PROYEK LRT SUMATERA SELATAN

LAPORAN PERENCANAAN SALURAN AREA DEPO

Rain Water Debit CHANNEL DESIGN PROCEDURE.


"DARCY FORMULA" Qr = C x I x Ac Non-Erodible Channel.
Where FL. ± 0.000
Qr = Debit of rainfall, cubic meter per second (m³/s) Ad*R²'³ x S¹´²
Qd =
C = Coeffisient of run (Categorized by Use) n
1. Roof 0.9
2. Road 0.8 Where
3. Green 0.15 Qd = Flow, cubic meter per second (m³/s)
n = Manning roughness coefficient. Friction factor range h Design (m)
I = Rainfall intencity for Roof (300mm/m²/hour) 1. Formed not finish 0.013 ~ 0.017
= Rainfall intencity for Road & Green (200mm/m²/hour) 2. Trowel finish 0.012 ~ 0.014
3. Float finish 0.013 ~ 0.015
Ac = Area of catchment 4. Float finish, some gravel on bottom 0.015 ~ 0.017
5. Gunite, good section 0.016 ~ 0.019 w Design (m)
6. Gunite, wavy section 0.016 ~ 0.022
Ad = Area, square meter (m²)
P = Weeted perimeter, meter (m) (P = w + 2h)
R = Hydraulic radius (A/P)
S = Slope (m/m)

Rainfall Water Debit "DARCY FOMULA" Drainage/ Channel Design (Non-Erobidle Channel) Vr
No LOCATION W L Ac C I I Qr N w h Ad P R S n Qd Vd (Actual) Remarks
Categorised Use
(m) (m) (m²) (mm/hour) (m/s) (m³/s) line nos (m) (m) (m²) (m) (Ad/P) (m/m) (m³/s) (m/s) (m/s)

TALANG STASIUN

1 TALANG STASIUN
AS 1 AS 13 ROOF STASIUN 1,440 0.9 300 8.33E-05 0.108 Min
0.310
1,440 0.108 1 0.450 0.310 0.140 1.070 0.130 0.003 0.013 0.151 1.083 0.774 Qr < Qd → OK
`
PROYEK LRT SUMATERA SELATAN
LAPORAN PERENCANAAN SALURAN AREA DEPO

Rain Water Debit CHANNEL DESIGN PROCEDURE.


"DARCY FORMULA" Qr = C x I x Ac Non-Erodible Channel.
Where FL. ± 0.000
Qr = Debit of rainfall, cubic meter per second (m³/s) Ad*R²'³ x S¹´²
Qd =
C = Coeffisient of run (Categorized by Use) n
1. Roof 0.9
2. Road 0.8 Where
3. Green 0.15 Qd = Flow, cubic meter per second (m³/s)
n = Manning roughness coefficient. Friction factor range h Design (m)
I = Rainfall intencity for Roof (300mm/m²/hour) 1. Formed not finish 0.013 ~ 0.017
= Rainfall intencity for Road & Green (200mm/m²/hour) 2. Trowel finish 0.012 ~ 0.014
3. Float finish 0.013 ~ 0.015
Ac = Area of catchment 4. Float finish, some gravel on bottom 0.015 ~ 0.017
5. Gunite, good section 0.016 ~ 0.019 w Design (m)
6. Gunite, wavy section 0.016 ~ 0.022
Ad = Area, square meter (m²)
P = Weeted perimeter, meter (m) (P = w + 2h)
R = Hydraulic radius (A/P)
S = Slope (m/m)

Rainfall Water Debit "DARCY FOMULA" Drainage/ Channel Design (Non-Erobidle Channel) Vr
No LOCATION W L Ac C I I Qr N w h Ad P R S n Qd Vd (Actual) Remarks
Categorised Use
(m) (m) (m²) (mm/hour) (m/s) (m³/s) line nos (m) (m) (m²) (m) (Ad/P) (m/m) (m³/s) (m/s) (m/s)

TALANG STASIUN

1 TALANG STASIUN
AS 1 AS 13 ROOF STASIUN 1,440 0.9 300 8.33E-05 0.108 Min
0.310
1,440 0.108 1 0.450 0.310 0.140 1.070 0.130 0.003 0.013 0.151 1.083 0.774 Qr < Qd → OK
`