You are on page 1of 6

Title: Y2 - MC8G_Schedule Batch Job for Mass

Processing
Functional Area: Production Planning
Sub Area:

Last Update: 09/06/20

Y2 - MC8G_Schedule Batch Job for Mass MC8G


Processing

Publisher Information

File Name
Y2 - MC8G_Schedule Batch Job for Mass Processing
Link 1

Link 2

Link 3

Link 4

Job Role

Insert Job Role rows as necessary.

Transaction User Data Description


MC8G Schedule Batch Job for Mass Processing
Client Language Doc Type Job Role
EN BPP

File Name: 489762047.doc Page: 1 of 6


Title: Y2 - MC8G_Schedule Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

Change History
Update the following table as necessary when this document is changed.
 
Date Name Change Description
     

Trigger: When you need to transfer the forecast over to demand management via a background job. 
 
 
Business Process Overview
 You have the option of transferring the forecast over to demand management via a job.  You can also do it
online.  This job can be set to run on a periodic basis. 
 
 
 
 
 
 
 
Input - Required Fields Field Value / Comments
   
   
   
 
 
Output - Results Comments
   
   
   
 
 
Tips and Tricks
 
 If you wish for the job to be set on a periodic basis, then you need to specify the periods when
setting the job schedule.
 
 

Access Transaction:
 
Via Menu Path Logistics  Planning and MRP Execution  Sale Operation
Planning (SOP)  Transactions  MC8G - Schedule Batch Job for
Mass Processing
Via Transaction Code MC8G
 

File Name: 489762047.doc Page: 2 of 6


Title: Y2 - MC8G_Schedule Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

Procedure:

Schedule Background Run for Selected Planning Objects

1. Update the following required and optional fields:

Field Name Description R/O/C Values


Job number Number that uniquely R Enter value in Job number.
identifies a background job.
Example: ZSOP-8110

2. Click button.

Start Time

File Name: 489762047.doc Page: 3 of 6


Title: Y2 - MC8G_Schedule Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

Error: Reference source not found Tip:  You can either execute this batch job to be
immediate or set a scheduled date and time.

A) To schedule a date & time, refer to steps 3 to 6.


B) To execute this batch job immediately, refer to steps 7 to 9.

File Name: 489762047.doc Page: 4 of 6


Title: Y2 - MC8G_Schedule Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

OPTION A : To set a date and time to execute this batch job.

3. Click button.

Start Time

4. Update the following required and optional fields:

Field Name Description R/O/C Values


Date Date the batch input session R Enter value in Date.
was created
Example: 12.05.2008
Time Description of the Time. R Enter value in Time.
Example: 10:00:00
Periodic job Indicator to make job run O
periodically

5. Click to check if there is any missing information. If everything is in place, then click
to save the job.

6. Message “ ” will be displayed.

File Name: 489762047.doc Page: 5 of 6


Title: Y2 - MC8G_Schedule Batch Job for Mass
Processing
Functional Area: Production Planning
Sub Area:

OPTION B : To execute the batch job immediately.

7. Click .

Start Time

8. Click to check if there is any missing information. If everything is in place, then click
to save the job.

9. Message “ ” will be displayed.

10. The Schedule batch job for mass process (transfer SOP to demand management) task is completed.

File Name: 489762047.doc Page: 6 of 6

You might also like