i. Defective materials
ii. Faulty design
iii. Fault in erection or at workshop
iv. Bad workmanship
v. Lack of skill
vi. Carelessness
vii. Shortage of water in boiler
viii. Short circuit
ix. Physical explosion
x. Tearing apart on account of centrifugal force
xi. Storm.
Replacement cost includes cost, freight, duties, taxes, erection costs etc.
Under Insurance shall apply if sum insured does not represent new replacement
value.
Underwriting Considerations:-
The rate, terms and conditions for such type of insurance are obtained from the
re-insurer Sadhatan Bima Corporation (SBC).
Period : Annual
Page 1 of 6
ENGINEERING INSURANCE
Badal Ch Rajbangshi ACA, FCS
Loss or damage to stock due to rise in temperature within the cold storage
chamber in consequence of sudden and unforeseen physical loss/damage to
machinery covered under Machinery Insurance Policy.
Sum Insured:
Premium:
Minimum 50%of full premium based on sum insured stated in the schedule at the
time of commencement of the policy to be retained.
Underwriting Considerations:
The rate, terms and conditions for such type of insurance are obtained from the
re-insurer Sadharan Bima Corporation (SBC).
Period: Annual
Page 2 of 6
ENGINEERING INSURANCE
Badal Ch Rajbangshi ACA, FCS
Unforeseen and sudden physical loss of or damage to construction works as per schedule
of the policy during construction period from any cause, not specifically excluded.
Any peril, not excluded specifically is covered. But main perils include collapse, crack,
erosion, fire, burglary etc.
Additional perils viz, SRCC, Design defects, Flood, Cyclone, Earthquake, inland transit
may also be covered on consideration of additional premium.
Liability to third party for bodily injury or death or damage to third party property may
also be included on consideration of additional premium.
Initially Total Contract Value (TCV) as per Contract Agreement between the Principal and
the Contractor.
On successful completion of the construction works TCV is adjusted with completed value
on actual basis.
TCV includes cost of all construction materials including freight, custom duties, and
wages.
Cost/value of materials supplied by the Principal also to be included in the sum insured.
Cost for clearance of debris may also be included in the sum insured.
Whole period of contract as per Contract of Agreement between the Principal and the
Contractor but basically it commences on unloading of materials at site of construction
and ceases immediately on successful completion and handing over whichever is earlier.
Underwriting Considerations:
The rate, terms and conditions for such type of insurance are obtained from the re-
insurer Sadharan Bima Corporation.
Page 3 of 6
ENGINEERING INSURANCE
Badal Ch Rajbangshi ACA, FCS
Any peril, not excluded specifically is covered. But main perils include consequence of
human error in erection or faulty erection, fire, burglary etc.
Additional perils viz, SRCC, Manufacturers’ risks, Design defects, Flood, Cyclone,
Earthquake, inland transit may also be covered on consideration of additional premium.
Liability to third party or third party property damage may also be included on
consideration of additional premium.
Initially Total Contract Value (TCV) as per Contract Agreement between the principal and
the erector.
Period of Policy:
Whole period of contract as per Contract of Agreement between the Principal and the
erector but basically it commences on arrival of 1 st consignment of materials at site of
erection and ceases immediately on successful completion and handing over whichever is
earlier.
Underwriting Considerations:
The rate, terms and conditions for such type of insurance are obtained from the re-
insurer Sadharan Bima Corporation.
Page 4 of 6
ENGINEERING INSURANCE
Badal Ch Rajbangshi ACA, FCS
This policy is intended to cover unforeseen and sudden physical loss/damage to the
insured’s plant and machinery from any cause, not excluded specifically during :-
At work or at rest
In course of operation
In course of re-erection.
Underwriting Considerations:
The rate, terms and conditions for such type of insurance are obtained from the re-
insurer Sadharan Bima Corporation.
This insurance is intended to cover sudden and unforeseen damage to or loss of:-
Liability at law for fatal or non-fatal injury to any person other than insured’s
own employees or workmen and members of insured’s family.
New Replacement Value (NRV) of Boiler or Vessel of same kind and capacity.
Page 5 of 6
ENGINEERING INSURANCE
Badal Ch Rajbangshi ACA, FCS
Replacement cost includes cost, freight, duties, taxes, erection costs etc.
Under Insurance shall apply if sum insured does not represent new replacement value.
Underwriting Considerations:
The rate, terms and conditions for such type of insurance are obtained from the re-
insurer Sadharan Bima Corporation.
Period : Annual
1) Sudden and unforeseen physical loss to the Electrical Equipment from any cause
not excluded specifically during:-
a. at work or at rest
b. during dismantling for overhauling or cleaning
c. in course of operation
d. in course of re-erection
NRV includes cost, freight, customs duties, taxes and cost of erection.
Underinsurance shall apply if sum insured does not represent new replacement value.
Underwriting Considerations:
The rate, terms and conditions for such type of insurance are obtained from the re-
insurer Sadharan Bima Corporation.
Period: Annual
Page 6 of 6