length Diameter Spacing Area No Bar No Name length Diameter Spacing Area No bar No Name
Top Near 30 25 150 3272 OK 201 201Y25--150N1 6.89 20 200 1570.8 35 35Y20--200N2
Top Far 30 25 150 3272 OK 201 201Y25--150F1 6.89 20 200 1570.8 35 35Y20--200F2
Top Near 30 16 150 1340 OK 201 201Y16--150N1 6.89 16 150 1340.4 47 47Y16--150N2
Top Far 30 16 150 1340 OK 201 201Y16--150F1 6.89 16 150 1340.4 47 47Y16--150F2
Top Near 30 16 150 1340 OK 201 201Y16--150N1 6.89 16 150 1570.8 47 47Y16--150N2
Top Far 30 16 150 1340 OK 201 201Y16--150F1 6.89 16 150 1570.8 47 47Y16--150F2
Middle Wall
Top Near 30 25 125 3927 OK 241 241Y25--125N1 6.89 16 150 1570.8 47 47Y16--150N2
Top Far 30 25 125 3927 OK 241 241Y25--125F1 6.89 16 150 1570.8 47 47Y16--150F2
Bar Type
length Diameter Spacing Area No Bar No Name length Diameter Spacing Area No bar No Name
Top Near 30 16 150 1340 OK 201 201Y16--150N1 6.89 16 150 1340.4 47 47Y16--150N2
Top Far 30 16 150 1340 OK 201 201Y16--150F1 6.89 16 150 1340.4 47 47Y16--150F2
Bottom Slab
Top Near 30 20 200 3927 OK 151 151Y20--200N1 49.5 20 200 1570.8 248 248Y20--200N2
Top Far 30 20 200 3927 OK 151 151Y20--200F1 49.5 20 200 1570.8 248 248Y20--200F2
Top Near 43.00 20.00 200.00 3927 OK 216 216Y20--200N1 6.5 16 125 1570.8 53 53Y16--125N2
Top Far 43.00 20.00 200.00 3927 OK 216 216Y20--200F1 6.5 16 125 1570.8 53 53Y16--125F2
Top Near 15.00 20.00 150.00 3927 OK 101 101Y20--150N1 30 16 100 1570.8 300 300Y16--100N2
Bar Type
length Diameter Spacing Area No Bar No Name length Diameter Spacing Area No bar No Name
Top Far 15.00 20.00 150.00 3927 OK 101 101Y20--150F1 30 16 100 1570.8 300 300Y16--100F2
Reinforcement Quantity:
Assumption: The overlap lengths, bending shapes and corner details have been addressed by increment of 20% till BBS is prepared.
Vertical Horizontal Vertical Horizontal Vertical Horizontal Vertical Horizontal Vertical Horizontal
Vertical Horizontal Vertical Horizontal Vertical Horizontal Vertical Horizontal Vertical Horizontal
Assumption: The overlap lengths, bending shapes and corner details have been addressed by increment of 20% till BBS is prepared.
Assumption: The overlap lengths, bending shapes and corner details have been addressed by increment of 20% till BBS is prepared.
280 280
K bal K bal
280 3 st Kbal 0.253 280 3 st Kbal 0.253
280 280
K bal K bal
280 3 st Kbal 0.253 280 3 st Kbal 0.253
280 280
K bal K bal
280 3 st Kbal 0.253 280 3 st Kbal 0.253
280 280
K bal K bal
280 3 st Kbal 0.253 280 3 st Kbal 0.253
280 280
K bal K bal
280 3 st Kbal 0.253 280 3 st Kbal 0.253
280 280
K bal K bal
280 3 st Kbal 0.253 280 3 st Kbal 0.253
280 280
K bal K bal
280 3 st Kbal 0.253 280 3 st Kbal 0.253
Earth Pressure
Ko 1 sin ' for sands and gravel
Ka 1 sin ' for clay, consider C value
1 sin '
Soil Property
saturated density γsat
submerged density γsat-γw
Area of reinforcement mm2
8 50.27
10 78.54
12 113.10
16 201.06
20 314.16
25 490.87
Assumptions
1. 100 yrs Flood level at settling basin 461.215 Hence, assume water table at 461.215
2. Lowest level of settling basin at the end 452.19
3. Consider the case, one chamber is flushed, water level in other two chambers is up to invert level of gate at forebay
4. Soil is considered to be moist clay and and sand clay mixture
Settling Basin
S.N Description Quantity Unit Remarks
1 Weight of settling basin
Area 81.64 m2 From dwg, mid section
Length 15 m each panel of length 15 m
Volume 1224.6585 m3
Unit weight 25 KN/m3
Weight 30616.4625 KN
2 Weight of Water
Depth of water 0 m
width of settling basin 60 m
Length 15 m
Unit weight 10 m
Weight of water 0 KN
Total Vertical force 30616.4625 KN
3 Uplift pressure of Water
Area 322 m2
Max depth of water level 9.025 m 100 yrs flood level
Creeps coefficient 9 Gorge, page 530
Head loss (Bligh's theory) 1.00 m
Water head 8.02 m
Pressure intensity 80.22 KN/m2 Section F-F
Uplift force 25831.6 KN
Factor of safety 1
Design uplift force 25831.56 KN
4 Check Safe in uplift
Forebay Basin
note: due to varying dimensions, apporximate quantities are taken
water inside the chamber is not considered, since the intake level of pipe is at the base of the basin