15/06/2020
1. Task of the Day
Monday  Follow Cadastre team to perform strata survey at Mont Kiara
Banyan

2. Job overview
 To check whether asbuilt building is built according to
architect specifications

3. Procedure
 Identify areas that are needed to perform strata survey
 Using a distometer, collect the necessary distance data
 Record the data and compare the data with the provisional
strata plan
 The available tolerance is up to 0.1m, if the measured data is
more than 0.1m from the data on the provisional strata plan,
re-measure the length of the building again. If the same
issue occurs, then 2 possibilities might come into play:
 The length of the building on the provisional strata plan
was texted incorrectly
 The building was not built according to the dimensions
set by the architect plan
 Record and highlight any building length that exceeds the
available tolerance
 Ensure that all the necessary building entities are measured,
including
 Building perimeter
 Center of party wall (excluding mosaic)
 Staircase dimensions
 Floor levels
 Record all data in a neat and organized manner
4. Attachments

Site location

Site location
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

16/06/2020
1. Task of the Day
Tuesday  Follow Cadastre team to LEKAS highway, Nilai to perform demarcation
survey

2. Job overview
 Land acquisition hs been performed prior to the construction of LEKAS
highway from Kajang to Seremban
 With the highway now completed, it is necessary to properly
demarcate boundaries of lots on which the highway passed through
 The final output from this survey is the Certified Plans/Pelan Akui
(CP/PA) which will then be used to signify the new lot boundary

3. Procedure
 Perform control traverse around the lot that is required to perform
demarcation and
 Ensure that the accuracy of the control traverse is first-class (1:8000)
 Along the traverse, pick-up any old boundary marks along the way and
record in the field book
 Perform solar observation and ensure that the bearig obtained is first-
class (difference between 1st and 2nd observation is within 10”)
 Perform C- and M- corrections to obtain corrected traverse bearing
based on azimuth
 Compute boundary marks bearing distance based on:
 Observed bearing distance based on traverse
 Computed bearing distance based on old CP of the lot
 The allowable misclose of bearing is within 30”, while the allowable
misclose of distance is within 0.0003m per 20m between the boundary
marks
 From there, determine the suitable “base” on which scaling
computations are based upon. The base is any 2 boundary marks that
fulfill the criteria of the allowable misclosure of the breaing and
distance
 Scale the old bearing and distance of the base to the new observed
bearing distance of the base for all old boundary bearing and distances
of the lot
 For bearing, simply add/minus the difference in bearing of the base
 For distance, the formula is given as
𝑁𝑒𝑤 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒
𝐷𝑖𝑓𝑓𝑒𝑟𝑒𝑛𝑐𝑒 𝑖𝑛 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑜𝑙𝑑 𝑎𝑛𝑑 𝑛𝑒𝑤 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑜𝑓 𝑏𝑎𝑠𝑒
=−
𝑂𝑙𝑑 𝑏𝑎𝑠𝑒 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
∗ 𝑙𝑜𝑡 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
 Once all the lot bearing and distances has been scaled up to the new
bearing distance, compute the direct line between the nearest survey
stations to the boundary mark
 Using the computed data, set up the total station on the field and
target the bearing distance of the boundary mark based on the
computed data
 Use a tripod with the prism attached to correctly identify the spot to
plant the boundary mark, then excavate the area with a shovel
 The dimensions of the boundary mark must be as shown:

 Ensure that the planted boundary mark is almost fully submerged in


the ground, with only ~2 cm of the top of the boundary mark visible
 After the boundary mark has been planted, re-observation must be
done to ensure that the boundary mark is perfectly in place
 Survey and plant the remainder of the boundary marks for the lot

4. Progress work
 2 boundary marks planted before halting work due to rain.
5. Attachments

Identified new boundary mark location and performing ground clearing to ensure
that the tripod is able to sit on top of the boundary mark area

Access to site
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

17/06/2020
1. Task of the Day
Wednesday  Resume demarcating at LEKAS highway

2. Progress work
 2 boundary marks planted before stopping work due to
heavy rain
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

18/06/2020
1. Task of the Day
Thursday  Resume demarcating at LEKAS highway

2. Progress work
 4 boundary marks planted
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

19/06/2020
1. Task of the Day
Friday  Resume demarcating at LEKAS highway

2. Progress work
 1 boundary mark planted before stopping work due to heavy
rain
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

22/06/2020
1. Task of the Day
Monday  Resume demarcating at LEKAS highway

2. Progress work
 2 boundary marks planted before stopping work due to
heavy rain
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

23/06/2020
1. Task of the Day
Tuesday  Resume demarcating at LEKAS highway

2. Progress work
 Last boundary mark planted, job completed and fieldbook
sent to office for processing/checking.
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

24/06/2020
1. Task of the Day
Wednesday  Performed EDM test at Shah Alam EDM test pillar site

2. Job overview
 EDM testing of the total station must be done once every 6
months
 This is done at EDM test pillars
 The observed distance results are compared with the known
distance results and the differences summed and averaged.
 The allowable tolerance is <0.01m

3. Procedure
 There’s a total of 10 pillars at the EDM test site.
 Set-up total station at pillar 1, while prism is set up at pillar 2
 Measure the distance
 Continue measuring from pillar 1 to pillar 3 up to pillar 10
 When prism is at pillar 10, move total station to pillar 2, and
repeat observation from pillar 2 to 10 up to pillar 2 to 3
 Compute the differences and average the sum of differences
to obtain the results
 If the results is >0.01m, it means that the EDM is possibly
faulty, and must be sent for recalibration

4. Results
 Computed result is 0.004m, which is acceptable.
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

25/06/2020
1. Task of the Day
Thursday  Followed Cadastre team to perform strata survey at Flora
Rosa, Putrajaya

2. To note:
 Requires CIDB card and safety boots + COVID-19 test
approval
 COVID-19 test to be done on future visits

3. Progress work
 Finished surveying 4th floor using distometer and measuring
tape
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

26/06/2020
1. Task of the Day
Friday  Finished up logbook for June in office
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

29/06/2020
1. Task of the Day
Monday  Continued strata survey at Mont Kiara Banyan
 Resurvey traverse for detail survey, previous survey did not
meet 1st class requirements

2. Progress work
 Traverse manage to upgrade to 1st class after resurvey
(1:13000)

3. Attachments

Previous established mark was covered by platform but still visible for
setup
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.

TARIKH CATATAN

30/06/2020
1. Task of the Day
Tuesday  Followed Cadastre team to LEKAS highway, Seremban
stretch for title survey

2. Progress work
 8 boundary marks planted