STANDARED CALCULATION FOR LAYING R.C.

C PIPE
(ASTM SPECIFICATION)

Max. Discharge
External Thickness Hight Of Width of Qty. Of Crush /
SR I/d Of Bedding when Running Slope /
Dia of of Pipe Crushed Excavation Dry Rammed
No. Pipe D/4 Full 2.5 ft / sec Gradient
Pipe D/12+1 Stone FT Cft / Rft
Velocity

1 9" 13" 2" 4" 0.875 2.88' 2.06 1.10 1 /265

2 12" 16" 2" 4" 1' 3.13' 2.43 1.96 1 /385

3 15" 19.5" 2.25" 4.875" 1.219' 3.42' 3.13 3.06 1 /520

4 18" 23" 2.5" 5.75" 1.437' 3.71' 3.89 4.43 1 /660

5 21" 26.5" 2.75" 6.625" 1.656' 4' 4.71 6.00 1 /820

6 24" 30" 3" 7.5" 1.875' 4.29' 5.59 7.88 1 /970

7 27" 33.5" 3.25" 8.375" 2.094' 4.58' 6.54 10.13 1 /1100

8 30" 37" 3.5" 9.25" 2.312' 4.88' 7.54 12.33 1 /1300

9 33" 40.5" 3.75" 10.125" 2.531' 5.17' 8.61 14.81 1 /1500

10 36" 44" 4" 11" 2.75' 5.46' 9.75 17.81 1 /1650

11 42" 51" 4.5" 12.75" 3.188' 6.04' 12.16 24.10 ,1/2050

12 48" 58" 5" 14.5" 3.625' 6.63' 14.84 31.48 ,1/2450

13 54" 65" 5.5" 16.25" 4.062' 7.21' 17.76 39.96 ,1/2850

14 60" 72" 6" 18" 4.5' 7.79' 20.93 49.18 ,1/3300

15 66" 79" 6.5" 19.75" 5.375' 8.38' 27.95 61.56 ,1/3500

16 72" 86" 7" 21.5" 5.479' 8.96' 28.88 70.69 ,1/3500