QUALITY CONTROL DEPARTMENT

AL BABTAIN CONTRACTING COMPANY

Request For Action (RFA)


115KV OHTL &
Project Name UNDERGROUND CABLE Contract No. : 01-36-16-2038 Ref. No.:RFA-E-36
FISF
Date of Inspection 10/05/2018 Time of Inspection 9: 20 AM
Quality & Safety Inspections
INSPECTION

Observation Location
ABC QC notice during the daily surveillance the duct bank #4 & 7 are used for heaving 115 KV
equipment traffic. Underground cable
route

Recommended Corrective Action to be taken


Recommendations Target

ABC QC would like to notify construction team proactively to close the duct bank for heavy traffic
or make sure the below grade level to be complied as per standard requirements ASAP
SAES-P-104 table 2.
QC Engineer
ACTION

Name: Raziq ullah

Signature: Date : 10/05/2018


Compliance with the Recommended Corrective Action
Site Manager/Engineer
Actions:
Name: Suleiman Al khaldi

Signature: Date :
Confirmation of Corrective Action

Closed out Date: Signature :


Remarks……………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………
REVIEW

Note: If the issue is pertaining after providing the inspection, remainder has to be given once again (please mention as REMAINDER
in the Ref. no column) and send that copy to Project manager and Site Engineer.
Project Manager Comments:

Name: Signature: Date:

Form No . :AC: PR: CNC: 01/F07 Version:04 15.06.2017