Professional Documents
Culture Documents
Y2 - MC8G - Schedule Batch Job For Mass Processing
Y2 - MC8G - Schedule Batch Job For Mass Processing
Processing
Functional Area: Production Planning
Sub Area:
Publisher Information
File Name
Y2 - MC8G_Schedule Batch Job for Mass Processing
Link 1
Link 2
Link 3
Link 4
Job Role
Change History
Update the following table as necessary when this document is changed.
Date Name Change Description
Trigger: When you need to transfer the forecast over to demand management via a background job.
Business Process Overview
You have the option of transferring the forecast over to demand management via a job. You can also do it
online. This job can be set to run on a periodic basis.
Input - Required Fields Field Value / Comments
Output - Results Comments
Tips and Tricks
If you wish for the job to be set on a periodic basis, then you need to specify the periods when
setting the job schedule.
Access Transaction:
Via Menu Path Logistics Planning and MRP Execution Sale Operation
Planning (SOP) Transactions MC8G - Schedule Batch Job for
Mass Processing
Via Transaction Code MC8G
Procedure:
2. Click button.
Start Time
Error: Reference source not found Tip: You can either execute this batch job to be
immediate or set a scheduled date and time.
3. Click button.
Start Time
5. Click to check if there is any missing information. If everything is in place, then click
to save the job.
7. Click .
Start Time
8. Click to check if there is any missing information. If everything is in place, then click
to save the job.
10. The Schedule batch job for mass process (transfer SOP to demand management) task is completed.