Norms for Rate Analysis

Activity Group:- 19 : Bearings and expansion joints (Bridges, slab etc.)


Spec. Resources
Activity
Nos
Clause Description of works Labour Materials Equipment Remarks
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
19.01 1902 Providing and installing different no Bearing no 1.0000
type of Bearings including all
necessaary axilliary and incidental Add 10% of the cost of Bearing for necessary labour, materials, equipment and other consumables.
works etc. complete as per
drawing and specification.

19.02 1901 Providing and installing Expansion m Expansion Joint m 1.1000


Joints including all necessaary
axilliary and incidental works etc.
complete as per drawing and Add 10% of the cost of expansion joint for necessary labour, materials, equipment and other consumables.
specification.

19 - 1
Norms for Rate Analysis
Activity Group:- 19 : Bearings and expansion joints (Bridges, slab etc.)
Spec. Resources
Activity
Nos
Clause Description of works Labour Materials Equipment Remarks
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.

19 - 2