Professional Documents
Culture Documents
June 2
June 2
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
15/06/2020
1. Task of the Day
Monday Follow Cadastre team to perform strata survey at Mont Kiara
Banyan
2. Job overview
To check whether asbuilt building is built according to
architect specifications
3. Procedure
Identify areas that are needed to perform strata survey
Using a distometer, collect the necessary distance data
Record the data and compare the data with the provisional
strata plan
The available tolerance is up to 0.1m, if the measured data is
more than 0.1m from the data on the provisional strata plan,
re-measure the length of the building again. If the same
issue occurs, then 2 possibilities might come into play:
The length of the building on the provisional strata plan
was texted incorrectly
The building was not built according to the dimensions
set by the architect plan
Record and highlight any building length that exceeds the
available tolerance
Ensure that all the necessary building entities are measured,
including
Building perimeter
Center of party wall (excluding mosaic)
Staircase dimensions
Floor levels
Record all data in a neat and organized manner
4. Attachments
Site location
Site location
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
16/06/2020
1. Task of the Day
Tuesday Follow Cadastre team to LEKAS highway, Nilai to perform demarcation
survey
2. Job overview
Land acquisition hs been performed prior to the construction of LEKAS
highway from Kajang to Seremban
With the highway now completed, it is necessary to properly
demarcate boundaries of lots on which the highway passed through
The final output from this survey is the Certified Plans/Pelan Akui
(CP/PA) which will then be used to signify the new lot boundary
3. Procedure
Perform control traverse around the lot that is required to perform
demarcation and
Ensure that the accuracy of the control traverse is first-class (1:8000)
Along the traverse, pick-up any old boundary marks along the way and
record in the field book
Perform solar observation and ensure that the bearig obtained is first-
class (difference between 1st and 2nd observation is within 10”)
Perform C- and M- corrections to obtain corrected traverse bearing
based on azimuth
Compute boundary marks bearing distance based on:
Observed bearing distance based on traverse
Computed bearing distance based on old CP of the lot
The allowable misclose of bearing is within 30”, while the allowable
misclose of distance is within 0.0003m per 20m between the boundary
marks
From there, determine the suitable “base” on which scaling
computations are based upon. The base is any 2 boundary marks that
fulfill the criteria of the allowable misclosure of the breaing and
distance
Scale the old bearing and distance of the base to the new observed
bearing distance of the base for all old boundary bearing and distances
of the lot
For bearing, simply add/minus the difference in bearing of the base
For distance, the formula is given as
𝑁𝑒𝑤 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒
𝐷𝑖𝑓𝑓𝑒𝑟𝑒𝑛𝑐𝑒 𝑖𝑛 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑜𝑙𝑑 𝑎𝑛𝑑 𝑛𝑒𝑤 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑜𝑓 𝑏𝑎𝑠𝑒
=−
𝑂𝑙𝑑 𝑏𝑎𝑠𝑒 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
∗ 𝑙𝑜𝑡 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
Once all the lot bearing and distances has been scaled up to the new
bearing distance, compute the direct line between the nearest survey
stations to the boundary mark
Using the computed data, set up the total station on the field and
target the bearing distance of the boundary mark based on the
computed data
Use a tripod with the prism attached to correctly identify the spot to
plant the boundary mark, then excavate the area with a shovel
The dimensions of the boundary mark must be as shown:
4. Progress work
2 boundary marks planted before halting work due to rain.
5. Attachments
Identified new boundary mark location and performing ground clearing to ensure
that the tripod is able to sit on top of the boundary mark area
Access to site
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
17/06/2020
1. Task of the Day
Wednesday Resume demarcating at LEKAS highway
2. Progress work
2 boundary marks planted before stopping work due to
heavy rain
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
18/06/2020
1. Task of the Day
Thursday Resume demarcating at LEKAS highway
2. Progress work
4 boundary marks planted
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
19/06/2020
1. Task of the Day
Friday Resume demarcating at LEKAS highway
2. Progress work
1 boundary mark planted before stopping work due to heavy
rain
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
22/06/2020
1. Task of the Day
Monday Resume demarcating at LEKAS highway
2. Progress work
2 boundary marks planted before stopping work due to
heavy rain
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
23/06/2020
1. Task of the Day
Tuesday Resume demarcating at LEKAS highway
2. Progress work
Last boundary mark planted, job completed and fieldbook
sent to office for processing/checking.
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
24/06/2020
1. Task of the Day
Wednesday Performed EDM test at Shah Alam EDM test pillar site
2. Job overview
EDM testing of the total station must be done once every 6
months
This is done at EDM test pillars
The observed distance results are compared with the known
distance results and the differences summed and averaged.
The allowable tolerance is <0.01m
3. Procedure
There’s a total of 10 pillars at the EDM test site.
Set-up total station at pillar 1, while prism is set up at pillar 2
Measure the distance
Continue measuring from pillar 1 to pillar 3 up to pillar 10
When prism is at pillar 10, move total station to pillar 2, and
repeat observation from pillar 2 to 10 up to pillar 2 to 3
Compute the differences and average the sum of differences
to obtain the results
If the results is >0.01m, it means that the EDM is possibly
faulty, and must be sent for recalibration
4. Results
Computed result is 0.004m, which is acceptable.
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
25/06/2020
1. Task of the Day
Thursday Followed Cadastre team to perform strata survey at Flora
Rosa, Putrajaya
2. To note:
Requires CIDB card and safety boots + COVID-19 test
approval
COVID-19 test to be done on future visits
3. Progress work
Finished surveying 4th floor using distometer and measuring
tape
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
26/06/2020
1. Task of the Day
Friday Finished up logbook for June in office
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
29/06/2020
1. Task of the Day
Monday Continued strata survey at Mont Kiara Banyan
Resurvey traverse for detail survey, previous survey did not
meet 1st class requirements
2. Progress work
Traverse manage to upgrade to 1st class after resurvey
(1:13000)
3. Attachments
Previous established mark was covered by platform but still visible for
setup
(SILA CETAK IKUT KEPERLUAN)
Tulis laporan harian di sini, sekurang-kurangnya satu mukasurat untuk satu hari.
Laporan harian boleh ditulis dengan tangan atau ditaip.
Gambar rajah boleh ditampar atau dilukis.
TARIKH CATATAN
30/06/2020
1. Task of the Day
Tuesday Followed Cadastre team to LEKAS highway, Seremban
stretch for title survey
2. Progress work
8 boundary marks planted