Construction of Eight Lane access-controlled expressway starting from junction with SH-63 near Pratap Nagar village and

ending at junction with NE-1 near Dodka village of Vadodara


Project : District (Ch. 824+920 to Ch. 844+382; Design Ch. 372+500 to Ch. 391+962) section of Delhi–Vadodara Greenfield Alignment (NH-148 N) on EPC Mode under Bharatmala Pariyojana in the
State of Gujarat (Pkg-31).
National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Client :
Authority Engineer
: L.N.Malviya Infra Projects Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 19.426 Kms.
Contract Price (INR) : ₹ 7,894,000,000.00
PERIOD : 730 Days as per CA
MONTHLY PAYMENT CERTIFICATE NO. - 09 (18.05.21 to 31.05.21)
Quantities as per Scope Quantities As per certified Work Done Amount As per certified Work Done
Weigh Percenta
Weightag
tage in ge
Sl No. Item e in % of Item Description Unit Cumulative Value upto Remarks
Cost Weightag BOQ Amount Quantity upto Quantity Cumulative value Value of this MPC
CP Quantity Rate Quantity Previous MPC
of CP e (In Rs.) Previous MPC of this MPC upto this MPC (Rs) (Rs)
upto this MPC ( Rs)

B.1- Reconstruction/New 8-Lane Realignment / Bypass (Flexible Pavement)


Road Works including Culverts, widening and repair of

(1) Earthwork up to top of the sub-grade +


KM 33.80% 71.867 14,538,658.33 1,044,856,155.20 - - - - -
Site Clearance

(2) Earthwork in Shoulders KM 0.55% 71.867 236,575.80 17,002,097.20 - - - - -

(3) Sub-base Course KM 10.34% 71.867 4,447,625.06 319,639,427.36 - - - - -


3091290400

(4) Non-bituminous Base course KM 4.45% 71.867 1,914,113.30 137,562,422.80 - - - - -


culverts

39.16%

1
(5) Bituminous Base course KM 35.27% 71.867 15,170,960.93 1,090,298,124.08 - - - - -

(6) Wearing Coat KM 7.99% 77.320 3,194,440.03 246,994,102.96 - - - - -

D- Reconstruction & New Culverts on


- - - - -
existing road, realignments, bypasses

Culverts (length < 6m) No. 5.89% 35.000 5,202,200.13 182,077,004.56 2.000 2.000 10,404,400.26 10,404,400.26 -

Additional Culverts No. 1.71% 15.000 3,524,071.06 52,861,065.84 - - - - -

A.2- New Minor bridges (length >6 m and <


- - - - -
60 m)

(1) Foundation: On completion of the


foundation work including foundations for RM 3.51% 350.000 65,707.40 22,997,590.20 18.000 18.000 1,182,733.21 1,182,733.21 -
wing and return walls, abutments, piers.

(2) Sub-structure: On completion of


abutments, piers upto the abutment/ pier cap RM 13.58% 350.000 254,218.38 88,976,431.60 - - - - -
including wing/ return wall upto top
(3) Super-structure: On completion of the
super-structure in all respects including RM 11.69% 350.000 218,837.47 76,593,113.80 - - - - -
Girder, Deck slab, bearings.
(4) Approaches: On completion of
approaches including Retaining walls, stone
pitching, protection works complete in all RM 14.83% 720.000 134,953.41 97,166,456.60 - - - - -
respect, tests on completion in all respect and
fit for use.

(5) Guide Bunds and River Training Works:


On completion of Guide Bunds and River RM 0.00% - - - - - -
training works complete in all respects.
Minor bridge/Underpasses/

(6) Other Ancillary Works: On completion of


wearing coat, expansion joints, hand rails,
RM 1.32% 350.000 24,710.48 8,648,666.40 - - - - -
crash barriers, road signs & markings, tests
on completion in all respect.
655202000
8.30%

2 B.2- New Underpasses/Overpasses - - - - -


Construction of Eight Lane access-controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara
Project : District (Ch. 824+920 to Ch. 844+382; Design Ch. 372+500 to Ch. 391+962) section of Delhi–Vadodara Greenfield Alignment (NH-148 N) on EPC Mode under Bharatmala Pariyojana in the
State of Gujarat (Pkg-31).
National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Client :
Authority Engineer
: L.N.Malviya Infra Projects Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 19.426 Kms.
Contract Price (INR) : ₹ 7,894,000,000.00
PERIOD : 730 Days as per CA
MONTHLY PAYMENT CERTIFICATE NO. - 09 (18.05.21 to 31.05.21)
Minor bridge/Underpasses/

Quantities as per Scope Quantities As per certified Work Done Amount As per certified Work Done
Weigh Percenta
Weightag
tage in ge
Sl No. Item e in % of Item Description Unit Cumulative Value upto Remarks
Cost Weightag
655202000

CP BOQ Amount Quantity upto Quantity Cumulative value Value of this MPC
of CP e Quantity Rate Quantity Previous MPC
(In Rs.) Previous MPC of this MPC upto this MPC (Rs) (Rs)
8.30%

2 upto this MPC ( Rs)

(1) Foundation: On completion of the


foundation work including foundations for RM 9.82% 326.000 197,364.53 64,340,836.40 12.000 12.000 2,368,374.35 2,368,374.35 -
wing and return walls, abutments, piers.

(2) Sub-structure: On completion of


abutments, piers upto the abutment/ pier cap RM 12.29% 326.000 247,007.13 80,524,325.80 - - - - -
including wing/ return wall upto top.
(3) Super-structure: On completion of the
super-structure in all respects including RM 11.19% 326.000 224,899.09 73,317,103.80 - - - - -
Girder, Deck slab, bearings.
(4) On completion of Retaining/ Reinforced
earth walls complete in all respect and fit for Sqm. 13.75% 1380.750 65,247.35 90,090,275.00 - - - - -
use.

(5) Approaches and Other Ancillary Works:


On completion of wearing coat, expansion
joints, hand rails, crash barriers, stone
pitching, protection works, road signs &
markings, tests on completion in all respect.
Wearing Coat (a) in case of Overpass- RM 8.02% 800.000 65,684.00 52,547,200.40 - - - - -
wearing coat including expansion joints
complete in all respects as specified and
(b) in case of underpass-rigid pavement
including drainage facility complete in all
respects as specified

A.2- New Major Bridges - - - - -


(1) Foundation: On completion of the
foundation work including foundations for RM 19.68% 2640.000 139,877.37 369,276,267.84 - - - - -
return walls, abutments, piers.

(2) Sub-structure: On completion of


RM 10.13% 2640.000 71,999.89 190,079,704.94 - - - - -
abutments, piers upto the abutment/ pier cap.

(3) Super-structure: On completion of the


super-structure in all respects including RM 39.05% 2640.000 277,551.40 732,735,683.90 17.500 - 17.500 4,857,149.42 - 4,857,149.42
Girder, Deck slab, bearings

(4) Wearing Coat including expansion joints RM 1.60% 2640.000 11,372.14 30,022,460.80 - - - - -
ctions/flyovers including viaducts, if any

(5) Miscellaneous Items like hand rails, crash


RM 0.86% 2640.000 6,112.53 16,137,072.68 - - - - -
barrier, road markings etc.
(6) Wing walls/return walls upto top No. 0.16% 16.000 187,640.38 3,002,246.08 - - - - -

(7) Guide bunds, River Training works etc. RM 0.00% - - - - - -

(8) Approaches (including Retaining walls,


RM 3.14% 320.000 184,122.12 58,919,079.32 - - - - -
stone pitching and protection works)

B.2- New ROB/RUB - - - - -


(1) Foundations RM 2.70% 224.560 225,609.65 50,662,902.60 - - - - -
(2) Sub-Structure RM 1.25% 224.560 104,448.91 23,455,047.50 - - - - -
(3) Super-Structure (Including bearings) RM 6.43% 224.560 537,285.20 120,652,764.34 - - - - -
Construction of Eight Lane access-controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara
Project : District (Ch. 824+920 to Ch. 844+382; Design Ch. 372+500 to Ch. 391+962) section of Delhi–Vadodara Greenfield Alignment (NH-148 N) on EPC Mode under Bharatmala Pariyojana in the
Major bridge(length>60m) works and ROB/RUB/elevated sections/flyovers including viaducts, if any
State of Gujarat (Pkg-31).
National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Client :
Authority Engineer
: L.N.Malviya Infra Projects Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 19.426 Kms.
Contract Price (INR) : ₹ 7,894,000,000.00
PERIOD : 730 Days as per CA
MONTHLY PAYMENT CERTIFICATE NO. - 09 (18.05.21 to 31.05.21)
Quantities as per Scope Quantities As per certified Work Done Amount As per certified Work Done
Weigh Percenta
Weightag
tage in ge
Sl No. Item e in % of Item Description Unit Cumulative Value upto Remarks
Cost Weightag BOQ Amount Quantity upto Quantity Cumulative value Value of this MPC
CP Quantity Rate Quantity Previous MPC
of CP e (In Rs.) Previous MPC of this MPC upto this MPC (Rs) (Rs)
upto this MPC ( Rs)

(4) Wearing Coat (a) in case of ROB- wearing


coat including expansion joints complete in all
respects as specified and
RM 0.15% 224.560 12,533.87 2,814,605.70 - - - - -
1876403800

(b) in case of RUB-rigid pavement under RUB


23.77%

including drainage facility complete in all


3 respects as specified
(5) Miscellaneous Items like hand rails, crash
RM 0.08% 224.560 6,684.73 1,501,123.04 - - - - -
barrier, road markings etc.
(6) Wing walls/Return walls RM 0.00% - - - - - -
(7) Retaining/ Reinforced earth walls Sqm 0.03% 24270.356 23.19 562,921.14 - - - - -
(8) Approaches and Other Ancillary Works
(Approaches, stone pitching, protection RM 0.02% 80.000 4,691.01 375,280.76 - - - - -
works, etc.)
C.2- New Elevated Section/Flyovers/Grade
- - - - -
Separators
(1) Foundation: On completion of the
foundation work including foundations for RM 2.90% 398.000 136,722.89 54,415,710.20 - - - - -
wing and return walls, abutments, piers.
(2) Sub-structure: On completion of
abutments, piers upto the abutment/ pier cap RM 3.69% 398.000 173,968.09 69,239,300.22 - - - - -
upto top.
(3) Super-structure: On completion of the
super-structure in all respects including
RM 3.98% 398.000 187,640.38 74,680,871.24 - - - - -
Girder, Deck slab, bearings, tests on
completion in all respect

(4) Wearing Coat including expansion joints RM 0.38% 398.000 17,915.41 7,130,334.44 - - - - -

(5) Miscellaneous Items like hand rails, crash


RM 0.16% 398.000 7,543.33 3,002,246.08 - - - - -
barrier, road markings etc.
(6) Wing walls/Return walls No. 0.12% 40.000 56,292.11 2,251,684.56 - - - - -
(7) Retaining/ Reinforced earth walls Sqm 2.44% 2025.000 22,609.51 45,784,252.72 - - - - -
(8) Approaches and Other Ancillary Works
(Approaches, stone pitching, protection RM 1.05% 480.000 41,046.33 19,702,239.90 - - - - -
works, etc.)
Other Works - - - - -
(i) Toll Plaza No. 7.77% 1.000 176,464,765.26 176,464,765.26 - - - - -
(ii) Road side drains - - - - -
Lined Drain Km 1.87% 7.644 5,555,944.67 42,469,641.06 - - - - -
Unlined Drain Km 0.07% 31.016 51,256.53 1,589,772.66 - - - - -
(iii) Road signs, safety Devices, Road
Km 2.38% 38.660 1,398,144.61 54,052,270.44 - - - - -
Furnitures etc.
(iv) Road markings & Studs Km 0.76% 38.660 446,466.34 17,260,388.88 - - - - -
(v) Crash Barrier Km 7.05% 29803.440 5,372.29 160,112,817.90 - - - - -
(vi) Project facilities 0.00% - - - - - -
a) Bus Bays 0.00% - - - - - -
b) Wayside Amenities excluding Slip Roads &
but including all internal roads (Service areas No. 0.00% - - - - - -
including Truck Lay-Byes)
c) Others RM 1.11% 2472.000 10,197.92 25,209,252.18 - - - - -
r Works

1103800

(vii) Rain Water Harvesting No. 0.41% 39.000 238,757.07 9,311,525.58 - - - - -


8.77%

4
Construction of Eight Lane access-controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara
Project : District (Ch. 824+920 to Ch. 844+382; Design Ch. 372+500 to Ch. 391+962) section of Delhi–Vadodara Greenfield Alignment (NH-148 N) on EPC Mode under Bharatmala Pariyojana in the
State of Gujarat (Pkg-31).
National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Client :
Authority Engineer
: L.N.Malviya Infra Projects Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 19.426 Kms.
Contract Price (INR) : ₹ 7,894,000,000.00
PERIOD : 730 Days as per CA
MONTHLY PAYMENT CERTIFICATE NO. - 09 (18.05.21 to 31.05.21)
Quantities as per Scope Quantities As per certified Work Done Amount As per certified Work Done
Weigh Percenta
Weightag
tage in ge
Sl No. Item e in % of Item Description Unit Cumulative Value upto Remarks
Cost Weightag BOQ Amount Quantity upto Quantity Cumulative value Value of this MPC
CP Quantity Rate Quantity Previous MPC
of CP e (In Rs.) Previous MPC of this MPC upto this MPC (Rs) (Rs)
Other Works

2271103800

upto this MPC ( Rs)


28.77%

4 (viii) Retaining Wall/ Breast Wall Sqm 7.19% 6204.000 26,320.50 163,292,363.22 - - - - -
(ix) RE Wall Sqm 50.40% 14995.148 76,333.78 1,144,636,315.20 - - - - -
(x) Street Lighting RM 3.41% 3568.560 21,701.93 77,444,639.58 - - - - -
(xi) Utility Ducts RM 1.10% 210.000 118,962.58 24,982,141.80 - - - - -
(xii) ATMS RM 2.55% 38660.000 1,498.01 57,913,146.90 - - - - -
(xiii) Road side Plantation including
RM 3.56% 35119.440 2,302.18 80,851,295.28 - - - - -
Horticulture in Wayside Amenities

(xiv) Protection Works other than approaches


to the bridges, elevated sections/ flyover/ RM 0.14% 840.000 3,785.17 3,179,545.32 - - - - -
grade separators and ROBs/ RUBs

(xv) Boundary wall RM 0.73% 35119.440 472.08 16,579,057.74 - - - - -


(xvi) Safety & Traffic Management during
6 Monthly 8.06% 4.000 45,762,741.57 183,050,966.28 - - - - -
const.
(xvii) Other miscellaneous works including
Connecting road & Junction under Grade No. 1.44% 10.000 3,270,389.47 32,703,894.72 - - - - -
separator
Total Amount (In Rs.) > > > 7,894,000,000 18,812,657.24 13,955,507.82 4,857,149.42

Note :- Schedule "H" has been prepared provisionaly based on original scope of works as defined in Schedule "B" & "C" of the Contract Agreement. Some components of Schedule "H" shall be revised after the formal approval of Plan &
Profile and Structure work Drawings submitted by EPC Contractor.

Submitted by:

Authorized Signatory
PNC Infratech Limited
1 15-Jun-21 Jun-21 PNC/DVE-31/HW/2080 Subgrade Top 372+500 372+650 LHS
2 12-Feb-22 Feb-22 PNC/DVE-31/HW/5035 Subgrade Top 372+650 372+680 LHS
3 14-Jun-21 Jun-21 PNC/DVE-31/HW/1988 Subgrade Top 372+680 372+870 LHS
4 11-Jan-22 Jan-22 PNC/DVE-31/HW/4555 Subgrade Top 372+870 372+890 LHS
5 16-Jun-21 Jun-21 PNC/DVE-31/HW/2181 Subgrade Top 372+890 373+090 LHS
6 17-Jun-21 Jun-21 PNC/DVE-31/HW/2236 Subgrade Top 373+160 373+300 LHS
7 14-Jan-22 Jan-22 PNC/DVE-31/HW/4619 Subgrade Top 373+300 373+360 LHS
8 17-Jun-21 Jun-21 PNC/DVE-31/HW/2238 Subgrade Top 373+360 373+460 LHS
9 14-Jan-22 Jan-22 PNC/DVE-31/HW/4621 Subgrade Top 373+460 373+500 LHS
10 18-Jun-21 Jun-21 PNC/DVE-31/HW/2256 Subgrade Top 373+500 373+660 LHS
11 18-Jun-21 Jun-21 PNC/DVE-31/HW/2262 Subgrade Top 375+000 375+180 LHS
1 25-Dec-21 Dec-21 PNC/DVE-31/HW/4268 Subgrade Top 375+180 375+200 LHS
2 15-Jun-21 Jun-21 PNC/DVE-31/HW/2083 Subgrade Top 375+200 375+460 LHS
3 6-Dec-21 Dec-21 PNC/DVE-31/HW/3855 Subgrade Top 375+460 375+490 LHS
4 14-Jun-21 Jun-21 PNC/DVE-31/HW/1991 Subgrade Top 375+490 375+680 LHS
5 6-Dec-21 Dec-21 PNC/DVE-31/HW/3859 Subgrade Top 375+680 375+710 LHS
6 16-Jun-21 Jun-21 PNC/DVE-31/HW/2184 Subgrade Top 375+710 375+900 LHS
7 12-Feb-22 Feb-22 PNC/DVE-31/HW/5036 Subgrade Top 375+900 375+940 LHS
8 17-Jun-21 Jun-21 PNC/DVE-31/HW/2230 Subgrade Top 375+940 376+000 LHS
9 15-Jun-21 Jun-21 PNC/DVE-31/HW/2086 Subgrade Top 376+630 377+000 LHS
1 25-Nov-21 Nov-21 PNC/DVE-31/HW/3535 Subgrade Top 377+000 377+040 LHS
2 15-Jun-21 Jun-21 PNC/DVE-31/HW/2089 Subgrade Top 377+040 377+140 LHS
3 15-Jun-21 Jun-21 PNC/DVE-31/HW/2092 Subgrade Top 377+190 377+310 LHS
4 13-Mar-22 Mar-22 PNC/DVE-31/HW/5741 Subgrade Top 377+310 377+360 LHS
5 18-Jun-21 Jun-21 PNC/DVE-31/HW/2258 Subgrade Top 377+360 377+610 LHS
6 30-Nov-21 Nov-21 PNC/DVE-31/HW/3660 Subgrade Top 377+610 377+650 LHS
7 25-Nov-21 Nov-21 PNC/DVE-31/HW/3541 Subgrade Top 377+620 377+640 LHS
8 18-Jun-21 Jun-21 PNC/DVE-31/HW/2264 Subgrade Top 377+650 377+860 LHS
9 18-Jun-21 Jun-21 PNC/DVE-31/HW/2254 Subgrade Top 378+170 378+530 LHS
10 22-Jan-22 Jan-22 PNC/DVE-31/HW/4738 Subgrade Top 378+530 378+560 LHS
11 15-Jun-21 Jun-21 PNC/DVE-31/HW/2095 Subgrade Top 378+560 378+720 LHS
12 13-Mar-22 Mar-22 PNC/DVE-31/HW/5747 Subgrade Top 378+720 378+750 LHS
13 14-Jun-21 Jun-21 PNC/DVE-31/HW/2000 Subgrade Top 378+750 379+240 LHS
14 20-Jan-22 Jan-22 PNC/DVE-31/HW/4718 Subgrade Top 379+240 379+270 LHS
15 14-Jun-21 Jun-21 PNC/DVE-31/HW/2003 Subgrade Top 379+270 379+480 LHS
1 1-Jan-22 Jan-22 PNC/DVE-31/HW/4434 Subgrade Top 379+480 379+510 LHS
2 15-Jun-21 Jun-21 PNC/DVE-31/HW/2071 Subgrade Top 379+510 379+720 LHS
3 9-Mar-22 Mar-22 PNC/DVE-31/HW/5697 Subgrade Top 379+720 379+740 LHS
4 15-Jun-21 Jun-21 PNC/DVE-31/HW/2074 Subgrade Top 379+740 380+000 LHS
5 14-Jun-21 Jun-21 PNC/DVE-31/HW/1994 Subgrade Top 380+000 380+100 LHS
6 30-Jan-22 Jan-22 PNC/DVE-31/HW/4848 Subgrade Top 380+100 380+120 LHS
7 14-Jun-21 Jun-21 PNC/DVE-31/HW/1997 Subgrade Top 380+120 380+370 LHS
8 26-Mar-22 Mar-22 PNC/DVE-31/HW/6047 Subgrade Top 380+370 380+406 LHS
9 26-Mar-22 Mar-22 PNC/DVE-31/HW/6048 Subgrade Top 380+424 380+450 LHS
10 14-Jun-21 Jun-21 PNC/DVE-31/HW/2006 Subgrade Top 380+450 380+840 LHS
11 27-Dec-21 Dec-21 PNC/DVE-31/HW/4344 Subgrade Top 380+840 380+860 LHS
12 14-Jun-21 Jun-21 PNC/DVE-31/HW/2009 Subgrade Top 380+860 381+150 LHS
13 31-Jan-22 Jan-22 PNC/DVE-31/HW/4883 Subgrade Top 381+150 381+180 LHS
14 19-Feb-22 Feb-22 PNC/DVE-31/HW/5198 Subgrade Top 381+150 381+180 LHS
15 15-Jun-21 Jun-21 PNC/DVE-31/HW/2098 Subgrade Top 381+180 381+270 LHS
16 30-Jan-22 Jan-22 PNC/DVE-31/HW/4854 Subgrade Top 381+270 381+300 LHS
17 16-Jun-21 Jun-21 PNC/DVE-31/HW/2190 Subgrade Top 381+300 381+460 LHS
18 15-Jan-22 Jan-22 PNC/DVE-31/HW/4640 Subgrade Top 381+460 381+480 LHS
19 15-Jun-21 Jun-21 PNC/DVE-31/HW/2104 Subgrade Top 381+480 381+690 LHS
20 26-Mar-22 Mar-22 PNC/DVE-31/HW/6049 Subgrade Top 381+690 381+721 LHS
21 26-Mar-22 Mar-22 PNC/DVE-31/HW/6050 Subgrade Top 381+733 381+760 LHS
22 17-Jun-21 Jun-21 PNC/DVE-31/HW/2241 Subgrade Top 381+760 381+820 LHS
23 15-Jun-21 Jun-21 PNC/DVE-31/HW/2107 Subgrade Top 381+820 381+970 LHS
24 26-Mar-22 Mar-22 PNC/DVE-31/HW/6051 Subgrade Top 381+970 381+992 LHS
25 23-Mar-22 Mar-22 PNC/DVE-31/HW/5979 Subgrade Top 382+140 382+300 LHS
26 14-Jun-21 Jun-21 PNC/DVE-31/HW/2012 Subgrade Top 382+580 382+640 LHS
27 21-Feb-22 Feb-22 PNC/DVE-31/HW/5296 Subgrade Top 382+640 382+642 LHS
28 21-Feb-22 Feb-22 PNC/DVE-31/HW/5296 Subgrade Top 382+649 382+680 LHS
29 14-Jun-21 Jun-21 PNC/DVE-31/HW/2015 Subgrade Top 382+680 382+770 LHS
30 25-Dec-21 Dec-21 PNC/DVE-31/HW/4299 Subgrade Top 382+770 382+790 LHS
31 15-Jun-21 Jun-21 PNC/DVE-31/HW/2077 Subgrade Top 382+790 382+950 LHS
32 7-Mar-22 Mar-22 PNC/DVE-31/HW/5676 Subgrade Top 382+950 382+970 LHS
33 15-Jun-21 Jun-21 PNC/DVE-31/HW/2110 Subgrade Top 382+970 383+230 LHS
34 15-Jun-21 Jun-21 PNC/DVE-31/HW/2101 Subgrade Top 383+250 383+400 LHS
35 17-Jun-21 Jun-21 PNC/DVE-31/HW/2233 Subgrade Top 383+400 383+500 LHS
36 7-Dec-21 Dec-21 PNC/DVE-31/HW/3899 Subgrade Top 384+670 384+700 LHS
1 28-Oct-21 Oct-21 PNC/DVE-31/HW/3071 Subgrade Top 384+700 384+900 LHS
2 24-Nov-21 Nov-21 PNC/DVE-31/HW/3511 Subgrade Top 385+080 385+160 LHS
1 30-Sep-21 Sep-21 PNC/DVE-31/HW/2820 Subgrade Top 385+160 385+290 LHS
2 8-Dec-21 Dec-21 PNC/DVE-31/HW/3928 Subgrade Top 385+290 385+310 LHS
3 30-Sep-21 Sep-21 PNC/DVE-31/HW/2822 Subgrade Top 385+310 385+420 LHS
4 30-Sep-21 Sep-21 PNC/DVE-31/HW/2824 Subgrade Top 385+420 385+600 LHS
5 30-Sep-21 Sep-21 PNC/DVE-31/HW/2826 Subgrade Top 385+700 386+000 LHS
6 5-Mar-22 Mar-22 PNC/DVE-31/HW/5624 Subgrade Top 386+000 386+050 LHS
7 30-Sep-21 Sep-21 PNC/DVE-31/HW/2828 Subgrade Top 386+050 386+150 LHS
8 30-Sep-21 Sep-21 PNC/DVE-31/HW/2830 Subgrade Top 386+150 386+260 LHS
9 16-Jun-21 Jun-21 PNC/DVE-31/HW/2187 Subgrade Top 387+080 387+290 LHS
1 14-Feb-22 Feb-22 PNC/DVE-31/HW/5077 Subgrade Top 387+390 387+420 LHS
2 30-Sep-21 Sep-21 PNC/DVE-31/HW/2832 Subgrade Top 387+420 387+500 LHS
3 15-Jun-21 Jun-21 PNC/DVE-31/HW/2113 Subgrade Top 387+550 387+830 LHS
4 30-Nov-21 Nov-21 PNC/DVE-31/HW/3669 Subgrade Top 387+830 387+930 LHS
5 13-Dec-21 Dec-21 PNC/DVE-31/HW/4048 Subgrade Top 387+930 387+970 LHS
6 16-Jun-21 Jun-21 PNC/DVE-31/HW/2178 Subgrade Top 387+970 388+280 LHS
7 18-Jun-21 Jun-21 PNC/DVE-31/HW/2260 Subgrade Top 388+790 389+060 LHS
8 30-Sep-21 Sep-21 PNC/DVE-31/HW/2834 Subgrade Top 389+060 389+130 LHS
9 15-Nov-21 Nov-21 PNC/DVE-31/HW/3372 Subgrade Top 389+130 389+170 LHS
10 30-Jun-21 Jun-21 PNC/DVE-31/HW/2388 Subgrade Top 389+170 389+240 LHS
11 30-Jun-21 Jun-21 PNC/DVE-31/HW/2390 Subgrade Top 389+240 389+360 LHS
12 30-Jun-21 Jun-21 PNC/DVE-31/HW/2392 Subgrade Top 389+360 389+500 LHS
13 30-Sep-21 Sep-21 PNC/DVE-31/HW/2836 Subgrade Top 389+600 389+740 LHS
14 30-Sep-21 Sep-21 PNC/DVE-31/HW/2837 Subgrade Top 389+740 389+790 LHS
15 14-Nov-21 Nov-21 PNC/DVE-31/HW/3353 Subgrade Top 389+790 389+810 LHS
16 30-Sep-21 Sep-21 PNC/DVE-31/HW/2839 Subgrade Top 389+810 389+840 LHS
17 17-Oct-21 Oct-21 PNC/DVE-31/HW/2923 Subgrade Top 389+840 389+850 LHS
18 30-Sep-21 Sep-21 PNC/DVE-31/HW/2840 Subgrade Top 389+850 389+940 LHS
19 30-Sep-21 Sep-21 PNC/DVE-31/HW/2842 Subgrade Top 390+070 390+100 LHS
20 30-Sep-21 Sep-21 PNC/DVE-31/HW/2844 Subgrade Top 390+150 390+200 LHS
21 8-Dec-21 Dec-21 PNC/DVE-31/HW/3934 Subgrade Top 390+430 390+490 LHS
22 28-Oct-21 Oct-21 PNC/DVE-31/HW/3073 Subgrade Top 390+490 390+550 LHS
23 5-Dec-21 Dec-21 PNC/DVE-31/HW/3837 Subgrade Top 390+610 390+700 LHS
24 30-Nov-21 Nov-21 PNC/DVE-31/HW/3671 Subgrade Top 390+700 390+830 LHS
25 28-Dec-21 Dec-21 PNC/DVE-31/HW/4360 Subgrade Top 391+060 391+230 LHS

26 15-Jun-21 Jun-21 PNC/DVE-31/HW/2081 Subgrade Top 372+500 372+650 RHS


27 22-Feb-22 Feb-22 PNC/DVE-31/HW/5351 Subgrade Top 372+650 372+680 RHS
28 14-Jun-21 Jun-21 PNC/DVE-31/HW/1989 Subgrade Top 372+680 372+870 RHS
29 11-Jan-22 Jan-22 PNC/DVE-31/HW/4556 Subgrade Top 372+870 372+890 RHS
30 16-Jun-21 Jun-21 PNC/DVE-31/HW/2182 Subgrade Top 372+890 373+080 RHS
31 17-Jun-21 Jun-21 PNC/DVE-31/HW/2237 Subgrade Top 373+160 373+280 RHS
32 14-Jan-22 Jan-22 PNC/DVE-31/HW/4620 Subgrade Top 373+280 373+340 RHS
33 17-Jun-21 Jun-21 PNC/DVE-31/HW/2239 Subgrade Top 373+340 373+460 RHS
34 14-Jan-22 Jan-22 PNC/DVE-31/HW/4622 Subgrade Top 373+460 373+500 RHS
35 18-Jun-21 Jun-21 PNC/DVE-31/HW/2257 Subgrade Top 373+500 373+670 RHS
36 18-Jun-21 Jun-21 PNC/DVE-31/HW/2263 Subgrade Top 375+000 375+180 RHS
37 25-Dec-21 Dec-21 PNC/DVE-31/HW/4269 Subgrade Top 375+180 375+200 RHS
38 15-Jun-21 Jun-21 PNC/DVE-31/HW/2084 Subgrade Top 375+200 375+460 RHS
39 6-Dec-21 Dec-21 PNC/DVE-31/HW/3856 Subgrade Top 375+460 375+490 RHS
40 14-Jun-21 Jun-21 PNC/DVE-31/HW/1992 Subgrade Top 375+490 375+680 RHS
41 6-Dec-21 Dec-21 PNC/DVE-31/HW/3860 Subgrade Top 375+680 375+710 RHS
42 16-Jun-21 Jun-21 PNC/DVE-31/HW/2185 Subgrade Top 375+710 375+900 RHS
1 5-Mar-22 Mar-22 PNC/DVE-31/HW/5606 Subgrade Top 375+900 375+940 RHS
2 17-Jun-21 Jun-21 PNC/DVE-31/HW/2231 Subgrade Top 375+940 376+000 RHS
3 15-Jun-21 Jun-21 PNC/DVE-31/HW/2087 Subgrade Top 376+630 377+000 RHS
4 25-Nov-21 Nov-21 PNC/DVE-31/HW/3536 Subgrade Top 377+000 377+040 RHS
5 15-Jun-21 Jun-21 PNC/DVE-31/HW/2090 Subgrade Top 377+040 377+140 RHS
6 15-Jun-21 Jun-21 PNC/DVE-31/HW/2093 Subgrade Top 377+190 377+310 RHS
7 13-Mar-22 Mar-22 PNC/DVE-31/HW/5742 Subgrade Top 377+310 377+360 RHS
8 18-Jun-21 Jun-21 PNC/DVE-31/HW/2259 Subgrade Top 377+360 377+610 RHS
9 30-Nov-21 Nov-21 PNC/DVE-31/HW/3661 Subgrade Top 377+610 377+650 RHS
10 25-Nov-21 Nov-21 PNC/DVE-31/HW/3542 Subgrade Top 377+620 377+640 RHS
11 18-Jun-21 Jun-21 PNC/DVE-31/HW/2265 Subgrade Top 377+650 377+860 RHS
12 18-Jun-21 Jun-21 PNC/DVE-31/HW/2255 Subgrade Top 378+170 378+530 RHS
13 22-Jan-22 Jan-22 PNC/DVE-31/HW/4739 Subgrade Top 378+530 378+560 RHS
14 15-Jun-21 Jun-21 PNC/DVE-31/HW/2096 Subgrade Top 378+560 378+720 RHS
15 13-Mar-22 Mar-22 PNC/DVE-31/HW/5748 Subgrade Top 378+720 378+750 RHS
16 14-Jun-21 Jun-21 PNC/DVE-31/HW/2001 Subgrade Top 378+750 379+240 RHS
17 20-Jan-22 Jan-22 PNC/DVE-31/HW/4719 Subgrade Top 379+240 379+270 RHS
18 14-Jun-21 Jun-21 PNC/DVE-31/HW/2004 Subgrade Top 379+270 379+480 RHS
19 1-Jan-22 Jan-22 PNC/DVE-31/HW/4435 Subgrade Top 379+480 379+510 RHS
20 15-Jun-21 Jun-21 PNC/DVE-31/HW/2072 Subgrade Top 379+510 379+720 RHS
21 9-Mar-22 Mar-22 PNC/DVE-31/HW/5698 Subgrade Top 379+720 379+740 RHS
22 15-Jun-21 Jun-21 PNC/DVE-31/HW/2075 Subgrade Top 379+740 380+000 RHS
23 14-Jun-21 Jun-21 PNC/DVE-31/HW/1995 Subgrade Top 380+000 380+100 RHS
24 30-Jan-22 Jan-22 PNC/DVE-31/HW/4849 Subgrade Top 380+100 380+120 RHS
25 14-Jun-21 Jun-21 PNC/DVE-31/HW/1998 Subgrade Top 380+120 380+370 RHS
26 14-Jun-21 Jun-21 PNC/DVE-31/HW/2007 Subgrade Top 380+450 380+840 RHS
27 27-Dec-21 Dec-21 PNC/DVE-31/HW/4345 Subgrade Top 380+840 380+860 RHS
28 14-Jun-21 Jun-21 PNC/DVE-31/HW/2010 Subgrade Top 380+860 381+150 RHS
29 15-Jun-21 Jun-21 PNC/DVE-31/HW/2099 Subgrade Top 381+180 381+270 RHS
30 30-Jan-22 Jan-22 PNC/DVE-31/HW/4855 Subgrade Top 381+270 381+300 RHS
31 16-Jun-21 Jun-21 PNC/DVE-31/HW/2191 Subgrade Top 381+300 381+460 RHS
32 15-Jan-22 Jan-22 PNC/DVE-31/HW/4641 Subgrade Top 381+460 381+480 RHS
33 15-Jun-21 Jun-21 PNC/DVE-31/HW/2105 Subgrade Top 381+480 381+690 RHS
34 17-Jun-21 Jun-21 PNC/DVE-31/HW/2242 Subgrade Top 381+760 381+820 RHS
35 15-Jun-21 Jun-21 PNC/DVE-31/HW/2108 Subgrade Top 381+820 381+970 RHS
36 14-Jun-21 Jun-21 PNC/DVE-31/HW/2013 Subgrade Top 382+580 382+640 RHS
37 21-Feb-22 Feb-22 PNC/DVE-31/HW/5297 Subgrade Top 382+640 382+642 RHS
38 21-Feb-22 Feb-22 PNC/DVE-31/HW/5297 Subgrade Top 382+649 382+680 RHS
39 14-Jun-21 Jun-21 PNC/DVE-31/HW/2016 Subgrade Top 382+680 382+770 RHS
40 25-Dec-21 Dec-21 PNC/DVE-31/HW/4300 Subgrade Top 382+770 382+790 RHS
41 15-Jun-21 Jun-21 PNC/DVE-31/HW/2078 Subgrade Top 382+790 382+950 RHS
42 7-Mar-22 Mar-22 PNC/DVE-31/HW/5677 Subgrade Top 382+950 382+970 RHS
43 15-Jun-21 Jun-21 PNC/DVE-31/HW/2111 Subgrade Top 382+970 383+230 RHS
44 15-Jun-21 Jun-21 PNC/DVE-31/HW/2102 Subgrade Top 383+250 383+400 RHS
45 17-Jun-21 Jun-21 PNC/DVE-31/HW/2234 Subgrade Top 383+400 383+500 RHS
46 7-Dec-21 Dec-21 PNC/DVE-31/HW/3900 Subgrade Top 384+670 384+700 RHS
47 28-Oct-21 Oct-21 PNC/DVE-31/HW/3072 Subgrade Top 384+700 384+900 RHS
48 24-Nov-21 Nov-21 PNC/DVE-31/HW/3512 Subgrade Top 385+080 385+160 RHS
49 30-Sep-21 Sep-21 PNC/DVE-31/HW/2821 Subgrade Top 385+160 385+290 RHS
50 8-Dec-21 Dec-21 PNC/DVE-31/HW/3929 Subgrade Top 385+290 385+310 RHS
51 30-Sep-21 Sep-21 PNC/DVE-31/HW/2823 Subgrade Top 385+310 385+420 RHS
52 30-Oct-21 Oct-21 PNC/DVE-31/HW/3122 Subgrade Top 385+420 385+433 RHS
53 30-Sep-21 Sep-21 PNC/DVE-31/HW/2825 Subgrade Top 385+440 385+600 RHS
54 30-Sep-21 Sep-21 PNC/DVE-31/HW/2827 Subgrade Top 385+700 386+000 RHS
55 5-Mar-22 Mar-22 PNC/DVE-31/HW/5625 Subgrade Top 386+000 386+050 RHS
56 30-Sep-21 Sep-21 PNC/DVE-31/HW/2829 Subgrade Top 386+050 386+150 RHS
57 30-Sep-21 Sep-21 PNC/DVE-31/HW/2831 Subgrade Top 386+150 386+260 RHS
58 16-Jun-21 Jun-21 PNC/DVE-31/HW/2188 Subgrade Top 387+080 387+340 RHS
59 14-Feb-22 Feb-22 PNC/DVE-31/HW/5078 Subgrade Top 387+390 387+420 RHS
60 30-Sep-21 Sep-21 PNC/DVE-31/HW/2833 Subgrade Top 387+420 387+500 RHS
61 15-Jun-21 Jun-21 PNC/DVE-31/HW/2114 Subgrade Top 387+550 387+830 RHS
62 30-Nov-21 Nov-21 PNC/DVE-31/HW/3670 Subgrade Top 387+830 387+930 RHS
63 13-Dec-21 Dec-21 PNC/DVE-31/HW/4049 Subgrade Top 387+930 387+970 RHS
64 16-Jun-21 Jun-21 PNC/DVE-31/HW/2179 Subgrade Top 387+970 388+280 RHS
65 18-Jun-21 Jun-21 PNC/DVE-31/HW/2261 Subgrade Top 388+790 389+060 RHS
66 30-Sep-21 Sep-21 PNC/DVE-31/HW/2835 Subgrade Top 389+060 389+130 RHS
67 15-Nov-21 Nov-21 PNC/DVE-31/HW/3373 Subgrade Top 389+130 389+170 RHS
68 30-Jun-21 Jun-21 PNC/DVE-31/HW/2389 Subgrade Top 389+170 389+240 RHS
69 30-Jun-21 Jun-21 PNC/DVE-31/HW/2391 Subgrade Top 389+240 389+360 RHS
70 30-Jun-21 Jun-21 PNC/DVE-31/HW/2393 Subgrade Top 389+360 389+500 RHS
71 30-Sep-21 Sep-21 PNC/DVE-31/HW/2838 Subgrade Top 389+740 389+790 RHS
72 14-Nov-21 Nov-21 PNC/DVE-31/HW/3354 Subgrade Top 389+790 389+810 RHS
73 30-Sep-21 Sep-21 PNC/DVE-31/HW/2841 Subgrade Top 389+810 389+940 RHS
74 30-Sep-21 Sep-21 PNC/DVE-31/HW/2843 Subgrade Top 390+070 390+100 RHS
75 30-Sep-21 Sep-21 PNC/DVE-31/HW/2845 Subgrade Top 390+150 390+200 RHS
76 8-Dec-21 Dec-21 PNC/DVE-31/HW/3935 Subgrade Top 390+430 390+490 RHS
77 24-Oct-21 Oct-21 PNC/DVE-31/HW/2984 Subgrade Top 390+490 390+550 RHS
78 5-Dec-21 Dec-21 PNC/DVE-31/HW/3838 Subgrade Top 390+620 390+700 RHS
79 30-Nov-21 Nov-21 PNC/DVE-31/HW/3672 Subgrade Top 390+700 390+800 RHS
150 0.30 1
30 0.06 8 00+000
190 0.38 1 00+000
20 0.04 7 00+000
200 0.40 1 00+000
140 0.28 1 00+070
60 0.12 7 00+000
100 0.20 1 00+000
40 0.08 7 00+000
160 0.32 1 00+000
180 0.36 1 01+340
20 0.04 6 00+000
260 0.52 1 00+000
30 0.06 6 00+000
190 0.38 1 00+000
30 0.06 6 00+000
190 0.38 1 00+000
40 0.08 8 00+000
60 0.12 1 00+000
370 0.74 1 00+630
40 0.08 5 00+000
100 0.20 1 00+000
120 0.24 1 00+050
50 0.10 9 00+000
250 0.50 1 00+000
40 0.08 5 00+000
20 0.04 5 -00+030
210 0.42 1 00+010
360 0.72 1 00+310
30 0.06 7 00+000
160 0.32 1 00+000
30 0.06 9 00+000
490 0.98 1 00+000
30 0.06 7 00+000
210 0.42 1 00+000
30 0.06 7 00+000
210 0.42 1 00+000
20 0.04 9 00+000
260 0.52 1 00+000
100 0.20 1 00+000
20 0.04 7 00+000
250 0.50 1 00+000
36 0.07 9 00+000
26 0.05 9 00+018
390 0.78 1 00+000
20 0.04 6 00+000
290 0.58 1 00+000
30 0.06 7 00+000
30 0.06 8 -00+030
90 0.18 1 00+000
30 0.06 7 00+000
160 0.32 1 00+000
20 0.04 7 00+000
210 0.42 1 00+000
31 0.06 9 00+000
27 0.05 9 00+012
60 0.12 1 00+000
150 0.30 1 00+000
22 0.04 9 00+000
160 0.32 9 00+148
60 0.12 1 00+280
2 0.00 8 00+000
31 0.06 8 00+007 11.695
90 0.18 1 00+000
20 0.04 6 00+000
160 0.32 2 00+000
20 0.04 9 00+000
260 0.52 1 00+000
150 0.30 1 00+020
100 0.20 3 00+000
30 0.06 6 01+170
200 0.40 4 00+000
80 0.16 5 00+180
130 0.26 3 00+000
20 0.04 6 00+000
110 0.22 3 00+000
180 0.36 3 00+000
300 0.60 3 00+100
50 0.10 9 00+000
100 0.20 3 00+000
110 0.22 3 00+000
210 0.42 2 00+820
30 0.06 8 00+100
80 0.16 3 00+000
280 0.56 1 00+050
100 0.20 5 00+000
40 0.08 6 00+000
310 0.62 3 00+000
270 0.54 3 00+510
70 0.14 3 00+000
40 0.08 5 00+000
70 0.14 2 00+000
120 0.24 2 00+000
140 0.28 2 00+000
140 0.28 3 00+100
50 0.10 3 00+000
20 0.04 5 00+000
30 0.06 3 00+000
10 0.02 4 00+000
90 0.18 3 00+000
30 0.06 3 00+130
50 0.10 3 00+050
60 0.12 6 00+230
60 0.12 4 00+000
90 0.18 6 00+060
130 0.26 5 00+000
170 0.34 6 00+230

150 0.30 1
30 0.06 8 00+000
190 0.38 1 00+000
20 0.04 7 00+000
190 0.38 1 00+000
120 0.24 1 00+080
60 0.12 7 00+000
120 0.24 1 00+000
40 0.08 7 00+000
170 0.34 1 00+000
180 0.36 1 01+330
20 0.04 6 00+000
260 0.52 1 00+000
30 0.06 6 00+000
190 0.38 1 00+000
30 0.06 6 00+000
190 0.38 1 00+000
40 0.08 9 00+000
60 0.12 1 00+000
370 0.74 1 00+630
40 0.08 5 00+000
100 0.20 1 00+000
120 0.24 1 00+050
50 0.10 9 00+000
250 0.50 1 00+000
40 0.08 5 00+000
20 0.04 5 -00+030
210 0.42 1 00+010
360 0.72 1 00+310
30 0.06 7 00+000
160 0.32 1 00+000
30 0.06 9 00+000
490 0.98 1 00+000
30 0.06 7 00+000
210 0.42 1 00+000
30 0.06 7 00+000
210 0.42 1 00+000
20 0.04 9 00+000
260 0.52 1 00+000
100 0.20 1 00+000
20 0.04 7 00+000 11.285
250 0.50 1 00+000
390 0.78 1 00+080
20 0.04 6 00+000
290 0.58 1 00+000
90 0.18 1 00+030
30 0.06 7 00+000
160 0.32 1 00+000
20 0.04 7 00+000
210 0.42 1 00+000
60 0.12 1 00+070
150 0.30 1 00+000
60 0.12 1 00+610
2 0.00 8 00+000
31 0.06 8 00+007
90 0.18 1 00+000
20 0.04 6 00+000
160 0.32 2 00+000
20 0.04 9 00+000
260 0.52 1 00+000
150 0.30 1 00+020
100 0.20 3 00+000
30 0.06 6 01+170
200 0.40 4 00+000
80 0.16 5 00+180
130 0.26 3 00+000
20 0.04 6 00+000
110 0.22 3 00+000
13 0.03 4 00+000
160 0.32 3 00+007
300 0.60 3 00+100
50 0.10 9 00+000
100 0.20 3 00+000
110 0.22 3 00+000
260 0.52 2 00+820
30 0.06 8 00+050
80 0.16 3 00+000
280 0.56 1 00+050
100 0.20 5 00+000
40 0.08 6 00+000
310 0.62 3 00+000
270 0.54 3 00+510
70 0.14 3 00+000
40 0.08 5 00+000
70 0.14 2 00+000
120 0.24 2 00+000
140 0.28 2 00+000
50 0.10 3 00+240
20 0.04 5 00+000
130 0.26 3 00+000
30 0.06 3 00+130
50 0.10 3 00+050
60 0.12 6 00+230
60 0.12 4 00+000
80 0.16 6 00+070
100 0.20 5 00+000
47.32
1 1-Mar-22 Mar-22 PNC/DVE-31/HW/5520 GSB TOP 372+500 372+690 LHS
1 30-Sep-21 Sep-21 PNC/DVE-31/HW/2793 GSB TOP 372+690 372+860 LHS
2 11-Jan-22 Jan-22 PNC/DVE-31/HW/4557 GSB TOP 372+860 373+080 LHS
3 28-Jan-22 Jan-22 PNC/DVE-31/HW/4807 GSB TOP 373+180 373+500 LHS
4 12-Jan-22 Jan-22 PNC/DVE-31/HW/4591 GSB TOP 373+500 373+650 LHS
5 23-Jan-22 Jan-22 PNC/DVE-31/HW/4754 GSB TOP 375+020 375+200 LHS
6 21-Dec-21 Dec-21 PNC/DVE-31/HW/4179 GSB TOP 375+200 375+500 LHS
1 29-Nov-21 Nov-21 PNC/DVE-31/HW/3609 GSB TOP 375+500 375+670 LHS
1 7-Dec-21 Dec-21 PNC/DVE-31/HW/3893 GSB TOP 375+670 375+710 LHS
2 29-Nov-21 Nov-21 PNC/DVE-31/HW/3611 GSB TOP 375+710 375+900 LHS
3 2-Mar-22 Mar-22 PNC/DVE-31/HW/5530 GSB TOP 375+900 375+990 LHS
4 30-Nov-21 Nov-21 PNC/DVE-31/HW/3662 GSB TOP 376+640 376+990 LHS
5 30-Nov-21 Nov-21 PNC/DVE-31/HW/3664 GSB TOP 376+990 377+130 LHS
6 7-Jan-22 Jan-22 PNC/DVE-31/HW/4534 GSB TOP 377+200 377+300 LHS
7 17-Dec-21 Dec-21 PNC/DVE-31/HW/4127 GSB TOP 377+380 377+600 LHS
8 19-Dec-21 Dec-21 PNC/DVE-31/HW/4156 GSB TOP 377+600 377+850 LHS
9 23-Jan-22 Jan-22 PNC/DVE-31/HW/4753 GSB TOP 378+180 378+380 LHS
10 24-Jan-22 Jan-22 PNC/DVE-31/HW/4766 GSB TOP 378+380 378+520 LHS
11 23-Mar-22 Mar-22 PNC/DVE-31/HW/5980 GSB TOP 378+520 378+760 LHS
12 23-Mar-22 Mar-22 PNC/DVE-31/HW/5981 GSB TOP 378+760 378+960 LHS
13 7-Feb-22 Feb-22 PNC/DVE-31/HW/4986 GSB TOP 379+000 379+120 LHS
14 6-Feb-22 Feb-22 PNC/DVE-31/HW/4977 GSB TOP 379+220 379+340 LHS
15 2-Feb-22 Feb-22 PNC/DVE-31/HW/4919 GSB TOP 379+340 379+500 LHS
16 1-Feb-22 Feb-22 PNC/DVE-31/HW/4905 GSB TOP 379+500 379+600 LHS
1 1-Feb-22 Feb-22 PNC/DVE-31/HW/4904 GSB TOP 379+600 379+700 LHS
2 3-Feb-22 Feb-22 PNC/DVE-31/HW/4940 GSB TOP 380+000 380+090 LHS
3 8-Feb-22 Feb-22 PNC/DVE-31/HW/4997 GSB TOP 380+090 380+190 LHS
4 9-Mar-22 Mar-22 PNC/DVE-31/HW/5699 GSB TOP 380+190 380+300 LHS
5 21-Mar-22 Mar-22 PNC/DVE-31/HW/5924 GSB TOP 380+300 380+360 LHS
6 27-Mar-22 Mar-22 PNC/DVE-31/HW/6064 GSB TOP 380+360 380+406 LHS
7 27-Mar-22 Mar-22 PNC/DVE-31/HW/6065 GSB TOP 380+424 380+450 LHS
8 24-Dec-21 Dec-21 PNC/DVE-31/HW/4250 GSB TOP 380+450 380+700 LHS
9 26-Dec-21 Dec-21 PNC/DVE-31/HW/4325 GSB TOP 380+700 380+820 LHS
10 28-Dec-21 Dec-21 PNC/DVE-31/HW/4354 GSB TOP 380+820 380+880 LHS
11 26-Dec-21 Dec-21 PNC/DVE-31/HW/4326 GSB TOP 380+880 381+070 LHS
12 20-Feb-22 Feb-22 PNC/DVE-31/HW/5255 GSB TOP 381+120 381+320 LHS
13 17-Jan-22 Jan-22 PNC/DVE-31/HW/4678 GSB TOP 381+430 381+530 LHS
14 14-Jan-22 Jan-22 PNC/DVE-31/HW/4631 GSB TOP 381+530 381+670 LHS
15 15-Jan-22 Jan-22 PNC/DVE-31/HW/4652 GSB TOP 381+760 381+920 LHS
16 10-Mar-22 Mar-22 PNC/DVE-31/HW/5713 GSB TOP 382+580 382+640 LHS
17 22-Feb-22 Feb-22 PNC/DVE-31/HW/5360 GSB TOP 382+640 382+654 LHS
18 22-Feb-22 Feb-22 PNC/DVE-31/HW/5364 GSB TOP 382+661 382+670 LHS
19 12-Mar-22 Mar-22 PNC/DVE-31/HW/5735 GSB TOP 382+670 382+690 LHS
20 20-Jan-22 Jan-22 PNC/DVE-31/HW/4723 GSB TOP 382+690 382+930 LHS
21 11-Mar-22 Mar-22 PNC/DVE-31/HW/5725 GSB TOP 382+930 383+000 LHS
1 2-Jan-22 Jan-22 PNC/DVE-31/HW/4460 GSB TOP 383+000 383+180 LHS
2 3-Jan-22 Jan-22 PNC/DVE-31/HW/4480 GSB TOP 383+280 383+480 LHS
3 8-Dec-21 Dec-21 PNC/DVE-31/HW/3924 GSB TOP 384+680 384+710 LHS
1 28-Oct-21 Oct-21 PNC/DVE-31/HW/3074 GSB TOP 384+710 384+890 LHS
2 29-Nov-21 Nov-21 PNC/DVE-31/HW/3625 GSB TOP 385+090 385+170 LHS
3 28-Oct-21 Oct-21 PNC/DVE-31/HW/3076 GSB TOP 385+170 385+270 LHS
4 9-Dec-21 Dec-21 PNC/DVE-31/HW/3960 GSB TOP 385+280 385+320 LHS
5 31-Oct-21 Oct-21 PNC/DVE-31/HW/3158 GSB TOP 385+320 385+590 LHS
6 29-Oct-21 Oct-21 PNC/DVE-31/HW/3108 GSB TOP 385+710 385+990 LHS
7 30-Oct-21 Oct-21 PNC/DVE-31/HW/3123 GSB TOP 386+060 386+250 LHS
8 25-Oct-21 Oct-21 PNC/DVE-31/HW/3005 GSB TOP 387+100 387+280 LHS
9 14-Feb-22 Feb-22 PNC/DVE-31/HW/5079 GSB TOP 387+400 387+470 LHS
10 18-Oct-21 Oct-21 PNC/DVE-31/HW/2935 GSB TOP 387+580 387+800 LHS
11 8-Jan-22 Jan-22 PNC/DVE-31/HW/4538 GSB TOP 387+810 388+000 LHS
12 22-Oct-21 Oct-21 PNC/DVE-31/HW/2950 GSB TOP 388+000 388+120 LHS
13 23-Oct-21 Oct-21 PNC/DVE-31/HW/2958 GSB TOP 388+120 388+240 LHS
14 29-Oct-21 Oct-21 PNC/DVE-31/HW/3110 GSB TOP 388+800 389+120 LHS
15 29-Nov-21 Nov-21 PNC/DVE-31/HW/3637 GSB TOP 389+120 389+180 LHS
16 30-Oct-21 Oct-21 PNC/DVE-31/HW/3125 GSB TOP 389+180 389+490 LHS
17 28-Oct-21 Oct-21 PNC/DVE-31/HW/3078 GSB TOP 389+610 389+780 LHS
18 14-Nov-21 Nov-21 PNC/DVE-31/HW/3355 GSB TOP 389+780 389+820 LHS
19 28-Oct-21 Oct-21 PNC/DVE-31/HW/3080 GSB TOP 389+820 389+930 LHS
20 4-Feb-22 Feb-22 PNC/DVE-31/HW/4964 GSB TOP 390+440 390+500 LHS
21 31-Oct-21 Oct-21 PNC/DVE-31/HW/3160 GSB TOP 390+500 390+540 LHS
22 9-Feb-22 Feb-22 PNC/DVE-31/HW/5002 GSB TOP 390+630 390+780 LHS
23 12-Feb-22 Feb-22 PNC/DVE-31/HW/5043 GSB TOP 391+080 391+220 LHS

24 28-Feb-22 Feb-22 PNC/DVE-31/HW/5508 GSB TOP 372+500 372+680 RHS


25 22-Jan-22 Jan-22 PNC/DVE-31/HW/4744 GSB TOP 372+680 372+860 RHS
26 21-Jan-22 Jan-22 PNC/DVE-31/HW/4732 GSB TOP 372+860 373+030 RHS
27 30-Jan-22 Jan-22 PNC/DVE-31/HW/4872 GSB TOP 373+180 373+500 RHS
28 6-Jan-22 Jan-22 PNC/DVE-31/HW/4521 GSB TOP 373+500 373+650 RHS
29 5-Jan-22 Jan-22 PNC/DVE-31/HW/4502 GSB TOP 375+020 375+200 RHS
30 22-Dec-21 Dec-21 PNC/DVE-31/HW/4196 GSB TOP 375+200 375+410 RHS
31 4-Jan-22 Jan-22 PNC/DVE-31/HW/4491 GSB TOP 375+410 375+500 RHS
32 29-Nov-21 Nov-21 PNC/DVE-31/HW/3610 GSB TOP 375+500 375+670 RHS
33 7-Dec-21 Dec-21 PNC/DVE-31/HW/3894 GSB TOP 375+670 375+710 RHS
34 29-Nov-21 Nov-21 PNC/DVE-31/HW/3612 GSB TOP 375+710 375+900 RHS
35 30-Nov-21 Nov-21 PNC/DVE-31/HW/3663 GSB TOP 376+640 376+990 RHS
36 30-Nov-21 Nov-21 PNC/DVE-31/HW/3665 GSB TOP 376+990 377+130 RHS
37 7-Jan-22 Jan-22 PNC/DVE-31/HW/4535 GSB TOP 377+200 377+300 RHS
38 17-Dec-21 Dec-21 PNC/DVE-31/HW/4128 GSB TOP 377+380 377+540 RHS
39 19-Dec-21 Dec-21 PNC/DVE-31/HW/4157 GSB TOP 377+540 377+850 RHS
40 24-Jan-22 Jan-22 PNC/DVE-31/HW/4767 GSB TOP 378+180 378+300 RHS
41 25-Jan-22 Jan-22 PNC/DVE-31/HW/4777 GSB TOP 378+300 378+520 RHS
42 24-Mar-22 Mar-22 PNC/DVE-31/HW/6004 GSB TOP 378+520 378+760 RHS
43 24-Mar-22 Mar-22 PNC/DVE-31/HW/6005 GSB TOP 378+760 378+960 RHS
44 25-Mar-22 Mar-22 PNC/DVE-31/HW/6032 GSB TOP 378+960 379+160 RHS
45 25-Mar-22 Mar-22 PNC/DVE-31/HW/6033 GSB TOP 379+160 379+360 RHS
46 26-Mar-22 Mar-22 PNC/DVE-31/HW/6052 GSB TOP 379+360 379+560 RHS
47 26-Mar-22 Mar-22 PNC/DVE-31/HW/6053 GSB TOP 379+560 379+760 RHS
48 28-Dec-21 Dec-21 PNC/DVE-31/HW/4353 GSB TOP 379+760 380+000 RHS
49 13-Mar-22 Mar-22 PNC/DVE-31/HW/5753 GSB TOP 380+000 380+100 RHS
50 14-Mar-22 Mar-22 PNC/DVE-31/HW/5760 GSB TOP 380+100 380+250 RHS
51 15-Mar-22 Mar-22 PNC/DVE-31/HW/5766 GSB TOP 380+250 380+370 RHS
52 30-Nov-21 Nov-21 PNC/DVE-31/HW/3666 GSB TOP 380+460 380+820 RHS
53 28-Dec-21 Dec-21 PNC/DVE-31/HW/4355 GSB TOP 380+820 380+880 RHS
54 10-Dec-21 Dec-21 PNC/DVE-31/HW/3984 GSB TOP 380+880 381+070 RHS
55 8-Mar-22 Mar-22 PNC/DVE-31/HW/5685 GSB TOP 381+120 381+320 RHS
56 27-Jan-22 Jan-22 PNC/DVE-31/HW/4797 GSB TOP 381+430 381+660 RHS
57 18-Jan-22 Jan-22 PNC/DVE-31/HW/4698 GSB TOP 381+800 381+900 RHS
58 10-Mar-22 Mar-22 PNC/DVE-31/HW/5714 GSB TOP 382+580 382+640 RHS
59 22-Feb-22 Feb-22 PNC/DVE-31/HW/5361 GSB TOP 382+640 382+654 RHS
60 22-Feb-22 Feb-22 PNC/DVE-31/HW/5365 GSB TOP 382+661 382+670 RHS
61 12-Mar-22 Mar-22 PNC/DVE-31/HW/5736 GSB TOP 382+670 382+720 RHS
62 19-Jan-22 Jan-22 PNC/DVE-31/HW/4705 GSB TOP 382+720 382+940 RHS
63 11-Mar-22 Mar-22 PNC/DVE-31/HW/5726 GSB TOP 382+940 383+030 RHS
64 2-Jan-22 Jan-22 PNC/DVE-31/HW/4461 GSB TOP 383+030 383+180 RHS
65 3-Jan-22 Jan-22 PNC/DVE-31/HW/4481 GSB TOP 383+280 383+340 RHS
66 6-Jan-22 Jan-22 PNC/DVE-31/HW/4532 GSB TOP 383+340 383+380 RHS
67 3-Jan-22 Jan-22 PNC/DVE-31/HW/4482 GSB TOP 383+380 383+480 RHS
68 8-Dec-21 Dec-21 PNC/DVE-31/HW/3925 GSB TOP 384+680 384+710 RHS
69 28-Oct-21 Oct-21 PNC/DVE-31/HW/3075 GSB TOP 384+710 384+890 RHS
70 29-Nov-21 Nov-21 PNC/DVE-31/HW/3626 GSB TOP 385+090 385+170 RHS
71 28-Oct-21 Oct-21 PNC/DVE-31/HW/3077 GSB TOP 385+170 385+320 RHS
72 9-Dec-21 Dec-21 PNC/DVE-31/HW/3961 GSB TOP 385+280 385+320 RHS
73 31-Oct-21 Oct-21 PNC/DVE-31/HW/3159 GSB TOP 385+320 385+590 RHS
74 29-Oct-21 Oct-21 PNC/DVE-31/HW/3109 GSB TOP 385+710 385+990 RHS
75 30-Oct-21 Oct-21 PNC/DVE-31/HW/3124 GSB TOP 386+060 386+250 RHS
76 24-Oct-21 Oct-21 PNC/DVE-31/HW/2968 GSB TOP 387+100 387+220 RHS
77 25-Oct-21 Oct-21 PNC/DVE-31/HW/2989 GSB TOP 387+220 387+300 RHS
78 14-Feb-22 Feb-22 PNC/DVE-31/HW/5080 GSB TOP 387+400 387+470 RHS
79 18-Oct-21 Oct-21 PNC/DVE-31/HW/2936 GSB TOP 387+580 387+810 RHS
80 9-Jan-22 Jan-22 PNC/DVE-31/HW/4545 GSB TOP 387+810 388+000 RHS
81 21-Oct-21 Oct-21 PNC/DVE-31/HW/2949 GSB TOP 388+000 388+240 RHS
82 29-Oct-21 Oct-21 PNC/DVE-31/HW/3111 GSB TOP 389+000 389+120 RHS
83 29-Nov-21 Nov-21 PNC/DVE-31/HW/3638 GSB TOP 389+120 389+180 RHS
84 30-Oct-21 Oct-21 PNC/DVE-31/HW/3126 GSB TOP 389+180 389+490 RHS
85 28-Oct-21 Oct-21 PNC/DVE-31/HW/3079 GSB TOP 389+750 389+780 RHS
86 14-Nov-21 Nov-21 PNC/DVE-31/HW/3356 GSB TOP 389+780 389+820 RHS
87 28-Oct-21 Oct-21 PNC/DVE-31/HW/3081 GSB TOP 389+820 389+930 RHS
88 4-Feb-22 Feb-22 PNC/DVE-31/HW/4965 GSB TOP 390+430 390+500 RHS
89 31-Oct-21 Oct-21 PNC/DVE-31/HW/3161 GSB TOP 390+500 390+540 RHS
90 9-Feb-22 Feb-22 PNC/DVE-31/HW/5003 GSB TOP 390+650 390+760 RHS
190 0.38 9
170 0.34 4 00+000
220 0.44 7 00+000
320 0.64 7 00+100
150 0.30 7 00+000
180 0.36 7 01+370
300 0.60 6 00+000
170 0.34 5 00+000
40 0.08 6 00+000
190 0.38 5 00+000
90 0.18 9 00+000
350 0.70 5 00+650
140 0.28 5 00+000
100 0.20 7 00+070
220 0.44 6 00+080
250 0.50 6 00+000
200 0.40 7 00+330
140 0.28 7 00+000
240 0.48 9 00+000
200 0.40 9 00+000
120 0.24 8 00+040
120 0.24 8 00+100
160 0.32 8 00+000
100 0.20 8 00+000
100 0.20 8 00+000
90 0.18 8 00+300
100 0.20 8 00+000
110 0.22 9 00+000
60 0.12 9 00+000
46 0.09 9 00+000
26 0.05 9 00+018
250 0.50 6 00+000
120 0.24 6 00+000
60 0.12 6 00+000
190 0.38 6 00+000
200 0.40 8 00+050
100 0.20 7 00+110
140 0.28 7 00+000
160 0.32 7 00+090
60 0.12 9 00+660
14 0.03 8 00+000
10 0.02 8 00+007
20 0.04 9 00+000
240 0.48 7 00+000
70 0.14 9 00+000
180 0.36 7 00+000
200 0.40 7 00+100
30 0.06 6 01+200
180 0.36 4 00+000
80 0.16 5 00+200
100 0.20 4 00+000
40 0.08 6 00+010
270 0.54 4 00+000
280 0.56 4 00+120
190 0.38 4 00+070
180 0.36 4 00+850
70 0.14 8 00+120
220 0.44 4 00+110
190 0.38 7 00+010
120 0.24 4 00+000
120 0.24 4 00+000
320 0.64 4 00+560
60 0.12 5 00+000
310 0.62 4 00+000
170 0.34 4 00+120
40 0.08 5 00+000
110 0.22 4 00+000
60 0.12 8 00+510
40 0.08 4 00+000
150 0.30 8 00+090
140 0.28 8 00+300

180 0.36 8
180 0.36 7 00+000
170 0.34 7 00+000
320 0.64 7 00+150
150 0.30 7 00+000
180 0.36 7 01+370
210 0.42 6 00+000
90 0.18 7 00+000
170 0.34 5 00+000
40 0.08 6 00+000
190 0.38 5 00+000
350 0.70 5 00+740
140 0.28 5 00+000
100 0.20 7 00+070
160 0.32 6 00+080
310 0.62 6 00+000
120 0.24 7 00+330
220 0.44 7 00+000
240 0.48 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
240 0.48 6 00+000
100 0.20 9 00+000
150 0.30 9 00+000
120 0.24 9 00+000
360 0.72 5 00+090
60 0.12 6 00+000
190 0.38 6 00+000
200 0.40 9 00+050
230 0.46 7 00+110
100 0.20 7 00+140
60 0.12 9 00+680
14 0.03 8 00+000
10 0.02 8 00+007
50 0.10 9 00+000
220 0.44 7 00+000
90 0.18 9 00+000
150 0.30 7 00+000
60 0.12 7 00+100
40 0.08 7 00+000
100 0.20 7 00+000
30 0.06 6 01+200
180 0.36 4 00+000
80 0.16 5 00+200
150 0.30 4 00+000
40 0.08 6 -00+040
270 0.54 4 00+000
280 0.56 4 00+120
190 0.38 4 00+070
120 0.24 4 00+850
80 0.16 4 00+000
70 0.14 8 00+100
230 0.46 4 00+110
190 0.38 7 00+000
240 0.48 4 00+000
120 0.24 4 00+760
60 0.12 5 00+000
310 0.62 4 00+000
30 0.06 4 00+260
40 0.08 5 00+000
110 0.22 4 00+000
70 0.14 8 00+500
40 0.08 4 00+000
110 0.22 8 00+110
40.96
1 2-Mar-22 Mar-22 PNC/DVE-31/HW/5531 WMM TOP 372+500 372+690 LHS
2 14-Jan-22 Jan-22 PNC/DVE-31/HW/4632 WMM TOP 372+690 373+080 LHS
3 28-Jan-22 Jan-22 PNC/DVE-31/HW/4808 WMM TOP 373+180 373+500 LHS
4 15-Jan-22 Jan-22 PNC/DVE-31/HW/4653 WMM TOP 373+500 373+650 LHS
5 29-Jan-22 Jan-22 PNC/DVE-31/HW/4838 WMM TOP 375+020 375+220 LHS
6 23-Dec-21 Dec-21 PNC/DVE-31/HW/4214 WMM TOP 375+220 375+500 LHS
1 8-Dec-21 Dec-21 PNC/DVE-31/HW/3921 WMM TOP 375+500 375+880 LHS
2 5-Mar-22 Mar-22 PNC/DVE-31/HW/5601 WMM TOP 375+880 375+980 LHS
3 9-Dec-21 Dec-21 PNC/DVE-31/HW/3955 WMM TOP 376+650 376+980 LHS
4 17-Dec-21 Dec-21 PNC/DVE-31/HW/4129 WMM TOP 376+980 377+120 LHS
5 18-Dec-21 Dec-21 PNC/DVE-31/HW/4143 WMM TOP 377+380 377+580 LHS
6 20-Dec-21 Dec-21 PNC/DVE-31/HW/4164 WMM TOP 377+580 377+840 LHS
7 25-Jan-22 Jan-22 PNC/DVE-31/HW/4778 WMM TOP 378+180 378+520 LHS
8 24-Mar-22 Mar-22 PNC/DVE-31/HW/6006 WMM TOP 378+520 378+760 LHS
9 24-Mar-22 Mar-22 PNC/DVE-31/HW/6007 WMM TOP 378+760 378+960 LHS
1 9-Feb-22 Feb-22 PNC/DVE-31/HW/5004 WMM TOP 379+990 380+190 LHS
2 22-Mar-22 Mar-22 PNC/DVE-31/HW/5953 WMM TOP 380+190 380+360 LHS
3 27-Dec-21 Dec-21 PNC/DVE-31/HW/4346 WMM TOP 380+460 380+810 LHS
4 28-Dec-21 Dec-21 PNC/DVE-31/HW/4356 WMM TOP 380+810 380+880 LHS
5 27-Dec-21 Dec-21 PNC/DVE-31/HW/4347 WMM TOP 380+880 381+060 LHS
6 2-Jan-22 Jan-22 PNC/DVE-31/HW/4456 WMM TOP 381+060 381+120 LHS
7 20-Feb-22 Feb-22 PNC/DVE-31/HW/5256 WMM TOP 381+120 381+330 LHS
1 1-Jan-22 Jan-22 PNC/DVE-31/HW/4446 WMM TOP 381+330 381+420 LHS
2 18-Jan-22 Jan-22 PNC/DVE-31/HW/4699 WMM TOP 381+420 381+670 LHS
3 18-Jan-22 Jan-22 PNC/DVE-31/HW/4700 WMM TOP 381+760 381+920 LHS
4 15-Mar-22 Mar-22 PNC/DVE-31/HW/5771 WMM TOP 382+580 382+640 LHS
5 22-Feb-22 Feb-22 PNC/DVE-31/HW/5362 WMM TOP 382+640 382+654 LHS
6 22-Feb-22 Feb-22 PNC/DVE-31/HW/5366 WMM TOP 382+661 382+670 LHS
7 15-Mar-22 Mar-22 PNC/DVE-31/HW/5773 WMM TOP 382+670 382+690 LHS
8 21-Jan-22 Jan-22 PNC/DVE-31/HW/4734 WMM TOP 382+690 382+930 LHS
9 15-Mar-22 Mar-22 PNC/DVE-31/HW/5775 WMM TOP 382+930 383+000 LHS
10 3-Jan-22 Jan-22 PNC/DVE-31/HW/4489 WMM TOP 383+000 383+180 LHS
11 4-Jan-22 Jan-22 PNC/DVE-31/HW/4496 WMM TOP 383+280 383+480 LHS
12 9-Dec-21 Dec-21 PNC/DVE-31/HW/3958 WMM TOP 384+690 384+720 LHS
1 29-Oct-21 Oct-21 PNC/DVE-31/HW/3112 WMM TOP 384+720 384+880 LHS
1 29-Nov-21 Nov-21 PNC/DVE-31/HW/3627 WMM TOP 385+100 385+180 LHS
2 29-Oct-21 Oct-21 PNC/DVE-31/HW/3114 WMM TOP 385+180 385+270 LHS
3 10-Dec-21 Dec-21 PNC/DVE-31/HW/3986 WMM TOP 385+270 385+330 LHS
4 31-Oct-21 Oct-21 PNC/DVE-31/HW/3162 WMM TOP 385+330 385+580 LHS
5 30-Oct-21 Oct-21 PNC/DVE-31/HW/3127 WMM TOP 385+720 385+980 LHS
6 31-Oct-21 Oct-21 PNC/DVE-31/HW/3164 WMM TOP 386+070 386+240 LHS
7 30-Oct-21 Oct-21 PNC/DVE-31/HW/3155 WMM TOP 387+110 387+270 LHS
8 22-Oct-21 Oct-21 PNC/DVE-31/HW/2951 WMM TOP 387+590 387+800 LHS
9 11-Jan-22 Jan-22 PNC/DVE-31/HW/4558 WMM TOP 387+800 388+000 LHS
10 24-Oct-21 Oct-21 PNC/DVE-31/HW/2969 WMM TOP 388+000 388+230 LHS
11 30-Oct-21 Oct-21 PNC/DVE-31/HW/3129 WMM TOP 388+810 389+110 LHS
12 29-Nov-21 Nov-21 PNC/DVE-31/HW/3639 WMM TOP 389+110 389+190 LHS
13 31-Oct-21 Oct-21 PNC/DVE-31/HW/3166 WMM TOP 389+190 389+480 LHS
14 29-Oct-21 Oct-21 PNC/DVE-31/HW/3116 WMM TOP 389+620 389+770 LHS
15 15-Nov-21 Nov-21 PNC/DVE-31/HW/3370 WMM TOP 389+770 389+830 LHS
16 29-Oct-21 Oct-21 PNC/DVE-31/HW/3117 WMM TOP 389+830 389+920 LHS
17 16-Feb-22 Feb-22 PNC/DVE-31/HW/5129 WMM TOP 390+440 390+530 LHS
18 13-Feb-22 Feb-22 PNC/DVE-31/HW/5055 WMM TOP 390+640 390+780 LHS
19 17-Feb-22 Feb-22 PNC/DVE-31/HW/5151 WMM TOP 391+080 391+220 LHS

20 2-Mar-22 Mar-22 PNC/DVE-31/HW/5532 WMM TOP 372+500 372+680 RHS


21 23-Jan-22 Jan-22 PNC/DVE-31/HW/4755 WMM TOP 372+680 373+030 RHS
22 30-Jan-22 Jan-22 PNC/DVE-31/HW/4873 WMM TOP 373+180 373+500 RHS
23 10-Jan-22 Jan-22 PNC/DVE-31/HW/4550 WMM TOP 373+500 373+650 RHS
24 9-Jan-22 Jan-22 PNC/DVE-31/HW/4543 WMM TOP 375+020 375+220 RHS
25 23-Dec-21 Dec-21 PNC/DVE-31/HW/4215 WMM TOP 375+220 375+410 RHS
26 9-Jan-22 Jan-22 PNC/DVE-31/HW/4544 WMM TOP 375+410 375+500 RHS
27 8-Dec-21 Dec-21 PNC/DVE-31/HW/3922 WMM TOP 375+500 375+880 RHS
28 9-Dec-21 Dec-21 PNC/DVE-31/HW/3956 WMM TOP 376+650 376+980 RHS
29 17-Dec-21 Dec-21 PNC/DVE-31/HW/4130 WMM TOP 376+980 377+120 RHS
30 18-Dec-21 Dec-21 PNC/DVE-31/HW/4144 WMM TOP 377+380 377+540 RHS
31 20-Dec-21 Dec-21 PNC/DVE-31/HW/4165 WMM TOP 377+540 377+840 RHS
32 25-Jan-22 Jan-22 PNC/DVE-31/HW/4779 WMM TOP 378+180 378+520 RHS
33 25-Mar-22 Mar-22 PNC/DVE-31/HW/6034 WMM TOP 378+520 378+760 RHS
34 25-Mar-22 Mar-22 PNC/DVE-31/HW/6035 WMM TOP 378+760 378+960 RHS
35 26-Mar-22 Mar-22 PNC/DVE-31/HW/6054 WMM TOP 378+960 379+160 RHS
36 26-Mar-22 Mar-22 PNC/DVE-31/HW/6055 WMM TOP 379+160 379+360 RHS
37 27-Mar-22 Mar-22 PNC/DVE-31/HW/6066 WMM TOP 379+360 379+560 RHS
38 27-Mar-22 Mar-22 PNC/DVE-31/HW/6067 WMM TOP 379+560 379+760 RHS
39 19-Mar-22 Mar-22 PNC/DVE-31/HW/5873 WMM TOP 379+990 380+370 RHS
40 10-Dec-21 Dec-21 PNC/DVE-31/HW/3983 WMM TOP 380+470 380+810 RHS
41 28-Dec-21 Dec-21 PNC/DVE-31/HW/4357 WMM TOP 380+810 380+880 RHS
42 26-Dec-21 Dec-21 PNC/DVE-31/HW/4327 WMM TOP 380+880 381+060 RHS
43 2-Jan-22 Jan-22 PNC/DVE-31/HW/4457 WMM TOP 381+060 381+120 RHS
44 14-Mar-22 Mar-22 PNC/DVE-31/HW/5761 WMM TOP 381+120 381+330 RHS
45 1-Jan-22 Jan-22 PNC/DVE-31/HW/4447 WMM TOP 381+330 381+420 RHS
46 28-Jan-22 Jan-22 PNC/DVE-31/HW/4809 WMM TOP 381+420 381+660 RHS
47 18-Jan-22 Jan-22 PNC/DVE-31/HW/4701 WMM TOP 381+800 381+900 RHS
48 15-Mar-22 Mar-22 PNC/DVE-31/HW/5772 WMM TOP 382+580 382+640 RHS
49 22-Feb-22 Feb-22 PNC/DVE-31/HW/5363 WMM TOP 382+640 382+654 RHS
50 22-Feb-22 Feb-22 PNC/DVE-31/HW/5367 WMM TOP 382+661 382+670 RHS
51 15-Mar-22 Mar-22 PNC/DVE-31/HW/5774 WMM TOP 382+670 382+720 RHS
52 21-Jan-22 Jan-22 PNC/DVE-31/HW/4733 WMM TOP 382+720 382+940 RHS
53 15-Mar-22 Mar-22 PNC/DVE-31/HW/5776 WMM TOP 382+940 383+030 RHS
54 3-Jan-22 Jan-22 PNC/DVE-31/HW/4490 WMM TOP 383+030 383+180 RHS
55 5-Jan-22 Jan-22 PNC/DVE-31/HW/4513 WMM TOP 383+280 383+340 RHS
56 6-Jan-22 Jan-22 PNC/DVE-31/HW/4533 WMM TOP 383+340 383+380 RHS
57 5-Jan-22 Jan-22 PNC/DVE-31/HW/4514 WMM TOP 383+380 383+480 RHS
58 9-Dec-21 Dec-21 PNC/DVE-31/HW/3959 WMM TOP 384+690 384+720 RHS
59 29-Oct-21 Oct-21 PNC/DVE-31/HW/3113 WMM TOP 384+720 384+880 RHS
60 29-Nov-21 Nov-21 PNC/DVE-31/HW/3628 WMM TOP 385+100 385+180 RHS
61 29-Oct-21 Oct-21 PNC/DVE-31/HW/3115 WMM TOP 385+180 385+270 RHS
62 10-Dec-21 Dec-21 PNC/DVE-31/HW/3987 WMM TOP 385+270 385+330 RHS
63 31-Oct-21 Oct-21 PNC/DVE-31/HW/3163 WMM TOP 385+330 385+580 RHS
64 30-Oct-21 Oct-21 PNC/DVE-31/HW/3128 WMM TOP 385+720 385+980 RHS
65 31-Oct-21 Oct-21 PNC/DVE-31/HW/3165 WMM TOP 386+070 386+240 RHS
66 25-Oct-21 Oct-21 PNC/DVE-31/HW/3006 WMM TOP 387+100 387+300 RHS
67 19-Oct-21 Oct-21 PNC/DVE-31/HW/2941 WMM TOP 387+590 387+800 RHS
68 11-Jan-22 Jan-22 PNC/DVE-31/HW/4559 WMM TOP 387+800 388+000 RHS
69 23-Oct-21 Oct-21 PNC/DVE-31/HW/2959 WMM TOP 388+000 388+230 RHS
70 30-Oct-21 Oct-21 PNC/DVE-31/HW/3130 WMM TOP 388+810 389+110 RHS
71 29-Nov-21 Nov-21 PNC/DVE-31/HW/3640 WMM TOP 389+110 389+190 RHS
72 31-Oct-21 Oct-21 PNC/DVE-31/HW/3167 WMM TOP 389+190 389+480 RHS
73 15-Nov-21 Nov-21 PNC/DVE-31/HW/3371 WMM TOP 389+770 389+830 RHS
74 29-Oct-21 Oct-21 PNC/DVE-31/HW/3118 WMM TOP 389+830 389+920 RHS
75 16-Feb-22 Feb-22 PNC/DVE-31/HW/5130 WMM TOP 390+430 390+540 RHS
76 13-Feb-22 Feb-22 PNC/DVE-31/HW/5056 WMM TOP 390+650 390+760 RHS
190 0.38 9
390 0.78 7 00+000
320 0.64 7 00+100
150 0.30 7 00+000
200 0.40 7 01+370
280 0.56 6 00+000
380 0.76 6 00+000
100 0.20 9 00+000
330 0.66 6 00+670
140 0.28 6 00+000
200 0.40 6 00+260
260 0.52 6 00+000
340 0.68 7 00+340
240 0.48 9 00+000
200 0.40 9 00+000
200 0.40 8 8.445 01+030
170 0.34 9 00+000
350 0.70 6 00+100
70 0.14 6 00+000
180 0.36 6 00+000
60 0.12 7 00+000
210 0.42 8 00+000
90 0.18 7 00+000
250 0.50 7 00+000
160 0.32 7 00+090
60 0.12 9 00+660
14 0.03 8 00+000
10 0.02 8 00+007
20 0.04 9 00+000
240 0.48 7 00+000
70 0.14 9 00+000
180 0.36 7 00+000
200 0.40 7 00+100
30 0.06 6 01+210
160 0.32 4 00+000
80 0.16 5 00+220
90 0.18 4 00+000
60 0.12 6 00+000
250 0.50 4 00+000
260 0.52 4 00+140
170 0.34 4 00+090
160 0.32 4 00+870
210 0.42 4 00+320
200 0.40 7 00+000
230 0.46 4 00+000
300 0.60 4 00+580
80 0.16 5 00+000
290 0.58 4 00+000
150 0.30 4 00+140
60 0.12 5 00+000
90 0.18 4 00+000
90 0.18 8 00+520
140 0.28 8 00+110
140 0.28 8 00+300

180 0.36 9
350 0.70 7 00+000
320 0.64 7 00+150
150 0.30 7 00+000
200 0.40 7 01+370
190 0.38 6 00+000
90 0.18 7 00+000
380 0.76 6 00+000
330 0.66 6 00+770
140 0.28 6 00+000
160 0.32 6 00+260
300 0.60 6 00+000
340 0.68 7 00+340
240 0.48 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
200 0.40 9 00+000
380 0.76 9 00+230
340 0.68 6 00+100
70 0.14 6 00+000
180 0.36 6 00+000
60 0.12 7 00+000
210 0.42 9 00+000
90 0.18 7 00+000
240 0.48 7 00+000
100 0.20 7 00+140
60 0.12 9 00+680
14 0.03 8 00+000
10 0.02 8 00+007
50 0.10 9 00+000
220 0.44 7 00+000
90 0.18 9 00+000
150 0.30 7 00+000
60 0.12 7 00+100
40 0.08 7 00+000
100 0.20 7 00+000
30 0.06 6 01+210
160 0.32 4 00+000
80 0.16 5 00+220
90 0.18 4 00+000
60 0.12 6 00+000
250 0.50 4 00+000
260 0.52 4 00+140
170 0.34 4 00+090
200 0.40 4 00+860
210 0.42 4 00+290
200 0.40 7 00+000
230 0.46 4 00+000
300 0.60 4 00+580
80 0.16 5 00+000
290 0.58 4 00+000
60 0.12 5 00+290
90 0.18 4 00+000
110 0.22 8 00+510
110 0.22 8 00+110
38.61