GIVEN DATA

HT OF SPILLWAY CREST FROM STREAM DATA = 6m

SPILLWAY CREST ELEVATION = 500 m

DESIGN FLLOD = 4000 m3/s

NO OF SPAN AND CLEAR SPAN WITH = 4 EACH 12.5 m wide

NO OF PIER & WITH THEIR THICK = 3 PIER each 3 m thick

D/S WATER LEVEL = 402 m

MANNING RAGOSITY COFF GOR DESIGN OF DISCHARGE CARRIER = 0.018

DESIGN OF APPROACH CHANNEL & HEAD OVER CREST

Head over crest is given by Q= LeCHe 3/2


Assuming coefficient of discharge = 2.17

Le 50 m

He= 11.08 m

U/S WATER LEVEL = CREST LEVEL+H


511.08 m

RIVER BED LEVEL = 494 m

WATER DEPTH = 17.08 m

ASSUMING TRAPEZOIDAL APPROACH CHANNEL 1:1 SIDE SLOPE

AERA OF CHANNEL A= (B+Y)*Y VELOCITY APPROACH Va = Q/A VELOCITY HEAD Ha = Va2/2*g


1299.4464 m2 3.07823393100324 0.482952 m

WETTED PERIMETER OF P OF THE CHANNEL Hydraullic Mean Depth = A/P


12.10933 m
P= 107.309535290665 m

ASSUMING THE LENGTH OF CHANNEL AS 150 m


Frictional head loss upto the spillway crest
hf= n2v2*L/R3/4 0.01092847157838 m CORRECTION COFF OF DISCHARGE
1) CORRECTION DUE TO HT OF WEIR
THE LEVEL 0F U/S TEL
h/HD 0.51939
U/S WATER LEVEL + VELOCITY HEAD -HEAD LOSS UPTO SPILLWAY CREST
He/Hd 0.676348
= 511.552023828828 m
HEAD OVER THE CREST INCLUDING VELOCITY CORRECTION FACTOR 1.002
He 11.5520238288283
Hencce corrected Cd = 2.13

ASSUMING THAT THE D/S APRON ELEVATION IS MAINTAINED SUCH THAT IT DOES NOT AFFECTED

effective length Le = 50-2(Nkp+Ka)*He


47 m
0.01
0.1
Hence discharge capacity of spillway crest= 4000 m3/s

DESIGN OF CREST PROFILE

For evaluating coordinates of x & y Rating Curve


20
= 1.869*Hd0.75*y x(m) y(m) x(m) y(m)
15
0 0 10 4.806336

y(m)
10 Rating Curve
= x1.75/11.77 0.5 0.02541 12 6.612738
1 0.08547 14 8.660405 5
2 0.287486 16 10.94017 0
5 1.428932 18 13.44439 0 5 10 15 20 25
6 1.965979 20 16.16652 x(m)
8 3.252532
Position of development of the d/s apron level
the d/s profile is designed b/w RL 500(crest level) &RL = 492(APRON LEVEL)

ha+d/He >1.7 MAX CO ORDINATE Y

or ha+d 19.6384405090082 CORESPONDING VALUE OF X IS OBTAINED FROM

hence max apron elevation y=X1.747/11.77


TEL -(HA+D)= 491.91358331982 m

DISCHARGE INTENSITY D/S OF SPILLWAY PIER q= 67.7966101694915


68 m3/sec ASSUMING CO ORDINATE OF D/S PROFILE B/W 0 TO 13.33

if d is the water depth then the velocity = 68/d


Rating Curve
d+v2/2g = 19.8 x Y=X1.747/11.77 9
→ d= 3.868565 m 0 0 8
0.5 0.02531186437073 7

Y=X1.747/11.77
6
1 0.08496176720476
5
2 0.28518254447121 Rating Curve
4
4 0.95724331480855 3
6 1.94380981890112 2
8 3.21308152097703 1
0
10 4.74486146760264 0 2 4 6 8 10 12 14
12 6.52458921654002 x(m)
13.33 7.83974267814757

DESIGN OF DISCHARGE CARRIER

Yc=3√q2/g = 7.8656 m

critical velocity = q/yc


8.61938188688613 m/s

v= 1/nR^(2/3).s^(1/2)

critical flow = 465.62

p = 139.02
r = 3.34930225866782

sc 0.17658
0.07888091704422

sc 12.6773374026503

Design of Curve No.1 (convex ) DESIGN A CURVE AT THE JUNCTION OF 6:1 SLOPE & 2:1

Bed level at the end of (1/200) slope


y=-xtanƟ-x^2/(1.5{4(d+hv)}cos^2Ɵ d+hv

y= -(x/6+x2/6*38.7)
Rating curve
y= x/200-x/6*15.76 dy/dx 7

6
dy/dx= 1/200-x/47.28 x=
5
0.2364

y=x/6+x2/232.5
4.23011844331641 x y=x/6+x2/232.5 4
Rating curve
3
10.940592 0 0
1 0.170972371726 2
10 2.097237172587
1
y= x/200+x2/94.56 20 4.645690763183
Rating Curve 30 5.023557959463 0
0 5 10 15 20 25 30 35 40 45
1.4 38.25 6.401600681456 x
y= x/200+x2/94.56

1.2
x y= x/200+x2/94.56 1
0.8
0 0 Rating Curve
0.6
1 0.015575296108291 0.4
3 0.110177664974619 0.2
0
7 0.552642087470949 0 2 4 6 8 10 12
10 1.1075296108291 x
10.94 1.31992842639594

Design of Energy Dissipator


y1= 1.87 m Water depth in stilling basin should be 5per. More than calculated conjugate depth
v= 36.5 m/s hence req. water depth= 22.5 m
F1= 3.5
Req. Basin level= 379.5 m
y2= 21.5 m

N= 0.08 Y2= 23.5 m


Y1= 1.6 Req. basin floor level 378.5 m
Velocity (v) 42.5 m/s Length of jump= 101 m
Froude no. 10.73

Chute Block End Sill


Height= 4.3 m
Height= Width = Spacing = y1 = 1.87 m Spacing of dents & teeths= 3.525 m
Downstream slope= 2:01
Top thickness= 0.43m
Structural Design

Thickness of lining = 0.5m


Slabs Dimension Central two slabs 9.5m wide each and other two 10m wide each
Reinforcement 0.25per. Each way will be given

Submitted By:- Rishi Maheshwari


E.No.- 0801CE171085