

0.065
0.58

8 0.10 1 47

0.065
0.58

9.95 8 0.2 1 4

9.95 8 0.2 1 4

8 0.10 1 16

0.065
0.65
8 0.10 1 15

0.065
0.65

3.39 8 0.2 1 5

3.39 8 0.2 1 5

8 0.10 1 16

0.065
0.83

8 0.10 1 15

0.065
0.83

3.39 8 0.2 1 6

3.39 8 0.2 1 6

8 0.10 4 13

0.065
0.58
8 0.10 4 12

0.065
0.58

2.86 8 0.2 4 4

2.86 8 0.2 4 4

8 0.10 4 7

0.065
0.38

8 0.10 4 6

0.065
0.38

1.345 8 0.2 4 3

1.345 8 0.2 4 3

8 0.10 4 13

0.065
0.38
8 0.10 4 12

0.065
0.38

1.54 8 0.2 4 3

1.54 8 0.2 4 3

Checked By:-
C. L.
A D Less Bent Total length (m)
(m)
8mm 10mm 12mm
- - -
- - -
- - -
3.39 0.048 0.03 3.37 229.12 - -
- - -
- - -
3.3901 0.048 0.03 3.37 222.38 - -
- - -
- - -
- - -
3.66 0.048 0.03 3.64 160.13 - -
- - -
- - -
3.6601 0.048 0.03 3.64 116.46 - -
- - -

- - -
4.12 0.048 0.03 4.10 65.59 - -
- - -

- - -
3.39 3.39 67.80 - -
- - -
3.39 3.39 94.92 - -
- - -
3.66 3.66 43.92 - -
- - -
3.66 3.66 43.92 - -
- - -
- - -
- - -
- - -
3.21 0.032 0.03 3.20 230.47 - -
- - -
- - -
3.1701 0.048 0.03 3.15 214.16 - -
- - -
- - -
- - -
3.76 0.048 0.03 3.74 149.58 - -
- - -
- - -
4.883 0.048 0.03 4.86 194.47 - -
- - -
- - -
3.205 3.21 64.10 - -
- - -
3.205 3.21 89.74 - -
- - -
3.76 3.76 60.16 - -
- - -
3.76 3.76 60.16 - -
- - -
- - -
- - -
- - -
4.78 0.040 0.04 4.77 - 477.36 -
- - -
- - -
4.740 0.060 0.04 4.72 - 452.92 -
- - -
- - -
- - -
5.464 0.040 0.04 5.46 - 502.46 -
- - -
- - -
5.226 0.040 0.04 5.22 - 480.61 -
- - -
- - -
4.775 4.78 - 191.00 -
- - -
4.775 4.78 - 191.00 -
- - -
5.225 5.23 - 188.10 -
- - -
5.225 5.23 - 188.10 -
- - -
- - -
- - -
- - -
2.79 0.032 0.03 2.78 77.85 - -
- - -
- - -
2.750 0.03 2.78 66.66 - -
- - -
- - -
- - -
3.285 0.048 0.03 3.26 91.40 - -
- - -
- - -
3.973 0.048 0.03 3.95 94.84 - -
- - -
- - -
2.785 2.79 22.28 - -
- - -
2.785 2.79 33.42 - -
- - -
3.205 3.21 25.64 - -
- - -
3.205 3.21 25.64 - -
- - -
- - -
- - -
- - -
3.66 0.048 0.03 3.64 138.45 - -
- - -
- - -
3.664 0.048 0.03 3.64 80.15 - -
- - -

- - -
4.397 0.048 0.03 4.38 61.26 - -
- - -

- - -
- - -
4.300 0.048 0.03 4.28 102.70 - -
- - -
- - -
4.420 0.048 0.03 4.40 96.78 - -
- - -
- - -
3.664 3.66 51.30 - -
- - -
3.664 3.66 51.30 - -
- - -
4.045 4.05 32.36 - -
- - -
4.045 4.05 32.36 - -
- - -
- - -
- - -
- - -
4.36 0.048 0.03 4.34 69.43 - -
- - -
- - -
- - -
3.61 0.048 0.03 3.59 43.07 - -
- - -

3.610 0.048 0.03 3.59 96.91 - -


- - -
- - -
- - -
6.000 0.048 0.03 5.98 71.75 - -
- - -
- - -
6.120 0.048 0.03 6.10 67.09 - -
- - -
- - -
3.61 3.61 39.71 - -
- - -
3.61 3.61 39.71 - -
- - -
5.745 5.75 22.98 - -
- - -
5.745 5.75 22.98 - -
- - -
- - -
- - -
- - -
4.36 0.048 0.03 4.34 26.04 - -
- - -
- - -
4.36 0.048 0.03 4.34 82.45 - -
- - -

3.610 0.048 0.03 3.59 78.96 - -


- - -
- - -
- - -
5.160 0.048 0.03 5.14 61.67 - -
- - -
- - -
5.280 0.048 0.03 5.26 57.85 - -
- - -
- - -
3.61 3.61 32.49 - -
- - -
3.61 3.61 32.49 - -
- - -
4.905 4.91 19.62 - -
- - -
4.905 4.91 19.62 - -
- - -
- - -
- - -
- - -
3.45 0.048 0.03 3.43 180.25 - -
- - -
- - -
4.178 0.048 0.03 4.16 212.00 - -
- - -

- - -
- - -
3.80 0.048 0.03 3.78 124.85 - -
- - -
- - -
3.804 0.048 0.03 3.78 124.85 - -
- - -
- - -
3.39 3.39 50.85 - -
- - -
3.39 3.39 71.19 - -
- - -
3.74 3.74 33.66 - -
- - -
3.74 3.74 33.66 - -
- - -
- - -
- - -
- - -
3.45 0.048 0.03 3.43 75.53 - -
- - -
- - -
4.178 0.032 0.03 4.17 89.72 - -
- - -
- - -
- - -
4.77 0.048 0.03 4.75 52.24 - -
- - -
- - -
4.77 0.048 0.03 4.75 47.49 - -
- - -
- - -
3.39 3.39 20.34 - -
- - -
3.39 3.39 30.51 - -
- - -
4.69 4.69 14.07 - -
- - -
4.69 4.69 14.07 - -
- - -
- - -
- - -
- - -
1.89 0.03 1.92 138.05 - -
- - -
- - -
1.890 0.03 1.92 136.13 - -
- - -
- - -
22.116 22.12 44.23 - -
- - -
22.116 22.12 44.23 - -
- - -
- - -
- - -
- - -
2.99 0.03 3.02 60.40 - -
- - -
- - -
3.06 0.03 3.08 55.53 - -
- - -
- - -
3.04 3.04 12.16 - -
- - -
3.04 3.04 12.16 - -
- - -
- - -
- - -
- - -
1.30 0.032 1.27 30.43 - -
- - -
- - -
1.30 0.032 1.27 25.36 - -
- - -
- - -
1.60 0.032 1.57 31.36 - -
- - -
- - -
1.60 0.032 1.57 25.09 - -
- - -
- - -
- - -
- - -
1.48 0.032 1.45 46.34 - -
- - -
- - -
1.48 0.032 1.45 40.54 - -
- - -
- - -
1.90 0.032 1.86 44.71 - -
- - -
- - -
1.90 0.032 1.86 37.26 - -
- - -
- - -
- - -
- - -
1.40 0.032 1.37 49.25 - -
- - -
- - -
1.40 0.032 1.37 43.78 - -
- - -
- - -
2.19 0.032 2.16 43.16 - -
- - -
- - -
2.19 0.032 2.16 34.53 - -
- - -
- - -
- - -
- - -
1.52 0.032 1.49 35.71 - -
- - -
- - -
1.52 0.032 1.49 29.76 - -
- - -
- - -
1.60 0.032 1.57 37.63 - -
- - -
- - -
1.60 0.032 1.57 31.36 - -
- - -
- - -
- - -
- - -
1.44 0.032 1.41 39.42 - -
- - -
- - -
1.44 0.032 1.41 33.79 - -
- - -
- - -
1.75 0.032 1.72 34.36 - -
- - -
- - -
1.73 0.032 1.69 27.10 - -
- - -
- - -
- - -
- - -
1.44 0.032 1.41 39.42 - -
- - -
- - -
1.44 0.032 1.41 33.79 - -
- - -
- - -
1.67 0.032 1.64 32.76 - -
- - -
- - -
1.67 0.032 1.64 26.21 - -
- - -
- - -
- - -
- - -
1.78 0.032 1.75 55.94 - -
- - -
- - -
1.78 0.032 1.75 48.94 - -
- - -
- - -
1.86 0.032 1.83 51.18 - -
- - -
- - -
1.86 0.032 1.83 43.87 - -
- - -
- - -
- - -
- - -
1.67 0.080 1.59 31.80 - -
- - -
- - -
- - -
- - -
- - -
2.14 0.096 2.05 32.77 - -
- - -
- - -
- - -
- - -
- - -
1.21 1.21 19.36 - -
- - -
1.21 1.21 19.36 - -
- - -
- - -
- - -
- - -
1.64 0.080 1.56 81.12 - -
- - -
- - -
- - -
- - -
- - -
2.08 0.096 1.99 95.42 - -
- - -
- - -
- - -
- - -
- - -
2.93 2.93 46.88 - -
- - -
2.93 2.93 46.88 - -
- - -
- - -
- - -
- - -
2.04 0.060 1.98 95.04 - -
- - -
- - -
- - -
- - -
- - -
2.88 0.072 2.81 123.73 - -
- - -
- - -
- - -
- - -
- - -
3.54 3.54 84.96 - -
- - -
3.54 3.54 84.96 - -
- - -
- - -
- - -
- - -
1.64 0.060 1.58 63.20 - -
- - -
- - -
- - -
- - -
- - -
2.08 0.080 2.00 72.14 - -
- - -
- - -
- - -
- - -
- - -
1.83 1.83 29.28 - -
- - -
1.83 1.83 29.28 - -
- - -
- - -
- - -
- - -
2.09 0.080 2.01 88.44 - -
- - -
- - -
- - -
- - -
- - -
2.98 0.080 2.90 116.16 - -
- - -
- - -
- - -
- - -
- - -
3.46 3.46 83.04 - -
- - -
3.46 3.46 83.04 - -
- - -
- - -
- - -
- - -
1.72 0.080 1.64 78.72 - -
- - -
- - -
- - -
- - -
- - -
2.24 0.080 2.16 101.71 - -
- - -
- - -
- - -
- - -
- - -
9.95 9.95 39.80 - -
- - -
9.95 9.95 39.80 - -
- - -
- - -
- - -
- - -
1.79 0.080 1.71 27.36 - -
- - -
- - -
- - -
- - -
- - -
2.38 0.080 2.30 34.56 - -
- - -
- - -
- - -
- - -
- - -
3.39 3.39 16.95 - -
- - -
3.39 3.39 16.95 - -
- - -
- - -
- - -
- - -
1.97 0.080 1.89 30.24 - -
- - -
- - -
- - -
- - -
- - -
2.74 0.080 2.66 39.96 - -
- - -
- - -
- - -
- - -
- - -
3.39 3.39 20.34 - -
- - -
3.39 3.39 20.34 - -
- - -
- - -
- - -
- - -
1.72 0.080 1.64 85.28 - -
- - -
- - -
- - -
- - -
- - -
2.24 0.080 2.16 103.87 - -
- - -
- - -
- - -
- - -
- - -
2.86 2.86 45.76 - -
- - -
2.86 2.86 45.76 - -
- - -
- - -
- - -
- - -
1.52 0.080 1.44 40.32 - -
- - -
- - -
- - -
- - -
- - -
1.84 0.080 1.76 42.34 - -
- - -
- - -
- - -
- - -
- - -
1.345 1.35 16.14 - -
- - -
1.345 1.35 16.14 - -
- - -
- - -
- - -
- - -
1.52 0.080 1.44 74.88 - -
- - -
- - -
- - -
- - -
- - -
1.84 0.080 1.76 84.67 - -
- - -
- - -
- - -
- - -
- - -
1.54 1.54 18.48 - -
- - -
1.54 1.54 18.48 - -
- - -
- - -
Total 9193.23 2671.55 0.00
Unit Weight (kg/m) 0.395 0.617 0.889
Weight(MT) 3.63 1.65 0.00
Total Weight (MT) 5.281

Checked By:-
h (m)
16mm 20mm 25mm 32mm
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.00 0.00 0.00 0.00
1.58 2.469 3.858 6.321
0.00 0.00 0.00 0.00
5.281
Contractor : J.R.D Enterprises
Site : Hubtown chunabhatti mumbai
Work : P.W.D Rsidential building cunabhatti mumbai
R.A No: 9th
STAIRCASE BBS 6th FLOOR
LONG SHORT DEPTH OF
STAIRCASE NO SHAPE OF
SR. SPAN SPAN SLAB BAR
1 STAIRCASE 1
Waist slab (Bottom Steel) 3.870 1.430 0.200
Top Steel Floor Level
Bottom Steel (Mid Landing)
Bottom Steel Floor Level (Extra Bottom)
Extra Top Steel (Midlanding)
Floor Level Cutoff Main bar
Midlanding Level Cutoff Main bar

Distrubution waist slab 2.470 1.430


Distrubution waist slab (Below Bentup) 1.080 1.430
Distrubution Mid Landing (Top & Bottom) 1.430 2.900

TO
U
TOT
WE

TOTA
6th FLOOR
CUTTING Nos. of No of Total 10 12
Dia.
LENGTH Slabs Bars Length

4.690 2 14 12 134.134 134.13


2.445 2 14 12 69.927 69.93
2.345 2 14 12 67.067 67.07
0.840 2 14 12 24.024 24.02
1.080 2 14 12 30.888 30.89
1.590 1 4 12 6.360 6.36
1.610 1 4 12 6.440 6.44

2.465 2 12 10 60.886 60.886 0.00


1.465 2 5 10 15.822 15.822 0.00
3.450 1 14 10 49.335 49.335 0.00

10mm 12mm
TOTAL LENGTH 126.043 338.840
UNIT WEIGHT 0.395 0.889
TOTAL WT IN K.G 49.79 301.23
WEIGHT IN M.T 0.05 0.30

TOTAL WT IN MT 0.351
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises

Concrete Summary
Sr.no. Description Quantity Unit
M30 M40
B Superstructure Concrete
Stub Column 50.62 cum

1 Ground Floor
Ground Floor Column 68.5297 cum
1st Floor Beam 79.7562 cum
1st Floor Slab 63.5729 cum

2 1st Floor
1st Floor Column 68.5297 cum
2nd Floor Beam 79.7562 cum
2nd Floor Slab 63.5729 cum

3 2nd Floor
2nd Floor Column 68.5297 cum
3rd Floor Beam 79.7562 cum
3rd Floor Slab 63.5729 cum

4 3rd Floor
3rd Floor Column 68.5297 cum
4th Floor Beam 79.7562 cum
4th Floor Slab 63.5729 cum

5 4th Floor
4th Floor Column 68.53 cum
5th Floor Beam 73.74 cum
5th Floor Slab 63.57 cum

6 5th Floor
5th Floor Column 68.53 cum
6th Floor Beam 77.27 cum
6th Floor Slab 61.20 cum

7 6th Floor
6th Floor Column 68.53
7th Floor Beam 77.27
7th Floor Slab 61.26

8 7th Floor
7th Floor Column 68.53
8th Floor Beam 77.27
8th Floor Slab 62.17

9 8th Floor
8th Floor Column 68.53
9th Floor Beam 77.27
9th floor Slab 62.14

10 9th Floor
9th Floor Column 68.53
10th Floor Beam 77.27
10th Floor Slab 62.14

TOTAL M30 CONCRETE 1405.88

Total= 2034.31 cum


RA 07 CERTIFIED QTY 996.41
RA 08 CERTIFED QTY 342.65
This Bill Qty 695.25 cum

1037.90
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Concrete for Columns from 5th to 6th floor level.

Concrete Summary
6th Slab Concrete
Sr.no. Quantity
M30 M40
A
1 5th to 6th Floor Column 68.53
2 6th Floor Beam 77.27
3 6th Floor Slab 61.20
B
6th to 7th Floor Column 68.53
7th Floor Beam 77.27
7th Floor Slab 61.26
C
7th to 8th Floor Column 68.53
8th Floor Beam 77.27
8th Floor Slab 62.17
D
8th to 9th Floor Column 68.53
9th Floor Beam 77.27
9th Floor Slab 62.14

E
9th to 10th Floor Column 68.53
10th Floor Beam 77.27
10th Floor Slab 62.14

Total 695.25 342.65

Total= 1037.90
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Concrete for Columns from 5th floor level.
Drawing No -GES/508/SCH-COL-3RD TO 6TH LVL-I/3 And GES/5081/STR/CL-LY And DET 01
Residential Quarters BLDG -II

Total
Sr. No Description Nos Length Breadth Height
Qty.

C1,2,3,4,5,7,8,10,11,12,13,14,15,16,,1
1 7,18,19,20,21,22,23,24,C27,C28,29,3 52 0.9 0.3 2.95 41.42
0,31,32,33,36,37,38,39,40,41,42,43,4
4,,45,,46,47,
49,50,51,52,54,55,56,57,58,59,60

2 C6,9,48,53 4 0.9 0.4 2.95 4.248

3 C25,C26 2 1 0.3 2.95 1.77

4 C34,C35 2 1 0.3 2.95 1.77

5 L5, L2 2 2.5 0.23 2.95 3.39

6 L10,L12,L4,L6,L1,L3,L7,L9 8 2.46 0.23 2.95 13.35

7 L11,L8 2 1.9 0.23 2.95 2.58

72 Total= 68.530
Total Qty 68.530
Unit Remark

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum
Cum
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Concrete for 6th and 7th floor
Drawing No -GES5081/STR/02 And GES5081/sch-Beam 5th And 6th LVL

6th lvl Beams

Sr. No Description Nos Length Breadth


X Direction Beam
1 3.1,18.1,44.1,59.1, 1.1,15.1,45.1,57.1 8 2.86 0.23
2 22.03,40.3, 15.3, 45.03 4 1.87 0.23
3 22.1,40.1,23.1,37.1 4 3.23 0.23
4 32.1,29.01 2 2.7 0.23
5 31.1, 29.1 2 3.68 0.23
6 20.1, 20.3,42.1,42.3,17.1,2.3,43.1,43.3 8 3.15 0.23
7 9.3 1 2.5 0.23
8 36.3,19.3,30.3 3 2.5 0.23
9 5.1, 9.1,53.3,47.3 4 2.23 0.23
10 8.1,52.1,6.1,48.1 4 2.47 0.23
10 8.3,8.5,8.7,35.3,35.5,35.7,6.3,6.5,6.7,33.3,33.5,33.7 12 2.54 0.23
11 26.1,27.1,33.1 3 2.21 0.23
12 35.1 1 2.14 0.23
13 L6.1,7.3,7.4,25.1,34.3,49.1 6 3.15 0.23
14 14.3,14.4 2 3.07 0.23
15 51.03,51.1 2 3.14 0.23
16 34.1 1 4.17 0.23
17 L12.1, 1 4.24 0.23
18 L11.1, L8.01 2 0.87 0.23
19 L4.1, L1.1 2 2.5 0.23
20 55.03 1 3 0.23
21 55.1 1 2.86 0.23
22 11.1 1 2.93 0.23
23 L10.1,L7.1 2 1.9 0.23
24 50.1 1 2.86 0.23
25 13.1 1 2.93 0.23
26 L9.1 1 3.1 0.23
27 L3.3,L3.1 2 3.94 0.23
28 12.1ML 1 2.96 0.23

Y Direction
1 24.2,23.2 2 4.45 0.23
2 4.2,46.2, 1.2, 45.2 4 1.93 0.23
3 16.2,46.02,45.02,15.2 4 2.35 0.23
4 22.04,40.4,45.04,15.4 4 1.05 0.23
5 22.02,40.2,21.02,39.2 4 1.68 0.23
6 22.2,32.2,21.2,29.2 4 2.745 0.23
7 3.2,44.2, 2.2,43.2 4 2.45 0.23
8 20.2,30.2,19.2,31.2 4 4.135 0.23
9 9.2,6.2 2 5.27 0.4
10 36.2,33.2 2 5.745 0.4
11 8.4,35.8,6.4,33.8 4 0.84 0.23
12 8.6,35.6,6.6,33.6 4 1.23 0.23
13 8.8,35.4,6.8,33.4 4 0.89 0.23
14 8.2 1 2.84 0.23
15 35.2 1 5.05 0.23
16 34.2 1 4.57 0.23
17 7.2 1 4.57 0.23
18 28.2,26.2,L6.2,25.2,L1.2,27.2 6 1.5 0.23
19 51.02, 1 5.86 0.23
20 55.02 1 6.23 0.23
21 14.2,11.2 2 2.68 0.23
22 42.2 1 1.61 0.23
23 10.2,5.2,41.2 3 1.135 0.23
24 13.2,12.2 2 3.3 0.23
25 L10.2 1 3.63 0.23
27 L9.2 1 4.03 0.23
28 50.2 1 1 0.23
29 56.2 1 0.6 0.23

153
Total
Height Unit
Qty.

0.8 4.21 Cum


0.6 1.03 Cum
0.8 2.38 Cum
0.8 0.99 Cum
0.8 1.35 Cum
0.8 4.64 Cum
0.6 0.35 Cum
0.8 1.38 Cum
0.8 1.64 Cum
0.8 1.82 Cum
0.8 5.61 Cum
0.8 1.22 Cum
0.8 0.39 Cum
0.8 3.48 Cum
0.8 1.13 Cum
0.8 1.16 Cum
0.8 0.77 Cum
0.8 0.78 Cum
0.8 0.32 Cum
0.8 0.92 Cum
0.8 0.55 Cum
0.8 0.53 Cum
0.8 0.54 Cum
0.8 0.70 Cum
0.8 0.53 Cum
0.8 0.54 Cum
0.8 0.57 Cum
0.8 1.45 Cum
0.8 0.54 Cum

0.8 1.64 Cum


0.8 1.42 Cum
0.8 1.73 Cum
0.6 0.58 Cum
0.8 1.24 Cum
0.8 2.02 Cum
0.8 1.80 Cum
0.8 3.04 Cum
1 4.22 Cum
1 4.60 Cum
0.6 0.46 Cum
0.6 0.68 Cum
0.6 0.49 Cum
0.8 0.52 Cum
0.8 0.93 Cum
0.8 0.84 Cum
0.8 0.84 Cum
0.8 1.66 Cum
0.8 1.08 Cum
0.8 1.15 Cum
0.8 0.99 Cum
0.8 0.30 Cum
0.8 0.63 Cum
0.8 1.21 Cum
0.8 0.67 Cum
0.8 0.74 Cum
0.8 0.18 Cum
0.8 0.11 Cum

Total= 77.27 Cum


Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Concrete for 6h floor

Total
Sr. No Descriptio Nos Length Breadth Height Unit
Qty.
X Direction Beam
1 3.1,18.1,44 8 2.86 0.23 0.8 4.21 Cum
2 22.03,40.3, 4 1.87 0.23 0.6 1.03 Cum
3 22.1,40.1,2 4 3.23 0.23 0.8 2.38 Cum
4 32.1,29.01 2 2.7 0.23 0.8 0.99 Cum
5 31.1, 29.1 2 3.68 0.23 0.8 1.35 Cum
6 20.1, 20.3, 8 3.15 0.23 0.8 4.64 Cum
7 9.3 1 2.5 0.23 0.6 0.35 Cum
8 36.3,19.3,3 3 2.5 0.23 0.8 1.38 Cum
9 5.1, 9.1,53 4 2.23 0.23 0.8 1.64 Cum
10 8.1,52.1,6. 4 2.47 0.23 0.8 1.82 Cum
10 8.3,8.5,8.7 12 2.54 0.23 0.8 5.61 Cum
11 26.1,27.1,3 3 2.21 0.23 0.8 1.22 Cum
12 35.1 1 2.14 0.23 0.8 0.39 Cum
13 L6.1,7.3,7. 6 3.15 0.23 0.8 3.48 Cum
14 14.3,14.4 2 3.07 0.23 0.8 1.13 Cum
15 51.03,51.1 2 3.14 0.23 0.8 1.16 Cum
16 34.1 1 4.17 0.23 0.8 0.77 Cum
17 L12.1, 1 4.24 0.23 0.8 0.78 Cum
18 L11.1, L8. 2 0.87 0.23 0.8 0.32 Cum
19 L4.1, L1.1 2 2.5 0.23 0.8 0.92 Cum
20 55.03 1 3 0.23 0.8 0.55 Cum
21 55.1 1 2.86 0.23 0.8 0.53 Cum
22 11.1 1 2.93 0.23 0.8 0.54 Cum
23 L10.1,L7.1 2 1.9 0.23 0.8 0.70 Cum
24 50.1 1 2.86 0.23 0.8 0.53 Cum
25 13.1 1 2.93 0.23 0.8 0.54 Cum
26 L9.1 1 3.1 0.23 0.8 0.57 Cum
27 L3.3,L3.1 2 3.94 0.23 0.8 1.45 Cum
28 12.1ML 1 2.96 0.23 0.8 0.54 Cum

Y Direction
1 24.2,23.2 2 4.45 0.23 0.8 1.64 Cum
2 4.2,46.2, 1 4 1.93 0.23 0.8 1.42 Cum
3 16.2,46.02, 4 2.35 0.23 0.8 1.73 Cum
4 22.04,40.4, 4 1.05 0.23 0.6 0.58 Cum
5 22.02,40.2, 4 1.68 0.23 0.8 1.24 Cum
6 22.2,32.2,2 4 2.745 0.23 0.8 2.02 Cum
7 3.2,44.2, 2 4 2.45 0.23 0.8 1.80 Cum
8 20.2,30.2,1 4 4.135 0.23 0.8 3.04 Cum
9 9.2,6.2 2 5.27 0.4 1 4.22 Cum
10 36.2,33.2 2 5.745 0.4 1 4.60 Cum
11 8.4,35.8,6. 4 0.84 0.23 0.6 0.46 Cum
12 8.6,35.6,6. 4 1.23 0.23 0.6 0.68 Cum
13 8.8,35.4,6. 4 0.89 0.23 0.6 0.49 Cum
14 8.2 1 2.84 0.23 0.8 0.52 Cum
15 35.2 1 5.05 0.23 0.8 0.93 Cum
16 34.2 1 4.57 0.23 0.8 0.84 Cum
17 7.2 1 4.57 0.23 0.8 0.84 Cum
18 28.2,26.2,L 6 1.5 0.23 0.8 1.66 Cum
19 51.02, 1 5.86 0.23 0.8 1.08 Cum
20 55.02 1 6.23 0.23 0.8 1.15 Cum
21 14.2,11.2 2 2.68 0.23 0.8 0.99 Cum
22 42.2 1 1.61 0.23 0.8 0.30 Cum
23 10.2,5.2,41 3 1.135 0.23 0.8 0.63 Cum
24 13.2,12.2 2 3.3 0.23 0.8 1.21 Cum
25 L10.2 1 3.63 0.23 0.8 0.67 Cum
27 L9.2 1 4.03 0.23 0.8 0.74 Cum
28 50.2 1 1 0.23 0.8 0.18 Cum
29 56.2 1 0.6 0.23 0.8 0.11 Cum

153 Total= 77.27 Cum


Total 77.27 Cum
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Concrete for 6th and 7th floor Slab

6th lvl slab


Sr. No Location Slab no. Nos Length Breadth
Bedroom
1 Flat. No. 2,3,6,7 200S2.1 4 3 3.28

Deduct Column Area


C59,C60,C46,C16,C4,C3,C1,C2,C15,C45, -12 0.67 0.07
C57,C58
-4 0.15 0.07
Deduct Column Area C18,C44,C43,C17
Flat. No. 1 200S2.6 1 4.3 3
Deduct Column Area C50,C51 -2 0.9 0.07
Flat. No.4 ,5,8 200S2.1 3 3.35 3
Deduct Flat 8 Column C55,C56 -2 0.67 0.07

2 Kitchen
Flat. No. 2,3,6,7 200S2.5 4 3.45 2.82
Deduction Column Area -4 0.67 0.07
C38,C24,C23,C37
Deduction Column Area C32,C29 -2 0.67 0.035
Flat. No. 1 200S2.2 1 2.83 2.61
DEDUCTION Column 52 -1 0.67 0.07
Flat. No. 4,5,8 200S2.2 3 2.36 2.61
Deduction Of Column c8,c7,c49 -3 0.67 0.07

3 Living room
Flat. No. 2,3,6,7 200S2.3 4 4.35 4.84
offset 4 0.83 0.52
infront of WC 200S1.1 4 1 0.67
Deduct Column Area c42,c20,c19,c41 -4 0.67 0.07
Flat. No. 1 200S2.7 1 3.14 5.32
Flat. No. 8 200S2.6 1 4.48 3.14
Deduct Column C34 -1 0.67 0.07
Flat. No. 4,5 200S2.4 2 3.2 3.62
deduct Column C26 c25 -2 0.67 0.07

Balcony
Flat. No. 2,3,6,7 300S1.1 4 3.22 0.84
Flat. No. 1,4,5,8 300S1.1 4 3.21 0.84

4 Bathroom Sunk
Flat. No. 2,3,6,7 200S1.2 4 1.87 1.07
Deduct Column Area C22,C40,C21,C39 -4 0.67 0.07
Flat. No. 1,4 200S1.1 2 1.31 1.23
Flat. No. 5,8 200S1.1 2 1.31 1.23

5 Toilet Sunk
Flat. No. 2,3,6,7 200S1.1 4 0.97 1.05
Flat. No. 1,4 200S1.1 2 1.12 0.89
Flat. No. 5,8 200S1.1 2 1.12 0.89

6 Passage 300S1.2 2 2.4 2.465


Column Deduction c28,c36,c33,c27 -4 0.35 0.3
300S1.3 2 2.54 1.5
300S1.3 2 3.15 1.5
300S1.3 1 9.4 1.5
Passage near kitchen 200S1.2 4 1.71 0.84
Flat no. 1,4,5,8. 4 1.18 1

Slab near staircasee 300S1.4 1 3.94 1.42

7 Chajja
Bedroom flat no. 2,3,6,7 200SC1.1 4 2.1 0.6
Toilet Flat no. 2,3,6,7 200 S1.3 4 2.58 0.45
200SC1.1 4 1.05 0.6
Living room Flat no. 2,3,6,7 75SC1.1 4 3.22 0.45
Living room Flat no. 1,8 75SC1.1 2 3.14 0.45
Living room Flat no. 4,5 75SC1.1 2 3.21 0.45
Chajja in ducts 200S1.3 4 2.6 0.45
200S1.3 4 2.3 0.45
Kitchen at no. 1,4,5,8 200SC1.1 4 1.5 0.6

Staircase Concrete
Flight from floor to Midlanding 2 3.08 1.6
Midlanding 1 3.1 1.6
Steps 18 3.1 0.15
7th lvl slab
Sr. No Location Slab no. Nos Length Breadth
Bedroom
1 Flat. No. 2,3,6,7 200S2.1 4 3 3.28

Deduct Column Area


C59,C60,C46,C16,C4,C3,C1,C2,C15,C45, -12 0.67 0.07
C57,C58
-4 0.15 0.07
Deduct Column Area C18,C44,C43,C17
Flat. No. 1 200S2.6 1 4.3 3
Deduct Column Area C50,C51 -2 0.9 0.07
Flat. No.4 ,5,8 200S2.1 3 3.35 3
Deduct Flat 8 Column C55,C56 -2 0.67 0.07

2 Kitchen
Flat. No. 2,3,6,7 200S2.5 4 3.45 2.82
Deduction Column Area -4 0.67 0.07
C38,C24,C23,C37
Deduction Column Area C32,C29 -2 0.67 0.035
Flat. No. 1 200S2.2 1 2.83 2.61
DEDUCTION Column 52 -1 0.67 0.07
Flat. No. 4,5,8 200S2.2 3 2.36 2.61
Deduction Of Column c8,c7,c49 -3 0.67 0.07

3 Living room
Flat. No. 2,3,6,7 200S2.3 4 4.35 4.84
offset 4 0.83 0.52
infront of WC 200S1.1 4 1 0.67
Deduct Column Area c42,c20,c19,c41 -4 0.67 0.07
Flat. No. 1 200S2.7 1 3.14 5.32
Flat. No. 8 200S2.6 1 4.48 3.14
Deduct Column C34 -1 0.67 0.07
Flat. No. 4,5 200S2.4 2 3.2 3.62
deduct Column C26 c25 -2 0.67 0.07

Balcony
Flat. No. 2,3,6,7 300S1.1 4 3.22 0.84
Flat. No. 1,4,5,8 300S1.1 4 3.21 0.84
4 Bathroom Sunk
Flat. No. 2,3,6 200S1.2 3 1.87 1.07
Deduct Column Area C22,C40,C21,C39 -4 0.67 0.07
Flat. No. 1,4 200S1.1 2 1.31 1.23
Flat. No. 5,8 200S1.1 2 1.31 1.23

5 Toilet Sunk
Flat. No. 2,3,6 200S1.1 3 0.97 1.05
Flat. No. 1,4 200S1.1 2 1.12 0.89
Flat. No. 5,8 200S1.1 2 1.12 0.89

6 Passage 300S1.2 2 2.4 2.465


Column Deduction c28,c36,c33,c27 -4 0.35 0.3
300S1.3 2 2.54 1.5
300S1.3 2 3.15 1.5
300S1.3 1 9.4 1.5
300S2.1 1 1.92 2.12
Passage near kitchen 200S1.2 4 1.71 0.84
Flat no. 1,4,5,8. 4 1.18 1

Slab near staircasee 300S1.4 1 3.94 1.42

7 Chajja
Bedroom flat no. 2,3,6,7 200SC1.1 4 2.1 0.6
Toilet Flat no. 2,3,6,7 200 S1.3 4 2.58 0.45
200SC1.1 4 1.05 0.6
Living room Flat no. 2,3,6,7 75SC1.1 4 3.22 0.45
Living room Flat no. 1,8 75SC1.1 2 3.14 0.45
Living room Flat no. 4,5 75SC1.1 2 3.21 0.45
Chajja in ducts 200S1.3 4 2.6 0.45
200S1.3 4 2.3 0.45
Kitchen at no. 1,4,5,8 200SC1.1 4 1.5 0.6

Staircase Concrete
Flight from floor to Midlanding 2 3.08 1.6
Midlanding 1 3.1 1.6
Steps 18 3.1 0.15
8th lvl slab
Sr. No Location Slab no. Nos Length Breadth
Bedroom
1 Flat. No. 2,3,6,7 200S2.1 4 3 3.28

Deduct Column Area


C59,C60,C46,C16,C4,C3,C1,C2,C15,C45, -12 0.67 0.07
C57,C58
-4 0.15 0.07
Deduct Column Area C18,C44,C43,C17
Flat. No. 1 200S2.6 1 4.3 3
Deduct Column Area C50,C51 -2 0.9 0.07
Flat. No.4 ,5,8 200S2.1 3 3.35 3
Deduct Flat 8 Column C55,C56 -2 0.67 0.07

2 Kitchen
Flat. No. 2,3,6,7 200S2.5 4 3.45 2.82
Deduction Column Area -4 0.67 0.07
C38,C24,C23,C37
Deduction Column Area C32,C29 -2 0.67 0.035
Flat. No. 1 200S2.2 1 2.83 2.61
DEDUCTION Column 52 -1 0.67 0.07
Flat. No. 4,5,8 200S2.2 3 2.36 2.61
Deduction Of Column c8,c7,c49 -3 0.67 0.07

3 Living room
Flat. No. 2,3,6,7 200S2.3 4 4.35 4.84
offset 4 0.83 0.52
infront of WC 200S1.1 4 1 0.67
Deduct Column Area c42,c20,c19,c41 -4 0.67 0.07
Flat. No. 1 200S2.7 1 3.14 5.32
Flat. No. 8 200S2.6 1 4.48 3.14
Deduct Column C34 -1 0.67 0.07
Flat. No. 4,5 200S2.4 2 3.2 3.62
deduct Column C26 c25 -2 0.67 0.07

Balcony
Flat. No. 2,3,6,7 300S1.1 4 3.22 0.84
Flat. No. 1,4,5,8 300S1.1 4 3.21 0.84

4 Bathroom Sunk
Flat. No. 2,3,6 200S1.2 3 1.87 1.07
Deduct Column Area C22,C40,C21,C39 -4 0.67 0.07
Flat. No. 1,4 200S1.1 2 1.31 1.23
Flat. No. 5,8 200S1.1 2 1.31 1.23

5 Toilet Sunk
Flat. No. 2,3,6 200S1.1 3 0.97 1.05
Flat. No. 1,4 200S1.1 2 1.12 0.89
Flat. No. 5,8 200S1.1 2 1.12 0.89

6 Passage 300S1.2 2 2.4 2.465


Column Deduction c28,c36,c33,c27 -4 0.35 0.3
300S1.3 2 2.54 1.5
300S1.3 2 3.15 1.5
300S1.3 1 9.4 1.5
300S2.1 1 1.92 2.12
Passage near kitchen 200S1.2 4 1.71 0.84
Flat no. 1,4,5,8. 4 1.18 1

Slab near staircasee 300S1.4 1 3.94 1.42

7 Chajja
Bedroom flat no. 2,3,6,7 200SC1.1 4 2.1 0.6
Toilet Flat no. 2,3,6,7 200 S1.3 4 2.58 0.45
200SC1.1 4 1.05 0.6
Living room Flat no. 2,3,6,7 75SC1.1 4 3.22 0.45
Living room Flat no. 1,8 75SC1.1 2 3.14 0.45
Living room Flat no. 4,5 75SC1.1 2 3.21 0.45
Chajja in ducts 200S1.3 4 2.6 0.45
200S1.3 4 2.3 0.45
Kitchen at no. 1,4,5,8 200SC1.1 4 1.5 0.6

8 front duct outer slab 200SC1.1 1 10.1 0.6

Staircase Concrete
Flight from floor to Midlanding 2 3.08 1.6
Midlanding 1 3.1 1.6
Steps 18 3.1 0.15
9th and 10th lvl slab
Sr. No Location Slab no. Nos Length Breadth
Bedroom
1 Flat. No. 2,3,6,7 200S2.1 4 3 3.28

Deduct Column Area


C59,C60,C46,C16,C4,C3,C1,C2,C15,C45, -12 0.67 0.07
C57,C58
-4 0.15 0.07
Deduct Column Area C18,C44,C43,C17
Flat. No. 1 200S2.6 1 4.25 3
Deduct Column Area C50,C51 -2 0.9 0.07
Flat. No.4 ,5,8 200S2.1 3 3.35 3
Deduct Flat 8 Column C55,C56 -2 0.67 0.07

2 Kitchen
Flat. No. 2,3,6,7 200S2.5 4 3.45 2.82
Deduction Column Area -4 0.67 0.07
C38,C24,C23,C37
Deduction Column Area C32,C29 -2 0.67 0.035
Flat. No. 1 200S2.2 1 2.83 2.61
DEDUCTION Column 52 -1 0.67 0.07
Flat. No. 4,5,8 200S2.2 3 2.36 2.61
Deduction Of Column c8,c7,c49 -3 0.67 0.07

3 Living room
Flat. No. 2,3,6,7 200S2.3 4 4.35 4.84
offset 4 0.83 0.52
infront of WC 200S1.1 4 1 0.67
Deduct Column Area c42,c20,c19,c41 -4 0.67 0.07
Flat. No. 1 200S2.7 1 3.14 5.32
Flat. No. 8 200S2.6 1 4.48 3.14
Deduct Column C34 -1 0.67 0.07
Flat. No. 4,5 200S2.4 2 3.2 3.62
deduct Column C26 c25 -2 0.67 0.07

Balcony
Flat. No. 2,3,6,7 300S1.1 4 3.22 0.84
Flat. No. 1,4,5,8 300S1.1 4 3.21 0.84

4 Bathroom Sunk
Flat. No. 2,3,6 200S1.2 3 1.87 1.07
Deduct Column Area C22,C40,C21,C39 -4 0.67 0.07
Flat. No. 1,4 200S1.1 2 1.31 1.23
Flat. No. 5,8 200S1.1 2 1.31 1.23

5 Toilet Sunk
Flat. No. 2,3,6 200S1.1 3 0.97 1.05
Flat. No. 1,4 200S1.1 2 1.12 0.89
Flat. No. 5,8 200S1.1 2 1.12 0.89

6 Passage 300S1.2 2 2.4 2.465


Column Deduction c28,c36,c33,c27 -4 0.35 0.3
300S1.3 2 2.54 1.5
300S1.3 2 3.15 1.5
300S1.3 1 9.4 1.5
300S2.1 1 1.92 2.12
Passage near kitchen 200S1.2 4 1.71 0.84
Flat no. 1,4,5,8. 4 1.18 1

Slab near staircasee 300S1.4 1 3.94 1.42

7 Chajja
Bedroom flat no. 2,3,6,7 200SC1.1 4 2.1 0.6
Toilet Flat no. 2,3,6,7 200 S1.3 4 2.55 0.45
200SC1.1 4 1.05 0.6
Living room Flat no. 2,3,6,7 75SC1.1 4 3.22 0.45
Living room Flat no. 1,8 75SC1.1 2 3.14 0.45
Living room Flat no. 4,5 75SC1.1 2 3.21 0.45
Chajja in ducts 200S1.3 4 2.6 0.45
200S1.3 4 2.3 0.45
Kitchen at no. 1,4,5,8 200SC1.1 4 1.5 0.6

8 front duct outer slab 200SC1.1 1 10.1 0.6

Staircase Concrete
Flight from floor to Midlanding 2 3.08 1.6
Midlanding 1 3.1 1.6
Steps 18 3.1 0.15
atti, Mumbai

Total
Depth Unit
Qty.

0.125 4.92 Cum

0.125 -0.07 Cum

0.125 -0.01 Cum


0.125 1.61 Cum
0.125 -0.02 Cum
0.125 3.77 Cum
1.125 -0.11 Cum

0.125 4.86 Cum


0.125 -0.02 Cum
0.125 -0.01 Cum
0.125 0.92 Cum
0.125 -0.01 Cum
0.125 2.31 Cum
0.125 -0.02 Cum

0.15 12.63 Cum


0.15 0.26 Cum
0.15 0.40 Cum
0.125 -0.02 Cum
0.125 2.09 Cum
0.125 1.76 Cum
1.125 -0.05 Cum
0.125 2.90 Cum
1.125 -0.11 Cum
0.125 1.35 Cum
0.125 1.35 Cum

0.15 1.20 Cum


1.125 -0.21 Cum
0.15 0.48 Cum
0.15 0.48 Cum

0.15 0.61 Cum


0.15 0.30 Cum
0.15 0.30 Cum

0.125 1.48 Cum


0.125 -0.05 Cum
0.125 0.95 Cum
0.125 1.18 Cum
0.125 1.76 Cum
0.15 0.86 Cum
0.15 0.71 Cum

0.125 0.70 Cum

0.125 0.63 Cum


0.125 0.58 Cum
0.125 0.32 Cum
0.125 0.72 Cum
0.125 0.35 Cum
0.125 0.36 Cum
0.125 0.59 Cum
0.125 0.518 Cum
0.125 0.45 Cum

0.2 1.97 Cum


0.15 0.74 Cum
0.3 2.51 Cum

Total= 61.20 Cum


Total
Depth Unit
Qty.

0.125 4.92 Cum

0.125 -0.07 Cum

0.125 -0.01 Cum


0.125 1.61 Cum
0.125 -0.02 Cum
0.125 3.77 Cum
1.125 -0.11 Cum

0.125 4.86 Cum


0.125 -0.02 Cum
0.125 -0.01 Cum
0.125 0.92 Cum
0.125 -0.01 Cum
0.125 2.31 Cum
0.125 -0.02 Cum

0.15 12.63 Cum


0.15 0.26 Cum
0.15 0.40 Cum
0.125 -0.02 Cum
0.125 2.09 Cum
0.125 1.76 Cum
1.125 -0.05 Cum
0.125 2.90 Cum
1.125 -0.11 Cum

0.125 1.35 Cum


0.125 1.35 Cum
0.15 0.90 Cum
1.125 -0.21 Cum
0.15 0.48 Cum
0.15 0.48 Cum

0.15 0.46 Cum


0.15 0.30 Cum
0.15 0.30 Cum

0.125 1.48 Cum


0.125 -0.05 Cum
0.125 0.95 Cum
0.125 1.18 Cum
0.125 1.76 Cum
0.125 0.51 Cum
0.15 0.86 Cum
0.15 0.71 Cum

0.125 0.70 Cum

0.125 0.63 Cum


0.125 0.58 Cum
0.125 0.32 Cum
0.125 0.72 Cum
0.125 0.35 Cum
0.125 0.36 Cum
0.125 0.59 Cum
0.125 0.518 Cum
0.125 0.45 Cum

0.2 1.97 Cum


0.15 0.74 Cum
0.3 2.51 Cum

Total= 61.26 Cum


Total
Depth Unit
Qty.

0.125 4.92 Cum

0.125 -0.07 Cum

0.125 -0.01 Cum


0.125 1.61 Cum
0.125 -0.02 Cum
0.125 3.77 Cum
1.125 -0.11 Cum

0.125 4.86 Cum


0.125 -0.02 Cum
0.125 -0.01 Cum
0.125 0.92 Cum
0.125 -0.01 Cum
0.125 2.31 Cum
0.125 -0.02 Cum

0.15 12.63 Cum


0.15 0.26 Cum
0.15 0.40 Cum
0.125 -0.02 Cum
0.125 2.09 Cum
0.125 1.76 Cum
1.125 -0.05 Cum
0.125 2.90 Cum
1.125 -0.11 Cum

0.125 1.35 Cum


0.125 1.35 Cum
0.15 0.90 Cum
1.125 -0.21 Cum
0.15 0.48 Cum
0.15 0.48 Cum

0.15 0.46 Cum


0.15 0.30 Cum
0.15 0.30 Cum

0.125 1.48 Cum


0.125 -0.05 Cum
0.125 0.95 Cum
0.125 1.18 Cum
0.125 1.76 Cum
0.125 0.51 Cum
0.15 0.86 Cum
0.15 0.71 Cum

0.125 0.70 Cum

0.125 0.63 Cum


0.125 0.58 Cum
0.125 0.32 Cum
0.125 0.72 Cum
0.125 0.35 Cum
0.125 0.36 Cum
0.125 0.59 Cum
0.125 0.518 Cum
0.125 0.45 Cum

0.15 0.909 Cum

0.2 1.97 Cum


0.15 0.74 Cum
0.3 2.51 Cum

Total= 62.17 Cum


Total
Depth Unit
Qty.

0.125 4.92 Cum

0.125 -0.07 Cum

0.125 -0.01 Cum


0.125 1.59 Cum
0.125 -0.02 Cum
0.125 3.77 Cum
1.125 -0.11 Cum

0.125 4.86 Cum


0.125 -0.02 Cum
0.125 -0.01 Cum
0.125 0.92 Cum
0.125 -0.01 Cum
0.125 2.31 Cum
0.125 -0.02 Cum

0.15 12.63 Cum


0.15 0.26 Cum
0.15 0.40 Cum
0.125 -0.02 Cum
0.125 2.09 Cum
0.125 1.76 Cum
1.125 -0.05 Cum
0.125 2.90 Cum
1.125 -0.11 Cum

0.125 1.35 Cum


0.125 1.35 Cum
0.15 0.90 Cum
1.125 -0.21 Cum
0.15 0.48 Cum
0.15 0.48 Cum

0.15 0.46 Cum


0.15 0.30 Cum
0.15 0.30 Cum

0.125 1.48 Cum


0.125 -0.05 Cum
0.125 0.95 Cum
0.125 1.18 Cum
0.125 1.76 Cum
0.125 0.51 Cum
0.15 0.86 Cum
0.15 0.71 Cum

0.125 0.70 Cum

0.125 0.63 Cum


0.125 0.57 Cum
0.125 0.32 Cum
0.125 0.72 Cum
0.125 0.35 Cum
0.125 0.36 Cum
0.125 0.59 Cum
0.125 0.518 Cum
0.125 0.45 Cum

0.15 0.909 Cum

0.2 1.97 Cum


0.15 0.74 Cum
0.3 2.51 Cum

Total= 62.14 Cum


Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of Brick work and Blockwork

Sr No Description Unit Qty Remark


230 In CUM 150 100

1 3rd Floor Blockwork sqm 61.55 260.50 66.71

2 4th floor blockwork sqm 61.55 260.50 -

3 5th floor sqm 61.55 260.50 -

4 6th floor sqm 61.55 260.50 -

5 7th floor sqm 61.55 260.50 -

Total Qty sqm 307.75 1,302.50 66.71


Previous sqm 0
This Bill qty sqm 307.75 1,302.50 66.71
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of 3rd Floor Brick work
Residential Quarters BLDG -II
Drawing No- II-03

TOTAL WALL LENGTH HEIGHT WIDTH (m)


Sr No DESCRIPTION NO NO (m) (m)
0.230
Floor No.1ST
Flat No. : - 1( 1BHK)
Living Room
1 1 W1 2.310 2.150
2 1 W2 2.190 2.150
3 1 W3 2.580 2.150
4 1 W4 1.920 2.150
1 W5 3.140 0.300 0.230
7
8 BEDROOM 1 W1 3.150 2.150
9 Deduction (W1) -1 0.230
10 1 W2 3.400 2.150 0.230
11 1 W3 3.000 0.700
chajja projection 1 0.680 2.150
1 1.600 2.150
14
15 Kitchen 1 W1 2.600 0.700 0.230
16 1 W2 0.810 2.150
17 Deduction (W3) -1
18 1 W3 0.900 1.940 0.230
19 1 W4 2.470 1.940 0.230
22
23 ELEVATION BOX NR. KITCHEN 1 W1 0.600 2.150
24 1 W2 0.785 2.150
25 1 W3 0.600 2.150
26
27 1 W1 0.600 2.150
28 1 W2 0.785 2.150
29 1 W3 0.600 2.150
30
31 PASSAGE 1 W1 1.010 2.340 0.230
32 1 W2 0.710 2.150
33
34 BATHROOM 1 W1 0.910 2.150 0.230
35 1 W2 1.310 1.940 0.230
36 DEDUCTION (V1) -1 0.600 1.100 0.230
37 1 W3 2.020 2.350
38 1 W4 0.440 2.150
39
40 TOILET 1 W1 1.200 2.340
41 DEDUCTION (V1) -1 0.600 1.100
42
43
44 MAIN PASSAGE LOOBY 1 W1 5.210 2.150
45 1 W2 3.165 2.150 0.230
46 DEDUCTION (W3) -1 1.500 1.300 0.230
48
49
50
51
52 Flat No. : - 2(1BHK)
53 Living Room
54 1 W1 3.080 2.150 0.230
55 1 W2 1.130 2.150 0.230
56 1 W3 3.220 0.300 0.230
57 1 W4 0.700 2.790
59
60 BEDROOM 1 W1 3.240 2.150 0.230
61 Deduction (W1) -1 1.200 1.300 0.230
62 1 W2 2.700 2.150 0.230
63 1 W3 2.160 2.150 0.230
64 1 W4 1.960 2.150
65
66 ELEVATION BOX NR.BEDROOM 1 W1 0.600 2.150
67 1 W2 0.690 2.150
68 1 W3 0.600 2.150
69
70 1 W1 0.600 2.150
71 1 W2 0.690 2.150
72 1 W3 0.600 2.150
73
74 TOILET 1 W1 0.250 2.350
75 1 W2 1.050 2.150 0.230
76 DEDUCTION (V1) -1 0.600 1.100 0.230
77 1 W3 1.320 2.150
78
79 BATHROOM 1 W1 1.240 2.150 0.230
80 1 W2 0.640 2.150
81 DEDUCTION (V1) -1 0.600 1.100 0.230
82
83
84 KITCHEN 1 W1 1.920 2.150
85 1 W2 1.210 2.150 0.230
86 1 W3 2.160 2.150 0.230
87 1 W4 2.700 2.150
89
90
91
92 Flat No. : - 3(1BHK)
93 Living Room
94 1 W1 3.090 2.150 0.230
95 1 W2 1.130 2.150 0.230
96 1 W3 3.150 0.300 0.230
97 1 W4 0.690 2.790
98
99
100 BEDROOM 1 W1 2.450 2.150 0.230
101 Deduction (W1) -1 2.080 1.200 0.230
102 1 W2 2.700 2.150 0.230
103 1 W3 1.930 2.150 0.230
104 1 W4 1.950 2.150
105
106ELEVATION BOX NR.BEDROOM 1 W1 0.600 2.150
107 1 W2 0.690 2.150
108 1 W3 0.600 2.150
109
110 1 W1 0.600 2.150
111 1 W2 0.690 2.150
112 1 W3 0.600 2.150
113
114 TOILET 1 W1 0.250 2.150
115 1 W2 1.050 2.150 0.230
116 DEDUCTION (V1) -1 0.600 2.150 0.230
117 1 W3 1.400 2.150
118
119 BATHROOM 1 W1 1.250 2.150
120 1 W2 1.050 2.150 0.230
121 DEDUCTION (V1) -1 0.600 1.100 0.230
122 1 W3 0.630 2.150

123
124 KITCHEN 1 W1 1.820 2.150
125 Deduction (W1) -1 1.200 1.300 0.230
126 1 W2 1.950 2.150 0.230
128 1 W4 1.920 2.150
129
130 MAIN PASSAGE LOOBY 1 W1 5.210 2.150
131 1 W2 3.165 2.150 0.230
132 DEDUCTION (W3) -1 1.500 1.300 0.230
133
134
135 Flat No. : - 4(1BHK)
136 Living Room
137 1 W1 2.580 2.150
138 1 W2 3.140 0.300 0.230
144
145 BEDROOM 1 W1 2.930 2.150 0.230
146 Deduction (W1) -1 2.080 1.300 0.230
147 1 W2 2.930 2.150 0.230
148 1 W3 2.450 2.150 0.230
149 1 W4 0.610 2.150 0.230
1 W5 1.630 2.150
Chajja outer wall
1 W6 0.735 2.150
150
151
152 Kitchen 1 W1 1.900 2.150 0.230
153 1 W2 2.585 2.150 0.230
154 Deduction (W3) -1 1.500 1.200 0.230
156 1 W3 1.700 1.950 0.230
157 1 W4 0.900 2.150 0.230
158 1 W5 0.810 2.150
159
160 ELEVATION BOX NR. KITCHEN 1 W1 0.600 2.150
161 1 W2 0.790 2.150
162 1 W3 0.600 2.150
163
164 1 W1 0.600 2.150
165 1 W2 0.790 2.150
166 1 W3 0.600 2.150
167
168 PASSAGE 1 W1 1.010 2.350 0.230
169
170
171 BATHROOM 1 W1 0.710 2.150
172 1 W2 1.250 1.950 0.230
173 DEDUCTION (V1) -1 0.600 1.100 0.230
174 1 W3 0.930 2.150 0.230
175 1 W4 0.420 2.350
176
177 TOILET 1 W1 1.070 2.150 0.230
178 DEDUCTION (V1) -1 0.600 1.100 0.230
179 1 W2 2.03 2.15

181
182 Flat No. : - 5(1BHK)
183 Living Room
184 1 W1 2.450 2.150
186 1 W2 3.140 2.150 0.230
190 Deduction -1 1.230 0.750 0.230
191
195 Kitchen 1 W1 1.840 2.150 0.230
196 1 W2 2.600 2.150 0.230
197 Deduction (W3) -1 1.500 1.200 0.230
198 1 W3 0.810 2.150
199 1 W4 1.690 2.150 0.230
200 1 W5 0.900 2.150 0.230
201
202
203 ELEVATION BOX NR. KITCHEN 1 W1 0.600 2.150
204 1 W2 0.790 2.150
205 1 W3 0.600 2.150
206
207 1 W1 0.600 2.150
208 1 W2 0.790 2.150
209 1 W3 0.600 2.150
210
211 PASSAGE 1 W1 1.020 2.350 0.230
212
213 BATHROOM 1 W1 0.710 2.150
214 1 W2 1.220 2.150 0.230
215 DEDUCTION (V1) -1 0.600 1.100 0.230
216 1 W3 1.450 1.950
217 1 W4 2.030 2.150
218 1 W5 0.450 2.150
219
220 TOILET 1 W1 1.200 2.350
221 DEDUCTION (V1) -1 0.600 1.100
222
223
224 BEDROOM 1 W1 0.870 2.150 0.230
225 1 W2 2.680 2.150 0.230
227 1 W3 2.830 2.150 0.230
228 Deduction (W1) -1 2.100 1.300 0.230
229 chajja projection 1 0.815 2.150
1 1.630 2.150

PASSAGE MAIN LOOBY 1 W1 2.220 2.350


230
231
232 Flat No. : - 6(1BHK)
233 Living Room
234 1 W1 3.090 2.150 0.230
235 1 W2 1.620 2.150 0.230
236 1 W3 3.220 0.300 0.230
237 1 W4 0.690 2.790
238 1 W5 3.450 2.150

239
240 BEDROOM 1 W1 2.930 2.150 0.230
241 Deduction (W1) -1 2.100 1.200 0.230
242 1 W2 1.930 2.150 0.230
243 1 W3 1.930 2.150 0.230
244 1 W4 1.960 2.150
245
246ELEVATION BOX NR.BEDROOM 1 W1 0.600 2.150
247 1 W2 0.690 2.150
248 1 W3 0.600 2.150
249
250 1 W1 0.600 2.150
251 1 W2 0.690 2.150
252 1 W3 0.600 2.150
253
254 TOILET 1 W1 0.250 2.350
255 1 W2 1.050 2.150 0.230
256 DEDUCTION (V1) -1 0.600 1.200 0.230
257 1 W3 1.400 2.150
258
259 BATHROOM 1 W1 1.250 2.150 0.230
260 1 W2 1.800 2.150
261 DEDUCTION (V1) -1 0.600 1.200 0.230
262
263
264 KITCHEN 1 W1 1.820 2.150
265 Deduction (W1) -1 1.500 1.300 0.230
266 1 W2 1.410 2.150 0.230
267 1 W3 2.150 2.150 0.230
268 1 W4 2.030 2.150
269
270 MAIN PASSAGE LOOBY 1 W1 5.210 2.150
130 1 W2 3.165 2.150 0.230
131 DEDUCTION (W3) -1 1.500 1.300 0.230
132
133 Flat No. : - 7(1BHK)
275 Living Room
276 1 W1 3.090 2.150 0.230
277 1 W2 1.130 2.150 0.230
278 1 W3 3.150 0.300 0.230
279 1 W4 0.700 2.790
280 1 W5 3.750 2.150
281
BEDROOM 1 W1 2.930 2.150 0.230
241 Deduction (W1) -1 2.100 1.200 0.230
242 1 W2 1.930 2.150 0.230
243 1 W3 1.930 2.150 0.230
244 1 W4 1.970 2.150
245
288ELEVATION BOX NR.BEDROOM 1 W1 0.600 2.150
289 1 W2 0.690 2.150
290 1 W3 0.600 2.150
291
292 1 W1 0.600 2.150
293 1 W2 0.690 2.150
294 1 W3 0.600 2.150
295
296 BATHROOM 1 W1 0.250 2.350
297 1 W2 1.240 2.150 0.230
298 DEDUCTION (V1) -1 0.600 1.100 0.230
299 1 W3 1.320 2.150
300
301 TOILET 1 W1 1.240 2.150 0.230
302 1 W2 1.040 2.150
303 DEDUCTION (V1) -1 0.600 1.100 0.230
304
305 KITCHEN 1 W1 1.820 2.150
306 Deduction (W1) -1 1.200 1.300 0.230
307 1 W2 1.410 2.150 0.230
308 1 W3 2.150 2.150 0.230
309 1 W4 2.030 2.150
310
312 FLAT NO :-8(1BHK)
313 Living Room
314 1 W1 2.250 2.150
315 1 W2 2.710 2.150
316 1 W2 3.240 0.300 0.230
317
318 BEDROOM 1 W1 1.660 2.150
319 Deduction (W1) -1 0.230
320 1 W2 0.230
321 1 W3 2.870 2.160 0.230
322 chajja projection 1 0.690 2.150
323 1 1.580 2.150

324
325 Kitchen 1 W1 1.840 2.150 0.230
326 1 W2 2.460 2.150 0.230
327 Deduction (W3) -1 1.500 1.300 0.230
328 1 W3 1.680 1.950 0.230
329 1 W4 0.910 2.500 0.230
330 1 W5 0.790 2.150
331
332
333 ELEVATION BOX NR. KITCHEN 1 W1 0.600 2.150
334 1 W2 0.790 2.150
335 1 W3 0.600 2.150
336
337 1 W1 0.600 2.150
338 1 W2 0.790 2.150
339 1 W3 0.600 2.150
340
341 PASSAGE 1 W1 1.020 2.350 0.230
342
343
344 BATHROOM 1 W1 0.710 2.150
345 1 W2 1.130 2.150 0.230
346 DEDUCTION (V1) -1 0.600 1.100 0.230
347 1 W3 1.240 1.950 0.230
348 1 W4 0.440 2.350
349
350 TOILET 1 W1 2.050 2.150
351 DEDUCTION (V1) -1 0.600 1.100 0.230
352 1 W2 1.05 2.15 0.230
353 1 W3 1.75 2.15
354
tti, Mumbai

Qty in Qty in
WIDTH (m) Qty in Sqm Remark
CUM Sqm
0.150 0.100 0.230 0.150 0.100

0.150 4.97 -
0.150 4.71 -
0.150 - 5.55 -
0.150 - 4.13 -
0.22 -
- - -
0.150 - 6.77 -
- - -
1.68 -
0.150 - 2.10 -
0.150 - 1.46 -
0.150 - 3.44 -
- - -
0.42 -
0.150 - 1.74 -
- - -
0.40 -
1.10 -
- - -
0.1 - 1.29
0.1 - 1.69
0.1 - 1.29
- -
0.1 - 1.29
0.1 - 1.69
0.1 - 1.29
- - -
0.54 -
0.150 - 1.53 -
- - -
0.45 -
0.58 -
(0.15) -
0.150 - 4.75 -
0.150 - 0.95 -
- - -
0.150 - 2.81 -
0.150 - (0.66) -
- - -
- - -
0.150 - 11.20 -
1.57 -
(0.45) -
- - -
- - -
- - -
- - -
- - -
- - -
1.52 -
0.56 -
0.22 -
0.150 - 1.95 -
- - -
1.60 -
(0.36) -
1.34 -
1.07 -
0.150 - 4.21 -
- - -
0.100 - 1.29
0.100 - 1.48
0.100 - 1.29
- -
0.100 - 1.29
0.100 - 1.48
0.100 - 1.29
- - -
0.150 - 0.59 -
0.52 -
(0.15) -
0.150 - 2.84 -
- - -
0.61 -
0.150 - 1.38 -
(0.15) -
- - -
- - -
0.150 - 4.13 -
0.60 -
1.07 -
0.150 - 5.81 -
- - -
- - -
- - -
- - -
- - -
1.53 -
0.56 -
0.22 -
0.150 - 1.93 -
- - -
- - -
1.21 -
(0.57) -
1.34 -
0.95 -
0.150 - 4.19 -
- - -
0.100 - 1.29
0.100 - 1.48
0.100 - 1.29
- -
0.100 - 1.29
0.100 - 1.48
0.100 - 1.29
- - -
0.150 - 0.54 -
0.52 -
(0.30) -
0.150 - 3.01 -
- - -
0.150 - 2.69 -
0.52 -
(0.15) -
0.150 - 1.35 -
-
- - -
0.150 - 3.91 -
(0.36) -
0.96 -
0.150 - 4.13 -
- - -
0.150 - 11.20 -
1.57 -
(0.45) -
- - -
- - -
- - -
- - -
0.150 - 5.55 -
0.22 -
- - -
1.45 -
(0.62) -
1.45 -
1.21 -
0.30 -
0.150 3.50 -
0.150 1.58 -
- - -
- - -
0.94 -
1.28 -
(0.41) -
0.76 -
0.45 -
0.150 - 1.74 -
- - -
0.100 - 1.29
0.100 - 1.70
0.100 - 1.29
- -
0.100 - 1.29
0.100 - 1.70
0.100 - 1.29
- - -
0.55 -
- - -
- - -
0.150 - 1.53 -
0.56 -
(0.15) -
0.46 -
0.150 - 0.99 -
- - -
0.53 -
(0.15) -
0.150 - 4.36 -
- - -
- - -
- - -
- - -
0.150 - 5.27 -
1.55 -
(0.21) -
- - -
0.91 -
1.29 -
(0.41) -
0.150 - 1.74 -
0.84 -
0.45 -
- - -
- - -
0.100 - 1.29
0.100 - 1.70
0.100 - 1.29
- -
0.100 - 1.29
0.100 - 1.70
0.100 - 1.29
- - -
0.55 -
- - -
0.150 - 1.53 -
0.60 -
(0.15) -
0.150 - 2.83 -
0.150 - 4.36 -
0.150 - 0.97 -
- - -
0.150 - 2.82 -
0.150 - (0.66) -
- - -
- - -
0.43 -
1.33 -
1.40 -
(0.63) -
0.150 1.75 -
0.150 3.50 -
-
-
0.150 - 5.22 -
- - -
- - -
- - -
- - -
1.53 -
0.80 -
0.22 -
0.150 - 1.93 -
0.150 - 7.42 -
- - -
- - - 3.45
1.45 -
(0.58) -
0.95 -
0.95 -
0.150 - 4.21 -
- - -
0.100 - 1.29
0.100 - 1.48
0.100 - 1.29
- -
0.100 - 1.29
0.100 - 1.48
0.100 - 1.29
. - -
0.150 - 0.59 -
0.52 -
(0.17) -
0.150 - 3.01 -
- - -
0.62 -
0.150 - 3.87 -
(0.17) -
- - -
- - -
0.150 - 3.91 -
(0.45) -
0.70 -
1.06 -
0.150 - 4.36 -
- - -
0.150 - 11.20 -
1.57 -
(0.45) -
- - -
- - -
- - -
1.53 -
0.56 -
0.22 -
0.150 - 1.95 -
0.150 - 8.06 -
-
1.45 -
(0.58) -
0.95 -
0.95 -
0.150 - 4.24 -
- - -
0.100 - 1.29
0.100 - 1.48
0.100 - 1.29
- - -
0.100 - 1.29
0.100 - 1.48
0.100 - 1.29
- - -
0.150 - 0.59 -
0.61 -
(0.15) -
0.150 - 2.84 -
- - -
0.61 -
0.150 - 2.24 -
(0.15) -
- - -
0.150 - 3.91 -
(0.36) -
0.70 -
1.06 -
0.150 - 4.36 -
- - -
- - -
- - -
0.150 - 4.84 -
0.150 - 5.83 -
0.22 -
- - -
0.150 - 3.57 -
- - -
- - -
1.43 -
0.150 - 1.48 -
0.150 - 3.40 -
- - -
- - -
0.91 -
1.22 -
(0.45) -
0.75 -
0.52 -
0.150 - 1.70 -
- - -
- - -
0.100 - 1.29
0.100 - 1.70
0.100 - 1.29
- -
0.100 - 1.29
0.100 - 1.70
0.100 - 1.29
- - -
0.55 2.40 -
- - -
- - -
0.150 - 1.53 -
0.56 -
(0.15) -
0.56 -
0.150 - 1.03 -
- - -
0.150 - 4.41 -
(0.15) -
0.52 -
0.150 - 3.76 -
TOTAL 61.55 260.50 66.71
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of 4th to 7th floor
Residential Quarters BLDG -II
Drawing No- II-03

TOTAL LENGTH HEIGHT WIDTH (m)


Sr No DESCRIPTION WALL NO
NO (m) (m)
0.230
Floor No.1ST
Flat No. : - 1( 1BHK)
Living Room
1 1 W1 2.310 2.150
2 1 W2 2.190 2.150
3 1 W3 2.580 2.150
4 1 W4 1.920 2.150
1 W5 3.140 0.300 0.230
7
8 BEDROOM 1 W1 3.150 2.150
9 Deduction (W1) -1 0.230
10 1 W2 3.400 2.150 0.230
11 1 W3 3.000 0.700
chajja projection 1 0.680 2.150
1 1.600 2.150
14
15 Kitchen 1 W1 2.600 0.700 0.230
16 1 W2 0.810 2.150
17 Deduction (W3) -1
18 1 W3 0.900 1.940 0.230
19 1 W4 2.470 1.940 0.230
22
30
31 PASSAGE 1 W1 1.010 2.340 0.230
32 1 W2 0.710 2.150
33
34 BATHROOM 1 W1 0.910 2.150 0.230
35 1 W2 1.310 1.940 0.230
36 DEDUCTION (V1) -1 0.600 1.100 0.230
37 1 W3 2.020 2.350
38 1 W4 0.440 2.150
39
40 TOILET 1 W1 1.200 2.340
41 DEDUCTION (V1) -1 0.600 1.100
42
43
44 MAIN PASSAGE LOOBY 1 W1 5.210 2.150
45 1 W2 3.165 2.150 0.230
46 DEDUCTION (W3) -1 1.500 1.300 0.230
48
49
50
51
52 Flat No. : - 2(1BHK)
53 Living Room
54 1 W1 3.080 2.150 0.230
55 1 W2 1.130 2.150 0.230
56 1 W3 3.220 0.300 0.230
57 1 W4 0.700 2.790
59
60 BEDROOM 1 W1 3.240 2.150 0.230
61 Deduction (W1) -1 1.200 1.300 0.230
62 1 W2 2.700 2.150 0.230
63 1 W3 2.160 2.150 0.230
64 1 W4 1.960 2.150
65
73
74 TOILET 1 W1 0.250 2.350
75 1 W2 1.050 2.150 0.230
76 DEDUCTION (V1) -1 0.600 1.100 0.230
77 1 W3 1.320 2.150
78
79 BATHROOM 1 W1 1.240 2.150 0.230
80 1 W2 0.640 2.150
81 DEDUCTION (V1) -1 0.600 1.100 0.230
82
83
84 KITCHEN 1 W1 1.920 2.150
85 1 W2 1.210 2.150 0.230
86 1 W3 2.160 2.150 0.230
87 1 W4 2.700 2.150
89
90
91
92 Flat No. : - 3(1BHK)
93 Living Room
94 1 W1 3.090 2.150 0.230
95 1 W2 1.130 2.150 0.230
96 1 W3 3.150 0.300 0.230
97 1 W4 0.690 2.790
98
99
100 BEDROOM 1 W1 2.450 2.150 0.230
101 Deduction (W1) -1 2.080 1.200 0.230
102 1 W2 2.700 2.150 0.230
103 1 W3 1.930 2.150 0.230
104 1 W4 1.950 2.150
105
113
114 TOILET 1 W1 0.250 2.150
115 1 W2 1.050 2.150 0.230
116 DEDUCTION (V1) -1 0.600 2.150 0.230
117 1 W3 1.400 2.150
118
119 BATHROOM 1 W1 1.250 2.150
120 1 W2 1.050 2.150 0.230
121 DEDUCTION (V1) -1 0.600 1.100 0.230
122 1 W3 0.630 2.150

123
124 KITCHEN 1 W1 1.820 2.150
125 Deduction (W1) -1 1.200 1.300 0.230
126 1 W2 1.950 2.150 0.230
128 1 W4 1.920 2.150
129
130 MAIN PASSAGE LOOBY 1 W1 5.210 2.150
131 1 W2 3.165 2.150 0.230
132 DEDUCTION (W3) -1 1.500 1.300 0.230
133
134
135 Flat No. : - 4(1BHK)
136 Living Room
137 1 W1 2.580 2.150
138 1 W2 3.140 0.300 0.230
144
145 BEDROOM 1 W1 2.930 2.150 0.230
146 Deduction (W1) -1 2.080 1.300 0.230
147 1 W2 2.930 2.150 0.230
148 1 W3 2.450 2.150 0.230
149 1 W4 0.610 2.150 0.230
1 W5 1.630 2.150
Chajja outer wall
1 W6 0.735 2.150
150
151
152 Kitchen 1 W1 1.900 2.150 0.230
153 1 W2 2.585 2.150 0.230
154 Deduction (W3) -1 1.500 1.200 0.230
156 1 W3 1.700 1.950 0.230
157 1 W4 0.900 2.150 0.230
158 1 W5 0.810 2.150
159
167
168 PASSAGE 1 W1 1.010 2.350 0.230
169
170
171 BATHROOM 1 W1 0.710 2.150
172 1 W2 1.250 1.950 0.230
173 DEDUCTION (V1) -1 0.600 1.100 0.230
174 1 W3 0.930 2.150 0.230
175 1 W4 0.420 2.350
176
177 TOILET 1 W1 1.070 2.150 0.230
178 DEDUCTION (V1) -1 0.600 1.100 0.230
179 1 W2 2.03 2.15

181
182 Flat No. : - 5(1BHK)
183 Living Room
184 1 W1 2.450 2.150
186 1 W2 3.140 2.150 0.230
190 Deduction -1 1.230 0.750 0.230
191
195 Kitchen 1 W1 1.840 2.150 0.230
196 1 W2 2.600 2.150 0.230
197 Deduction (W3) -1 1.500 1.200 0.230
198 1 W3 0.810 2.150
199 1 W4 1.690 2.150 0.230
200 1 W5 0.900 2.150 0.230
201
202
210
211 PASSAGE 1 W1 1.020 2.350 0.230
212
213 BATHROOM 1 W1 0.710 2.150
214 1 W2 1.220 2.150 0.230
215 DEDUCTION (V1) -1 0.600 1.100 0.230
216 1 W3 1.450 1.950
217 1 W4 2.030 2.150
218 1 W5 0.450 2.150
219
220 TOILET 1 W1 1.200 2.350
221 DEDUCTION (V1) -1 0.600 1.100
222
223
224 BEDROOM 1 W1 0.870 2.150 0.230
225 1 W2 2.680 2.150 0.230
227 1 W3 2.830 2.150 0.230
228 Deduction (W1) -1 2.100 1.300 0.230
229 chajja projection 1 0.815 2.150
1 1.630 2.150

PASSAGE MAIN LOOBY 1 W1 2.220 2.350


230
231
232 Flat No. : - 6(1BHK)
233 Living Room
234 1 W1 3.090 2.150 0.230
235 1 W2 1.620 2.150 0.230
236 1 W3 3.220 0.300 0.230
237 1 W4 0.690 2.790
238 1 W5 3.450 2.150

239
240 BEDROOM 1 W1 2.930 2.150 0.230
241 Deduction (W1) -1 2.100 1.200 0.230
242 1 W2 1.930 2.150 0.230
243 1 W3 1.930 2.150 0.230
244 1 W4 1.960 2.150
245
253
254 TOILET 1 W1 0.250 2.350
255 1 W2 1.050 2.150 0.230
256 DEDUCTION (V1) -1 0.600 1.200 0.230
257 1 W3 1.400 2.150
258
259 BATHROOM 1 W1 1.250 2.150 0.230
260 1 W2 1.800 2.150
261 DEDUCTION (V1) -1 0.600 1.200 0.230
262
263
264 KITCHEN 1 W1 1.820 2.150
265 Deduction (W1) -1 1.500 1.300 0.230
266 1 W2 1.410 2.150 0.230
267 1 W3 2.150 2.150 0.230
268 1 W4 2.030 2.150
269
270 MAIN PASSAGE LOOBY 1 W1 5.210 2.150
130 1 W2 3.165 2.150 0.230
131 DEDUCTION (W3) -1 1.500 1.300 0.230
132
133 Flat No. : - 7(1BHK)
275 Living Room
276 1 W1 3.090 2.150 0.230
277 1 W2 1.130 2.150 0.230
278 1 W3 3.150 0.300 0.230
279 1 W4 0.700 2.790
280 1 W5 3.750 2.150
281
BEDROOM 1 W1 2.930 2.150 0.230
241 Deduction (W1) -1 2.100 1.200 0.230
242 1 W2 1.930 2.150 0.230
243 1 W3 1.930 2.150 0.230
244 1 W4 1.970 2.150
245
295
296 BATHROOM 1 W1 0.250 2.350
297 1 W2 1.240 2.150 0.230
298 DEDUCTION (V1) -1 0.600 1.100 0.230
299 1 W3 1.320 2.150
300
301 TOILET 1 W1 1.240 2.150 0.230
302 1 W2 1.040 2.150
303 DEDUCTION (V1) -1 0.600 1.100 0.230
304
305 KITCHEN 1 W1 1.820 2.150
306 Deduction (W1) -1 1.200 1.300 0.230
307 1 W2 1.410 2.150 0.230
308 1 W3 2.150 2.150 0.230
309 1 W4 2.030 2.150
310
312 FLAT NO :-8(1BHK)
313 Living Room
314 1 W1 2.250 2.150
315 1 W2 2.710 2.150
316 1 W2 3.240 0.300 0.230
317
318 BEDROOM 1 W1 1.660 2.150
319 Deduction (W1) -1 0.230
320 1 W2 0.230
321 1 W3 2.870 2.160 0.230
322 chajja projection 1 0.690 2.150
323 1 1.580 2.150
324
325 Kitchen 1 W1 1.840 2.150 0.230
326 1 W2 2.460 2.150 0.230
327 Deduction (W3) -1 1.500 1.300 0.230
328 1 W3 1.680 1.950 0.230
329 1 W4 0.910 2.500 0.230
330 1 W5 0.790 2.150
331
332
340
341 PASSAGE 1 W1 1.020 2.350 0.230
342
343
344 BATHROOM 1 W1 0.710 2.150
345 1 W2 1.130 2.150 0.230
346 DEDUCTION (V1) -1 0.600 1.100 0.230
347 1 W3 1.240 1.950 0.230
348 1 W4 0.440 2.350
349
350 TOILET 1 W1 2.050 2.150
351 DEDUCTION (V1) -1 0.600 1.100 0.230
352 1 W2 1.05 2.15 0.230
353 1 W3 1.75 2.15
354
355
356
357
358
Qty in Qty in Qty in
WIDTH (m) Remark
CUM Sqm Sqm
0.150 0.100 0.230 0.150 0.100

0.150 4.97 -
0.150 4.71 -
0.150 - 5.55 -
0.150 - 4.13 -
0.22 -
- - -
0.150 - 6.77 -
- - -
1.68 -
0.150 - 2.10 -
0.150 - 1.46 -
0.150 - 3.44 -
- - -
0.42 -
0.150 - 1.74 -
- - -
0.40 -
1.10 -
- - -
- - -
0.54 -
0.150 - 1.53 -
- - -
0.45 -
0.58 -
(0.15) -
0.150 - 4.75 -
0.150 - 0.95 -
- - -
0.150 - 2.81 -
0.150 - (0.66) -
- - -
- - -
0.150 - 11.20 -
1.57 -
(0.45) -
- - -
- - -
- - -
- - -
- - -
- - -
1.52 -
0.56 -
0.22 -
0.150 - 1.95 -
- - -
1.60 -
(0.36) -
1.34 -
1.07 -
0.150 - 4.21 -
- - -
- - -
0.150 - 0.59 -
0.52 -
(0.15) -
0.150 - 2.84 -
- - -
0.61 -
0.150 - 1.38 -
(0.15) -
- - -
- - -
0.150 - 4.13 -
0.60 -
1.07 -
0.150 - 5.81 -
- - -
- - -
- - -
- - -
- - -
1.53 -
0.56 -
0.22 -
0.150 - 1.93 -
- - -
- - -
1.21 -
(0.57) -
1.34 -
0.95 -
0.150 - 4.19 -
- - -
- - -
0.150 - 0.54 -
0.52 -
(0.30) -
0.150 - 3.01 -
- - -
0.150 - 2.69 -
0.52 -
(0.15) -
0.150 - 1.35 -
-
- - -
0.150 - 3.91 -
(0.36) -
0.96 -
0.150 - 4.13 -
- - -
0.150 - 11.20 -
1.57 -
(0.45) -
- - -
- - -
- - -
- - -
0.150 - 5.55 -
0.22 -
- - -
1.45 -
(0.62) -
1.45 -
1.21 -
0.30 -
0.150 3.50 -
0.150 1.58 -
- - -
- - -
0.94 -
1.28 -
(0.41) -
0.76 -
0.45 -
0.150 - 1.74 -
- - -
- - -
0.55 -
- - -
- - -
0.150 - 1.53 -
0.56 -
(0.15) -
0.46 -
0.150 - 0.99 -
- - -
0.53 -
(0.15) -
0.150 - 4.36 -
- - -
- - -
- - -
- - -
0.150 - 5.27 -
1.55 -
(0.21) -
- - -
0.91 -
1.29 -
(0.41) -
0.150 - 1.74 -
0.84 -
0.45 -
- - -
- - -
- - -
0.55 -
- - -
0.150 - 1.53 -
0.60 -
(0.15) -
0.150 - 2.83 -
0.150 - 4.36 -
0.150 - 0.97 -
- - -
0.150 - 2.82 -
0.150 - (0.66) -
- - -
- - -
0.43 -
1.33 -
1.40 -
(0.63) -
0.150 1.75 -
0.150 3.50 -
-
-
0.150 - 5.22 -
- - -
- - -
- - -
- - -
1.53 -
0.80 -
0.22 -
0.150 - 1.93 -
0.150 - 7.42 -
- - -
- - -
1.45 -
(0.58) -
0.95 -
0.95 -
0.150 - 4.21 -
- - -
. - -
0.150 - 0.59 -
0.52 -
(0.17) -
0.150 - 3.01 -
- - -
0.62 -
0.150 - 3.87 -
(0.17) -
- - -
- - -
0.150 - 3.91 -
(0.45) -
0.70 -
1.06 -
0.150 - 4.36 -
- - -
0.150 - 11.20 -
1.57 -
(0.45) -
- - -
- - -
- - -
1.53 -
0.56 -
0.22 -
0.150 - 1.95 -
0.150 - 8.06 -
-
1.45 -
(0.58) -
0.95 -
0.95 -
0.150 - 4.24 -
- - -
- - -
0.150 - 0.59 -
0.61 -
(0.15) -
0.150 - 2.84 -
- - -
0.61 -
0.150 - 2.24 -
(0.15) -
- - -
0.150 - 3.91 -
(0.36) -
0.70 -
1.06 -
0.150 - 4.36 -
- - -
- - -
- - -
0.150 - 4.84 -
0.150 - 5.83 -
0.22 -
- - -
0.150 - 3.57 -
- - -
- - -
1.43 -
0.150 - 1.48 -
0.150 - 3.40 -
- - -
0.91 -
1.22 -
(0.45) -
0.75 -
0.52 -
0.150 - 1.70 -
- - -
- - -
- - -
0.55 2.40 -
- - -
- - -
0.150 - 1.53 -
0.56 -
(0.15) -
0.56 -
0.150 - 1.03 -
- - -
0.150 - 4.41 -
(0.15) -
0.52 -
0.150 - 3.76 -
- - -
- - -
-
TOTAL
61.55 260.50 -
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of 3rd Floor plaster
Residential Quarters BLDG -II
Drawing No- II-03

Sr No Description Unit Quantity Remark

1 1st to 3rd floor plaster sqm 3,638.27 #REF!

2 4th and 5th floor plaster sqm 2,426.06

Total Qty Of Plaster sqm 12,487.71 #REF!


Previous sqm -
This Bill qty sqm 6,064.32 #REF!
Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of 1st to 3rd Floor plaster
Residential Quarters BLDG -II
Drawing No- II-03
1st floor to 3rd floor (typical)
Description Nos. Length Height Area Deduction Total
Flat No 1
Hall left wall 1 5.5 2.75 15.125
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 1 3.26 2.75 8.965
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 5.5 2.825 15.5375
(-) Door 1 1 2.1 ----- 2.1
Hall door wall 1 3.25 2.825 9.18125
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 0.1 2.2 0.44
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
1 4.7 2.75 12.925
1 4.7 2.825 13.2775
(-) Door 1 0.9 2.1 ----- 1.89
Door dhar 2 0.1 2.2 0.44
1 0.1 0.9 0.09
Kitchen 2 2.61 2.75 14.355
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
2 2.83 2.75 15.565
Door dhar 2 2.2 0.1 0.44
1 0.9 0.1 0.09
Kitchen Passage wall 2 3.57 2.825 20.1705
(-) Door 2 0.9 2.1 ----- 3.78
1 0.94 2.75 2.585
Bathroom passage 1 3.7 2.825 10.4525
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 5.38 2.4 12.912
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.4 1.87 8.228
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
177.2793 31.62 145.6593
Flat No.2
door wall 1 4.88 2.75 13.42
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 2.1 0.1 0.42
1 1 0.1 0.1
left wall 1 4.5 2.825 12.7125
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 2 3.22 2.825 18.193
(-) Window 1 3 2.05 ----- 6.15
Kitchen wall 2 3.45 2.75 18.975
2 2.82 2.825 15.933
(-) Window 1 1.2 1.5 ----- 1.8
(-) Door 1 0.9 2.1 ----- 1.89
Bedroom wall 2 3 2.825 16.95
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 2.1 1.2 2.52
walls 2 3.35 2.75 18.425
Kitchen passage area 2 3.04 2.75 16.72
bathroom passage 1 2.1 2.825 5.9325
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 4.56 2.4 10.944
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
WC 1 4.2 1.87 7.854
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
159.099 23.22 135.879
Flat No.3
Hall left side wall 1 4.88 2.75 13.42
(-) Door 1 1 2.1 ----- 2.1
Window wall 1 3.22 2.75 8.855
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 4.88 2.825 13.786
(-) Door 1 0.9 2.2 ----- 1.98
Hall door wall 1 4.35 2.825 12.28875
Door dhar 2 0.1 2.1 0.42
1 0.1 1 0.1
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
(-) Door 1 0.9 2.1 ----- 1.89
1 4.26 2.75 11.715
Door dhar 2 0.1 2.1 0.42
1 0.1 0.9 0.09
Bedroom door wall 2 3.35 2.825 18.9275
Kitchen 2 3.45 2.75 18.975
2 2.82 2.75 15.51
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
Door dhar 2 0.1 2.1 0.42
1 0.1 0.9 0.09
Kitchen passage wall 1 2.21 2.825 6.24325
Bathroom Passage 1 3.55 2.825 10.02875
(-) Door 2 0.7 2.1 ----- 2.94
Bathroom 1 4.56 2.4 10.944
(-) Window 1 0.6 0.6 0.36
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.35 1.87 8.1345
(-) Window 1 0.6 0.6 0.36
(-) Door 1 0.75 2.1 ----- 1.575
167.5878 24.42 143.1678

Flat No 4.
Hall left wall 1 3.7 2.75 10.175
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 1 3.3 2.75 9.075
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 3.7 2.825 10.4525
(-) Door 1 1 2.1 ----- 2.1
Hall door wall 1 3.3 2.825 9.3225
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 0.1 2.2 0.44
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
1 3.35 2.75 9.2125
1 3.35 2.825 9.46375
(-) Door 1 0.9 2.1 ----- 1.89
Door dhar 2 0.1 2.2 0.44
1 0.1 0.9 0.09
Kitchen 2 2.61 2.75 14.355
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
2 2.36 2.75 12.98
Door dhar 2 2.2 0.1 0.44
1 0.9 0.1 0.09
Kitchen Passage wall 2 3.57 2.825 20.1705
(-) Door 2 0.9 2.1 ----- 3.78
1 0.94 2.75 2.585
Bathroom passage 1 3.7 2.825 10.4525
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 5.36 2.4 12.864
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.5 1.87 8.415
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
157.5233 31.62 125.9033

Flat No 5.
Hall left wall 1 3.7 2.75 10.175
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 1 3.3 2.75 9.075
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 3.7 2.825 10.4525
(-) Door 1 1 2.1 ----- 2.1
Hall door wall 1 3.3 2.825 9.3225
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 0.1 2.2 0.44
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
1 3.35 2.75 9.2125
1 3.35 2.825 9.46375
(-) Door 1 0.9 2.1 ----- 1.89
Door dhar 2 0.1 2.2 0.44
1 0.1 0.9 0.09
Kitchen 2 2.61 2.75 14.355
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
2 2.36 2.75 12.98
Door dhar 2 2.2 0.1 0.44
1 0.9 0.1 0.09
Kitchen Passage wall 2 3.57 2.825 20.1705
(-) Door 2 0.9 2.1 ----- 3.78
1 0.94 2.75 2.585
Bathroom passage 1 3.7 2.825 10.4525
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 5.36 2.4 12.864
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.5 1.87 8.415
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
157.5233 31.62 125.9033

Flat No.6
door wall 1 4.88 2.75 13.42
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 2.1 0.1 0.42
1 1 0.1 0.1
left wall 1 4.5 2.825 12.7125
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 2 3.22 2.825 18.193
(-) Window 1 3 2.05 ----- 6.15
Kitchen wall 2 3.45 2.75 18.975
2 2.82 2.825 15.933
(-) Window 1 1.2 1.5 ----- 1.8
(-) Door 1 0.9 2.1 ----- 1.89
Bedroom wall 2 3 2.825 16.95
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 2.1 1.2 2.52
walls 2 3.35 2.75 18.425
Kitchen passage area 2 3.04 2.75 16.72
bathroom passage 1 2.1 2.825 5.9325
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 4.56 2.4 10.944
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
WC 1 4.2 1.87 7.854
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
159.099 23.22 135.879

Flat No.7
door wall 1 4.88 2.75 13.42
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 2.1 0.1 0.42
1 1 0.1 0.1
left wall 1 4.5 2.825 12.7125
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 2 3.22 2.825 18.193
(-) Window 1 3 2.05 ----- 6.15
Kitchen wall 2 3.45 2.75 18.975
2 2.82 2.825 15.933
(-) Window 1 1.2 1.5 ----- 1.8
(-) Door 1 0.9 2.1 ----- 1.89
Bedroom wall 2 3 2.825 16.95
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 2.1 1.2 2.52
walls 2 3.35 2.75 18.425
Kitchen passage area 2 3.04 2.75 16.72
bathroom passage 1 2.1 2.825 5.9325
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 4.56 2.4 10.944
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
WC 1 4.2 1.87 7.854
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
159.099 23.22 135.879

Flat No 8
Hall left wall 1 4.56 2.75 12.54
(-) Door 1 1 2.1 ----- 2.1
Window wall 1 3.3 2.75 9.075
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 4.56 2.825 12.882
(-) Door 1 0.9 2.1 ----- 1.89
Hall door wall 1 3.3 2.825 9.3225
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 0.1 2.2 0.44
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
1 3.35 2.75 9.2125
1 3.35 2.825 9.46375
(-) Door 1 0.9 2.1 ----- 1.89
Door dhar 2 0.1 2.2 0.44
1 0.1 0.9 0.09
Kitchen 2 2.61 2.75 14.355
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
2 2.36 2.75 12.98
Door dhar 2 2.2 0.1 0.44
1 0.9 0.1 0.09
Kitchen Passage wall 2 3.57 2.825 20.1705
(-) Door 2 0.9 2.1 ----- 3.78
1 0.94 2.75 2.585
Bathroom passage 1 3.7 2.825 10.4525
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 5.38 2.4 12.912
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.5 1.87 8.415
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
162.3658 31.62 130.7458

Passage 2 27.18 2.75 149.49


(-) Duct window 2x2 1.5 1.2 ----- 7.2
(-) Door 6 1 2.1 ----- 12.6
(-) Electric duct 2 0.6 1.2 ----- 1.44
(-) Lift door 4 0.6 2.1 ----- 5.04
(-) Fire duct 1 0.74 1.2 ----- 0.888
Door wall 2 2.38 2.75 13.09
(-) Door 4 1 2.1 ----- 8.4
Beam 2 1.45 1.38 4.002
2 1.45 0.94 2.726
169.308 35.568 133.74

Floor 1 total Total 1468.884 256.128 1212.756

Typical for 3 Floors 4406.653 768.384 3638.269


Name of Work : - Proposed development on plot bearing CTS No. 627, Chunabhatti, Mumbai
Name of Client : - Hubtown Ltd
Name of Contractor : - JRD Enterprises
Quantity Analysis of 1st to 3rd Floor plaster
Residential Quarters BLDG -II
Drawing No- II-03
4th to 10th floor
Description Nos. Length Height Area Deduction Total
Flat No 1
Hall left wall 1 5.5 2.75 15.125
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 1 3.26 2.75 8.965
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 5.5 2.825 15.5375
(-) Door 1 1 2.1 ----- 2.1
Hall door wall 1 3.25 2.825 9.18125
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 0.1 2.2 0.44
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
1 4.7 2.75 12.925
1 4.5 2.825 12.7125
(-) Door 1 0.9 2.1 ----- 1.89
Door dhar 2 0.1 2.2 0.44
1 0.1 0.9 0.09
Kitchen 2 2.61 2.75 14.355
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
2 2.83 2.75 15.565
Door dhar 2 2.2 0.1 0.44
1 0.9 0.1 0.09
Kitchen Passage wall 2 3.6 2.825 20.34
(-) Door 2 0.9 2.1 ----- 3.78
1 0.94 2.75 2.585
Bathroom passage 1 3.7 2.825 10.4525
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 5.38 2.4 12.912
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.5 1.87 8.415
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
177.071 31.62 145.45075
Flat No.2
door wall 1 4.88 2.75 13.42
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 2.1 0.1 0.42
1 1 0.1 0.1
left wall 1 4.5 2.825 12.7125
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 2 3.22 2.825 18.193
(-) Window 1 3 2.05 ----- 6.15
Kitchen wall 2 3.45 2.75 18.975
2 2.82 2.825 15.933
(-) Window 1 1.2 1.5 ----- 1.8
(-) Door 1 0.9 2.1 ----- 1.89
Bedroom wall 2 3 2.825 16.95
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 2.1 1.2 2.52
walls 2 3.35 2.75 18.425
Kitchen passage area 2 3.04 2.75 16.72
bathroom passage 1 2.1 2.825 5.9325
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 4.56 2.4 10.944
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
WC 1 4.2 1.87 7.854
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
159.099 23.22 135.879
Flat No.3
Hall left side wall 1 4.88 2.75 13.42
(-) Door 1 1 2.1 ----- 2.1
Window wall 1 3.22 2.75 8.855
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 4.88 2.825 13.786
(-) Door 1 0.9 2.2 ----- 1.98
Hall door wall 1 4.35 2.825 12.2888
Door dhar 2 0.1 2.1 0.42
1 0.1 1 0.1
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
(-) Door 1 0.9 2.1 ----- 1.89
1 4.26 2.75 11.715
Door dhar 2 0.1 2.1 0.42
1 0.1 0.9 0.09
Bedroom door wall 2 3.35 2.825 18.9275
Kitchen 2 3.45 2.75 18.975
2 2.82 2.75 15.51
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
Door dhar 2 0.1 2.1 0.42
1 0.1 0.9 0.09
Kitchen passage wall 1 2.21 2.825 6.24325
Bathroom Passage 1 3.55 2.825 10.0288
(-) Door 2 0.7 2.1 ----- 2.94
Bathroom 1 4.58 2.4 10.992
(-) Window 1 0.6 0.6 0.36
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.35 1.87 8.1345
(-) Window 1 0.6 0.6 0.36
(-) Door 1 0.75 2.1 ----- 1.575
167.636 24.42 143.21575

Flat No 4.
Hall left wall 1 3.7 2.75 10.175
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 1 3.3 2.75 9.075
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 3.7 2.825 10.4525
(-) Door 1 1 2.1 ----- 2.1
Hall door wall 1 3.3 2.825 9.3225
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 0.1 2.2 0.44
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
1 3.35 2.75 9.2125
1 3.35 2.825 9.46375
(-) Door 1 0.9 2.1 ----- 1.89
Door dhar 2 0.1 2.2 0.44
1 0.1 0.9 0.09
Kitchen 2 2.61 2.75 14.355
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
2 2.36 2.75 12.98
Door dhar 2 2.2 0.1 0.44
1 0.9 0.1 0.09
Kitchen Passage wall 2 3.57 2.825 20.1705
(-) Door 2 0.9 2.1 ----- 3.78
1 0.94 2.75 2.585
Bathroom passage 1 3.7 2.825 10.4525
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 5.4 2.4 12.96
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.5 1.87 8.415
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
157.619 31.62 125.99925

Flat No 5.
Hall left wall 1 3.7 2.75 10.175
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 1 3.3 2.75 9.075
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 3.7 2.825 10.4525
(-) Door 1 1 2.1 ----- 2.1
Hall door wall 1 3.3 2.825 9.3225
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 0.1 2.2 0.44
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
1 3.35 2.75 9.2125
1 3.35 2.825 9.46375
(-) Door 1 0.9 2.1 ----- 1.89
Door dhar 2 0.1 2.2 0.44
1 0.1 0.9 0.09
Kitchen 2 2.61 2.75 14.355
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
2 2.36 2.75 12.98
Door dhar 2 2.2 0.1 0.44
1 0.9 0.1 0.09
Kitchen Passage wall 2 3.57 2.825 20.1705
(-) Door 2 0.9 2.1 ----- 3.78
1 0.94 2.75 2.585
Bathroom passage 1 3.7 2.825 10.4525
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 5.4 2.4 12.96
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.5 1.87 8.415
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
157.619 31.62 125.99925

Flat No.6
door wall 1 4.88 2.75 13.42
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 2.1 0.1 0.42
1 1 0.1 0.1
left wall 1 4.5 2.825 12.7125
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 2 3.22 2.825 18.193
(-) Window 1 3 2.05 ----- 6.15
Kitchen wall 2 3.45 2.75 18.975
2 2.82 2.825 15.933
(-) Window 1 1.2 1.5 ----- 1.8
(-) Door 1 0.9 2.1 ----- 1.89
Bedroom wall 2 3 2.825 16.95
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 2.1 1.2 2.52
walls 2 3.35 2.75 18.425
Kitchen passage area 2 3.04 2.75 16.72
bathroom passage 1 2.1 2.825 5.9325
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 4.56 2.4 10.944
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
WC 1 4.2 1.87 7.854
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
159.099 23.22 135.879

Flat No.7
door wall 1 4.88 2.75 13.42
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 2.1 0.1 0.42
1 1 0.1 0.1
left wall 1 4.5 2.825 12.7125
(-) Door 1 0.9 2.1 ----- 1.89
Window wall 2 3.22 2.825 18.193
(-) Window 1 3 2.05 ----- 6.15
Kitchen wall 2 3.45 2.75 18.975
2 2.82 2.825 15.933
(-) Window 1 1.2 1.5 ----- 1.8
(-) Door 1 0.9 2.1 ----- 1.89
Bedroom wall 2 3 2.825 16.95
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 2.1 1.2 2.52
walls 2 3.35 2.75 18.425
Kitchen passage area 2 3.04 2.75 16.72
bathroom passage 1 2.1 2.825 5.9325
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 4.56 2.4 10.944
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
WC 1 4.2 1.87 7.854
(-) Door 1 0.75 2.1 ----- 1.575
(-) Window 1 0.6 1 ----- 0.6
159.099 23.22 135.879

Flat No 8
Hall left wall 1 4.56 2.75 12.54
(-) Door 1 1 2.1 ----- 2.1
Window wall 1 3.3 2.75 9.075
(-) Window 1 3 2.05 ----- 6.15
Hall right side wall 1 4.56 2.825 12.882
(-) Door 1 0.9 2.1 ----- 1.89
Hall door wall 1 3.3 2.825 9.3225
(-) Door 1 1 2.1 ----- 2.1
Door dhar 2 0.1 2.2 0.44
Bedroom 2 3 2.75 16.5
(-) Window 1 2.1 1.2 ----- 2.52
1 3.35 2.75 9.2125
1 3.35 2.825 9.46375
(-) Door 1 0.9 2.1 ----- 1.89
Door dhar 2 0.1 2.2 0.44
1 0.1 0.9 0.09
Kitchen 2 2.61 2.75 14.355
(-) Door 1 0.9 2.1 ----- 1.89
(-) Window 1 1.2 1.5 ----- 1.8
2 2.36 2.75 12.98
Door dhar 2 2.2 0.1 0.44
1 0.9 0.1 0.09
Kitchen Passage wall 2 3.57 2.825 20.1705
(-) Door 2 0.9 2.1 ----- 3.78
1 0.94 2.75 2.585
Bathroom passage 1 3.7 2.825 10.4525
(-) Door 2 0.75 2.1 ----- 3.15
Bathroom 1 5.48 2.4 13.152
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
WC 1 4.5 1.87 8.415
(-) Window 1 1 0.6 ----- 0.6
(-) Door 1 0.75 2.1 ----- 1.575
162.606 31.62 130.98575

Passage 2 27.18 2.75 149.49


(-) Duct window 2x2 1.5 1.2 ----- 7.2
(-) Door 6 1 2.1 ----- 12.6
(-) Electric duct 2 0.6 1.2 ----- 1.44
(-) Lift door 4 0.6 2.1 ----- 5.04
(-) Fire duct 1 0.74 1.2 ----- 0.888
Door wall 2 2.38 2.75 13.09
(-) Door 4 1 2.1 ----- 8.4
Beam 2 1.45 1.38 4.002
2 1.45 0.94 2.726
169.308 35.568 133.74

4th floor total Total 1469.16 256.128 1213.02775

Typical for 2 Floors 2938.31 512.256 2426.06


Bill Summary

This bill claims for-

Shuttering for Column, Slab, Beam-5th to 10th floor column, 6th to


1 10th floor beam, 6th to 10th floor slab

Concrete for Column, Slab, Beam-5th to 10th floor column, 6th to


2 10th floor beam, 6th to 10th floor slab

3 Steel reinforcement for Column, Slab, Beam-5th to 10th floor


column, 6th to 10th floor beam, 6th to 10th floor slab

4 Staircase-6th floor to 10th floor

5 Blockwork-100mm,150mm, 230mm- 3rd floor to 7th floor

6 Loss of shuttering material

7 Extra Over & above qty for shuttering, concrete & steel, internal
cement plaster-ast to 5th floor