You are on page 1of 10

DOC-13

ABCI INFRASTRUCTURES PVT. LTD


KNOWLEDGE HUB, DN: 23,2ND FLOOR, SEC:V
SALTLAKE, KOLKATA: 700091

CONSTRUCTION OF BALANCE WORK OF DALKHOLA BYPASS (LENGTH 5.5KM)


INCLUDING ROB ON NH-34 IN THE STATE OF WEST BENGAL.

DETAILED DRAWING FOR


NON-VUP AT CH.-448+059 & VUP AT CH.-450+678
NOVEMBER 2017

CLIENT:- CONSULTANT:-
UL T I NG
NATIONAL HIGHWAYS NS

O
HIGHWAY CONSULTING

HWAY C

EN
AUTHORITY OF INDIA
HCE

G I NE ER
(MINISTRY OF ROAD TRANSPORT &
ENGINEERS PVT. LTD

IG
HIGHWAYS, GOVERNMENT OF INDIA) H S M-88, F/F GURU HARI KISAN NAGER,
G - 5 & 6, SECTOR - 10, DWARKA, NEW NEAR BSES OFFICE, NEW DELHI-110087
DELHI - 110075
DRAWINGS OF UNDERPASSES
DRAWING OF NON-VUP
AT CHAINAGE 448+059
SECTION 1-1 B

SECTION A-A

A
TO DHALKOLA

TO BIKAUR

PRO
CA POSED
PRO Km - 4 N-VUP
TY POSED 48+09
SPAPE OF Km - 0
N - STRU 448
1x10 CTU +059
.0m RE- .
VUP 6

MA
448 LINE
TCH
PLAN

000

44810
0
CLIENT:- EPC Contractor:- Authority Engineer:- Proof Consultant:- Safety Consultant:- Design Director: Consultant: Project:- PREPARED A.K.K Title: Date:
National Highways GENERAL ARRANGEMENT DRAWING OF NON
Authority of India ABCI Infra. Pvt. Ltd. Highway Consulting Nov, 2017
JINDALS CONSORTIUM NS
UL T I NG DESIGNED ANKITA VEHICULAR UNDERPASS AT CH:448+059
Engineers Pvt. Ltd. Construction of Balance Work of Dhalkola Bypass (Length
O

"Knowledge Hub" , DN: 23,


HWAY C

EN

(Ministry of Road Transport & Vikas Vihar, Prem Nagar


HCE
G I NE ER

Highways, Government of India)


2nd Floor, Sec : V Saltlake,
Ambala, Haryana-134003 M-88, F/F Guru Hari Kisan 5.5 km) including ROB on NH-34 in the state of West Bengal CHECKED S.A Scale: Drg. No: Sheet: Rev:
IG

Kolkata : 700091 AS SHOWN


H

S
G - 5 & 6, Sector - 10, Dwarka, Nager, Near Bses Office HCE/RAI-DAL/STR/NVUP/448+059/100
REV. DATE New Delhi - 110075 Delhi-110087 01 OF 01
DESCRIPTION Engr. D/M APPROVED S.A Size: A2 R 0
TRAFFIC DIRECTION TRAFFIC DIRECTION

CLIENT:- EPC Contractor:- Authority Engineer:- Proof Consultant:- Safety Consultant:- Design Director: Consultant: Project:- PREPARED A.K.K Title: Date:
National Highways REINFORCEMENT DRAWING OF NON VEHICULAR
Authority of India ABCI Infra. Pvt. Ltd. Highway Consulting UNDERPASS AT CH:448+059 Nov, 2017
JINDALS CONSORTIUM NS
UL T I NG
Construction of Balance Work of Dhalkola Bypass (Length DESIGNED ANKITA
Engineers Pvt. Ltd.
O

"Knowledge Hub" , DN: 23,


HWAY C

EN

(Ministry of Road Transport & Vikas Vihar, Prem Nagar


HCE
G I NE E R

Highways, Government of India)


2nd Floor, Sec : V Saltlake,
Ambala, Haryana-134003 M-88, F/F Guru Hari Kisan 5.5 km) including ROB on NH-34 in the state of West Bengal CHECKED S.A Scale: Drg. No: Sheet: Rev:
IG

G - 5 & 6, Sector - 10, Dwarka, Kolkata : 700091 H S


Nager, Near Bses Office AS SHOWN
New Delhi - 110075
HCE/RAI-DAL/STR/NVUP/448+059/201 01OF 02
REV. DATE DESCRIPTION Delhi-110087 R O
Engr. D/M APPROVED S.A Size: A2
TRAFFIC DIRECTION

CLIENT:- EPC Contractor:- Authority Engineer:- Proof Consultant:- Safety Consultant:- Design Director: Consultant: Project:- PREPARED A.K.K Title: Date:
National Highways REINFORCEMENT DRAWING OF NON VEHICULAR
Authority of India ABCI Infra. Pvt. Ltd. Highway Consulting UNDERPASS AT CH:448+059 Nov, 2017
JINDALS CONSORTIUM NS
UL T I NG
Construction of Balance Work of Dhalkola Bypass (Length DESIGNED ANKITA
Engineers Pvt. Ltd.
O

"Knowledge Hub" , DN: 23,


HWAY C

EN

(Ministry of Road Transport & Vikas Vihar, Prem Nagar


HCE
G I NE E R

Highways, Government of India)


2nd Floor, Sec : V Saltlake,
Ambala, Haryana-134003 M-88, F/F Guru Hari Kisan 5.5 km) including ROB on NH-34 in the state of West Bengal CHECKED S.A Scale: Drg. No: Sheet: Rev:
IG

G - 5 & 6, Sector - 10, Dwarka, Kolkata : 700091 H S


Nager, Near Bses Office AS SHOWN
New Delhi - 110075
HCE/RAI-DAL/STR/NVUP/448+059/201 02OF 02
REV. DATE DESCRIPTION Delhi-110087 R O
Engr. D/M APPROVED S.A Size: A2
DRAWING OF VUP
AT CHAINAGE 450+678
TO BIKAUR TO DHALKOLA

TABLE
SQ. STRAIGHT DIM.
SK. SKEW DIM.

SECTION B-B B

TABLE
FRL 43.341
FDN. LVL. 35.800

TO BIKAUR TO DHALKOLA

SECTION C-C

)
.539 R (m
0289 2.22
ART 64717 H. 28
X= AT C
H O. 1
RVIC EN SHO HIP N
TO BIKAUR TO DHALKOLA SH
E RO ULD
AD ER
RIAGBARRIE EDGE

RARY
EWA R

300
YE
SHOP SHOP DGE

280

TEMPO
SHOP
PLAN T.
ONS
WC
L - NE C
POS
A .0m E-RC
PRO - 1x12 RUCTUR 0+294
A N S T 2 8
SP E OF m - +300
TYP OSED K - 280
P
PRO TING Km
EXIS
VUP

HOSPE
KEY PLAN
High Tenssion Line Xing

T
Vertical Ht=7.800m

>>>
CLIENT:- EPC Contractor:- Authority Engineer:- Proof Consultant:- Safety Consultant:- Design Director: Consultant: Project:- PREPARED A.K.K Title: GENERAL ARRANGEMENT DRAWING OF VEHICULAR Date:
National Highways
Authority of India ABCI Infra. Pvt. Ltd. Highway Consulting UNDERPASS AT CH. 450+678 NOV,2017
JINDALS CONSORTIUM NS
UL T I NG
Construction of Balance Work of Dhalkola Bypass (Length DESIGNED ANKITA
Engineers Pvt. Ltd.
O

"Knowledge Hub" , DN: 23,


HWAY C

EN

(Ministry of Road Transport & Vikas Vihar, Prem Nagar


HCE
G I NE E R

AMIT Highways, Government of India)


2nd Floor, Sec : V Saltlake,
Ambala, Haryana-134003 M-88, F/F Guru Hari Kisan 5.5 km) including ROB on NH-34 in the state of West Bengal CHECKED S.A Scale: Drg. No: Sheet: Rev:
IG

G - 5 & 6, Sector - 10, Dwarka, Kolkata : 700091 H S


Nager, Near Bses Office AS SHOWN
REV. DATE DESCRIPTION Engr. D/M New Delhi - 110075 Delhi-110087
APPROVED S.A Size: A2 HCE/RAI-DAL/STR/VUP/450+678/GAD /101 1 OF 1 R 0
TRAFFIC DIRECTION

TRAFFIC DIRECTION TRAFFIC DIRECTION

CLIENT:- EPC Contractor:- Authority Engineer:- Proof Consultant:- Safety Consultant:- Design Director: Consultant: Project:- PREPARED KUMAR Title: Date:
National Highways REINFORCEMENT DETAIL OF VEHICULAR
Authority of India ABCI Infra. Pvt. Ltd. JINDALS CONSORTIUM NS
UL T I NG
Highway Consulting DESIGNED ANKITA UNDERPASS AT CH. 450+678 NOV,2017
Engineers Pvt. Ltd. Construction of Balance Work of Dhalkola Bypass (Length
O

"Knowledge Hub" , DN: 23,


HWAY C

EN

(Ministry of Road Transport & Vikas Vihar, Prem Nagar


HCE
G I NE E R

Highways, Government of India)


2nd Floor, Sec : V Saltlake,
Ambala, Haryana-134003 M-88, F/F Guru Hari Kisan 5.5 km) including ROB on NH-34 in the state of West Bengal CHECKED S.A Scale: Drg. No: Sheet: Rev:
IG

G - 5 & 6, Sector - 10, Dwarka, Kolkata : 700091 H S


Nager, Near Bses Office AS SHOWN
REV. DATE New Delhi - 110075 Delhi-110087 HCE/RAI-DAL/STR/VUP/450+678/REINF. /201 R 0
DESCRIPTION Engr. D/M APPROVED S.A Size: A2 1 OF 2
CLIENT:- EPC Contractor:- Authority Engineer:- Proof Consultant:- Safety Consultant:- Design Director: Consultant: Project:- PREPARED KUMAR Title: Date:
National Highways REINFORCEMENT DETAIL OF VEHICULAR
Authority of India ABCI Infra. Pvt. Ltd. JINDALS CONSORTIUM UL T I NG
Highway Consulting DESIGNED ANKITA UNDERPASS AT CH. 450+678 NOV,2017
NS
Engineers Pvt. Ltd. Construction of Balance Work of Dhalkola Bypass (Length
O

"Knowledge Hub" , DN: 23,


HWAY C

EN

(Ministry of Road Transport & Vikas Vihar, Prem Nagar


HCE
G I NE E R

Highways, Government of India)


2nd Floor, Sec : V Saltlake,
Ambala, Haryana-134003 M-88, F/F Guru Hari Kisan 5.5 km) including ROB on NH-34 in the state of West Bengal CHECKED S.A Scale: Drg. No: Sheet: Rev:
IG

G - 5 & 6, Sector - 10, Dwarka, Kolkata : 700091 H S


Nager, Near Bses Office AS SHOWN
REV. DATE DESCRIPTION Engr. D/M New Delhi - 110075 Delhi-110087
APPROVED S.A HCE/RAI-DAL/STR/VUP/450+678/REINF. /201 2 OF 2 R 0
Size: A2