39.16%
1
(5) Bituminous Base course KM 35.27% 71.867 15,170,960.93 1,090,298,124.08 - - - - -
Culverts (length < 6m) No. 5.89% 35.000 5,202,200.13 182,077,004.56 2.000 2.000 10,404,400.26 10,404,400.26 -
Quantities as per Scope Quantities As per certified Work Done Amount As per certified Work Done
Weigh Percenta
Weightag
tage in ge
Sl No. Item e in % of Item Description Unit Cumulative Value upto Remarks
Cost Weightag
655202000
CP BOQ Amount Quantity upto Quantity Cumulative value Value of this MPC
of CP e Quantity Rate Quantity Previous MPC
(In Rs.) Previous MPC of this MPC upto this MPC (Rs) (Rs)
8.30%
(4) Wearing Coat including expansion joints RM 1.60% 2640.000 11,372.14 30,022,460.80 - - - - -
ctions/flyovers including viaducts, if any
(4) Wearing Coat including expansion joints RM 0.38% 398.000 17,915.41 7,130,334.44 - - - - -
1103800
4
Construction of Eight Lane access-controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara
Project : District (Ch. 824+920 to Ch. 844+382; Design Ch. 372+500 to Ch. 391+962) section of Delhi–Vadodara Greenfield Alignment (NH-148 N) on EPC Mode under Bharatmala Pariyojana in the
State of Gujarat (Pkg-31).
National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Client :
Authority Engineer
: L.N.Malviya Infra Projects Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 19.426 Kms.
Contract Price (INR) : ₹ 7,894,000,000.00
PERIOD : 730 Days as per CA
MONTHLY PAYMENT CERTIFICATE NO. - 09 (18.05.21 to 31.05.21)
Quantities as per Scope Quantities As per certified Work Done Amount As per certified Work Done
Weigh Percenta
Weightag
tage in ge
Sl No. Item e in % of Item Description Unit Cumulative Value upto Remarks
Cost Weightag BOQ Amount Quantity upto Quantity Cumulative value Value of this MPC
CP Quantity Rate Quantity Previous MPC
of CP e (In Rs.) Previous MPC of this MPC upto this MPC (Rs) (Rs)
Other Works
2271103800
4 (viii) Retaining Wall/ Breast Wall Sqm 7.19% 6204.000 26,320.50 163,292,363.22 - - - - -
(ix) RE Wall Sqm 50.40% 14995.148 76,333.78 1,144,636,315.20 - - - - -
(x) Street Lighting RM 3.41% 3568.560 21,701.93 77,444,639.58 - - - - -
(xi) Utility Ducts RM 1.10% 210.000 118,962.58 24,982,141.80 - - - - -
(xii) ATMS RM 2.55% 38660.000 1,498.01 57,913,146.90 - - - - -
(xiii) Road side Plantation including
RM 3.56% 35119.440 2,302.18 80,851,295.28 - - - - -
Horticulture in Wayside Amenities
Note :- Schedule "H" has been prepared provisionaly based on original scope of works as defined in Schedule "B" & "C" of the Contract Agreement. Some components of Schedule "H" shall be revised after the formal approval of Plan &
Profile and Structure work Drawings submitted by EPC Contractor.
Submitted by:
Authorized Signatory
PNC Infratech Limited
1 15-Jun-21 Jun-21 PNC/DVE-31/HW/2080 Subgrade Top 372+500 372+650 LHS
2 12-Feb-22 Feb-22 PNC/DVE-31/HW/5035 Subgrade Top 372+650 372+680 LHS
3 14-Jun-21 Jun-21 PNC/DVE-31/HW/1988 Subgrade Top 372+680 372+870 LHS
4 11-Jan-22 Jan-22 PNC/DVE-31/HW/4555 Subgrade Top 372+870 372+890 LHS
5 16-Jun-21 Jun-21 PNC/DVE-31/HW/2181 Subgrade Top 372+890 373+090 LHS
6 17-Jun-21 Jun-21 PNC/DVE-31/HW/2236 Subgrade Top 373+160 373+300 LHS
7 14-Jan-22 Jan-22 PNC/DVE-31/HW/4619 Subgrade Top 373+300 373+360 LHS
8 17-Jun-21 Jun-21 PNC/DVE-31/HW/2238 Subgrade Top 373+360 373+460 LHS
9 14-Jan-22 Jan-22 PNC/DVE-31/HW/4621 Subgrade Top 373+460 373+500 LHS
10 18-Jun-21 Jun-21 PNC/DVE-31/HW/2256 Subgrade Top 373+500 373+660 LHS
11 18-Jun-21 Jun-21 PNC/DVE-31/HW/2262 Subgrade Top 375+000 375+180 LHS
1 25-Dec-21 Dec-21 PNC/DVE-31/HW/4268 Subgrade Top 375+180 375+200 LHS
2 15-Jun-21 Jun-21 PNC/DVE-31/HW/2083 Subgrade Top 375+200 375+460 LHS
3 6-Dec-21 Dec-21 PNC/DVE-31/HW/3855 Subgrade Top 375+460 375+490 LHS
4 14-Jun-21 Jun-21 PNC/DVE-31/HW/1991 Subgrade Top 375+490 375+680 LHS
5 6-Dec-21 Dec-21 PNC/DVE-31/HW/3859 Subgrade Top 375+680 375+710 LHS
6 16-Jun-21 Jun-21 PNC/DVE-31/HW/2184 Subgrade Top 375+710 375+900 LHS
7 12-Feb-22 Feb-22 PNC/DVE-31/HW/5036 Subgrade Top 375+900 375+940 LHS
8 17-Jun-21 Jun-21 PNC/DVE-31/HW/2230 Subgrade Top 375+940 376+000 LHS
9 15-Jun-21 Jun-21 PNC/DVE-31/HW/2086 Subgrade Top 376+630 377+000 LHS
1 25-Nov-21 Nov-21 PNC/DVE-31/HW/3535 Subgrade Top 377+000 377+040 LHS
2 15-Jun-21 Jun-21 PNC/DVE-31/HW/2089 Subgrade Top 377+040 377+140 LHS
3 15-Jun-21 Jun-21 PNC/DVE-31/HW/2092 Subgrade Top 377+190 377+310 LHS
4 13-Mar-22 Mar-22 PNC/DVE-31/HW/5741 Subgrade Top 377+310 377+360 LHS
5 18-Jun-21 Jun-21 PNC/DVE-31/HW/2258 Subgrade Top 377+360 377+610 LHS
6 30-Nov-21 Nov-21 PNC/DVE-31/HW/3660 Subgrade Top 377+610 377+650 LHS
7 25-Nov-21 Nov-21 PNC/DVE-31/HW/3541 Subgrade Top 377+620 377+640 LHS
8 18-Jun-21 Jun-21 PNC/DVE-31/HW/2264 Subgrade Top 377+650 377+860 LHS
9 18-Jun-21 Jun-21 PNC/DVE-31/HW/2254 Subgrade Top 378+170 378+530 LHS
10 22-Jan-22 Jan-22 PNC/DVE-31/HW/4738 Subgrade Top 378+530 378+560 LHS
11 15-Jun-21 Jun-21 PNC/DVE-31/HW/2095 Subgrade Top 378+560 378+720 LHS
12 13-Mar-22 Mar-22 PNC/DVE-31/HW/5747 Subgrade Top 378+720 378+750 LHS
13 14-Jun-21 Jun-21 PNC/DVE-31/HW/2000 Subgrade Top 378+750 379+240 LHS
14 20-Jan-22 Jan-22 PNC/DVE-31/HW/4718 Subgrade Top 379+240 379+270 LHS
15 14-Jun-21 Jun-21 PNC/DVE-31/HW/2003 Subgrade Top 379+270 379+480 LHS
1 1-Jan-22 Jan-22 PNC/DVE-31/HW/4434 Subgrade Top 379+480 379+510 LHS
2 15-Jun-21 Jun-21 PNC/DVE-31/HW/2071 Subgrade Top 379+510 379+720 LHS
3 9-Mar-22 Mar-22 PNC/DVE-31/HW/5697 Subgrade Top 379+720 379+740 LHS
4 15-Jun-21 Jun-21 PNC/DVE-31/HW/2074 Subgrade Top 379+740 380+000 LHS
5 14-Jun-21 Jun-21 PNC/DVE-31/HW/1994 Subgrade Top 380+000 380+100 LHS
6 30-Jan-22 Jan-22 PNC/DVE-31/HW/4848 Subgrade Top 380+100 380+120 LHS
7 14-Jun-21 Jun-21 PNC/DVE-31/HW/1997 Subgrade Top 380+120 380+370 LHS
8 26-Mar-22 Mar-22 PNC/DVE-31/HW/6047 Subgrade Top 380+370 380+406 LHS
9 26-Mar-22 Mar-22 PNC/DVE-31/HW/6048 Subgrade Top 380+424 380+450 LHS
10 14-Jun-21 Jun-21 PNC/DVE-31/HW/2006 Subgrade Top 380+450 380+840 LHS
11 27-Dec-21 Dec-21 PNC/DVE-31/HW/4344 Subgrade Top 380+840 380+860 LHS
12 14-Jun-21 Jun-21 PNC/DVE-31/HW/2009 Subgrade Top 380+860 381+150 LHS
13 31-Jan-22 Jan-22 PNC/DVE-31/HW/4883 Subgrade Top 381+150 381+180 LHS
14 19-Feb-22 Feb-22 PNC/DVE-31/HW/5198 Subgrade Top 381+150 381+180 LHS
15 15-Jun-21 Jun-21 PNC/DVE-31/HW/2098 Subgrade Top 381+180 381+270 LHS
16 30-Jan-22 Jan-22 PNC/DVE-31/HW/4854 Subgrade Top 381+270 381+300 LHS
17 16-Jun-21 Jun-21 PNC/DVE-31/HW/2190 Subgrade Top 381+300 381+460 LHS
18 15-Jan-22 Jan-22 PNC/DVE-31/HW/4640 Subgrade Top 381+460 381+480 LHS
19 15-Jun-21 Jun-21 PNC/DVE-31/HW/2104 Subgrade Top 381+480 381+690 LHS
20 26-Mar-22 Mar-22 PNC/DVE-31/HW/6049 Subgrade Top 381+690 381+721 LHS
21 26-Mar-22 Mar-22 PNC/DVE-31/HW/6050 Subgrade Top 381+733 381+760 LHS
22 17-Jun-21 Jun-21 PNC/DVE-31/HW/2241 Subgrade Top 381+760 381+820 LHS
23 15-Jun-21 Jun-21 PNC/DVE-31/HW/2107 Subgrade Top 381+820 381+970 LHS
24 26-Mar-22 Mar-22 PNC/DVE-31/HW/6051 Subgrade Top 381+970 381+992 LHS
25 23-Mar-22 Mar-22 PNC/DVE-31/HW/5979 Subgrade Top 382+140 382+300 LHS
26 14-Jun-21 Jun-21 PNC/DVE-31/HW/2012 Subgrade Top 382+580 382+640 LHS
27 21-Feb-22 Feb-22 PNC/DVE-31/HW/5296 Subgrade Top 382+640 382+642 LHS
28 21-Feb-22 Feb-22 PNC/DVE-31/HW/5296 Subgrade Top 382+649 382+680 LHS
29 14-Jun-21 Jun-21 PNC/DVE-31/HW/2015 Subgrade Top 382+680 382+770 LHS
30 25-Dec-21 Dec-21 PNC/DVE-31/HW/4299 Subgrade Top 382+770 382+790 LHS
31 15-Jun-21 Jun-21 PNC/DVE-31/HW/2077 Subgrade Top 382+790 382+950 LHS
32 7-Mar-22 Mar-22 PNC/DVE-31/HW/5676 Subgrade Top 382+950 382+970 LHS
33 15-Jun-21 Jun-21 PNC/DVE-31/HW/2110 Subgrade Top 382+970 383+230 LHS
34 15-Jun-21 Jun-21 PNC/DVE-31/HW/2101 Subgrade Top 383+250 383+400 LHS
35 17-Jun-21 Jun-21 PNC/DVE-31/HW/2233 Subgrade Top 383+400 383+500 LHS
36 7-Dec-21 Dec-21 PNC/DVE-31/HW/3899 Subgrade Top 384+670 384+700 LHS
1 28-Oct-21 Oct-21 PNC/DVE-31/HW/3071 Subgrade Top 384+700 384+900 LHS
2 24-Nov-21 Nov-21 PNC/DVE-31/HW/3511 Subgrade Top 385+080 385+160 LHS
1 30-Sep-21 Sep-21 PNC/DVE-31/HW/2820 Subgrade Top 385+160 385+290 LHS
2 8-Dec-21 Dec-21 PNC/DVE-31/HW/3928 Subgrade Top 385+290 385+310 LHS
3 30-Sep-21 Sep-21 PNC/DVE-31/HW/2822 Subgrade Top 385+310 385+420 LHS
4 30-Sep-21 Sep-21 PNC/DVE-31/HW/2824 Subgrade Top 385+420 385+600 LHS
5 30-Sep-21 Sep-21 PNC/DVE-31/HW/2826 Subgrade Top 385+700 386+000 LHS
6 5-Mar-22 Mar-22 PNC/DVE-31/HW/5624 Subgrade Top 386+000 386+050 LHS
7 30-Sep-21 Sep-21 PNC/DVE-31/HW/2828 Subgrade Top 386+050 386+150 LHS
8 30-Sep-21 Sep-21 PNC/DVE-31/HW/2830 Subgrade Top 386+150 386+260 LHS
9 16-Jun-21 Jun-21 PNC/DVE-31/HW/2187 Subgrade Top 387+080 387+290 LHS
1 14-Feb-22 Feb-22 PNC/DVE-31/HW/5077 Subgrade Top 387+390 387+420 LHS
2 30-Sep-21 Sep-21 PNC/DVE-31/HW/2832 Subgrade Top 387+420 387+500 LHS
3 15-Jun-21 Jun-21 PNC/DVE-31/HW/2113 Subgrade Top 387+550 387+830 LHS
4 30-Nov-21 Nov-21 PNC/DVE-31/HW/3669 Subgrade Top 387+830 387+930 LHS
5 13-Dec-21 Dec-21 PNC/DVE-31/HW/4048 Subgrade Top 387+930 387+970 LHS
6 16-Jun-21 Jun-21 PNC/DVE-31/HW/2178 Subgrade Top 387+970 388+280 LHS
7 18-Jun-21 Jun-21 PNC/DVE-31/HW/2260 Subgrade Top 388+790 389+060 LHS
8 30-Sep-21 Sep-21 PNC/DVE-31/HW/2834 Subgrade Top 389+060 389+130 LHS
9 15-Nov-21 Nov-21 PNC/DVE-31/HW/3372 Subgrade Top 389+130 389+170 LHS
10 30-Jun-21 Jun-21 PNC/DVE-31/HW/2388 Subgrade Top 389+170 389+240 LHS
11 30-Jun-21 Jun-21 PNC/DVE-31/HW/2390 Subgrade Top 389+240 389+360 LHS
12 30-Jun-21 Jun-21 PNC/DVE-31/HW/2392 Subgrade Top 389+360 389+500 LHS
13 30-Sep-21 Sep-21 PNC/DVE-31/HW/2836 Subgrade Top 389+600 389+740 LHS
14 30-Sep-21 Sep-21 PNC/DVE-31/HW/2837 Subgrade Top 389+740 389+790 LHS
15 14-Nov-21 Nov-21 PNC/DVE-31/HW/3353 Subgrade Top 389+790 389+810 LHS
16 30-Sep-21 Sep-21 PNC/DVE-31/HW/2839 Subgrade Top 389+810 389+840 LHS
17 17-Oct-21 Oct-21 PNC/DVE-31/HW/2923 Subgrade Top 389+840 389+850 LHS
18 30-Sep-21 Sep-21 PNC/DVE-31/HW/2840 Subgrade Top 389+850 389+940 LHS
19 30-Sep-21 Sep-21 PNC/DVE-31/HW/2842 Subgrade Top 390+070 390+100 LHS
20 30-Sep-21 Sep-21 PNC/DVE-31/HW/2844 Subgrade Top 390+150 390+200 LHS
21 8-Dec-21 Dec-21 PNC/DVE-31/HW/3934 Subgrade Top 390+430 390+490 LHS
22 28-Oct-21 Oct-21 PNC/DVE-31/HW/3073 Subgrade Top 390+490 390+550 LHS
23 5-Dec-21 Dec-21 PNC/DVE-31/HW/3837 Subgrade Top 390+610 390+700 LHS
24 30-Nov-21 Nov-21 PNC/DVE-31/HW/3671 Subgrade Top 390+700 390+830 LHS
25 28-Dec-21 Dec-21 PNC/DVE-31/HW/4360 Subgrade Top 391+060 391+230 LHS
150 0.30 1
30 0.06 8 00+000
190 0.38 1 00+000
20 0.04 7 00+000
190 0.38 1 00+000
120 0.24 1 00+080
60 0.12 7 00+000
120 0.24 1 00+000
40 0.08 7 00+000
170 0.34 1 00+000
180 0.36 1 01+330
20 0.04 6 00+000
260 0.52 1 00+000
30 0.06 6 00+000
190 0.38 1 00+000
30 0.06 6 00+000
190 0.38 1 00+000
40 0.08 9 00+000
60 0.12 1 00+000
370 0.74 1 00+630
40 0.08 5 00+000
100 0.20 1 00+000
120 0.24 1 00+050
50 0.10 9 00+000
250 0.50 1 00+000
40 0.08 5 00+000
20 0.04 5 -00+030
210 0.42 1 00+010
360 0.72 1 00+310
30 0.06 7 00+000
160 0.32 1 00+000
30 0.06 9 00+000
490 0.98 1 00+000
30 0.06 7 00+000
210 0.42 1 00+000
30 0.06 7 00+000
210 0.42 1 00+000
20 0.04 9 00+000
260 0.52 1 00+000
100 0.20 1 00+000
20 0.04 7 00+000 11.285
250 0.50 1 00+000
390 0.78 1 00+080
20 0.04 6 00+000
290 0.58 1 00+000
90 0.18 1 00+030
30 0.06 7 00+000
160 0.32 1 00+000
20 0.04 7 00+000
210 0.42 1 00+000
60 0.12 1 00+070
150 0.30 1 00+000
60 0.12 1 00+610
2 0.00 8 00+000
31 0.06 8 00+007
90 0.18 1 00+000
20 0.04 6 00+000
160 0.32 2 00+000
20 0.04 9 00+000
260 0.52 1 00+000
150 0.30 1 00+020
100 0.20 3 00+000
30 0.06 6 01+170
200 0.40 4 00+000
80 0.16 5 00+180
130 0.26 3 00+000
20 0.04 6 00+000
110 0.22 3 00+000
13 0.03 4 00+000
160 0.32 3 00+007
300 0.60 3 00+100
50 0.10 9 00+000
100 0.20 3 00+000
110 0.22 3 00+000
260 0.52 2 00+820
30 0.06 8 00+050
80 0.16 3 00+000
280 0.56 1 00+050
100 0.20 5 00+000
40 0.08 6 00+000
310 0.62 3 00+000
270 0.54 3 00+510
70 0.14 3 00+000
40 0.08 5 00+000
70 0.14 2 00+000
120 0.24 2 00+000
140 0.28 2 00+000
50 0.10 3 00+240
20 0.04 5 00+000
130 0.26 3 00+000
30 0.06 3 00+130
50 0.10 3 00+050
60 0.12 6 00+230
60 0.12 4 00+000
80 0.16 6 00+070
100 0.20 5 00+000
47.32
1 1-Mar-22 Mar-22 PNC/DVE-31/HW/5520 GSB TOP 372+500 372+690 LHS
1 30-Sep-21 Sep-21 PNC/DVE-31/HW/2793 GSB TOP 372+690 372+860 LHS
2 11-Jan-22 Jan-22 PNC/DVE-31/HW/4557 GSB TOP 372+860 373+080 LHS
3 28-Jan-22 Jan-22 PNC/DVE-31/HW/4807 GSB TOP 373+180 373+500 LHS
4 12-Jan-22 Jan-22 PNC/DVE-31/HW/4591 GSB TOP 373+500 373+650 LHS
5 23-Jan-22 Jan-22 PNC/DVE-31/HW/4754 GSB TOP 375+020 375+200 LHS
6 21-Dec-21 Dec-21 PNC/DVE-31/HW/4179 GSB TOP 375+200 375+500 LHS
1 29-Nov-21 Nov-21 PNC/DVE-31/HW/3609 GSB TOP 375+500 375+670 LHS
1 7-Dec-21 Dec-21 PNC/DVE-31/HW/3893 GSB TOP 375+670 375+710 LHS
2 29-Nov-21 Nov-21 PNC/DVE-31/HW/3611 GSB TOP 375+710 375+900 LHS
3 2-Mar-22 Mar-22 PNC/DVE-31/HW/5530 GSB TOP 375+900 375+990 LHS
4 30-Nov-21 Nov-21 PNC/DVE-31/HW/3662 GSB TOP 376+640 376+990 LHS
5 30-Nov-21 Nov-21 PNC/DVE-31/HW/3664 GSB TOP 376+990 377+130 LHS
6 7-Jan-22 Jan-22 PNC/DVE-31/HW/4534 GSB TOP 377+200 377+300 LHS
7 17-Dec-21 Dec-21 PNC/DVE-31/HW/4127 GSB TOP 377+380 377+600 LHS
8 19-Dec-21 Dec-21 PNC/DVE-31/HW/4156 GSB TOP 377+600 377+850 LHS
9 23-Jan-22 Jan-22 PNC/DVE-31/HW/4753 GSB TOP 378+180 378+380 LHS
10 24-Jan-22 Jan-22 PNC/DVE-31/HW/4766 GSB TOP 378+380 378+520 LHS
11 23-Mar-22 Mar-22 PNC/DVE-31/HW/5980 GSB TOP 378+520 378+760 LHS
12 23-Mar-22 Mar-22 PNC/DVE-31/HW/5981 GSB TOP 378+760 378+960 LHS
13 7-Feb-22 Feb-22 PNC/DVE-31/HW/4986 GSB TOP 379+000 379+120 LHS
14 6-Feb-22 Feb-22 PNC/DVE-31/HW/4977 GSB TOP 379+220 379+340 LHS
15 2-Feb-22 Feb-22 PNC/DVE-31/HW/4919 GSB TOP 379+340 379+500 LHS
16 1-Feb-22 Feb-22 PNC/DVE-31/HW/4905 GSB TOP 379+500 379+600 LHS
1 1-Feb-22 Feb-22 PNC/DVE-31/HW/4904 GSB TOP 379+600 379+700 LHS
2 3-Feb-22 Feb-22 PNC/DVE-31/HW/4940 GSB TOP 380+000 380+090 LHS
3 8-Feb-22 Feb-22 PNC/DVE-31/HW/4997 GSB TOP 380+090 380+190 LHS
4 9-Mar-22 Mar-22 PNC/DVE-31/HW/5699 GSB TOP 380+190 380+300 LHS
5 21-Mar-22 Mar-22 PNC/DVE-31/HW/5924 GSB TOP 380+300 380+360 LHS
6 27-Mar-22 Mar-22 PNC/DVE-31/HW/6064 GSB TOP 380+360 380+406 LHS
7 27-Mar-22 Mar-22 PNC/DVE-31/HW/6065 GSB TOP 380+424 380+450 LHS
8 24-Dec-21 Dec-21 PNC/DVE-31/HW/4250 GSB TOP 380+450 380+700 LHS
9 26-Dec-21 Dec-21 PNC/DVE-31/HW/4325 GSB TOP 380+700 380+820 LHS
10 28-Dec-21 Dec-21 PNC/DVE-31/HW/4354 GSB TOP 380+820 380+880 LHS
11 26-Dec-21 Dec-21 PNC/DVE-31/HW/4326 GSB TOP 380+880 381+070 LHS
12 20-Feb-22 Feb-22 PNC/DVE-31/HW/5255 GSB TOP 381+120 381+320 LHS
13 17-Jan-22 Jan-22 PNC/DVE-31/HW/4678 GSB TOP 381+430 381+530 LHS
14 14-Jan-22 Jan-22 PNC/DVE-31/HW/4631 GSB TOP 381+530 381+670 LHS
15 15-Jan-22 Jan-22 PNC/DVE-31/HW/4652 GSB TOP 381+760 381+920 LHS
16 10-Mar-22 Mar-22 PNC/DVE-31/HW/5713 GSB TOP 382+580 382+640 LHS
17 22-Feb-22 Feb-22 PNC/DVE-31/HW/5360 GSB TOP 382+640 382+654 LHS
18 22-Feb-22 Feb-22 PNC/DVE-31/HW/5364 GSB TOP 382+661 382+670 LHS
19 12-Mar-22 Mar-22 PNC/DVE-31/HW/5735 GSB TOP 382+670 382+690 LHS
20 20-Jan-22 Jan-22 PNC/DVE-31/HW/4723 GSB TOP 382+690 382+930 LHS
21 11-Mar-22 Mar-22 PNC/DVE-31/HW/5725 GSB TOP 382+930 383+000 LHS
1 2-Jan-22 Jan-22 PNC/DVE-31/HW/4460 GSB TOP 383+000 383+180 LHS
2 3-Jan-22 Jan-22 PNC/DVE-31/HW/4480 GSB TOP 383+280 383+480 LHS
3 8-Dec-21 Dec-21 PNC/DVE-31/HW/3924 GSB TOP 384+680 384+710 LHS
1 28-Oct-21 Oct-21 PNC/DVE-31/HW/3074 GSB TOP 384+710 384+890 LHS
2 29-Nov-21 Nov-21 PNC/DVE-31/HW/3625 GSB TOP 385+090 385+170 LHS
3 28-Oct-21 Oct-21 PNC/DVE-31/HW/3076 GSB TOP 385+170 385+270 LHS
4 9-Dec-21 Dec-21 PNC/DVE-31/HW/3960 GSB TOP 385+280 385+320 LHS
5 31-Oct-21 Oct-21 PNC/DVE-31/HW/3158 GSB TOP 385+320 385+590 LHS
6 29-Oct-21 Oct-21 PNC/DVE-31/HW/3108 GSB TOP 385+710 385+990 LHS
7 30-Oct-21 Oct-21 PNC/DVE-31/HW/3123 GSB TOP 386+060 386+250 LHS
8 25-Oct-21 Oct-21 PNC/DVE-31/HW/3005 GSB TOP 387+100 387+280 LHS
9 14-Feb-22 Feb-22 PNC/DVE-31/HW/5079 GSB TOP 387+400 387+470 LHS
10 18-Oct-21 Oct-21 PNC/DVE-31/HW/2935 GSB TOP 387+580 387+800 LHS
11 8-Jan-22 Jan-22 PNC/DVE-31/HW/4538 GSB TOP 387+810 388+000 LHS
12 22-Oct-21 Oct-21 PNC/DVE-31/HW/2950 GSB TOP 388+000 388+120 LHS
13 23-Oct-21 Oct-21 PNC/DVE-31/HW/2958 GSB TOP 388+120 388+240 LHS
14 29-Oct-21 Oct-21 PNC/DVE-31/HW/3110 GSB TOP 388+800 389+120 LHS
15 29-Nov-21 Nov-21 PNC/DVE-31/HW/3637 GSB TOP 389+120 389+180 LHS
16 30-Oct-21 Oct-21 PNC/DVE-31/HW/3125 GSB TOP 389+180 389+490 LHS
17 28-Oct-21 Oct-21 PNC/DVE-31/HW/3078 GSB TOP 389+610 389+780 LHS
18 14-Nov-21 Nov-21 PNC/DVE-31/HW/3355 GSB TOP 389+780 389+820 LHS
19 28-Oct-21 Oct-21 PNC/DVE-31/HW/3080 GSB TOP 389+820 389+930 LHS
20 4-Feb-22 Feb-22 PNC/DVE-31/HW/4964 GSB TOP 390+440 390+500 LHS
21 31-Oct-21 Oct-21 PNC/DVE-31/HW/3160 GSB TOP 390+500 390+540 LHS
22 9-Feb-22 Feb-22 PNC/DVE-31/HW/5002 GSB TOP 390+630 390+780 LHS
23 12-Feb-22 Feb-22 PNC/DVE-31/HW/5043 GSB TOP 391+080 391+220 LHS
180 0.36 8
180 0.36 7 00+000
170 0.34 7 00+000
320 0.64 7 00+150
150 0.30 7 00+000
180 0.36 7 01+370
210 0.42 6 00+000
90 0.18 7 00+000
170 0.34 5 00+000
40 0.08 6 00+000
190 0.38 5 00+000
350 0.70 5 00+740
140 0.28 5 00+000
100 0.20 7 00+070
160 0.32 6 00+080
310 0.62 6 00+000
120 0.24 7 00+330
220 0.44 7 00+000
240 0.48 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
240 0.48 6 00+000
100 0.20 9 00+000
150 0.30 9 00+000
120 0.24 9 00+000
360 0.72 5 00+090
60 0.12 6 00+000
190 0.38 6 00+000
200 0.40 9 00+050
230 0.46 7 00+110
100 0.20 7 00+140
60 0.12 9 00+680
14 0.03 8 00+000
10 0.02 8 00+007
50 0.10 9 00+000
220 0.44 7 00+000
90 0.18 9 00+000
150 0.30 7 00+000
60 0.12 7 00+100
40 0.08 7 00+000
100 0.20 7 00+000
30 0.06 6 01+200
180 0.36 4 00+000
80 0.16 5 00+200
150 0.30 4 00+000
40 0.08 6 -00+040
270 0.54 4 00+000
280 0.56 4 00+120
190 0.38 4 00+070
120 0.24 4 00+850
80 0.16 4 00+000
70 0.14 8 00+100
230 0.46 4 00+110
190 0.38 7 00+000
240 0.48 4 00+000
120 0.24 4 00+760
60 0.12 5 00+000
310 0.62 4 00+000
30 0.06 4 00+260
40 0.08 5 00+000
110 0.22 4 00+000
70 0.14 8 00+500
40 0.08 4 00+000
110 0.22 8 00+110
40.96
1 2-Mar-22 Mar-22 PNC/DVE-31/HW/5531 WMM TOP 372+500 372+690 LHS
2 14-Jan-22 Jan-22 PNC/DVE-31/HW/4632 WMM TOP 372+690 373+080 LHS
3 28-Jan-22 Jan-22 PNC/DVE-31/HW/4808 WMM TOP 373+180 373+500 LHS
4 15-Jan-22 Jan-22 PNC/DVE-31/HW/4653 WMM TOP 373+500 373+650 LHS
5 29-Jan-22 Jan-22 PNC/DVE-31/HW/4838 WMM TOP 375+020 375+220 LHS
6 23-Dec-21 Dec-21 PNC/DVE-31/HW/4214 WMM TOP 375+220 375+500 LHS
1 8-Dec-21 Dec-21 PNC/DVE-31/HW/3921 WMM TOP 375+500 375+880 LHS
2 5-Mar-22 Mar-22 PNC/DVE-31/HW/5601 WMM TOP 375+880 375+980 LHS
3 9-Dec-21 Dec-21 PNC/DVE-31/HW/3955 WMM TOP 376+650 376+980 LHS
4 17-Dec-21 Dec-21 PNC/DVE-31/HW/4129 WMM TOP 376+980 377+120 LHS
5 18-Dec-21 Dec-21 PNC/DVE-31/HW/4143 WMM TOP 377+380 377+580 LHS
6 20-Dec-21 Dec-21 PNC/DVE-31/HW/4164 WMM TOP 377+580 377+840 LHS
7 25-Jan-22 Jan-22 PNC/DVE-31/HW/4778 WMM TOP 378+180 378+520 LHS
8 24-Mar-22 Mar-22 PNC/DVE-31/HW/6006 WMM TOP 378+520 378+760 LHS
9 24-Mar-22 Mar-22 PNC/DVE-31/HW/6007 WMM TOP 378+760 378+960 LHS
1 9-Feb-22 Feb-22 PNC/DVE-31/HW/5004 WMM TOP 379+990 380+190 LHS
2 22-Mar-22 Mar-22 PNC/DVE-31/HW/5953 WMM TOP 380+190 380+360 LHS
3 27-Dec-21 Dec-21 PNC/DVE-31/HW/4346 WMM TOP 380+460 380+810 LHS
4 28-Dec-21 Dec-21 PNC/DVE-31/HW/4356 WMM TOP 380+810 380+880 LHS
5 27-Dec-21 Dec-21 PNC/DVE-31/HW/4347 WMM TOP 380+880 381+060 LHS
6 2-Jan-22 Jan-22 PNC/DVE-31/HW/4456 WMM TOP 381+060 381+120 LHS
7 20-Feb-22 Feb-22 PNC/DVE-31/HW/5256 WMM TOP 381+120 381+330 LHS
1 1-Jan-22 Jan-22 PNC/DVE-31/HW/4446 WMM TOP 381+330 381+420 LHS
2 18-Jan-22 Jan-22 PNC/DVE-31/HW/4699 WMM TOP 381+420 381+670 LHS
3 18-Jan-22 Jan-22 PNC/DVE-31/HW/4700 WMM TOP 381+760 381+920 LHS
4 15-Mar-22 Mar-22 PNC/DVE-31/HW/5771 WMM TOP 382+580 382+640 LHS
5 22-Feb-22 Feb-22 PNC/DVE-31/HW/5362 WMM TOP 382+640 382+654 LHS
6 22-Feb-22 Feb-22 PNC/DVE-31/HW/5366 WMM TOP 382+661 382+670 LHS
7 15-Mar-22 Mar-22 PNC/DVE-31/HW/5773 WMM TOP 382+670 382+690 LHS
8 21-Jan-22 Jan-22 PNC/DVE-31/HW/4734 WMM TOP 382+690 382+930 LHS
9 15-Mar-22 Mar-22 PNC/DVE-31/HW/5775 WMM TOP 382+930 383+000 LHS
10 3-Jan-22 Jan-22 PNC/DVE-31/HW/4489 WMM TOP 383+000 383+180 LHS
11 4-Jan-22 Jan-22 PNC/DVE-31/HW/4496 WMM TOP 383+280 383+480 LHS
12 9-Dec-21 Dec-21 PNC/DVE-31/HW/3958 WMM TOP 384+690 384+720 LHS
1 29-Oct-21 Oct-21 PNC/DVE-31/HW/3112 WMM TOP 384+720 384+880 LHS
1 29-Nov-21 Nov-21 PNC/DVE-31/HW/3627 WMM TOP 385+100 385+180 LHS
2 29-Oct-21 Oct-21 PNC/DVE-31/HW/3114 WMM TOP 385+180 385+270 LHS
3 10-Dec-21 Dec-21 PNC/DVE-31/HW/3986 WMM TOP 385+270 385+330 LHS
4 31-Oct-21 Oct-21 PNC/DVE-31/HW/3162 WMM TOP 385+330 385+580 LHS
5 30-Oct-21 Oct-21 PNC/DVE-31/HW/3127 WMM TOP 385+720 385+980 LHS
6 31-Oct-21 Oct-21 PNC/DVE-31/HW/3164 WMM TOP 386+070 386+240 LHS
7 30-Oct-21 Oct-21 PNC/DVE-31/HW/3155 WMM TOP 387+110 387+270 LHS
8 22-Oct-21 Oct-21 PNC/DVE-31/HW/2951 WMM TOP 387+590 387+800 LHS
9 11-Jan-22 Jan-22 PNC/DVE-31/HW/4558 WMM TOP 387+800 388+000 LHS
10 24-Oct-21 Oct-21 PNC/DVE-31/HW/2969 WMM TOP 388+000 388+230 LHS
11 30-Oct-21 Oct-21 PNC/DVE-31/HW/3129 WMM TOP 388+810 389+110 LHS
12 29-Nov-21 Nov-21 PNC/DVE-31/HW/3639 WMM TOP 389+110 389+190 LHS
13 31-Oct-21 Oct-21 PNC/DVE-31/HW/3166 WMM TOP 389+190 389+480 LHS
14 29-Oct-21 Oct-21 PNC/DVE-31/HW/3116 WMM TOP 389+620 389+770 LHS
15 15-Nov-21 Nov-21 PNC/DVE-31/HW/3370 WMM TOP 389+770 389+830 LHS
16 29-Oct-21 Oct-21 PNC/DVE-31/HW/3117 WMM TOP 389+830 389+920 LHS
17 16-Feb-22 Feb-22 PNC/DVE-31/HW/5129 WMM TOP 390+440 390+530 LHS
18 13-Feb-22 Feb-22 PNC/DVE-31/HW/5055 WMM TOP 390+640 390+780 LHS
19 17-Feb-22 Feb-22 PNC/DVE-31/HW/5151 WMM TOP 391+080 391+220 LHS
180 0.36 9
350 0.70 7 00+000
320 0.64 7 00+150
150 0.30 7 00+000
200 0.40 7 01+370
190 0.38 6 00+000
90 0.18 7 00+000
380 0.76 6 00+000
330 0.66 6 00+770
140 0.28 6 00+000
160 0.32 6 00+260
300 0.60 6 00+000
340 0.68 7 00+340
240 0.48 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
380 0.76 9 00+230
340 0.68 6 00+100
70 0.14 6 00+000
180 0.36 6 00+000
60 0.12 7 00+000
210 0.42 9 00+000
90 0.18 7 00+000
240 0.48 7 00+000
100 0.20 7 00+140
60 0.12 9 00+680
14 0.03 8 00+000
10 0.02 8 00+007
50 0.10 9 00+000
220 0.44 7 00+000
90 0.18 9 00+000
150 0.30 7 00+000
60 0.12 7 00+100
40 0.08 7 00+000
100 0.20 7 00+000
30 0.06 6 01+210
160 0.32 4 00+000
80 0.16 5 00+220
90 0.18 4 00+000
60 0.12 6 00+000
250 0.50 4 00+000
260 0.52 4 00+140
170 0.34 4 00+090
200 0.40 4 00+860
210 0.42 4 00+290
200 0.40 7 00+000
230 0.46 4 00+000
300 0.60 4 00+580
80 0.16 5 00+000
290 0.58 4 00+000
60 0.12 5 00+290
90 0.18 4 00+000
110 0.22 8 00+510
110 0.22 8 00+110
38.61