You are on page 1of 5
SOBHA LTD Ser s0ERN Ear ge eM Location: CPD Date of calibration 03.08.2019 Relwal Load) Indicated Ks Load (Kg) | Erforin Kg 9% (41+) Error ke a Oe 00%. 10 0 1 JOVER ALL REMARKS : Note: As per 18:4926:2003 teres preggo 3% Ug Withers int opr uate Rotual Load (Aggregate) Base Unloading Sequence indicated Load (Kay | EtPor in Kg | 9% (44) Error a t = SOBHA LTD atone rc den SecA teeing Sr Pa Ve an nn Location: CPO Cement (Base) Date of calibration 03.08.2019 Toading Sequence Unioading Sequence ‘Aetual Load] Indicated ‘Actual Load | Indicated (Kg) | Load (Ka) _| 9% (+7) Error (Kq)__| Load (Kg) (+) Exror 0 0 0 300 302 2 O% 20 20, 0 3.00% 280 281 4 0.36% 40 40 0 0.00% 261 262 1 0.38% 60 80 0 0.00% 240 24t 1 0.42% 80 80 0 0.00% 224 221 0 0.00% “100 404 4 1.00% 200 204 4 0.50% 120) “21 1 0.83% 180 182 2 4.11% 140. at 1 0.71% 160 “61 4 0.63% 160 160 ° 0.00% 140 144 4 Or1% 180 181 1 0.56% +120 124 1 0.83% 200 204 4 0.50% “100 102 2 2.00% 220) 224 1 0.45% at 8 0 0.00% 240 242 2 0.83% 60 60 0 0.00% 260 261 4 0.38% 40 40 0 0.00% 280. 281 1 0.36% 20 20 3 0.00% 300 302 2 0.67% 0 0 0 0.00% OVER ALL REMARKS : Note : As por 18:4926:2009 Holterances for Gement = #/-2% te Sam tent operator ually Conrot inc. “Plant Manager SOBHA LTD. Seearies0,0nSsmer ogee oP earn Moat JLocation: §=— CPD. Cement (Face) [Date of calibration 03.08.2019 Loading Sequence Unloading Sequence ‘Actual Load | Indicated ‘Actual Load | Indicated (Kg) Load (Kg) _| % (++) Error (Kg) Load (Kaj _fe (4/-) Error 0. 0 0 400 100 o 0.00% 20, 20 o 7.00% Ed 20. oO 0.00% 40, 40 a 0.00% 60. 0 o 0.00% 60, 60 a 0.00% at 40 = 2.48% 80 80. oO 0.00% 20, 20 o 0.00% 100 100) 0 0.00% 0 oO 0 OVER ALL REMARKS: Pant Oberator Quatty Céptrat SOBHA LTD Location: + CPD. Date of calioration 03.08.2019 Aggregate (Face) Loading Sequence Unioading Sequence ote: As per tS:4926:2009 otlerances for aggrecat Piant Operator Qvaliy Cohtret, ‘Actual Load | Indicated ‘Actual Load | Indicated (Kg) | Load (kg) | Errorinkg | % (#4) Error | (Ka) Load (Kg) [Error in Kg % (4/-) Ertor Oo. 0 300 304 4 [0.33% 20 20 0 0.00% 280 28 4 0.36% 40 40 0 .00% 261 261 0 0.00% 60 60. 0 0.00% 240 240 0 0.00% 80 80 0 0.00% 220 220 0 0.00% 400 | 100, 0 0.00% 201 201 0 0.09% | 420 120 0 0.00% 480 184 1 0.56% | 140 140. 0 0.00% 460 18t 4 160 160 0 0.00% at iat 0 180 181 4 0.56% 120 720, 0 __200 201 1 0.50% 400. “01 4 220 220 0 0.00% 81 84 0 240. 2a 0.42% 60 60 0 260. 260 0 0.00% 44 40 = 280 280 0 0.00% 20 20 0 300 301 4 0.33% 0 0 0 [OVER ALL REMARK’ SOBHA LTD Seer OLntaar lige Mace en ae Gro ra Location: CPD Pigment (Face) [Date of calibration 03.08.2018 Loading Sequence Unloading Sequence ‘Actual Load] Indicated Actual Lead | indicated (Kg) |_Load (Kg) | %6 (+H) Error Kg) Load (Kg) bo (42) Error 0 0 0 80. 81 1 125% 20 20, 0 0.60%. ‘60 60 0 0.00% 40 40 0 0.00% 40 40, 0 (0.00% 60 60 o 0.00%. 20 20 0 0.00% 80 81 4 1.25% 0 0 0 0.00% OVER ALL REMARKS = Note : As por 1:4926:2003 [Tottrances for Cement = +/-2% “eo aay fant Manager

You might also like