You are on page 1of 5

Title/Description Values/References to check

1.0 GENERAL PROVISIONS


1.1 Statement of Purpose
1.2 Scope of Service

2.0 DEFINITIONS setbacks (1,2)

CONDITIONS OF OWNERSHIP, USE,


3.0
AND OCCUPANCY
3.1 Obligation of Owner/Locator
3.2 Compliance and Inspection
3.3 Locator's Tenants and Guests
Subdivision and consolidation of
3.4 lots

3.5 Installation of Utilities

USE RESTRICTIONS AND PLANS


4.0 APPROVAL

4.1 Permitted Operations and Use DENR DAO 2000-02


4.2 Contractors and Subcontractors
4.3 Approval of Plans Php.50,000 review fee

4.4 Design Review by Government NBC,


Authorities
4.5 Plans to be Submitted 2 sets (standard size) of:
1 a. Building Plans & Specs
2 b. Electrical Plans
3 c. Site Plan

4 d. Grading and Drainage Plan

5 e. Landscaping Plan
6 f. Dev. Sched/ Bar Chart
7 g. Description of Operation
h. Power, Water, and Sewer
8
Requirements

9 i. Material Transport Reqmts

Temfacil 2 sets (A3 size) of:


a. Building Plans &
Specifications
b. Site Plan
c. Electrical Plans
d. Plumbing Details
4.6 Construction Bond
Non-conforming Developments at
4.7
time of adoption

5.0 BUILDING RESTRICTIONS


5.1 Building Construction NBC
5.2 Minimum Setback Along Main Road: 3 m
Along Secondary Rd: 2.5m
Along Service Rd: 2.5m
RROW=30+; s = 8m
RROW=25-29; s = 6m
RROW=<24; s = 5m
5.3 Maximum Building Area Building Area/ Lot Area
5.4 Fencing
7ft. Max, 1 m away from
Temporary Fence
Perimeter lIne

Construction On-Going Signage

1.5 m max Conc. Or CHB from


Permanent Fence
Street level
5.5 Entry/Exit Gates Max 2 gates. Openings
5.6 Landscaping 2.5m form Property Line

5.7 Entry of Persons and Vehicles Loading and Unloading Areas

5.8 Raw Materials and Equipment Enclosure


5.9 Parking
5.10 Utilities
Electricity
Water
Communication System
Storm Drainage
Sewage System
Garbage Disposal

5.11 Building and Ground Maintenance

6.0 BUILDING RESTRICTIONS


Remarks/Comments

easement? Define
property line, define

30 days to review
No temporary except Temfacil
RROW to Property Line
RROW to Property Line
RROW to Property Line
Fence to Building
Fence to Building
Fence to Building
70%

Plus Metal Structure to add Height

TECO can charge for improper Maintenance

30 days for temporary


ITEM DESCRIPTION ASSESSMENT REMARKS
1.0 REVIEW OF SUBMITTED PLANS

Plans Signed and Sealed by Respective Registered Non- Non-


Proffesionals Compliant compliant Applicable
A. Construction Plans:
Non- Non-
a. Building Plans & Specs
Compliant compliant
Non- Applicable
Non-
b. Electrical Plans
Compliant compliant
Non- Applicable
Non-
c. Site Plan
Compliant compliant
Non- Applicable
Non-
d. Grading and Drainage Plan
Compliant compliant
Non- Applicable
Non-
e. Landscaping Plan
Compliant compliant
Non- Applicable
Non-
f. Dev. Sched/ Bar Chart
Compliant compliant
Non- Applicable
Non-
g. Description of Operation
Compliant compliant
Non- Applicable
Non-
h. Power, Water, and Sewer Requirements
Compliant compliant
Non- Applicable
Non-
i. Material Transport Reqmts
Compliant compliant Applicable
B. Plans for Temporary Facilities:
Non- Non-
a. Building Plans & Specifications
Compliant compliant
Non- Applicable
Non-
b. Site Plan
Compliant compliant
Non- Applicable
Non-
c. Electrical Plans
Compliant compliant
Non- Applicable
Non-
d. Plumbing Details
Compliant compliant
Non- Applicable
Non-
Compliant compliant Applicable

2.0 BUILDING RESTRICTIONS Non- Non-


Compliant compliant Applicable
A. Construction Plans:
Non- Non-
a. Minimum Setbacks
Compliant compliant
Non- Applicable
Non-
b. Maximum Building Area
Compliant compliant
Non- Applicable
Non-
c. Permanent Fence Height
Compliant compliant
Non- Applicable
Non-
d. Temporary Fence Height
Compliant compliant
Non- Applicable
Non-
e. Landscaping
Compliant compliant Applicable

You might also like