You are on page 1of 88

Name of Project: Construction of Drainage Network- TECO Compound

Location: Mabalacat, Pampanga


Station:

HYDROLOGIC ANALYSIS

DESIGN PARAMETERS:

Proposed Invert Elevation, m


Station
Left Side Right Side
K0132+861 44.25 44.62
K0133+861 51.65 51.73
Difference in
7.4 7.11
Elevation, m

Length of Watercourse, (L) = 0.1824 km


Drainage Area, (D.A.) = 0.06223488 sq. km

Inlet Time = 5 min


Velocity (Minimum Design Velocity) = 0.80 m/s
Length = 182.4 m
Flow Time = 3.80 min
Time of Concentration = 8.80 min

Structure = Road Side Drainage


Return Period = 1 in 5 years

R 5 = Average rainfall intensity, in mm/hr ( for 5 years frequency) = 238.54 mm/hr

by using Rainfall Intensity Duration Frequency Curve

1435.14
Iba, Zambales R5 = = 238.54 mm/hr
( tc + 8.94 )0.63

619.07
Dagupan, Pangasinan R5 = = 302.21 mm/hr
( tc - 4.72 )0.51

2456.57
Cabanatuan, Nueva Ecija R5 = = 158.04 mm/hr
( tc.78 + 10.09 )

DESIGN DISCHARGE USING RATIONAL FORMULA:

cIA
Q=
360
c, Runoff Coefficient = 0.9
I ,Average rainfall intensity, in mm/hr ( for 5 years frequency) = 189.00 mm/hr
A, Drainage Area = 6.2 ha
Q, Design Discharge = 2.941 cu.m/sec

CAPACITY OF ROAD SIDE DRAINAGE USING MANNING FORMULA:

Q = AV

V = ( 1/n) R2/3 S 1/2

Design Flow = 90 % Full


Height = 1.2 m
Width = 0.9 m
n, Manning Coefficient of Roughness = 0.015
A, Cross Sectional Area = 1.08 sq.m
P, Wetted Perimeter = 3.06 m
R, Hydaulic Radius (A/P) = 0.35 m
S, Slope of the Hydraulic Gradient = 0.0406
V, Mean Velocity Across a Cross Section = 6.71 m/s > 0.80 m/s Safe
< 3.00 m/s Recompute

Q, Flow Rate = 7.243 cu.m/s > 2.941 cu.m/s Safe

1.20

0.15 0.15
0.90
12 mm dia. RSB
Spaced @ 0.10 M.O.C.
0.40
Concrete CURB and Gutter 10 mm dia. RSB
0.20 0.20 Spaced @ 0.10 M.O.C.
Bothways
Provide 3-0.50 m x 1.50 m
0.10 0.10
0.35 Concrete Cover @ Every
0.15 2.00 M.O.C
0.20

INLET 0.15 M X 0.20 M LINTEL BEAM


SPACED 0.050
2 - 12 MM Ø BARS W/
AT 0.20 10 MM Ø TIES SPACED
M.O.C. 6" CHB PLASTER FINISH @ 0.30 M O.C.
1.00 m
( INSIDE ONLY )
1.00

12 mm dia. U-Bar
Spaced @ 0.40 M.O.C.
W/ 12mm dia. HOR. BAR
at Every 2 Layer of CHB

0.10 0.10

0.150 0.90
0.150

S E C T I O N (CHB FLUME)
SC ALE : NTS

1.60 1.60

1.20 1.20
0.150 0.150
4.55
4.55 0.150 0.150 EMBANKMENT
0.90 0.40 0.90
0.80 M 0.40 6.10 M 0.80 M FRO M RO ADWAY EXC AVATIO N AND
FOR PUBLIC FO R PUBLIC
UTILITIES UTILITIES STRUC TURE EXC AVATIO N
0.10 1.50 % 0.10
1.50 %
0.35 0.35

0.05 0.15 0.15 0.05

1.00 EXISTING PAVEMENT (PC C P) T=0.2300M 1.00

ITEM 311 PC C P ( t= 0.30. m . ) - PLAIN


ITEM 200 AG G REG ATE SUB-BASE C O URSE ( T=0.20M)
ITEM 102 (2) RO ADWAY EXC AVATIO N
0.10 0.10
C O NC RETE C URB AND G UTTER
G RAVEL
0.10 C HB FLUME WITH C OVER 0.10
0.90 0.90
STRUC TURE EXC VATIO N G RAVEL
BEDDING 0.15 0.15 0.15 0.15
BEDDING

TYPICAL ROADWAY SECTIONS


1.60 1.60

1.20 1.20
0.150 0.150
4.55
4.55 0.150 0.150 EMBANKMENT
0.90 0.40 0.90
0.80 M 0.40 6.10 M 0.80 M FRO M RO ADWAY EXC AVATIO N AND
FOR PUBLIC FO R PUBLIC
UTILITIES UTILITIES STRUC TURE EXC AVATIO N
0.10 1.50 % 0.10
1.50 %
0.35 0.35

0.05 0.15 0.15 0.05

1.00 EXISTING PAVEMENT (PC C P) T=0.2300M 1.00

ITEM 311 PC C P ( t= 0.30. m . ) - PLAIN


ITEM 200 AG G REG ATE SUB-BASE C O URSE ( T=0.20M)
ITEM 102 (2) RO ADWAY EXC AVATIO N
0.10 0.10
C O NC RETE C URB AND G UTTER
G RAVEL
0.10 C HB FLUME WITH C OVER 0.10
0.90 0.90
BEDDING 0.15 STRUC TURE EXC VATIO N 0.15
G RAVEL
0.15 0.15
BEDDING

TYPICAL ROADWAY SECTIONS


width 341.2

Formula use by region

L 1.15
t C= = 3.669768 min.
51 (H)0.385

L 1.15
t C= = 3.613717 min.
51 (H)0.385

Kirpich's Equation

3.683631 min.

Hathaway Equation

6.866148 min.
HACIENDA LUISITA, SAN MIGUEL

BASED ON 11 YEARS OF RECORDS

COMPUTED EXTREME VALUES (IN MILLIMETERS) OF PRECIPITATION

RETURN PERIOD 5 10 15 30 60 2 3
(YEARS) MINS. MINS. MINS. MINS. MINS. HRS. HRS.

2 12.7 18.8 25.2 38.8 52.2 60.0 68.7


5 16.6 26.5 35.4 52.7 72.0 85.1 96.2
10 19.2 31.5 42.2 62.0 85.1 101.8 114.5
15 20.7 34.4 46.0 67.2 92.5 111.2 124.9
20 21.8 36.4 48.7 70.8 97.7 117.8 132.1
25 22.6 37.9 50.7 73.6 101.7 122.9 137.7
50 25.0 42.6 57.1 82.3 114.0 138.6 154.8
100 27.5 47.3 63.3 90.9 126.2 154.0 171.8

INTENSITY (IN MILLIMETERS/HOUR) OF COMPUTED EXTREME VALUES

RETURN PERIOD 5 10 15 30 60 2 3
(YEARS) MINS. MINS. MINS. MINS. MINS. HRS. HRS.

2 152.4 112.8 100.8 77.6 52.2 30.0 22.9


5 199.2 159 141.6 105.4 72.0 42.5 32.1
10 230.4 189 168.8 124 85.1 50.9 38.2
15 248.4 206.4 184 134.4 92.5 55.6 41.6
20 261.6 218.4 194.8 141.6 97.7 58.9 44.0
25 271.2 227.4 202.8 147.2 101.7 61.5 45.9
50 300.0 255.6 228.4 164.6 114.0 69.3 51.6
100 330.0 283.8 253.2 181.8 126.2 77.0 57.3

Prepared by:

HYDROMETEOROLOGICAL INVESTIGATIONS AND SPECIAL STUDIES SECTION


Flood Forecasing Branch, PAGASA
6 12 24
HRS. HRS. HRS.

83.5 101.3 126.6


111.5 148.3 198.2
130.1 179.3 245.5
140.5 196.9 272.3
147.9 209.2 291.0
153.5 218.6 305.4
170.9 247.7 349.8
188.2 276.7 393.9

6 12 24
HRS. HRS. HRS.

13.9 8.4 5.3


18.6 12.4 8.3
21.7 14.9 10.2
23.4 16.4 11.3
24.7 17.4 12.1
25.6 18.2 12.7
28.5 20.6 14.6
31.4 23.1 16.4
Length
Leg
LS RS
1 262 262
2 730 730
2b 280 280
3 1032 1032
4 307 142
5 739 833
6 1010 1010
7 638
8 267
9 350 350
10a 150 150
10b 239 239
11 230 230
12 504 504
13 311 311
14 262 262
Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALYSI

LEFT &

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in
Line No. Slope (I.E.) Width, m. Area,
Slope Line, m. Elevation, m.
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

1 Sta 0+000.00 Sta 0+030.00 78.00 77.85 0.00500 76.90 76.75 30.00 0.15 0.0050 120 0.0036

1 Sta 0+030.00 Sta 0+060.00 77.85 77.70 0.00500 76.75 76.60 30.00 0.15 0.0050 120 0.0072

1 Sta 0+060.00 Sta 0+090.00 77.70 77.55 0.00500 76.50 76.35 30.00 0.15 0.0050 120 0.0108

1 Sta 0+090.00 Sta 0+120.00 77.55 77.40 0.00500 76.35 76.20 30.00 0.15 0.0050 120 0.0144

1 Sta 0+120.00 Sta 0+150.00 77.40 77.25 0.00500 76.00 75.85 30.00 0.15 0.0050 120 0.0180

1 Sta 0+150.00 Sta 0+180.00 77.25 77.10 0.00500 75.85 75.70 30.00 0.15 0.0050 120 0.0216

1 Sta 0+180.00 Sta 0+210.00 77.10 76.95 0.00500 75.70 75.55 30.00 0.15 0.0050 120 0.0252

1 Sta 0+210.00 Sta 0+240.00 76.95 76.80 0.00500 75.55 75.40 30.00 0.15 0.0050 120 0.0288

1 Sta 0+240.00 Sta 0+262.00 76.80 76.69 0.00500 75.40 75.29 22.00 0.11 0.0050 120 0.0314

2 Sta 0+262.00 Sta 0+292.00 76.69 76.54 0.00500 75.29 75.14 30.00 0.15 0.0050 30 0.0323

2 Sta 0+292.00 Sta 0+322.00 76.54 76.39 0.00500 75.14 74.99 30.00 0.15 0.0050 30 0.0332

2 Sta 0+322.00 Sta 0+352.00 76.39 76.24 0.00500 74.89 74.74 30.00 0.15 0.0050 30 0.0341

2 Sta 0+352.00 Sta 0+382.00 76.24 76.09 0.00500 74.74 74.59 30.00 0.15 0.0050 30 0.0350

2 Sta 0+382.00 Sta 0+412.00 76.09 75.94 0.00500 74.59 74.44 30.00 0.15 0.0050 30 0.0359

2 Sta 0+412.00 Sta 0+442.00 75.94 75.79 0.00500 74.44 74.29 30.00 0.15 0.0050 30 0.0368

2 Sta 0+442.00 Sta 0+472.00 75.79 75.64 0.00500 74.29 74.14 30.00 0.15 0.0050 30 0.0377

2 Sta 0+472.00 Sta 0+502.00 75.64 75.49 0.00500 74.14 73.99 30.00 0.15 0.0050 30 0.0386
2 Sta 0+502.00 Sta 0+532.00 75.49 75.34 0.00500 73.99 73.84 30.00 0.15 0.0050 30 0.0395

2 Sta 0+532.00 Sta 0+562.00 75.34 75.19 0.00500 73.84 73.69 30.00 0.15 0.0050 30 0.0404

2 Sta 0+562.00 Sta 0+592.00 75.19 75.04 0.00500 73.69 73.54 30.00 0.15 0.0050 30 0.0413

2 Sta 0+592.00 Sta 0+622.00 75.04 74.89 0.00500 73.54 73.39 30.00 0.15 0.0050 30 0.0422

2 Sta 0+622.00 Sta 0+652.00 74.89 74.74 0.00500 73.39 73.24 30.00 0.15 0.0050 30 0.0431

2 Sta 0+652.00 Sta 0+682.00 74.74 74.59 0.00500 73.24 73.09 30.00 0.15 0.0050 30 0.0440

2 Sta 0+682.00 Sta 0+712.00 74.59 74.44 0.00500 73.09 72.94 30.00 0.15 0.0050 30 0.0449

2 Sta 0+712.00 Sta 0+742.00 74.44 74.29 0.00500 72.94 72.79 30.00 0.15 0.0050 30 0.0458

2 Sta 0+742.00 Sta 0+772.00 74.29 74.14 0.00500 72.79 72.64 30.00 0.15 0.0050 30 0.0467

2 Sta 0+772.00 Sta 0+802.00 74.14 73.99 0.00500 72.64 72.49 30.00 0.15 0.0050 30 0.0476

2 Sta 0+802.00 Sta 0+832.00 73.99 73.84 0.00500 72.49 72.34 30.00 0.15 0.0050 30 0.0485

2 Sta 0+832.00 Sta 0+862.00 73.84 73.69 0.00500 72.34 72.19 30.00 0.15 0.0050 30 0.0494

2 Sta 0+862.00 Sta 0+892.00 73.69 73.54 0.00500 72.19 72.04 30.00 0.15 0.0050 30 0.0503

2 Sta 0+892.00 Sta 0+922.00 73.54 73.39 0.00500 72.04 71.89 30.00 0.15 0.0050 30 0.0512

2 Sta 0+922.00 Sta 0+952.00 73.39 73.24 0.00500 71.89 71.74 30.00 0.15 0.0050 30 0.0521

2 Sta 0+952.00 Sta 0+982.00 73.24 73.09 0.00500 71.74 71.59 30.00 0.15 0.0050 30 0.0530

2 Sta 0+982.00 Sta 0+992.00 73.09 73.04 0.00500 71.59 71.54 10.00 0.05 0.0050 30 0.0533
Location:

IC ANALYSIS (DRAINAGE SYSTEM )

LEFT & RIGHT SIDE

Time of Rainfall Design Cross Wetted Flow


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter, Time,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m. min.

5.25 1 in 2 years 0.9 0.14 0.010 0.50 0.186125 1.249 0.15 1.99 0.25
152.4

5.50 1 in 2 years 0.9 0.27 0.010 0.50 0.186125 1.249 0.15 1.99 0.25
152.4
5.73 1 in 2 years 0.9 0.41 0.010 0.60 0.26802 1.4988 0.18 2.24 0.22
152.4
5.95 1 in 2 years 0.9 0.55 0.010 0.60 0.26802 1.4988 0.18 2.24 0.22
152.4
6.13 1 in 2 years 0.9 0.69 0.010 0.80 0.47648 1.9984 0.24 2.72 0.18
152.4
6.32 1 in 2 years 0.9 0.82 0.010 0.80 0.47648 1.9984 0.24 2.72 0.18
152.4
6.50 1 in 2 years 0.9 0.96 0.010 0.80 0.47648 1.9984 0.24 2.72 0.18
152.4
6.68 1 in 2 years 0.9 1.10 0.010 0.80 0.47648 1.9984 0.24 2.72 0.18
152.4
6.82 1 in 2 years 0.9 1.20 0.010 0.80 0.47648 1.9984 0.24 2.72 0.13
152.4

7.00 1 in 2 years 0.9 1.23 0.010 0.80 0.47648 1.9984 0.24 2.72 0.18
152.4
7.19 1 in 2 years 0.9 1.27 0.010 0.80 0.47648 1.9984 0.24 2.72 0.18
152.4
7.36 1 in 2 years 0.9 1.30 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4
7.53 1 in 2 years 0.9 1.34 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4
7.70 1 in 2 years 0.9 1.37 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4

7.87 1 in 2 years 0.9 1.40 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4

8.04 1 in 2 years 0.9 1.44 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4

8.21 1 in 2 years 0.9 1.47 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4
8.38 1 in 2 years 0.9 1.51 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4

8.55 1 in 2 years 0.9 1.54 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4

8.72 1 in 2 years 0.9 1.58 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
152.4

8.89 1 in 2 years 0.9 1.19 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

9.06 1 in 2 years 0.9 1.22 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

9.23 1 in 2 years 0.9 1.24 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

9.40 1 in 2 years 0.9 1.27 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

9.57 1 in 2 years 0.9 1.29 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

9.74 1 in 2 years 0.9 1.32 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

9.91 1 in 2 years 0.9 1.34 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

10.08 1 in 2 years 0.9 1.37 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

10.25 1 in 2 years 0.9 1.39 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

10.42 1 in 2 years 0.9 1.42 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

10.59 1 in 2 years 0.9 1.44 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

10.76 1 in 2 years 0.9 1.47 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

10.93 1 in 2 years 0.9 1.50 0.010 0.90 0.603045 2.2482 0.27 2.94 0.17
112.8

10.98 1 in 2 years 0.9 1.50 0.010 0.90 0.603045 2.2482 0.27 2.94 0.06
112.8
Design
Number of
Capacity, Remarks
Barrels
cu.m./sec.

1.00 0.37 safe

1.00 0.37 safe

1.00 0.60 safe

1.00 0.60 safe

1.00 1.30 safe

1.00 1.30 safe

1.00 1.30 safe

1.00 1.30 safe

1.00 1.30 safe

1.00 1.30 safe

1.00 1.30 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe


1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe

1.00 1.77 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALY

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

5 Sta 0+000.00 Sta 0+030.00 67.50 67.28 0.00744 66.40 66.18 30.00 0.223274695535 0.0074 120 0.0036

5 Sta 0+030.00 Sta 0+060.00 67.28 67.05 0.00744 66.18 65.95 30.00 0.223274695535 0.0074 120 0.0072

5 Sta 0+060.00 Sta 0+090.00 67.05 66.83 0.00744 65.95 65.73 30.00 0.223274695535 0.0074 120 0.0108

5 Sta 0+090.00 Sta 0+120.00 66.83 66.61 0.00744 65.63 65.41 30.00 0.223274695535 0.0074 120 0.0144

5 Sta 0+120.00 Sta 0+150.00 66.61 66.38 0.00744 65.41 65.18 30.00 0.223274695535 0.0074 120 0.0180

5 Sta 0+150.00 Sta 0+180.00 66.38 66.16 0.00744 64.98 64.76 30.00 0.223274695535 0.0074 120 0.0216

5 Sta 0+180.00 Sta 0+210.00 66.16 65.94 0.00744 64.76 64.54 30.00 0.223274695535 0.0074 120 0.0252

5 Sta 0+210.00 Sta 0+240.00 65.94 65.71 0.00744 64.54 64.31 30.00 0.223274695535 0.0074 120 0.0288

5 Sta 0+240.00 Sta 0+270.00 65.71 65.49 0.00744 64.31 64.09 30.00 0.223274695535 0.0074 120 0.0324

5 Sta 0+270.00 Sta 0+300.00 65.49 65.27 0.00744 64.09 63.87 30.00 0.223274695535 0.0074 120 0.0360

5 Sta 0+300.00 Sta 0+330.00 65.27 65.04 0.00744 63.87 63.64 30.00 0.223274695535 0.0074 120 0.0396

5 Sta 0+330.00 Sta 0+360.00 65.04 64.82 0.00744 63.54 63.32 30.00 0.223274695535 0.0074 120 0.0432

5 Sta 0+360.00 Sta 0+390.00 64.82 64.60 0.00744 63.32 63.10 30.00 0.223274695535 0.0074 120 0.0468

5 Sta 0+390.00 Sta 0+420.00 64.60 64.37 0.00744 63.10 62.87 30.00 0.223274695535 0.0074 120 0.0504

5 Sta 0+420.00 Sta 0+450.00 64.37 64.15 0.00744 62.87 62.65 30.00 0.223274695535 0.0074 120 0.0540

5 Sta 0+450.00 Sta 0+480.00 64.15 63.93 0.00744 62.45 62.23 30.00 0.223274695535 0.0074 120 0.0576

5 Sta 0+480.00 Sta 0+510.00 63.93 63.70 0.00744 62.23 62.00 30.00 0.223274695535 0.0074 120 0.0612

5 Sta 0+510.00 Sta 0+540.00 63.70 63.48 0.00744 62.00 61.78 30.00 0.223274695535 0.0074 120 0.0648
5 Sta 0+540.00 Sta 0+570.00 63.48 63.26 0.00744 61.78 61.56 30.00 0.223274695535 0.0074 120 0.0684

5 Sta 0+570.00 Sta 0+600.00 63.26 63.03 0.00744 61.56 61.33 30.00 0.223274695535 0.0074 120 0.0720

5 Sta 0+600.00 Sta 0+630.00 63.03 62.81 0.00744 61.33 61.11 30.00 0.223274695535 0.0074 120 0.0756

5 Sta 0+630.00 Sta 0+660.00 62.81 62.59 0.00744 61.11 60.89 30.00 0.223274695535 0.0074 120 0.0792

5 Sta 0+660.00 Sta 0+690.00 62.59 62.36 0.00744 60.89 60.66 30.00 0.223274695535 0.0074 120 0.0828

5 Sta 0+690.00 Sta 0+720.00 62.36 62.14 0.00744 60.66 60.44 30.00 0.223274695535 0.0074 120 0.0864

5 Sta 0+720.00 Sta 0+739.00 62.14 62.00 0.00744 60.44 60.30 19.00 0.141407307172 0.0074 120 0.0887
Location:

AULIC ANALYSIS (DRAINAGE SYSTEM )

RIGHT SIDE

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.21 1 in 2 years 0.9 0.14 0.010 0.50 0.186125 1.249 0.15 2.42
152.4

5.41 1 in 2 years 0.9 0.27 0.010 0.50 0.186125 1.249 0.15 2.42
152.4
5.62 1 in 2 years 0.9 0.41 0.010 0.50 0.186125 1.249 0.15 2.42
152.4
5.80 1 in 2 years 0.9 0.55 0.010 0.60 0.26802 1.4988 0.18 2.74
152.4
5.98 1 in 2 years 0.9 0.69 0.010 0.60 0.26802 1.4988 0.18 2.74
152.4
6.13 1 in 2 years 0.9 0.82 0.010 0.80 0.47648 1.9984 0.24 3.32
152.4
6.29 1 in 2 years 0.9 0.96 0.010 0.80 0.47648 1.9984 0.24 3.32
152.4
6.44 1 in 2 years 0.9 1.10 0.010 0.80 0.47648 1.9984 0.24 3.32
152.4
6.59 1 in 2 years 0.9 1.23 0.010 0.80 0.47648 1.9984 0.24 3.32
152.4
6.74 1 in 2 years 0.9 1.37 0.010 0.80 0.47648 1.9984 0.24 3.32
152.4
6.89 1 in 2 years 0.9 1.51 0.010 0.80 0.47648 1.9984 0.24 3.32
152.4
7.03 1 in 2 years 0.9 1.65 0.010 0.90 0.603045 2.2482 0.27 3.59
152.4
7.17 1 in 2 years 0.9 1.78 0.010 0.90 0.603045 2.2482 0.27 3.59
152.4
7.31 1 in 2 years 0.9 1.92 0.010 0.90 0.603045 2.2482 0.27 3.59
152.4
7.45 1 in 2 years 0.9 2.06 0.010 0.90 0.603045 2.2482 0.27 3.59
152.4

7.57 1 in 2 years 0.9 2.19 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
7.69 1 in 2 years 0.9 2.33 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
7.81 1 in 2 years 0.9 2.47 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
7.93 1 in 2 years 0.9 2.61 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
8.06 1 in 2 years 0.9 2.74 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
8.18 1 in 2 years 0.9 2.88 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
8.30 1 in 2 years 0.9 3.02 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
8.42 1 in 2 years 0.9 3.15 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
8.54 1 in 2 years 0.9 3.29 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
8.62 1 in 2 years 0.9 3.38 0.010 1.10 0.900845 2.7478 0.33 4.10
152.4
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.21 1.00 0.45 safe

0.21 1.00 0.45 safe

0.21 1.00 0.45 safe

0.18 1.00 0.73 safe

0.18 1.00 0.73 safe

0.15 1.00 1.58 safe

0.15 1.00 1.58 safe

0.15 1.00 1.58 safe

0.15 1.00 1.58 safe

0.15 1.00 1.58 safe

0.15 1.00 1.58 safe

0.14 1.00 2.16 safe

0.14 1.00 2.16 safe

0.14 1.00 2.16 safe

0.14 1.00 2.16 safe

0.12 1.00 3.70 safe

0.12 1.00 3.70 safe

0.12 1.00 3.70 safe


0.12 1.00 3.70 safe

0.12 1.00 3.70 safe

0.12 1.00 3.70 safe

0.12 1.00 3.70 safe

0.12 1.00 3.70 safe

0.12 1.00 3.70 safe

0.08 1.00 3.70 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANA

Location Ground Elevations Invert Elevations


Drainage
Length of Difference in
Line No. Ground Slope Slope (I.E.) Width, m. Area,
Line, m. Elevation, m.
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

3R Sta 0+000.00 Sta 0+030.00 78.00 77.74 0.00872 76.90 76.64 30.00 0.261627906977 0.0087 120 0.0036

3R Sta 0+030.00 Sta 0+060.00 77.74 77.48 0.00872 76.64 76.38 30.00 0.261627906977 0.0087 120 0.0072

3R Sta 0+060.00 Sta 0+090.00 77.48 77.22 0.00872 76.38 76.12 30.00 0.261627906977 0.0087 120 0.0108

3R Sta 0+090.00 Sta 0+120.00 77.22 76.95 0.00872 76.02 75.75 30.00 0.261627906977 0.0087 120 0.0144

3R Sta 0+120.00 Sta 0+150.00 76.95 76.69 0.00872 75.75 75.49 30.00 0.261627906977 0.0087 120 0.0180

3R Sta 0+150.00 Sta 0+180.00 76.69 76.43 0.00872 75.29 75.03 30.00 0.261627906977 0.0087 120 0.0216

3R Sta 0+180.00 Sta 0+210.00 76.43 76.17 0.00872 75.03 74.77 30.00 0.261627906977 0.0087 120 0.0252

3R Sta 0+210.00 Sta 0+240.00 76.17 75.91 0.00872 74.77 74.51 30.00 0.261627906977 0.0087 120 0.0288

3R Sta 0+240.00 Sta 0+270.00 75.91 75.65 0.00872 74.51 74.25 30.00 0.261627906977 0.0087 120 0.0324

3R Sta 0+270.00 Sta 0+300.00 75.65 75.38 0.00872 74.25 73.98 30.00 0.261627906977 0.0087 120 0.0360

3R Sta 0+300.00 Sta 0+330.00 75.38 75.12 0.00872 73.98 73.72 30.00 0.261627906977 0.0087 120 0.0396

3R Sta 0+330.00 Sta 0+360.00 75.12 74.86 0.00872 73.72 73.46 30.00 0.261627906977 0.0087 120 0.0432

3R Sta 0+360.00 Sta 0+390.00 74.86 74.60 0.00872 73.36 73.10 30.00 0.261627906977 0.0087 120 0.0468

3R Sta 0+390.00 Sta 0+420.00 74.60 74.34 0.00872 73.10 72.84 30.00 0.261627906977 0.0087 120 0.0504

3R Sta 0+420.00 Sta 0+450.00 74.34 74.08 0.00872 72.84 72.58 30.00 0.261627906977 0.0087 120 0.0540

3R Sta 0+450.00 Sta 0+480.00 74.08 73.81 0.00872 72.58 72.31 30.00 0.261627906977 0.0087 120 0.0576

3R Sta 0+480.00 Sta 0+510.00 73.81 73.55 0.00872 72.31 72.05 30.00 0.261627906977 0.0087 120 0.0612

3R Sta 0+510.00 Sta 0+540.00 73.55 73.29 0.00872 71.85 71.59 30.00 0.261627906977 0.0087 120 0.0648
3R Sta 0+540.00 Sta 0+570.00 73.29 73.03 0.00872 71.59 71.33 30.00 0.261627906977 0.0087 120 0.0684

3R Sta 0+570.00 Sta 0+600.00 73.03 72.77 0.00872 71.33 71.07 30.00 0.261627906977 0.0087 120 0.0720

3R Sta 0+600.00 Sta 0+630.00 72.77 72.51 0.00872 71.07 70.81 30.00 0.261627906977 0.0087 120 0.0756

3R Sta 0+630.00 Sta 0+660.00 72.51 72.24 0.00872 70.81 70.54 30.00 0.261627906977 0.0087 120 0.0792

3R Sta 0+660.00 Sta 0+690.00 72.24 71.98 0.00872 70.54 70.28 30.00 0.261627906977 0.0087 120 0.0828

3R Sta 0+690.00 Sta 0+720.00 71.98 71.72 0.00872 70.28 70.02 30.00 0.261627906977 0.0087 120 0.0864

3R Sta 0+720.00 Sta 0+750.00 71.72 71.46 0.00872 70.02 69.76 30.00 0.261627906977 0.0087 120 0.0900

3R Sta 0+750.00 Sta 0+780.00 71.46 71.20 0.00872 69.76 69.50 30.00 0.261627906977 0.0087 120 0.0936

3R Sta 0+780.00 Sta 0+810.00 71.20 70.94 0.00872 69.50 69.24 30.00 0.261627906977 0.0087 120 0.0972

3R Sta 0+810.00 Sta 0+840.00 70.94 70.67 0.00872 69.24 68.97 30.00 0.261627906977 0.0087 120 0.1008

3R Sta 0+840.00 Sta 0+870.00 70.67 70.41 0.00872 68.97 68.71 30.00 0.261627906977 0.0087 120 0.1044

3R Sta 0+870.00 Sta 0+900.00 70.41 70.15 0.00872 68.71 68.45 30.00 0.261627906977 0.0087 120 0.1080

3R Sta 0+900.00 Sta 0+930.00 70.15 69.89 0.00872 68.45 68.19 30.00 0.261627906977 0.0087 120 0.1116

3R Sta 0+930.00 Sta 0+960.00 69.89 69.63 0.00872 68.19 67.93 30.00 0.261627906977 0.0087 120 0.1152

3R Sta 0+960.00 Sta 0+990.00 69.63 69.37 0.00872 67.93 67.67 30.00 0.261627906977 0.0087 120 0.1188

3R Sta 0+990.00 Sta 1+020.00 69.37 69.10 0.00872 67.67 67.40 30.00 0.261627906977 0.0087 120 0.1224

3R Sta 1+020.00 Sta 1+032.00 69.10 69.00 0.00872 67.40 67.30 12.00 0.104651162791 0.0087 120 0.1238

Location Ground Elevations Invert Elevations


Drainage
Length of Difference in
Line No. Ground Slope Slope (I.E.) Width, m. Area,
Line, m. Elevation, m.
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

3L Sta 0+000.00 Sta 0+030.00 78.00 77.74 0.00872 76.90 76.64 30.00 0.261627906977 0.0087 150 0.0045

3L Sta 0+030.00 Sta 0+060.00 77.74 77.48 0.00872 76.64 76.38 30.00 0.261627906977 0.0087 150 0.0090

3L Sta 0+060.00 Sta 0+090.00 77.48 77.22 0.00872 76.28 76.02 30.00 0.261627906977 0.0087 150 0.0135

3L Sta 0+090.00 Sta 0+120.00 77.22 76.95 0.00872 76.02 75.75 30.00 0.261627906977 0.0087 150 0.0180
3L Sta 0+120.00 Sta 0+150.00 76.95 76.69 0.00872 75.55 75.29 30.00 0.261627906977 0.0087 150 0.0225

3L Sta 0+150.00 Sta 0+180.00 76.69 76.43 0.00872 75.29 75.03 30.00 0.261627906977 0.0087 150 0.0270

3L Sta 0+180.00 Sta 0+210.00 76.43 76.17 0.00872 75.03 74.77 30.00 0.261627906977 0.0087 150 0.0315

3L Sta 0+210.00 Sta 0+240.00 76.17 75.91 0.00872 74.77 74.51 30.00 0.261627906977 0.0087 150 0.0360

3L Sta 0+240.00 Sta 0+270.00 75.91 75.65 0.00872 74.51 74.25 30.00 0.261627906977 0.0087 150 0.0405

3L Sta 0+270.00 Sta 0+300.00 75.65 75.38 0.00872 74.15 73.88 30.00 0.261627906977 0.0087 150 0.0450

3L Sta 0+300.00 Sta 0+330.00 75.38 75.12 0.00872 73.88 73.62 30.00 0.261627906977 0.0087 150 0.0495

3L Sta 0+330.00 Sta 0+360.00 75.12 74.86 0.00872 73.62 73.36 30.00 0.261627906977 0.0087 150 0.0540

3L Sta 0+360.00 Sta 0+390.00 74.86 74.60 0.00872 73.36 73.10 30.00 0.261627906977 0.0087 150 0.0585

3L Sta 0+390.00 Sta 0+420.00 74.60 74.34 0.00872 72.90 72.64 30.00 0.261627906977 0.0087 150 0.0630

3L Sta 0+420.00 Sta 0+450.00 74.34 74.08 0.00872 72.64 72.38 30.00 0.261627906977 0.0087 150 0.0675

3L Sta 0+450.00 Sta 0+480.00 74.08 73.81 0.00872 72.38 72.11 30.00 0.261627906977 0.0087 150 0.0720

3L Sta 0+480.00 Sta 0+510.00 73.81 73.55 0.00872 72.11 71.85 30.00 0.261627906977 0.0087 150 0.0765

3L Sta 0+510.00 Sta 0+540.00 73.55 73.29 0.00872 71.85 71.59 30.00 0.261627906977 0.0087 150 0.0810

3L Sta 0+540.00 Sta 0+570.00 73.29 73.03 0.00872 71.59 71.33 30.00 0.261627906977 0.0087 150 0.0855

3L Sta 0+570.00 Sta 0+600.00 73.03 72.77 0.00872 71.33 71.07 30.00 0.261627906977 0.0087 150 0.0900

3L Sta 0+600.00 Sta 0+630.00 72.77 72.51 0.00872 71.07 70.81 30.00 0.261627906977 0.0087 150 0.0945

3L Sta 0+630.00 Sta 0+660.00 72.51 72.24 0.00872 70.81 70.54 30.00 0.261627906977 0.0087 150 0.0990

3L Sta 0+660.00 Sta 0+690.00 72.24 71.98 0.00872 70.54 70.28 30.00 0.261627906977 0.0087 150 0.1035

3L Sta 0+690.00 Sta 0+720.00 71.98 71.72 0.00872 70.18 69.92 30.00 0.261627906977 0.0087 150 0.1080

3L Sta 0+720.00 Sta 0+750.00 71.72 71.46 0.00872 69.92 69.66 30.00 0.261627906977 0.0087 150 0.1125

3L Sta 0+750.00 Sta 0+780.00 71.46 71.20 0.00872 69.66 69.40 30.00 0.261627906977 0.0087 150 0.1170

3L Sta 0+780.00 Sta 0+810.00 71.20 70.94 0.00872 69.40 69.14 30.00 0.261627906977 0.0087 150 0.1215

3L Sta 0+810.00 Sta 0+840.00 70.94 70.67 0.00872 69.14 68.87 30.00 0.261627906977 0.0087 150 0.1260
3L Sta 0+840.00 Sta 0+870.00 70.67 70.41 0.00872 68.87 68.61 30.00 0.261627906977 0.0087 150 0.1305

3L Sta 0+870.00 Sta 0+900.00 70.41 70.15 0.00872 68.61 68.35 30.00 0.261627906977 0.0087 150 0.1350

3L Sta 0+900.00 Sta 0+930.00 70.15 69.89 0.00872 68.35 68.09 30.00 0.261627906977 0.0087 150 0.1395

3L Sta 0+930.00 Sta 0+960.00 69.89 69.63 0.00872 68.09 67.83 30.00 0.261627906977 0.0087 150 0.1440

3L Sta 0+960.00 Sta 0+990.00 69.63 69.37 0.00872 67.83 67.57 30.00 0.261627906977 0.0087 150 0.1485

3L Sta 0+990.00 Sta 1+020.00 69.37 69.10 0.00872 67.57 67.30 30.00 0.261627906977 0.0087 150 0.1530

3L Sta 1+020.00 Sta 1+032.00 69.10 69.00 0.00872 67.30 67.20 12.00 0.104651162791 0.0087 150 0.1548

4L Sta 0+000.00 Sta 0+030.00 69.00 68.80 0.00651 66.20 66.00 30.00 0.195439739414 0.0065 150 0.1593

4L Sta 0+030.00 Sta 0+060.00 68.80 68.61 0.00651 66.00 65.81 30.00 0.195439739414 0.0065 150 0.1638

4L Sta 0+060.00 Sta 0+090.00 68.61 68.41 0.00651 65.71 65.51 30.00 0.195439739414 0.0065 150 0.1683

4L Sta 0+090.00 Sta 0+120.00 68.41 68.22 0.00651 65.51 65.32 30.00 0.195439739414 0.0065 150 0.1728

4L Sta 0+120.00 Sta 0+150.00 68.22 68.02 0.00651 65.32 65.12 30.00 0.195439739414 0.0065 150 0.1773

4L Sta 0+150.00 Sta 0+180.00 68.02 67.83 0.00651 65.12 64.93 30.00 0.195439739414 0.0065 150 0.1818

4L Sta 0+180.00 Sta 0+210.00 67.83 67.63 0.00651 64.93 64.73 30.00 0.195439739414 0.0065 150 0.1863

4L Sta 0+210.00 Sta 0+240.00 67.63 67.44 0.00651 64.73 64.54 30.00 0.195439739414 0.0065 150 0.1908

4L Sta 0+240.00 Sta 0+270.00 67.44 67.24 0.00651 64.54 64.34 30.00 0.195439739414 0.0065 150 0.1953

4L Sta 0+270.00 Sta 0+300.00 67.24 67.00 0.00803 64.34 64.10 30.00 0.241042345277 0.0080 150 0.1998

4L Sta 0+300.00 Sta 0+330.00 67.00 66.76 0.00803 64.10 63.86 30.00 0.241042345277 0.0080 150 0.2043

4L Sta 0+330.00 Sta 0+360.00 66.76 66.52 0.00803 63.86 63.62 30.00 0.241042345277 0.0080 150 0.2088

4L Sta 0+360.00 Sta 0+390.00 66.52 66.28 0.00803 63.62 63.38 30.00 0.241042345277 0.0080 150 0.2133

4L Sta 0+390.00 Sta 0+420.00 66.28 66.04 0.00803 63.38 63.14 30.00 0.241042345277 0.0080 150 0.2178

4L Sta 0+420.00 Sta 0+450.00 66.04 65.79 0.00803 63.14 62.89 30.00 0.241042345277 0.0080 150 0.2223

4L Sta 0+450.00 Sta 0+480.00 65.79 65.55 0.00803 62.89 62.65 30.00 0.241042345277 0.0080 150 0.2268
4L Sta 0+480.00 Sta 0+510.00 65.55 65.31 0.00803 62.65 62.41 30.00 0.241042345277 0.0080 150 0.2313
Location:

LIC ANALYSIS (DRAINAGE SYSTEM )

RIGHT SIDE

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.19 1 in 2 years 0.9 0.14 0.010 0.50 0.186125 1.249 0.15 2.62
152.4

5.38 1 in 2 years 0.9 0.27 0.010 0.50 0.186125 1.249 0.15 2.62
152.4
5.57 1 in 2 years 0.9 0.41 0.010 0.50 0.186125 1.249 0.15 2.62
152.4

5.74 1 in 2 years 0.9 0.55 0.010 0.60 0.26802 1.4988 0.18 2.96
152.4

5.91 1 in 2 years 0.9 0.69 0.010 0.60 0.26802 1.4988 0.18 2.96
152.4
6.05 1 in 2 years 0.9 0.82 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.19 1 in 2 years 0.9 0.96 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.33 1 in 2 years 0.9 1.10 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.47 1 in 2 years 0.9 1.23 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.61 1 in 2 years 0.9 1.37 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.74 1 in 2 years 0.9 1.51 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.88 1 in 2 years 0.9 1.65 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
7.01 1 in 2 years 0.9 1.78 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4
7.14 1 in 2 years 0.9 1.92 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4
7.27 1 in 2 years 0.9 2.06 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4

7.40 1 in 2 years 0.9 2.19 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4
7.53 1 in 2 years 0.9 2.33 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4
7.64 1 in 2 years 0.9 2.47 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.75 1 in 2 years 0.9 2.61 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.87 1 in 2 years 0.9 2.74 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.98 1 in 2 years 0.9 2.88 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
8.09 1 in 2 years 0.9 3.02 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
8.20 1 in 2 years 0.9 3.15 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
8.32 1 in 2 years 0.9 3.29 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
8.43 1 in 2 years 0.9 3.43 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
8.54 1 in 2 years 0.9 3.57 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
8.65 1 in 2 years 0.9 3.70 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4

8.77 1 in 2 years 0.9 2.84 0.010 1.10 0.900845 2.7478 0.33 4.44
112.8
8.88 1 in 2 years 0.9 2.94 0.010 1.10 0.900845 2.7478 0.33 4.44
112.8
8.99 1 in 2 years 0.9 3.05 0.010 1.10 0.900845 2.7478 0.33 4.44
112.8

9.10 1 in 2 years 0.9 3.15 0.010 1.10 0.900845 2.7478 0.33 4.44
112.8
9.22 1 in 2 years 0.9 3.25 0.010 1.10 0.900845 2.7478 0.33 4.44
112.8
9.33 1 in 2 years 0.9 3.35 0.010 1.10 0.900845 2.7478 0.33 4.44
112.8
9.44 1 in 2 years 0.9 3.45 0.010 1.10 0.900845 2.7478 0.33 4.44
112.8
9.49 1 in 2 years 0.9 3.49 0.010 1.10 0.900845 2.7478 0.33 4.44
112.8

LEFT SIDE

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.19 1 in 2 years 0.9 0.17 0.010 0.50 0.186125 1.249 0.15 2.62
152.4
5.38 1 in 2 years 0.9 0.34 0.010 0.50 0.186125 1.249 0.15 2.62
152.4
5.55 1 in 2 years 0.9 0.51 0.010 0.60 0.26802 1.4988 0.18 2.96
152.4

5.72 1 in 2 years 0.9 0.69 0.010 0.60 0.26802 1.4988 0.18 2.96
152.4
5.86 1 in 2 years 0.9 0.86 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.00 1 in 2 years 0.9 1.03 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.14 1 in 2 years 0.9 1.20 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.28 1 in 2 years 0.9 1.37 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.41 1 in 2 years 0.9 1.54 0.010 0.80 0.47648 1.9984 0.24 3.59
152.4
6.54 1 in 2 years 0.9 1.71 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4
6.67 1 in 2 years 0.9 1.89 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4
6.80 1 in 2 years 0.9 2.06 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4
6.93 1 in 2 years 0.9 2.23 0.010 0.90 0.603045 2.2482 0.27 3.88
152.4

7.04 1 in 2 years 0.9 2.40 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.15 1 in 2 years 0.9 2.57 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.27 1 in 2 years 0.9 2.74 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4

7.38 1 in 2 years 0.9 2.91 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.49 1 in 2 years 0.9 3.09 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.61 1 in 2 years 0.9 3.26 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.72 1 in 2 years 0.9 3.43 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.83 1 in 2 years 0.9 3.60 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
7.94 1 in 2 years 0.9 3.77 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
8.06 1 in 2 years 0.9 3.94 0.010 1.10 0.900845 2.7478 0.33 4.44
152.4
8.16 1 in 2 years 0.9 4.11 0.010 1.20 1.07208 2.9976 0.36 4.71
152.4
8.27 1 in 2 years 0.9 4.29 0.010 1.20 1.07208 2.9976 0.36 4.71
152.4
8.37 1 in 2 years 0.9 4.46 0.010 1.20 1.07208 2.9976 0.36 4.71
152.4
8.48 1 in 2 years 0.9 4.63 0.010 1.20 1.07208 2.9976 0.36 4.71
152.4

8.59 1 in 2 years 0.9 4.80 0.010 1.20 1.07208 2.9976 0.36 4.71
152.4
8.69 1 in 2 years 0.9 4.97 0.010 1.20 1.07208 2.9976 0.36 4.71
152.4
8.80 1 in 2 years 0.9 3.81 0.010 1.20 1.07208 2.9976 0.36 4.71
112.8
8.91 1 in 2 years 0.9 3.93 0.010 1.20 1.07208 2.9976 0.36 4.71
112.8
9.01 1 in 2 years 0.9 4.06 0.010 1.20 1.07208 2.9976 0.36 4.71
112.8
9.12 1 in 2 years 0.9 4.19 0.010 1.20 1.07208 2.9976 0.36 4.71
112.8
9.22 1 in 2 years 0.9 4.31 0.010 1.20 1.07208 2.9976 0.36 4.71
112.8
9.27 1 in 2 years 0.9 4.37 0.010 1.20 1.07208 2.9976 0.36 4.71
112.8

9.35 1 in 2 years 0.9 21.78 0.010 2.20 3.60338 5.4956 0.66 6.09
112.8
9.43 1 in 2 years 0.9 21.91 0.010 2.20 3.60338 5.4956 0.66 6.09
112.8
9.51 1 in 2 years 0.9 22.03 0.010 2.30 3.938405 5.7454 0.69 6.27
112.8

9.59 1 in 2 years 0.9 22.16 0.010 2.30 3.938405 5.7454 0.69 6.27
112.8
9.67 1 in 2 years 0.9 22.29 0.010 2.30 3.938405 5.7454 0.69 6.27
112.8
9.75 1 in 2 years 0.9 22.42 0.010 2.30 3.938405 5.7454 0.69 6.27
112.8
9.83 1 in 2 years 0.9 22.54 0.010 2.30 3.938405 5.7454 0.69 6.27
112.8
9.91 1 in 2 years 0.9 22.67 0.010 2.30 3.938405 5.7454 0.69 6.27
112.8
9.99 1 in 2 years 0.9 22.80 0.010 2.30 3.938405 5.7454 0.69 6.27
112.8
10.06 1 in 2 years 0.9 22.92 0.010 2.30 3.938405 5.7454 0.69 6.97
112.8

10.13 1 in 2 years 0.9 23.05 0.010 2.30 3.938405 5.7454 0.69 6.97
112.8

10.20 1 in 2 years 0.9 23.18 0.010 2.30 3.938405 5.7454 0.69 6.97
112.8

10.28 1 in 2 years 0.9 23.30 0.010 2.30 3.938405 5.7454 0.69 6.97
112.8

10.35 1 in 2 years 0.9 23.43 0.010 2.30 3.938405 5.7454 0.69 6.97
112.8

10.42 1 in 2 years 0.9 23.56 0.010 2.30 3.938405 5.7454 0.69 6.97
112.8

10.49 1 in 2 years 0.9 23.68 0.010 2.30 3.938405 5.7454 0.69 6.97
112.8
10.56 1 in 2 years 0.9 23.81 0.010 2.30 3.938405 5.7454 0.69 6.97
112.8
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.19 1.00 0.49 safe

0.19 1.00 0.49 safe

0.19 1.00 0.49 safe

0.17 1.00 0.79 safe

0.17 1.00 0.79 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.13 1.00 2.34 safe

0.13 1.00 2.34 safe

0.13 1.00 2.34 safe

0.13 1.00 2.34 safe

0.13 1.00 2.34 safe

0.11 1.00 4.00 safe


0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.05 1.00 4.00 safe

Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.19 1.00 0.49 safe

0.19 1.00 0.49 safe

0.17 1.00 0.79 safe

0.17 1.00 0.79 safe


0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.14 1.00 1.71 safe

0.13 1.00 2.34 safe

0.13 1.00 2.34 safe

0.13 1.00 2.34 safe

0.13 1.00 2.34 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 4.00 safe

0.11 1.00 5.04 safe

0.11 1.00 5.04 safe

0.11 1.00 5.04 safe

0.11 1.00 5.04 safe

0.11 1.00 5.04 safe


0.11 1.00 5.04 safe

0.11 1.00 5.04 safe

0.11 1.00 5.04 safe

0.11 1.00 5.04 safe

0.11 1.00 5.04 safe

0.11 1.00 5.04 safe

0.04 1.00 5.04 safe

0.08 1.00 21.95 safe

0.08 1.00 21.95 safe

0.08 1.00 24.71 safe

0.08 1.00 24.71 safe

0.08 1.00 24.71 safe

0.08 1.00 24.71 safe

0.08 1.00 24.71 safe

0.08 1.00 24.71 safe

0.08 1.00 24.71 safe

0.07 1.00 27.45 safe

0.07 1.00 27.45 safe

0.07 1.00 27.45 safe

0.07 1.00 27.45 safe

0.07 1.00 27.45 safe

0.07 1.00 27.45 safe

0.07 1.00 27.45 safe


0.07 1.00 27.45 safe
Name of Project:

HYDROLOGIC AND HYDRAULIC ANA

OUTFA

Location Ground Elevations Invert Elevations


Drainage
Length of Difference in
Line No. Slope Width, m. Area,
Line, m. Elevation, m.
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

4L 0 30 69 68.80456 0.0065147 66.2 66.00456 30 0.195439739414 0.00651 150 0.1593

4L 30 60 68.80456 68.609121 0.0065147 66.00456 65.809121 30 0.195439739414 0.00651 150 0.1638

4L 60 90 68.609121 68.413681 0.0065147 65.709121 65.513681 30 0.195439739414 0.00651 150 0.1683

4L 90 120 68.413681 68.218241 0.0065147 65.513681 65.318241 30 0.195439739414 0.00651 150 0.1728

4L 120 150 68.218241 68.022801 0.0065147 65.318241 65.122801 30 0.195439739414 0.00651 150 0.1773

4L 150 180 68.022801 67.827362 0.0065147 65.122801 64.927362 30 0.195439739414 0.00651 150 0.1818

4L 180 210 67.827362 67.631922 0.0065147 64.927362 64.731922 30 0.195439739414 0.00651 150 0.1863

4L 210 240 67.631922 67.436482 0.0065147 64.731922 64.536482 30 0.195439739414 0.00651 150 0.1908

4L 240 270 67.436482 67.241042 0.0065147 64.536482 64.341042 30 0.195439739414 0.00651 150 0.1953

4L 270 300 67.241042 67 0.0080347 64.341042 64.1 30 0.241042345277 0.00803 150 0.1998
Location:

DRAULIC ANALYSIS (DRAINAGE SYSTEM )

OUTFALL No. 1 (Texas Inn)

Canal Dimension
Time of Rainfall Design Cross Wetted
Runoff Design Manning Coefficient Hydraulic
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient Flow of Roughness Radius
min. mm./hr. cu.m./sec. Height, Width, Area, sq.m. m.
m. m.

9.34907437532214 1 in 2 years 112.8 0.9 21.781116 0.9 0.012 2.0 2.1 4.2 6.1 0.69

9.43115252580616 1 in 2 years 112.8 0.9 21.908016 0.90 0.012 2.0 2.1 4.2 6.1 0.69

9.51083401794146 1 in 2 years 112.8 0.9 22.034916 0.90 0.012 2.1 2.1 4.41 6.3 0.70

9.59051551007676 1 in 2 years 112.8 0.9 22.161816 0.90 0.012 2.1 2.1 4.41 6.3 0.70

9.67019700221206 1 in 2 years 112.8 0.9 22.288716 0.90 0.012 2.1 2.1 4.41 6.3 0.70

9.74987849434736 1 in 2 years 112.8 0.9 22.415616 0.90 0.012 2.1 2.1 4.41 6.3 0.70

9.82955998648266 1 in 2 years 112.8 0.9 22.542516 0.90 0.012 2.1 2.1 4.41 6.3 0.70

9.90924147861796 1 in 2 years 112.8 0.9 22.669416 0.90 0.012 2.1 2.1 4.41 6.3 0.70

9.98892297075325 1 in 2 years 112.8 0.9 22.796316 0.90 0.012 2.1 2.1 4.41 6.3 0.70

10.0606721972614 1 in 2 years 112.8 0.9 22.923216 0.90 0.012 2.1 2.1 4.41 6.3 0.70
Flow Design
Velocity,
Time, Capacity, Remarks
m./sec.
min. cu.m./sec.

5.24 0.10 22.03 safe

5.24 0.10 22.03 safe

5.30 0.09 23.38 safe

5.30 0.09 23.38 safe

5.30 0.09 23.38 safe

5.30 0.09 23.38 safe

5.30 0.09 23.38 safe

5.30 0.09 23.38 safe

5.30 0.09 23.38 safe

5.89 0.08 25.97 safe


Name of Project:

HYDROLOGIC AND HYDRAULIC ANA

OUTFA

Location Ground Elevations Invert Elevations


Drainage
Length of Difference in
Line No. Slope Width, m. Area,
Line, m. Elevation, m.
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

4L 0 30 69 68.80456 0.0065147 66.2 66.00456 30 0.195439739414 0.00651 150 0.1593

4L 30 60 68.80456 68.609121 0.0065147 66.00456 65.809121 30 0.195439739414 0.00651 150 0.1638

4L 60 90 68.609121 68.413681 0.0065147 65.709121 65.513681 30 0.195439739414 0.00651 150 0.1683

4L 90 120 68.413681 68.218241 0.0065147 65.513681 65.318241 30 0.195439739414 0.00651 150 0.1728

4L 120 150 68.218241 68.022801 0.0065147 65.318241 65.122801 30 0.195439739414 0.00651 150 0.1773

4L 150 180 68.022801 67.827362 0.0065147 65.122801 64.927362 30 0.195439739414 0.00651 150 0.1818

4L 180 210 67.827362 67.631922 0.0065147 64.927362 64.731922 30 0.195439739414 0.00651 150 0.1863

4L 210 240 67.631922 67.436482 0.0065147 64.731922 64.536482 30 0.195439739414 0.00651 150 0.1908

4L 240 270 67.436482 67.241042 0.0065147 64.536482 64.341042 30 0.195439739414 0.00651 150 0.1953

4L 270 300 67.241042 67 0.0080347 64.341042 64.1 30 0.241042345277 0.00803 150 0.1998
Location:

DRAULIC ANALYSIS (DRAINAGE SYSTEM )

OUTFALL No. 1 (Texas Inn)

Canal Dimension
Time of Rainfall Design Cross Wetted
Runoff Design Manning Coefficient Hydraulic
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient Flow of Roughness Radius
min. mm./hr. cu.m./sec. Height, Width, Area, sq.m. m.
m. m.

9.34907437532214 1 in 2 years 112.8 0.9 21.781116 0.9 0.012 2.5 1.8 4.5 6.8 0.66

9.43115252580616 1 in 2 years 112.8 0.9 21.908016 0.90 0.012 2.5 1.8 4.5 6.8 0.66

9.51083401794146 1 in 2 years 112.8 0.9 22.034916 0.90 0.012 2.5 1.8 4.5 6.8 0.66

9.59051551007676 1 in 2 years 112.8 0.9 22.161816 0.90 0.012 2.5 1.8 4.5 6.8 0.66

9.67019700221206 1 in 2 years 112.8 0.9 22.288716 0.90 0.012 2.5 1.8 4.5 6.8 0.66

9.74987849434736 1 in 2 years 112.8 0.9 22.415616 0.90 0.012 2.5 1.8 4.5 6.8 0.66

9.82955998648266 1 in 2 years 112.8 0.9 22.542516 0.90 0.012 2.5 1.8 4.5 6.8 0.66

9.90924147861796 1 in 2 years 112.8 0.9 22.669416 0.90 0.012 2.5 1.8 4.5 6.8 0.66

9.98892297075325 1 in 2 years 112.8 0.9 22.796316 0.90 0.012 2.5 1.8 4.5 6.8 0.66

10.0606721972614 1 in 2 years 112.8 0.9 22.923216 0.90 0.012 2.5 1.8 4.5 6.8 0.66
Flow Design
Velocity,
Time, Capacity, Remarks
m./sec.
min. cu.m./sec.

5.11 0.10 22.99 safe

5.11 0.10 22.99 safe

5.11 0.10 22.99 safe

5.11 0.10 22.99 safe

5.11 0.10 22.99 safe

5.11 0.10 22.99 safe

5.11 0.10 22.99 safe

5.11 0.10 22.99 safe

5.11 0.10 22.99 safe

5.67 0.09 25.53 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALY

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

6 Sta 0+000.00 Sta 0+030.00 77.80 77.54 0.00861 76.70 76.44 30.00 0.258 0.0086 100 0.0030

6 Sta 0+030.00 Sta 0+060.00 77.54 77.28 0.00861 76.44 76.18 30.00 0.258 0.0086 100 0.0060

6 Sta 0+060.00 Sta 0+090.00 77.28 77.02 0.00861 76.18 75.93 30.00 0.258 0.0086 100 0.0090

6 Sta 0+090.00 Sta 0+120.00 77.02 76.77 0.00861 75.93 75.67 30.00 0.258 0.0086 100 0.0120

6 Sta 0+120.00 Sta 0+150.00 76.77 76.51 0.00861 75.67 75.41 30.00 0.258 0.0086 100 0.0150

6 Sta 0+150.00 Sta 0+180.00 76.51 76.25 0.00861 75.41 75.15 30.00 0.258 0.0086 100 0.0180

6 Sta 0+180.00 Sta 0+210.00 76.25 75.99 0.00861 75.15 74.89 30.00 0.258 0.0086 100 0.0210

6 Sta 0+210.00 Sta 0+240.00 75.99 75.73 0.00861 74.89 74.64 30.00 0.258 0.0086 100 0.0240

6 Sta 0+240.00 Sta 0+270.00 75.73 75.47 0.00861 74.64 74.38 30.00 0.258 0.0086 100 0.0270

6 Sta 0+270.00 Sta 0+300.00 75.47 75.22 0.00861 74.38 74.12 30.00 0.258 0.0086 100 0.0300

6 Sta 0+300.00 Sta 0+330.00 75.22 74.96 0.00861 74.12 73.86 30.00 0.258 0.0086 100 0.0330

6 Sta 0+330.00 Sta 0+360.00 74.96 74.70 0.00861 73.86 73.60 30.00 0.258 0.0086 100 0.0360

6 Sta 0+360.00 Sta 0+390.00 74.70 74.44 0.00861 73.60 73.35 30.00 0.258 0.0086 100 0.0390

6 Sta 0+390.00 Sta 0+420.00 74.44 74.18 0.00861 73.35 73.09 30.00 0.258 0.0086 100 0.0420

6 Sta 0+420.00 Sta 0+450.00 74.18 73.92 0.00861 73.09 72.83 30.00 0.258 0.0086 100 0.0450

6 Sta 0+450.00 Sta 0+480.00 73.92 73.67 0.00861 72.83 72.57 30.00 0.258 0.0086 100 0.0480

6 Sta 0+480.00 Sta 0+510.00 73.67 73.41 0.00861 72.57 72.31 30.00 0.258 0.0086 100 0.0510

6 Sta 0+510.00 Sta 0+540.00 73.41 73.15 0.00861 72.31 72.06 30.00 0.258 0.0086 100 0.0540
6 Sta 0+540.00 Sta 0+570.00 73.15 72.89 0.00861 72.06 71.80 30.00 0.258 0.0086 100 0.0570

6 Sta 0+570.00 Sta 0+600.00 72.89 72.63 0.00861 71.80 71.54 30.00 0.258 0.0086 100 0.0600

6 Sta 0+600.00 Sta 0+630.00 72.63 72.37 0.00861 71.54 71.28 30.00 0.258 0.0086 100 0.0630

6 Sta 0+630.00 Sta 0+660.00 72.37 72.11 0.00861 71.28 71.02 30.00 0.258 0.0086 100 0.0660

6 Sta 0+660.00 Sta 0+690.00 72.11 71.86 0.00861 71.02 70.77 30.00 0.258 0.0086 100 0.0690

6 Sta 0+690.00 Sta 0+720.00 71.86 71.60 0.00861 70.77 70.51 30.00 0.258 0.0086 100 0.0720

6 Sta 0+720.00 Sta 0+750.00 71.60 71.34 0.00861 70.51 70.25 30.00 0.258 0.0086 100 0.0750

6 Sta 0+750.00 Sta 0+780.00 71.34 71.08 0.00861 70.25 69.99 30.00 0.258 0.0086 100 0.0780

6 Sta 0+780.00 Sta 0+810.00 71.08 70.82 0.00861 69.99 69.73 30.00 0.258 0.0086 100 0.0810

6 Sta 0+810.00 Sta 0+840.00 70.82 70.56 0.00861 69.73 69.48 30.00 0.258 0.0086 100 0.0840

6 Sta 0+840.00 Sta 0+870.00 70.56 70.31 0.00861 69.48 69.22 30.00 0.258 0.0086 100 0.0870

6 Sta 0+870.00 Sta 0+900.00 70.31 70.05 0.00861 69.22 68.96 30.00 0.258 0.0086 100 0.0900

6 Sta 0+900.00 Sta 0+930.00 70.05 69.79 0.00861 68.96 68.70 30.00 0.258 0.0086 100 0.0930

6 Sta 0+930.00 Sta 0+960.00 69.79 69.53 0.00861 68.70 68.44 30.00 0.258 0.0086 100 0.0960

6 Sta 0+960.00 Sta 0+990.00 69.53 69.27 0.00861 68.44 68.19 30.00 0.258 0.0086 100 0.0990

6 Sta 0+990.00 Sta 1+010.00 69.27 69.10 0.00861 68.19 67.93 20.00 0.258 0.0129 100 0.1010

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

14L Sta 0+000.00 Sta 0+030.00 69.10 69.09 0.00038 67.40 67.25 30.00 0.15 0.0050 60 0.0018

14L Sta 0+030.00 Sta 0+060.00 69.09 69.08 0.00038 67.25 67.10 30.00 0.15 0.0050 60 0.0036

14L Sta 0+060.00 Sta 0+090.00 69.08 69.07 0.00038 67.10 66.95 30.00 0.15 0.0050 60 0.0054

14L Sta 0+090.00 Sta 0+120.00 69.07 69.05 0.00038 66.95 66.80 30.00 0.15 0.0050 60 0.0072
14L Sta 0+120.00 Sta 0+150.00 69.05 69.04 0.00038 66.80 66.65 30.00 0.15 0.0050 60 0.0090

14L Sta 0+150.00 Sta 0+180.00 69.04 69.03 0.00038 66.65 66.50 30.00 0.15 0.0050 60 0.0108

14L Sta 0+180.00 Sta 0+210.00 69.03 69.02 0.00038 66.50 66.35 30.00 0.15 0.0050 60 0.0126

14L Sta 0+210.00 Sta 0+240.00 69.02 69.01 0.00038 66.35 66.20 30.00 0.15 0.0050 60 0.0144

14L Sta 0+240.00 Sta 0+262.00 69.01 69.00 0.00038 66.20 66.09 22.00 0.11 0.0050 60 0.0157
Location:

AULIC ANALYSIS (DRAINAGE SYSTEM )

LEFT

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.19 1 in 2 years 0.9 0.11 0.010 0.50 0.186125 1.249 0.15 2.61
152.4

5.38 1 in 2 years 0.9 0.23 0.010 0.50 0.186125 1.249 0.15 2.61
152.4
5.58 1 in 2 years 0.9 0.34 0.010 0.50 0.186125 1.249 0.15 2.61
152.4
5.77 1 in 2 years 0.9 0.46 0.010 0.50 0.186125 1.249 0.15 2.61
152.4
5.94 1 in 2 years 0.9 0.57 0.010 0.60 0.26802 1.4988 0.18 2.94
152.4
6.11 1 in 2 years 0.9 0.69 0.010 0.60 0.26802 1.4988 0.18 2.94
152.4
6.25 1 in 2 years 0.9 0.80 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
6.39 1 in 2 years 0.9 0.91 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
6.53 1 in 2 years 0.9 1.03 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
6.67 1 in 2 years 0.9 1.14 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
6.81 1 in 2 years 0.9 1.26 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
6.95 1 in 2 years 0.9 1.37 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
7.09 1 in 2 years 0.9 1.49 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
7.23 1 in 2 years 0.9 1.60 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
7.36 1 in 2 years 0.9 1.71 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4

7.49 1 in 2 years 0.9 1.83 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4
7.62 1 in 2 years 0.9 1.94 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4
7.75 1 in 2 years 0.9 2.06 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4
7.88 1 in 2 years 0.9 2.17 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4
8.01 1 in 2 years 0.9 2.29 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4
8.12 1 in 2 years 0.9 2.40 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
8.23 1 in 2 years 0.9 2.51 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
8.35 1 in 2 years 0.9 2.63 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
8.46 1 in 2 years 0.9 2.74 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
8.57 1 in 2 years 0.9 2.86 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
8.69 1 in 2 years 0.9 2.20 0.010 1.10 0.900845 2.7478 0.33 4.41
112.8
8.80 1 in 2 years 0.9 2.28 0.010 1.10 0.900845 2.7478 0.33 4.41
112.8

8.91 1 in 2 years 0.9 2.37 0.010 1.10 0.900845 2.7478 0.33 4.41
112.8
9.03 1 in 2 years 0.9 2.45 0.010 1.10 0.900845 2.7478 0.33 4.41
112.8
9.14 1 in 2 years 0.9 2.54 0.010 1.10 0.900845 2.7478 0.33 4.41
112.8

9.25 1 in 2 years 0.9 2.62 0.010 1.10 0.900845 2.7478 0.33 4.41
112.8
9.37 1 in 2 years 0.9 2.71 0.010 1.10 0.900845 2.7478 0.33 4.41
112.8
9.48 1 in 2 years 0.9 2.79 0.010 1.10 0.900845 2.7478 0.33 4.41
112.8
9.54 1 in 2 years 0.9 2.85 0.010 1.10 0.900845 2.7478 0.33 5.40
112.8

LEFT

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

9.69 1 in 2 years 0.9 2.90 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
9.84 1 in 2 years 0.9 2.95 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
9.99 1 in 2 years 0.9 3.00 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
10.13 1 in 2 years 0.9 3.05 0.010 1.20 1.07208 2.9976 0.36 3.56
112.8
10.27 1 in 2 years 0.9 3.10 0.010 1.20 1.07208 2.9976 0.36 3.56
112.8
10.41 1 in 2 years 0.9 3.15 0.010 1.20 1.07208 2.9976 0.36 3.56
112.8
10.55 1 in 2 years 0.9 3.20 0.010 1.20 1.07208 2.9976 0.36 3.56
112.8
10.69 1 in 2 years 0.9 3.25 0.010 1.20 1.07208 2.9976 0.36 3.56
112.8
10.79 1 in 2 years 0.9 3.29 0.010 1.20 1.07208 2.9976 0.36 3.56
112.8
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.19 1.00 0.49 safe

0.19 1.00 0.49 safe

0.19 1.00 0.49 safe

0.19 1.00 0.49 safe

0.17 1.00 0.79 safe

0.17 1.00 0.79 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.13 1.00 2.33 safe

0.13 1.00 2.33 safe

0.13 1.00 2.33 safe

0.13 1.00 2.33 safe


0.13 1.00 2.33 safe

0.13 1.00 2.33 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.06 1.00 4.86 safe

Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.14 1.00 3.82 safe


0.14 1.00 3.82 safe

0.14 1.00 3.82 safe

0.14 1.00 3.82 safe

0.14 1.00 3.82 safe

0.10 1.00 3.82 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALY

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

6R Sta 0+000.00 Sta 0+030.00 77.80 77.54 0.00861 76.70 76.44 30.00 0.258 0.0086 200 0.0060

6R Sta 0+030.00 Sta 0+060.00 77.54 77.28 0.00861 76.44 76.18 30.00 0.258 0.0086 200 0.0120

6R Sta 0+060.00 Sta 0+090.00 77.28 77.02 0.00861 76.18 75.93 30.00 0.258 0.0086 200 0.0180

6R Sta 0+090.00 Sta 0+120.00 77.02 76.77 0.00861 75.93 75.67 30.00 0.258 0.0086 200 0.0240

6R Sta 0+120.00 Sta 0+150.00 76.77 76.51 0.00861 75.67 75.41 30.00 0.258 0.0086 200 0.0300

6R Sta 0+150.00 Sta 0+180.00 76.51 76.25 0.00861 75.41 75.15 30.00 0.258 0.0086 200 0.0360

6R Sta 0+180.00 Sta 0+210.00 76.25 75.99 0.00861 75.15 74.89 30.00 0.258 0.0086 200 0.0420

6R Sta 0+210.00 Sta 0+240.00 75.99 75.73 0.00861 74.89 74.64 30.00 0.258 0.0086 200 0.0480

6R Sta 0+240.00 Sta 0+270.00 75.73 75.47 0.00861 74.64 74.38 30.00 0.258 0.0086 200 0.0540

6R Sta 0+270.00 Sta 0+300.00 75.47 75.22 0.00861 74.38 74.12 30.00 0.258 0.0086 200 0.0600

6R Sta 0+300.00 Sta 0+330.00 75.22 74.96 0.00861 74.12 73.86 30.00 0.258 0.0086 200 0.0660

6R Sta 0+330.00 Sta 0+360.00 74.96 74.70 0.00861 73.86 73.60 30.00 0.258 0.0086 200 0.0720

6R Sta 0+360.00 Sta 0+390.00 74.70 74.44 0.00861 73.60 73.35 30.00 0.258 0.0086 200 0.0780

6R Sta 0+390.00 Sta 0+420.00 74.44 74.18 0.00861 73.35 73.09 30.00 0.258 0.0086 200 0.0840

6R Sta 0+420.00 Sta 0+450.00 74.18 73.92 0.00861 73.09 72.83 30.00 0.258 0.0086 200 0.0900

6R Sta 0+450.00 Sta 0+480.00 73.92 73.67 0.00861 72.83 72.57 30.00 0.258 0.0086 200 0.0960

6R Sta 0+480.00 Sta 0+510.00 73.67 73.41 0.00861 72.57 72.31 30.00 0.258 0.0086 200 0.1020

6R Sta 0+510.00 Sta 0+540.00 73.41 73.15 0.00861 72.31 72.06 30.00 0.258 0.0086 200 0.1080
6R Sta 0+540.00 Sta 0+570.00 73.15 72.89 0.00861 72.06 71.80 30.00 0.258 0.0086 200 0.1140

6R Sta 0+570.00 Sta 0+600.00 72.89 72.63 0.00861 71.80 71.54 30.00 0.258 0.0086 200 0.1200

6R Sta 0+600.00 Sta 0+630.00 72.63 72.37 0.00861 71.54 71.28 30.00 0.258 0.0086 200 0.1260

6R Sta 0+630.00 Sta 0+660.00 72.37 72.11 0.00861 71.28 71.02 30.00 0.258 0.0086 200 0.1320

6R Sta 0+660.00 Sta 0+690.00 72.11 71.86 0.00861 71.02 70.77 30.00 0.258 0.0086 200 0.1380

6R Sta 0+690.00 Sta 0+720.00 71.86 71.60 0.00861 70.77 70.51 30.00 0.258 0.0086 200 0.1440

6R Sta 0+720.00 Sta 0+750.00 71.60 71.34 0.00861 70.51 70.25 30.00 0.258 0.0086 200 0.1500

6R Sta 0+750.00 Sta 0+780.00 71.34 71.08 0.00861 70.25 69.99 30.00 0.258 0.0086 200 0.1560

6R Sta 0+780.00 Sta 0+810.00 71.08 70.82 0.00861 69.99 69.73 30.00 0.258 0.0086 200 0.1620

6R Sta 0+810.00 Sta 0+840.00 70.82 70.56 0.00861 69.73 69.48 30.00 0.258 0.0086 200 0.1680

6R Sta 0+840.00 Sta 0+870.00 70.56 70.31 0.00861 69.48 69.22 30.00 0.258 0.0086 200 0.1740

6R Sta 0+870.00 Sta 0+900.00 70.31 70.05 0.00861 69.22 68.96 30.00 0.258 0.0086 200 0.1800

6R Sta 0+900.00 Sta 0+930.00 70.05 69.79 0.00861 68.96 68.70 30.00 0.258 0.0086 200 0.1860

6R Sta 0+930.00 Sta 0+960.00 69.79 69.53 0.00861 68.70 68.44 30.00 0.258 0.0086 200 0.1920

6R Sta 0+960.00 Sta 0+990.00 69.53 69.27 0.00861 68.44 68.19 30.00 0.258 0.0086 200 0.1980

6R Sta 0+990.00 Sta 1+010.00 69.27 69.10 0.00861 68.19 68.01 20.00 0.172 0.0086 200 0.2020

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

14R Sta 0+000.00 Sta 0+030.00 69.10 69.09 0.00038 67.00 66.85 30.00 0.15 0.0050 60 0.0018

14R Sta 0+030.00 Sta 0+060.00 69.09 69.08 0.00038 66.85 66.70 30.00 0.15 0.0050 60 0.0036

14R Sta 0+060.00 Sta 0+090.00 69.08 69.07 0.00038 66.70 66.55 30.00 0.15 0.0050 60 0.0054

14R Sta 0+090.00 Sta 0+120.00 69.07 69.05 0.00038 66.55 66.40 30.00 0.15 0.0050 60 0.0072
14R Sta 0+120.00 Sta 0+150.00 69.05 69.04 0.00038 66.40 66.25 30.00 0.15 0.0050 60 0.0090

14R Sta 0+150.00 Sta 0+180.00 69.04 69.03 0.00038 66.25 66.10 30.00 0.15 0.0050 60 0.0108

14R Sta 0+180.00 Sta 0+210.00 69.03 69.02 0.00038 66.10 65.95 30.00 0.15 0.0050 60 0.0126

14R Sta 0+210.00 Sta 0+240.00 69.02 69.01 0.00038 65.95 65.80 30.00 0.15 0.0050 60 0.0144

14R Sta 0+240.00 Sta 0+262.00 69.01 69.00 0.00038 65.80 65.65 22.00 0.15 0.0068 60 0.0157
Location:

AULIC ANALYSIS (DRAINAGE SYSTEM )

RIGHT

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.19 1 in 2 years 0.9 0.23 0.010 0.50 0.186125 1.249 0.15 2.61
152.4

5.38 1 in 2 years 0.9 0.46 0.010 0.50 0.186125 1.249 0.15 2.61
152.4
5.55 1 in 2 years 0.9 0.69 0.010 0.60 0.26802 1.4988 0.18 2.94
152.4
5.69 1 in 2 years 0.9 0.91 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
5.83 1 in 2 years 0.9 1.14 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
5.97 1 in 2 years 0.9 1.37 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
6.11 1 in 2 years 0.9 1.60 0.010 0.80 0.47648 1.9984 0.24 3.57
152.4
6.24 1 in 2 years 0.9 1.83 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4
6.37 1 in 2 years 0.9 2.06 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4
6.50 1 in 2 years 0.9 2.29 0.010 0.90 0.603045 2.2482 0.27 3.86
152.4
6.62 1 in 2 years 0.9 2.51 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
6.73 1 in 2 years 0.9 2.74 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
6.84 1 in 2 years 0.9 2.97 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
6.96 1 in 2 years 0.9 3.20 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
7.07 1 in 2 years 0.9 3.43 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4

7.18 1 in 2 years 0.9 3.66 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
7.30 1 in 2 years 0.9 3.89 0.010 1.10 0.900845 2.7478 0.33 4.41
152.4
7.40 1 in 2 years 0.9 4.11 0.010 1.20 1.07208 2.9976 0.36 4.67
152.4
7.51 1 in 2 years 0.9 4.34 0.010 1.20 1.07208 2.9976 0.36 4.67
152.4
7.62 1 in 2 years 0.9 4.57 0.010 1.20 1.07208 2.9976 0.36 4.67
152.4
7.73 1 in 2 years 0.9 4.80 0.010 1.20 1.07208 2.9976 0.36 4.67
152.4
7.83 1 in 2 years 0.9 5.03 0.010 1.30 1.258205 3.2474 0.39 4.93
152.4
7.93 1 in 2 years 0.9 5.26 0.010 1.30 1.258205 3.2474 0.39 4.93
152.4
8.03 1 in 2 years 0.9 5.49 0.010 1.30 1.258205 3.2474 0.39 4.93
152.4
8.13 1 in 2 years 0.9 5.72 0.010 1.30 1.258205 3.2474 0.39 4.93
152.4
8.23 1 in 2 years 0.9 4.40 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8
8.33 1 in 2 years 0.9 4.57 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8

8.44 1 in 2 years 0.9 4.74 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8
8.54 1 in 2 years 0.9 4.91 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8
8.64 1 in 2 years 0.9 5.08 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8

8.74 1 in 2 years 0.9 5.25 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8
8.84 1 in 2 years 0.9 5.41 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8
8.94 1 in 2 years 0.9 5.58 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8
9.01 1 in 2 years 0.9 5.70 0.010 1.30 1.258205 3.2474 0.39 4.93
112.8

RIGHT

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

9.13 1 in 2 years 0.9 5.75 0.010 1.50 1.675125 3.747 0.45 4.13
112.8
9.25 1 in 2 years 0.9 5.80 0.010 1.50 1.675125 3.747 0.45 4.13
112.8
9.37 1 in 2 years 0.9 5.85 0.010 1.50 1.675125 3.747 0.45 4.13
112.8
9.49 1 in 2 years 0.9 5.90 0.010 1.50 1.675125 3.747 0.45 4.13
112.8
9.61 1 in 2 years 0.9 5.95 0.010 1.50 1.675125 3.747 0.45 4.13
112.8
9.74 1 in 2 years 0.9 6.00 0.010 1.50 1.675125 3.747 0.45 4.13
112.8
9.86 1 in 2 years 0.9 6.05 0.010 1.50 1.675125 3.747 0.45 4.13
112.8
9.98 1 in 2 years 0.9 6.10 0.010 1.50 1.675125 3.747 0.45 4.13
112.8
10.05 1 in 2 years 0.9 6.14 0.010 1.50 1.675125 3.747 0.45 4.83
112.8
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.19 1.00 0.49 safe

0.19 1.00 0.49 safe

0.17 1.00 0.79 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.14 1.00 1.70 safe

0.13 1.00 2.33 safe

0.13 1.00 2.33 safe

0.13 1.00 2.33 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 3.97 safe

0.11 1.00 5.01 safe


0.11 1.00 5.01 safe

0.11 1.00 5.01 safe

0.11 1.00 5.01 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.10 1.00 6.20 safe

0.07 1.00 6.20 safe

Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.12 1.00 6.93 safe

0.12 1.00 6.93 safe

0.12 1.00 6.93 safe

0.12 1.00 6.93 safe


0.12 1.00 6.93 safe

0.12 1.00 6.93 safe

0.12 1.00 6.93 safe

0.12 1.00 6.93 safe

0.08 1.00 8.09 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALY

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

9 Sta 0+000.00 Sta 0+030.00 69.00 68.83 0.00571 67.90 67.73 30.00 0.171428571429 0.0057 100 0.0030

9 Sta 0+030.00 Sta 0+060.00 68.83 68.66 0.00571 67.73 67.56 30.00 0.171428571429 0.0057 100 0.0060

9 Sta 0+060.00 Sta 0+090.00 68.66 68.49 0.00571 67.56 67.39 30.00 0.171428571429 0.0057 100 0.0090

9 Sta 0+090.00 Sta 0+120.00 68.49 68.31 0.00571 67.39 67.21 30.00 0.171428571429 0.0057 100 0.0120

9 Sta 0+120.00 Sta 0+150.00 68.31 68.14 0.00571 67.21 67.04 30.00 0.171428571429 0.0057 100 0.0150

9 Sta 0+150.00 Sta 0+180.00 68.14 67.97 0.00571 67.04 66.87 30.00 0.171428571429 0.0057 100 0.0180

9 Sta 0+180.00 Sta 0+210.00 67.97 67.80 0.00571 66.87 66.70 30.00 0.171428571429 0.0057 100 0.0210

9 Sta 0+210.00 Sta 0+240.00 67.80 67.63 0.00571 66.70 66.53 30.00 0.171428571429 0.0057 100 0.0240

9 Sta 0+240.00 Sta 0+270.00 67.63 67.46 0.00571 66.53 66.36 30.00 0.171428571429 0.0057 100 0.0270

9 Sta 0+270.00 Sta 0+300.00 67.46 67.29 0.00571 66.36 66.19 30.00 0.171428571429 0.0057 100 0.0300

9 Sta 0+300.00 Sta 0+330.00 67.29 67.11 0.00571 66.19 66.01 30.00 0.171428571429 0.0057 100 0.0330

9 Sta 0+330.00 Sta 0+350.00 67.11 67.00 0.00571 66.01 65.90 20.00 0.114285714286 0.0057 100 0.0350

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

7 Sta 0+000.00 Sta 0+030.00 67.00 66.81 0.00627 65.50 65.35 30.00 0.15 0.0050 100 0.0030
7 Sta 0+030.00 Sta 0+060.00 66.81 66.62 0.00627 65.35 65.20 30.00 0.15 0.0050 100 0.0060

7 Sta 0+060.00 Sta 0+090.00 66.62 66.44 0.00627 65.20 65.05 30.00 0.15 0.0050 100 0.0090

7 Sta 0+090.00 Sta 0+120.00 66.44 66.25 0.00627 65.05 64.90 30.00 0.15 0.0050 100 0.0120

7 Sta 0+120.00 Sta 0+150.00 66.25 66.06 0.00627 64.90 64.75 30.00 0.15 0.0050 100 0.0150

7 Sta 0+150.00 Sta 0+180.00 66.06 65.87 0.00627 64.75 64.60 30.00 0.15 0.0050 100 0.0180

7 Sta 0+180.00 Sta 0+210.00 65.87 65.68 0.00627 64.60 64.45 30.00 0.15 0.0050 100 0.0210

7 Sta 0+210.00 Sta 0+240.00 65.68 65.50 0.00627 64.45 64.30 30.00 0.15 0.0050 100 0.0240

7 Sta 0+240.00 Sta 0+270.00 65.50 65.31 0.00627 64.30 64.15 30.00 0.15 0.0050 100 0.0270

7 Sta 0+270.00 Sta 0+300.00 65.31 65.12 0.00627 64.15 64.00 30.00 0.15 0.0050 100 0.0300

7 Sta 0+300.00 Sta 0+330.00 65.12 64.93 0.00627 64.00 63.85 30.00 0.15 0.0050 100 0.0330

7 Sta 0+330.00 Sta 0+360.00 64.93 64.74 0.00627 63.85 63.70 30.00 0.15 0.0050 100 0.0360

7 Sta 0+360.00 Sta 0+390.00 64.74 64.55 0.00627 63.70 63.55 30.00 0.15 0.0050 100 0.0390

7 Sta 0+390.00 Sta 0+420.00 64.55 64.37 0.00627 63.55 63.40 30.00 0.15 0.0050 100 0.0420

7 Sta 0+420.00 Sta 0+450.00 64.37 64.18 0.00627 63.40 63.25 30.00 0.15 0.0050 100 0.0450

7 Sta 0+450.00 Sta 0+480.00 64.18 63.99 0.00627 63.25 63.10 30.00 0.15 0.0050 100 0.0480

7 Sta 0+480.00 Sta 0+510.00 63.99 63.80 0.00627 63.10 62.95 30.00 0.15 0.0050 100 0.0510

7 Sta 0+510.00 Sta 0+540.00 63.80 63.61 0.00627 62.95 62.80 30.00 0.15 0.0050 100 0.0540

7 Sta 0+540.00 Sta 0+570.00 63.61 63.43 0.00627 62.80 62.65 30.00 0.15 0.0050 100 0.0570

7 Sta 0+570.00 Sta 0+600.00 63.43 63.24 0.00627 62.65 62.50 30.00 0.15 0.0050 100 0.0600

7 Sta 0+600.00 Sta 0+630.00 63.24 63.05 0.00627 62.50 62.35 30.00 0.15 0.0050 100 0.0630

7 Sta 0+630.00 Sta 0+638.00 63.05 63.00 0.00627 62.35 62.31 8.00 0.04 0.0050 100 0.0638
Location:

AULIC ANALYSIS (DRAINAGE SYSTEM )

LEFT

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.24 1 in 2 years 0.9 0.11 0.010 0.50 0.186125 1.249 0.15 2.12
152.4

5.47 1 in 2 years 0.9 0.23 0.010 0.50 0.186125 1.249 0.15 2.12
152.4
5.71 1 in 2 years 0.9 0.34 0.010 0.50 0.186125 1.249 0.15 2.12
152.4
5.91 1 in 2 years 0.9 0.46 0.010 0.60 0.26802 1.4988 0.18 2.40
152.4
6.12 1 in 2 years 0.9 0.57 0.010 0.60 0.26802 1.4988 0.18 2.40
152.4
6.29 1 in 2 years 0.9 0.69 0.010 0.80 0.47648 1.9984 0.24 2.91
152.4
6.47 1 in 2 years 0.9 0.80 0.010 0.80 0.47648 1.9984 0.24 2.91
152.4
6.64 1 in 2 years 0.9 0.91 0.010 0.80 0.47648 1.9984 0.24 2.91
152.4
6.81 1 in 2 years 0.9 1.03 0.010 0.80 0.47648 1.9984 0.24 2.91
152.4
6.98 1 in 2 years 0.9 1.14 0.010 0.80 0.47648 1.9984 0.24 2.91
152.4
7.15 1 in 2 years 0.9 1.26 0.010 0.80 0.47648 1.9984 0.24 2.91
152.4
7.27 1 in 2 years 0.9 1.33 0.010 0.80 0.47648 1.9984 0.24 2.91
152.4

LEFT SIDE

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

7.44 1 in 2 years 0.9 1.45 0.010 0.90 0.603045 2.2482 0.27 2.94
152.4
7.61 1 in 2 years 0.9 1.56 0.010 0.90 0.603045 2.2482 0.27 2.94
152.4
7.78 1 in 2 years 0.9 1.68 0.010 0.90 0.603045 2.2482 0.27 2.94
152.4
7.93 1 in 2 years 0.9 1.79 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.08 1 in 2 years 0.9 1.91 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.23 1 in 2 years 0.9 2.02 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.37 1 in 2 years 0.9 2.13 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.52 1 in 2 years 0.9 2.25 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.67 1 in 2 years 0.9 2.36 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.82 1 in 2 years 0.9 2.48 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4

8.97 1 in 2 years 0.9 2.59 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
9.12 1 in 2 years 0.9 2.71 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
9.27 1 in 2 years 0.9 2.82 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4

9.42 1 in 2 years 0.9 2.52 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
9.56 1 in 2 years 0.9 2.60 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
9.71 1 in 2 years 0.9 2.69 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
9.86 1 in 2 years 0.9 2.77 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
10.01 1 in 2 years 0.9 2.86 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
10.16 1 in 2 years 0.9 2.94 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
10.31 1 in 2 years 0.9 3.03 0.010 1.10 0.900845 2.7478 0.33 3.36
112.8
10.45 1 in 2 years 0.9 3.11 0.010 1.20 1.07208 2.9976 0.36 3.56
112.8
10.49 1 in 2 years 0.9 3.13 0.010 1.20 1.07208 2.9976 0.36 3.56
112.8
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.24 1.00 0.40 safe

0.24 1.00 0.40 safe

0.24 1.00 0.40 safe

0.21 1.00 0.64 safe

0.21 1.00 0.64 safe

0.17 1.00 1.38 safe

0.17 1.00 1.38 safe

0.17 1.00 1.38 safe

0.17 1.00 1.38 safe

0.17 1.00 1.38 safe

0.17 1.00 1.38 safe

0.11 1.00 1.38 safe

Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.17 1.00 1.77 safe


0.17 1.00 1.77 safe

0.17 1.00 1.77 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.14 1.00 3.82 safe

0.04 1.00 3.82 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALY

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

10a Sta 0+000.00 Sta 0+030.00 63.50 63.40 0.00333 62.40 62.25 30.00 0.15 0.0050 100 0.0030

10a Sta 0+030.00 Sta 0+060.00 63.40 63.30 0.00333 62.25 62.10 30.00 0.15 0.0050 100 0.0060

10a Sta 0+060.00 Sta 0+090.00 63.30 63.20 0.00333 62.10 61.95 30.00 0.15 0.0050 100 0.0090

10a Sta 0+090.00 Sta 0+120.00 63.20 63.10 0.00333 61.95 61.80 30.00 0.15 0.0050 100 0.0120

10a Sta 0+120.00 Sta 0+150.00 63.10 63.00 0.00333 61.80 61.65 30.00 0.15 0.0050 100 0.0150
Location:

AULIC ANALYSIS (DRAINAGE SYSTEM )

LEFT & RIGHT SIDE

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.25 1 in 2 years 0.9 0.11 0.010 0.50 0.186125 1.249 0.15 1.99
152.4

5.50 1 in 2 years 0.9 0.23 0.010 0.50 0.186125 1.249 0.15 1.99
152.4
5.75 1 in 2 years 0.9 0.34 0.010 0.50 0.186125 1.249 0.15 1.99
152.4
5.98 1 in 2 years 0.9 0.46 0.010 0.60 0.26802 1.4988 0.18 2.24
152.4
6.20 1 in 2 years 0.9 0.57 0.010 0.60 0.26802 1.4988 0.18 2.24
152.4
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.25 1.00 0.37 safe

0.25 1.00 0.37 safe

0.25 1.00 0.37 safe

0.22 1.00 0.60 safe

0.22 1.00 0.60 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALY

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

10b Sta 0+000.00 Sta 0+030.00 64.00 64.08 (0.00251) 62.90 62.75 30.00 0.15 0.0050 100 0.0030

10b Sta 0+030.00 Sta 0+060.00 64.08 64.15 (0.00251) 62.75 62.60 30.00 0.15 0.0050 100 0.0060

10b Sta 0+060.00 Sta 0+090.00 64.15 64.23 (0.00251) 62.60 62.45 30.00 0.15 0.0050 100 0.0090

10b Sta 0+090.00 Sta 0+120.00 64.23 64.30 (0.00251) 62.45 62.30 30.00 0.15 0.0050 100 0.0120

10b Sta 0+120.00 Sta 0+150.00 64.30 64.38 (0.00251) 62.30 62.15 30.00 0.15 0.0050 100 0.0150

10b Sta 0+150.00 Sta 0+180.00 64.38 64.45 (0.00251) 62.15 62.00 30.00 0.15 0.0050 100 0.0180

10b Sta 0+180.00 Sta 0+210.00 64.45 64.53 (0.00251) 62.00 61.85 30.00 0.15 0.0050 100 0.0210

10b Sta 0+210.00 Sta 0+239.00 64.53 64.60 (0.00260) 61.85 61.70 29.00 0.15 0.0052 100 0.0239
Location:

AULIC ANALYSIS (DRAINAGE SYSTEM )

LEFT SIDE

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.25 1 in 2 years 0.9 0.11 0.010 0.50 0.186125 1.249 0.15 1.99
152.4

5.50 1 in 2 years 0.9 0.23 0.010 0.50 0.186125 1.249 0.15 1.99
152.4
5.75 1 in 2 years 0.9 0.34 0.010 0.50 0.186125 1.249 0.15 1.99
152.4
5.98 1 in 2 years 0.9 0.46 0.010 0.60 0.26802 1.4988 0.18 2.24
152.4
6.20 1 in 2 years 0.9 0.57 0.010 0.60 0.26802 1.4988 0.18 2.24
152.4
6.38 1 in 2 years 0.9 0.69 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.57 1 in 2 years 0.9 0.80 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.74 1 in 2 years 0.9 0.91 0.010 0.80 0.47648 1.9984 0.24 2.77
152.4
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.25 1.00 0.37 safe

0.25 1.00 0.37 safe

0.25 1.00 0.37 safe

0.22 1.00 0.60 safe

0.22 1.00 0.60 safe

0.18 1.00 1.30 safe

0.18 1.00 1.30 safe

0.17 1.00 1.32 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALY

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

10a Sta 0+000.00 Sta 0+030.00 63.50 63.40 0.00333 62.40 62.25 30.00 0.15 0.0050 100 0.0030

10a Sta 0+030.00 Sta 0+060.00 63.40 63.30 0.00333 62.25 62.10 30.00 0.15 0.0050 100 0.0060

10a Sta 0+060.00 Sta 0+090.00 63.30 63.20 0.00333 62.10 61.95 30.00 0.15 0.0050 100 0.0090

10a Sta 0+090.00 Sta 0+120.00 63.20 63.10 0.00333 61.95 61.80 30.00 0.15 0.0050 100 0.0120

10a Sta 0+120.00 Sta 0+150.00 63.10 63.00 0.00333 61.80 61.65 30.00 0.15 0.0050 100 0.0150

11 BS Sta 0+000.00 Sta 0+030.00 63.00 63.00 - 61.60 61.45 30.00 0.15 0.0050 200 0.0210

11 BS Sta 0+030.00 Sta 0+060.00 63.00 63.00 - 61.45 61.30 30.00 0.15 0.0050 200 0.0270

11 BS Sta 0+060.00 Sta 0+090.00 63.00 63.00 - 61.30 61.15 30.00 0.15 0.0050 200 0.0330

11 BS Sta 0+090.00 Sta 0+120.00 63.00 63.00 - 61.15 61.00 30.00 0.15 0.0050 200 0.0390

11 BS Sta 0+120.00 Sta 0+150.00 63.00 63.00 - 61.00 60.85 30.00 0.15 0.0050 200 0.0450

11 BS Sta 0+150.00 Sta 0+180.00 63.00 63.00 - 60.85 60.70 30.00 0.15 0.0050 200 0.0510

11 BS Sta 0+180.00 Sta 0+210.00 63.00 63.00 - 60.70 60.55 30.00 0.15 0.0050 200 0.0570

11 BS Sta 0+210.00 Sta 0+230.00 63.00 63.00 - 60.55 60.40 20.00 0.15 0.0075 200 0.0610

13 Sta 0+000.00 Sta 0+030.00 63.00 63.00 - 61.30 61.15 30.00 0.15 0.0050 100 0.0640

13 Sta 0+030.00 Sta 0+060.00 63.00 63.00 - 61.15 61.00 30.00 0.15 0.0050 100 0.0670

13 Sta 0+060.00 Sta 0+090.00 63.00 63.00 - 61.00 60.85 30.00 0.15 0.0050 100 0.0700

13 Sta 0+090.00 Sta 0+120.00 63.00 63.00 - 60.85 60.70 30.00 0.15 0.0050 100 0.0730
13 Sta 0+120.00 Sta 0+150.00 63.00 63.00 - 60.70 60.55 30.00 0.15 0.0050 100 0.0760

13 Sta 0+150.00 Sta 0+180.00 63.00 63.00 - 60.55 60.40 30.00 0.15 0.0050 100 0.0790

13 Sta 0+180.00 Sta 0+210.00 63.00 63.00 - 60.40 60.25 30.00 0.15 0.0050 100 0.0820

13 Sta 0+210.00 Sta 0+240.00 63.00 63.00 - 60.25 60.10 30.00 0.15 0.0050 100 0.0850

13 Sta 0+240.00 Sta 0+270.00 63.00 63.00 - 60.10 59.95 30.00 0.15 0.0050 100 0.0880

13 Sta 0+270.00 Sta 0+300.00 63.00 63.00 - 59.95 59.80 30.00 0.15 0.0050 100 0.0910

13 Sta 0+300.00 Sta 0+311.00 63.00 63.00 - 59.80 59.75 11.00 0.055 0.0050 100 0.0921
Location:

AULIC ANALYSIS (DRAINAGE SYSTEM )

LEFT & RIGHT SIDE

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.25 1 in 2 years 0.9 0.11 0.010 0.50 0.186125 1.249 0.15 1.99
152.4

5.50 1 in 2 years 0.9 0.23 0.010 0.50 0.186125 1.249 0.15 1.99
152.4
5.75 1 in 2 years 0.9 0.34 0.010 0.50 0.186125 1.249 0.15 1.99
152.4
5.98 1 in 2 years 0.9 0.46 0.010 0.60 0.26802 1.4988 0.18 2.24
152.4
6.20 1 in 2 years 0.9 0.57 0.010 0.60 0.26802 1.4988 0.18 2.24
152.4

6.38 1 in 2 years 0.9 0.80 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.57 1 in 2 years 0.9 1.03 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.75 1 in 2 years 0.9 1.26 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.92 1 in 2 years 0.9 1.49 0.010 0.90 0.603045 2.2482 0.27 2.94
152.4
7.09 1 in 2 years 0.9 1.71 0.010 0.90 0.603045 2.2482 0.27 2.94
152.4
7.24 1 in 2 years 0.9 1.94 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.39 1 in 2 years 0.9 2.17 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.47 1 in 2 years 0.9 2.32 0.010 1.10 0.900845 2.7478 0.33 4.12
152.4

7.62 1 in 2 years 0.9 2.44 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.77 1 in 2 years 0.9 2.55 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.92 1 in 2 years 0.9 2.67 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.07 1 in 2 years 0.9 2.78 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.21 1 in 2 years 0.9 2.90 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.36 1 in 2 years 0.9 3.01 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
8.50 1 in 2 years 0.9 3.12 0.010 1.20 1.07208 2.9976 0.36 3.56
152.4
8.64 1 in 2 years 0.9 3.24 0.010 1.20 1.07208 2.9976 0.36 3.56
152.4
8.78 1 in 2 years 0.9 3.35 0.010 1.20 1.07208 2.9976 0.36 3.56
152.4
8.92 1 in 2 years 0.9 3.47 0.010 1.20 1.07208 2.9976 0.36 3.56
152.4
8.98 1 in 2 years 0.9 3.51 0.010 1.20 1.07208 2.9976 0.36 3.56
152.4
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.25 1.00 0.37 safe

0.25 1.00 0.37 safe

0.25 1.00 0.37 safe

0.22 1.00 0.60 safe

0.22 1.00 0.60 safe

0.18 1.00 1.30 safe

0.18 1.00 1.30 safe

0.18 1.00 1.30 safe

0.17 1.00 1.77 safe

0.17 1.00 1.77 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.08 1.00 3.71 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe


0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.14 1.00 3.82 safe

0.14 1.00 3.82 safe

0.14 1.00 3.82 safe

0.14 1.00 3.82 safe

0.05 1.00 3.82 safe


Name of Project: Development of Road Network and Drainage System, TECO Zone North Side

HYDROLOGIC AND HYDRAULIC ANALY

Location Ground Elevations Invert Elevations


Drainage
Ground Length of Difference in Slope
Line No. Width, m. Area,
Slope Line, m. Elevation, m. (I.E.)
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

12 Sta 0+000.00 Sta 0+030.00 62.74 62.70 0.00147 61.64 61.49 30.00 0.15 0.0050 150 0.0045

12 Sta 0+030.00 Sta 0+060.00 62.70 62.65 0.00147 61.49 61.34 30.00 0.15 0.0050 150 0.0090

12 Sta 0+060.00 Sta 0+090.00 62.65 62.61 0.00147 61.34 61.19 30.00 0.15 0.0050 150 0.0135

12 Sta 0+090.00 Sta 0+120.00 62.61 62.56 0.00147 61.19 61.04 30.00 0.15 0.0050 150 0.0180

12 Sta 0+120.00 Sta 0+150.00 62.56 62.52 0.00147 61.04 60.89 30.00 0.15 0.0050 150 0.0225

12 Sta 0+150.00 Sta 0+180.00 62.52 62.48 0.00147 60.89 60.74 30.00 0.15 0.0050 150 0.0270

12 Sta 0+180.00 Sta 0+210.00 62.48 62.43 0.00147 60.74 60.59 30.00 0.15 0.0050 150 0.0315

12 Sta 0+210.00 Sta 0+240.00 62.43 62.39 0.00147 60.59 60.44 30.00 0.15 0.0050 150 0.0360

12 Sta 0+240.00 Sta 0+270.00 62.39 62.34 0.00147 60.44 60.29 30.00 0.15 0.0050 150 0.0405

12 Sta 0+270.00 Sta 0+300.00 62.34 62.30 0.00147 60.29 60.14 30.00 0.15 0.0050 150 0.0450

12 Sta 0+300.00 Sta 0+330.00 62.30 62.26 0.00147 60.14 59.99 30.00 0.15 0.0050 150 0.0495

12 Sta 0+330.00 Sta 0+360.00 62.26 62.21 0.00147 59.99 59.84 30.00 0.15 0.0050 150 0.0540

12 Sta 0+360.00 Sta 0+390.00 62.21 62.17 0.00147 59.84 59.69 30.00 0.15 0.0050 150 0.0585

12 Sta 0+390.00 Sta 0+420.00 62.17 62.12 0.00147 59.69 59.54 30.00 0.15 0.0050 150 0.0630

12 Sta 0+420.00 Sta 0+450.00 62.12 62.08 0.00147 59.54 59.39 30.00 0.15 0.0050 150 0.0675

12 Sta 0+450.00 Sta 0+480.00 62.08 62.04 0.00147 59.39 59.24 30.00 0.15 0.0050 150 0.0720

12 Sta 0+480.00 Sta 0+504.00 62.04 62.00 0.00147 59.24 59.12 24.00 0.12 0.0050 150 0.0756
Location:

AULIC ANALYSIS (DRAINAGE SYSTEM )

LEFT & RIGHT SIDE

Time of Rainfall Design Cross Wetted


Runoff Manning Coefficient Pipe Diameter, Hydraulic Velocity,
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient of Roughness m Radius m./sec.
min. mm./hr. cu.m./sec. Area, sq.m. m.

5.25 1 in 2 years 0.9 0.17 0.010 0.50 0.186125 1.249 0.15 1.99
152.4

5.50 1 in 2 years 0.9 0.34 0.010 0.50 0.186125 1.249 0.15 1.99
152.4
5.73 1 in 2 years 0.9 0.51 0.010 0.60 0.26802 1.4988 0.18 2.24
152.4
5.91 1 in 2 years 0.9 0.69 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.09 1 in 2 years 0.9 0.86 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.28 1 in 2 years 0.9 1.03 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.46 1 in 2 years 0.9 1.20 0.010 0.80 0.47648 1.9984 0.24 2.72
152.4
6.63 1 in 2 years 0.9 1.37 0.010 0.90 0.603045 2.2482 0.27 2.94
152.4
6.80 1 in 2 years 0.9 1.54 0.010 0.90 0.603045 2.2482 0.27 2.94
152.4
6.97 1 in 2 years 0.9 1.71 0.010 0.90 0.603045 2.2482 0.27 2.94
152.4
7.12 1 in 2 years 0.9 1.89 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.27 1 in 2 years 0.9 2.06 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.42 1 in 2 years 0.9 2.23 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.57 1 in 2 years 0.9 2.40 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.72 1 in 2 years 0.9 2.57 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4

7.86 1 in 2 years 0.9 2.74 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
7.98 1 in 2 years 0.9 2.88 0.010 1.10 0.900845 2.7478 0.33 3.36
152.4
Flow Design
Number of
Time, Capacity, Remarks
Barrels
min. cu.m./sec.

0.25 1.00 0.37 safe

0.25 1.00 0.37 safe

0.22 1.00 0.60 safe

0.18 1.00 1.30 safe

0.18 1.00 1.30 safe

0.18 1.00 1.30 safe

0.18 1.00 1.30 safe

0.17 1.00 1.77 safe

0.17 1.00 1.77 safe

0.17 1.00 1.77 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.15 1.00 3.03 safe

0.12 1.00 3.03 safe


Location Ground Elevations Invert Elevations
Length of Difference in
Line No. Ground Slope
Line, m. Elevation, m.
Upper Lower Upper Lower
From To
End, m. End, m. End, m. End, m.

XX Sta 0+000.00 Sta 0+009.00 77.80 77.54 0.02871 75.70 75.66 9.00 0.045
Drainage Time of Rainfall Design Manning
Runoff Pipe Diameter,
Slope (I.E.) Width, m. Area, Concentration, Return Period Intensity, Discharge, Coefficient
Coefficient m
sq.km. min. mm./hr. cu.m./sec. of Roughness

0.0050 100 0.0009 5.04 1 in 2 years 0.9 6.82 0.010 1.50


152.4
Cross Wetted Flow Design
Hydraulic Velocity, Number of
Sectional Perimeter, Time, Capacity, Remarks
Radius m./sec. Barrels
Area, sq.m. m. min. cu.m./sec.

1.675125 3.747 0.45 4.13 0.04 1.00 6.93 safe


Name of Project:

HYDROLOGIC AND HYDRAULIC ANA

OUTFA

Location Ground Elevations Invert Elevations


Drainage
Length of Difference in
Line No. Slope Width, m. Area,
Line, m. Elevation, m.
Upper Lower Upper Lower sq.km.
From To
End, m. End, m. End, m. End, m.

4L 0 30 69 68.80456 0.0065147 66.2 66.00456 30 0.195439739414 0.00651 150 0.1593


Location:

DRAULIC ANALYSIS (DRAINAGE SYSTEM )

OUTFALL No. 1 (Texas Inn)

Canal Dimension
Time of Rainfall Design Cross Wetted
Runoff Design Manning Coefficient Hydraulic
Concentration, Return Period Intensity, Discharge, Sectional Perimeter,
Coefficient Flow of Roughness Radius
min. mm./hr. cu.m./sec. Height, Width, Area, sq.m. m.
m. m.

9.34907437532214 1 in 2 years 112.8 0.9 12.98 0.9 0.012 2.0 1.5 3 5.5 0.55
Flow Design
Velocity,
Time, Capacity, Remarks
m./sec.
min. cu.m./sec.

4.49 0.11 13.47 safe


Location Ground Elevations Invert Elevations
Length of Difference in
Line No. Ground Slope
Line, m. Elevation, m.
Upper Lower Upper Lower
From To
End, m. End, m. End, m. End, m.

XX Sta 0+000.00 Sta 0+009.00 77.80 77.54 0.01055 75.40 75.28 24.50 0.1225
Drainage Time of Rainfall Design Manning
Runoff Pipe Diameter,
Slope (I.E.) Width, m. Area, Concentration, Return Period Intensity, Discharge, Coefficient
Coefficient m
sq.km. min. mm./hr. cu.m./sec. of Roughness

0.0070 20 0.0005 5.07 1 in 2 years 0.9 12.98 0.010 1.80


152.4
Cross Wetted Flow Design
Hydraulic Velocity, Number of
Sectional Perimeter, Time, Capacity, Remarks
Radius m./sec. Barrels
Area, sq.m. m. min. cu.m./sec.

2.41218 4.4964 0.54 5.52 0.07 1.00 13.32 safe

You might also like