6MM THK. POWDERED COLORED
LTO.7.CR.P2.L1.2
CO M M U N
GLASS W/ ANALOK ALUMINUM
AWNING TYPE WINDOW FRAME
LTO.7.CR.P2.L1.1
EN
B A
TM
IC
AT
LTO.7.CR.P2.L1.0 R
N S DE PA
IO
1.03
1.00 0.30
Top of Beam
0.10
Ceiling Line
1.20 B LEGEND :
RAMP
TPD - TOILET PAPER DISPENSER
4.33
B TPH - TOILET PAPER HOLDER
3.10
0.88
HD TPD HD
TSD TSD TSD TSD
1.32
2.80
BH - BIDET HOSE
1.93
HD
A Finish Floor Line
0.20
1.48
A B Prepared by:
4 3 2 1 CHERYL S. GOCELA
Admin - aide
Roof Appex
1.03
Top of Beam Submitted by:
Roof Appex
Ceiling Line
1.03
4.33
Top of Beam
Ceiling Line RAUL B. AGUILOS, CESO III
3.10
Regional Director - Region 07
4.33
3.10
0.20
Natural Grade Line
0.90
1.00
Top of Beam
Ceiling Line
B ATTY. EFREN C. MONCUPA
4.33
3.80
3.10
Sheet Content:
TOILET FLOOR PLAN
Finish Floor Line FRONT ELEVATION
0.20
N
A
D
T OF TR
CO M M U N
EN
TM
IC
AT
R IO
1"X1" VENT SLAT W/ N S DE PA
1/2"X2" HEADER
Republic of the Philippines
FIBER CEMENT BOARD DEPARTMENT OF TRANSPORTATION
METAL FURRING AND COMMUNICATIONS
DS DS
LIGHTING LEGEND:
8 WATTS RECESSSED PINLIGHT
COVE LIGHT
PROJECT NAME :
CONSTRUCTION/RENOVATIONS
OF TOILET FACILITIES LTO
Region 7 Tagbilaran Office
LOCATION :
Prepared by:
CHERYL S. GOCELA
Admin - aide
2.80
2.80
Sheet No.:
2 2
A 2 TS 4
A T IO
OR T
CONSTRUCTION NOTES NS
P N
A
N
A
D
T OF TR
A. GENERAL
CO M M U N
1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS
OTHERWISE SHOWN OR NOTED MODIFY TYPICAL DETAILS AS DIRECTED TO MEET
1 2 3 4 4-12mm Ø Vert. Bars
EN
SPECIAL CONDITION.
10MM Ø LATERAL TIES
TM
IC
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL R IO
AT
STRUCTURAL STEELS. MISCELLANOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE 9.25 SPACED @ 2-0.05, 3-0.1, N S DE PA
SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION. 4-0.15 & REST @ 0.20M
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN 3.50 2.00 3.75 Republic of the Philippines
CHECK WITH MECHANICAL AND ELECTRICAL CONTRACTORS FOR CONDUITS PIPE
ON CENTER
SLEEVES, ETC., TO BE EMBEDDED IN CONCRETE. C1F1 C1F1 C1F1 C1F1 DEPARTMENT OF TRANSPORTATION
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE AND COMMUNICATIONS
SHORING & BRACINGS OF THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED B
0.25
1.00
DURING CONSTRUCTION. W1F1 W1F1 W1F1
2.80
W1F1
W1F1
W1F1
W1F1
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING
ON FILL ON FILL ON FILL
CODE OF AMERICAN CONCRETE INSTITUTE (ACI-318)
2. ALL CONCRETE SHALL DEVELOP A MIN, COMPRESSIVE STRENGTH AT THE END OF
TWENTY EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE AND
6-12MMØ BARS
W1F1 W1F1 W1F1 SPACED EQUALLY
SLUMPS AS FOLLOWS.
0.90
LOCATION 28 DAYS STRENGTH MAX SIZE AGGREGATE MAX. SLUMP A O.C. BOTHWAYS
0.25
1.20
FOUNDATION, FOOTINGS 4000PSI C1F1 C1F1 C1F1 C1F1
TIE BEAMS
ALL OTHERS, INCLUDING 4000 PSI 3/4 IN. (19MM) 4 IN. (100MM) 3.50 2.00 3.75 1.00
SUSPENDED SLABS
COLUMNS 4000 PSI 3/4 IN. (19MM) 4 IN. (100MM) 9.25
BEAMS, SLABS, GIRDERS 4000 PSI 3/4 IN. (19MM) 4 IN. (100MM)
10MMØ STEEL BARS
PROJECT NAME :
0.30
SLAB ON GRADE 2500 PSI 3/4 IN. (19MM) 4 IN. (100MM)
@ 0.60M O.C. BOTHWAYS
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 40 FPR DIAMETER 4" Gravel Bedding CONSTRUCTION/RENOVATIONS
16 AND SMALLER BARS; ASTM GRADE 60 FOR DIAMETER 20 AND LARGER BARS.
0.10
OF TOILET FACILITIES LTO
4. IN GENERAL THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE
FOUNDATION PLAN C1F1 SEC. DETAIL Region 7 Tagbilaran Office
DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS SCALE: 1:75 SCALE: 1:20 MTS. 1.00 LOCATION :
OTHERWISE SHOWN OR NOTED.
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. LTO, Region 7, Bais
SUSPENDED SLABS 3/4 IN. (19MM)
SLAB ON GRADE
1 IN. (25MM)
1 2 3 4
BEAM STIRRUPS AND COLUMN TIES 1 1/2 IN. (38MM)
2.80
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY 0.
0.90
RB 8
POSITIONED AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. 3
0.7 Submitted by:
0.67
4
0.50
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS,
0.32
SILLS, STOOLS, EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY
0.28
THE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS. RB RB RB
A
0.10
RAUL B. AGUILOS, CESO III
0.45
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE 3.50 2.00 3.75 0.82 2.70
DAYS IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP FOG SPRAYING, Regional Director - Region 07
CURING COMPOUNDS OR OTHER APPROVED METHODS. 9.25 3.52
3-10mm. dia. LONGITUDINAL
0.15
BARS O. C. & 10mm. dia. CROSS
10. STRIPPING OF FORMS AND SHORES: BARS SP. @ 0.30m. O. C.
0.10
ROOF BEAM PLAN
FOUNDATION 24 HRS
3.80
4 IN. (200MM) 10Ø @ 400MM 10Ø @ 600 MM
5. REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 30 BAR DIAMETERS WHERE H-T H-T H-T H-T
SPLICE DOWELS FROM FOOTING OR SLABS SHALL EXTEND INTO THE BLOCK WALL A Approved:
MINIMUM OF 30 BAR DIAMETERS, AND DOWELS TO MATCH.
0.30
10MMØ TYPICAL SAG ROD
TABLE OF LAP SPLICE & ANCHORAGE LENGTH 3-12mm Undersecretary for Project
SPACED @ 3.00m O.C. 2-12mm
BAR SIZES LAP SPLICES LENGTH ANCHORAGE
@midspan Implementation and Special Concerns
LENGTH (M) 12MMØ TYPICAL STIFFENER BARS L/5 L/5 @ support
(MM) TYPE "A" TYPE "B" Sheet Content:
10 0.40 0.30 0.60 2" x 4" STEEL CEE PURLINS FOUNDATION PLAN
SPACED AT 0.60m O.C.
12 0.45 0.35 0.60
TYPICAL RB SEC. DETAIL ROOF BEAM PLAN
16 0.61 0.40 0.60 SCALE: 1:30 MTS. ROOF FRAMING PLAN
0.56
C1F1 DETAIL
20 0.76 0.60
N
A
D
T OF TR
CO M M U N
USE : 2 - 3.5 mm² TW COPPER WIRE IN USE : 2 - 3.5 mm² TW COPPER WIRE IN
LEGEND :
15 mm Ø PVC CONDUIT
EN
15 mm Ø PVC CONDUIT
OVER CURRENT PROTECTION 4.50
TM
OVER CURRENT PROTECTION
IC
AT
USE : 20 A USE : 20 A R
FLOURESCENT LAMP N S DE PA
IO
1 2 0.15 2.00 0.15 0.95 0.15 0.95 0.15
INCANDESCENT LAMP 10MM Ø TOP BARS Republic of the Philippines
e Sef a Sc d c
2-GANG CONVENIENCE OUTLET
0.15
Sa DEPARTMENT OF TRANSPORTATION
e e
Sb
c c LIGHTING LINE 0.50 AND COMMUNICATIONS
4"Ø PVC Pipe, NELTEX PIPE
CONVENIENCE OUTLET LINE CO
d d d Manhole Manhole Manhole outlet
0.50
0.40
1.50
1.20
b
f f f
b PANEL BOARD CO
Sa SINGLE SWITCH
0.40
S ab TWO GANG SWITCH
0.15
S abc THREE GANG SWITCH
10MM Ø DEF.BARS SPACED @
LIGHTING LAYOUT SERVICE ENTRANCE
PLAN
0.15 M. O.C.
SCALE: 1:100 M KWH METER Inlet
0.10
OVER CURRENT PROTECTION
USE : 20 A
OF TOILET FACILITIES LTO
0.30
0.40 AIR SPACE 4"Ø PVC Pipe, NELTEX PIPE
3
outlet Region 7 Tagbilaran Office
SPECIFICATIONS: LOCATION :
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE
1.80
DIGESTIVE LEACHING LEACHING
LTO, Region 7, Bais
1.20
LATEST EDITION OF ELECTRICAL CODE OF THE PHILIPPINES.
2. THE CONTRACTOR SHALL VERIFY & ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE TO CHAMBER CHAMBER CHAMBER
POWER SUPPLY. 10MM Ø DEF.BARS SPACED @
3. ALL WIRING SHALL INSTALLED IN CONDUIT PIPE FOR LIGHTING & POWER FEEDER 0.15 M. O.C.
& SERVICE ENTRANCE.
4. ALL CONDUITS & WIREWAYS PASSING FROM PARTITION SHALL BE SEALED 2% slope 3-10MMØ HOR. BARS W/
TO PREVENT PASSAGE OF AIR MOISTURE. 10MM Ø TRANSVERSE BARS @ 0.30M. O.C.
0.20
5. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE UNDER THE DIRECT SUPERVISION
OF DULY PRO. ELECTRICAL ENGINEER OR MASTER ELECTRICIAN. Prepared by:
6. MOUNTING HEIGHTS SHALL BE AS FOLLOWS: 0.40
6.a ) LIGHT CONTROL SWITCHES
-----1.40 mts. above floor finish line @ center
POWER LAYOUT 6.b) COVENIENCE OUTLET & INTERCOM OUTLET SEPTIC TANK SEC. DETAIL
----0.30 mts. above floor finish @ center
6.c) PANEL BOARD & DISCONNECT SWITCHES
Scale: 1:35 mts. CHERYL S. GOCELA
SCALE: 1:100 - as required by field condition
Admin - aide
- as required by equipment served
7. ALL MOUNTING HEIGHTS & SAMPLES SHALL BE SUBJECT PRIOR TO APPROVAL BY THE ARCHITECT/ ENGINEER.
Submitted by:
CO
1-3/4"Ø 90° ELBOW 1-3/4" Ø TEE
CO VTR
RAUL B. AGUILOS, CESO III
FD
1-3/4" Ø TEE
1-3/4"Ø 90° ELBOW 1-3/4"Ø 90° THREADED ELBOW
1-3/4"Ø 90° ELBOW 1-3/4"Ø 90° ELBOW