You are on page 1of 12

STEEL WINDOWS

A STANDARD OF
EXCELLENCE

STEEL
WINDOW
INSTITUTE

Montage Hotel & Resort


Beverly Hills, CA
HKS Hill Glazier Studio
Integra Series
Description:STL212HR Hot Rolled Window
Function:Awning, Hopper, Casement, Fixed
Detail:ALL
Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1

2 1 1 2 1

2 2 W-0014
8 6
7

6
5 6

3 4 3 3 3 4 Optional Glazing Bead

HR-601

HR-601
HR-589

HR-595R INSIDE

HR-598
OUTSIDE

#6 X 1" PL-FH-SMS 8 MUTIN


410 TEK/2

HR-595R
HR-601

HR-601
HR-595R

HR-595R

HR-601

3
5 #6 X 1" PL-FH-SMS 6
410 TEK/2
HR-589

1
OUTSIDE

INSIDE

HR-601

HR-601

#6 X 1" PL-FH-SMS
410 TEK/2
HR-598

HR-598
OUTSIDE

INSIDE

4
HR-589
7

WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13


Integra Series
INTEGRA
Function:Awning,Series
Description:STL212HR Hot Rolled Window
Hopper, Casement, Fixed
STL212HR
Detail:ALL
Awning, Hopper, Casement, Fixed
Product Standards and Guide Specifications Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1

1995
2
CSI SECTION
1
08510 Steel Windows 1 2
2004 CSI SECTION 08 51 23 Steel Windows 1
A.
Heavy custom windows shall be manufactured from
PART 1 - GENERAL solid hot rolled steel shapes
1. DESCRIPTION
2 2 1. Combined weight W-0014of frame and ventilator sections
8 6 be a minimum of 4.20 pounds per lineal foot.
shall
7 A. Work included: Frame section alone shall not weigh less than 1.80
1. Furnish all labor and materials to complete the pounds per lineal foot.
6
5
fabrication of windows as shown on 6 architect's
B. Operable Hardware:
drawings and as specified herein. All windows 1. Awning, Hopper:
3 4 covered by this3specification 3shall be fabricated
3 by 4 a. Fastener: Brass orOptional
Bronze Glazing Bead
cam fastener.
Arcadia Inc. Vernon, California b. Ventilators shall be hung on heavy-duty
B. Related work specified elsewhere: stainless steel four bar hinges with brass
1. Glass, glazing and glazing materials, Section friction shoes.
2 08810. 2. Casement:
2. Perimeter caulking, Section 07915. a. Fastener: Brass or Bronze cam fastener
3. Miscellaneous structural items, Section 05100. b. Pivots: Aluminum-bronze pivot with stainless
2. HR-601 ASSURANCE
QUALITY steel pin.
A. Allowable tolerances: Size dimensions + 1/16 inch.

HR-601
c. Friction and limit device: Stainless steel with
B. Source quality control: sliding brass shoe and screw adjusted friction.
HR-589

1. Air infiltration test C. All screws that are furnished by Arcadia for hardware,
a. Products must be independently lab tested
INSIDE trim, covers, anchoring, weatherbars, water dams,
HR-595R and meet or exceed ASTM E-283.

HR-598
screens, etc. shall be non-ferrous brass or stainless
b. Maximum air infiltration 0.30 CFM/ SQFT with steel. Glazing bead retainer screws are plated steel.
differential pressure across window unit of 2. FABRICATION
1.57 / 6.24 PSFOUTSIDE A. Fabricate steel windows in accordance with approved
2. Water penetration test shop drawings.
a. Products must be independently lab tested B. Prior to fabrication, all hot rolled steel sections shall be
and meet or exceed ASTM E331. cleaned by shot blasting.
b. No water penetration for 15 minutes when
window is subjected to a rate of flow of 5 8
C. Glazing
#6 X 1" PL-FH-SMS MUTINglazing.
1. All windows shall be designed for outside
410 TEK/2 gal./hr/sq.ft with differential pressure across 2. Provide replaceable continuous glazing beads to
window unit of 6.00 PSF suit the glass as specified.
3. Field Testing D. Weatherstrip
a. Field testing criteria (when applicable) shall be 1. All ventilators shall receive continuous EPDM
in accordance with AAMA 502-08. weatherstripping that shall be applied to the interior
4. Structural test and exterior contact surfaces of the frame and
a. Meets or exceeds ASTM E330 ventilator sections.
5. Forced entry test 3. FACTORY FINISHING
a. Meets or exceeds ASTM F588 A. Pretreatment
HR-595R b. Grade 40 @ 300 pounds
HR-601

HR-601
1. Pretreatment process to thoroughly clean and
6. Quality of top coat combination shall meet or
HR-595R

HR-595R

prepare the substrates for zinc coating.


exceed the following ASTM designations: B. Paint Finish Top coat
a. ASTM D4585 Humidity Test 1. Following the zinc primer coat(s), all windows and
HR-601 b. ASTM D714 Paint Blistering Test accessories are given a spray coat of acrylic
c. ASTM B117–03 Salt Spray (Fog) Test polyurethane and oven baked at 225°F for 15
d. ASTM D1654–05 Painted Products in minutes to dry film thickness of 1.5-2.0 mils.
Corrosive Environments
3 e. ASTM G85 Cyclic Fog/Dry Test (Prohesion)
PART 3 - EXECUTION
f. ASTM D5894–96 Salt 5 Fog/UV Painted Metal 1. #6 X 1" PL-FH-SMS
INSPECTION 6
g. ASTM D4541 Pull off Strength of Coating Test 410 A. Window openings shall conform to details, dimensions
TEK/2
3.
HR-589
SUBMITTALS
and tolerances shown on the window manufacturer's
approved shop drawings.
A. Shop drawings 2. INSTALLATION
1 1. Submit for approval shop drawings showing A. Install windows in openings in strict accordance with
window and installation details, including approved shop drawings.
anchorage, fastening and recommended sealing 3. CLEANING
OUTSIDE

methods.
INSIDE

A. Window installer shall leave window surfaces clean after


2. Dimensioned elevations showing window opening installation and ready to receive glass and glazing. The
and window sizes. window installer will not be responsible for final cleaning.
HR-601

HR-601

4. PRODUCT, STORAGE AND HANDLING


#6 X 1" PL-FH-SMS
A. The General Contractor shall be responsible for the END OF SECTION
410 TEK/2
protection and storage of the windows after delivery to 6.
the site.
HR-598

HR-598

5. WARRANTY
OUTSIDE

INSIDE

A. Provide Arcadia’s standard 10 year Limited Warranty.

4 PART 2 - PRODUCT AND FABRICATION


1. MATERIALS
HR-589
7
1
WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13
Victoria Series
Description:STL212HRV Hot Rolled Window
Function:Awning, Hopper, Casement, Fixed
Detail:ALL
Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1

2 1 1 2 1

INSIDE

OUTSIDE
2 2
8 6 W-0014
7

6
5 6

3 4 3 3 3 4
Optional Glazing Bead
2

HR-601

OUTSIDE
HR-001

HR-601

HR-002
HR-002 INSIDE

HR-002

HR-601
HR-601

HR-002

HR-002

HR-601
5 6
3

HR-001
1
HR-002

HR-601

HR-601

HR-002

4
HR-001

WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13


Victoria Series
VICTORIA Series
Description:STL212HRV Hot Rolled Window
Function:Awning, Hopper, Casement, Fixed
STL212HRV
Detail:ALL
Awning, Hopper, Casement, Fixed
Product Standards and Guide Specifications Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1

1995 CSI SECTION 08510 Steel Windows


1
22004 CSI SECTION 08 51 23 Steel Windows 1 2 1

INSIDE

OUTSIDE
1.
Combined weight of frame and ventilator sections
PART 1 - GENERAL shall be a minimum of 4.20 pounds per lineal foot.
2 2 Frame section alone shall not weigh less than 1.80
1. DESCRIPTION pounds W-0014
per lineal foot.
8 6
7 A. Work included: B. Operable Hardware:
1. Furnish all labor and materials to complete the 1. Awning, Hopper:
6 fabrication of windows as shown 6on architect's
5 a. Fastener: Brass or Bronze cam fastener.
drawings and as specified herein. All windows b. Ventilators shall be hung on heavy-duty
3 4 covered by this 3 specification3 shall be fabricated
3 by stainless steel four bar hinges with brass
4
Arcadia Inc. Vernon, California Optional Glazing Bead
friction shoes.
B. Related work specified elsewhere: 2. Casement:
2 1. Glass, glazing and glazing materials, Section a. Fastener: Brass or Bronze cam fastener
08810. b. Pivots: Aluminum-bronze pivot with stainless
HR-601 2. Perimeter caulking, Section 07915. steel pin.
3. Miscellaneous structural items, Section 05100. c. Friction and limit device: Stainless steel with
2. QUALITY ASSURANCE sliding brass shoe and screw adjusted friction.
A. Allowable tolerances: Size dimensions + 1/16 inch. OUTSIDE
C. All screws that are furnished by Arcadia for hardware,
B. Source quality control: trim, covers, anchoring, weatherbars, water dams,
HR-001

1. Air infiltration test screens, etc. shall be non-ferrous brass or stainless


a. Products must be independently lab tested

HR-601

HR-002
HR-002 and meet or exceed ASTM E-283.
INSIDEscrews are plated steel.
steel. Glazing bead retainer
2. FABRICATION
b. Maximum air infiltration 0.30 CFM/ SQFT with A. Fabricate steel windows in accordance with approved
differential pressure across window unit of shop drawings.
1.57 / 6.24 PSF B. Prior to fabrication, all hot rolled steel sections shall be
2. Water penetration test cleaned by shot blasting.
a. Products must be independently lab tested C. Glazing
and meet or exceed ASTM E331. 1. All windows shall be designed for outside glazing.
b. No water penetration for 15 minutes when 8 2. Provide replaceable continuous glazing beads to
window is subjected to a rate of flow of 5 suit the glass as specified.
gal./hr/sq.ft with differential pressure across D. Weatherstrip
window unit of 6.00 PSF 1. All ventilators shall receive continuous EPDM
3. Field Testing weatherstripping that shall be applied to the interior
a. Field testing criteria (when applicable) shall be and exterior contact surfaces of the frame and
in accordance with AAMA 502-08. ventilator sections.
HR-002 4. Structural test 3. FACTORY FINISHING
a. Meets or exceeds ASTM E330 A. Pretreatment
5. Forced entry test 1. Pretreatment process to thoroughly clean and
a. Meets or exceeds ASTM F588 prepare the substrates for zinc coating.
b. Grade 40 @ 300 pounds B. Paint Finish Top coat
6. Quality of top coat combination shall meet or 1. Following the zinc primer coat(s), all windows and
exceed the following ASTM designations: accessories are given a spray coat of acrylic
HR-601 a. ASTM D4585 Humidity Test
HR-601

HR-002

HR-002

5 HR-601
polyurethane and oven baked at 225°F for615
3 b. ASTM D714 Paint Blistering Test minutes to dry film thickness of 1.5-2.0 mils.
c. ASTM B117–03 Salt Spray (Fog) Test PART 3 - EXECUTION
d. ASTM D1654–05 Painted Products in 1. INSPECTION
Corrosive Environments A. Window openings shall conform to details, dimensions
e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) and tolerances shown on the window manufacturer's
f. ASTM D5894–96 Salt Fog/UV Painted Metal approved shop drawings.
g. ASTM D4541 Pull off Strength of Coating Test 2. INSTALLATION
3. SUBMITTALS
HR-001 A. Install windows in openings in strict accordance with
1 A. Shop drawings approved shop drawings.
1. Submit for approval shop drawings showing 3. CLEANING
window and installation details, including A. Window installer shall leave window surfaces clean after
anchorage, fastening and recommended sealing installation and ready to receive glass and glazing. The
methods. window installer will not be responsible for final cleaning.
2. Dimensioned elevations showing window opening
and window sizes. END OF SECTION
4. PRODUCT, STORAGE AND HANDLING 6.
A. The General Contractor shall be responsible for the
protection and storage of the windows after delivery to
HR-002

HR-601

HR-601

HR-002

the site.
5. WARRANTY
A. Provide Arcadia’s standard 10 year Limited Warranty.

4
PART 2HR-001
- PRODUCT AND FABRICATION
1. MATERIALS
A. Heavy custom windows shall be manufactured from
7
solid hot rolled steel shapes

1
WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13
Venetian Series
Description:STL175HR Hot Rolled Window
Function:Awning, Hopper, Casement, Fixed
Detail:ALL
Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1

2 1 1 2 1

2 2
8 6
7

6
5 6

3 4 3 3 3 4

W8-630
W8-630

WT2-644
WH6-629

W7-640
8
WH5-628

WH6-629
W8-630

W8-630
WH6-629

WH6-629

W8-630

3 5 6

W7-640

1
W8-630 W8-630

4
7
W7-640
WH5-628 WH5-628

WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13


Venetian Series
VENETIAN Series
Description:STL175HR Hot Rolled Window
Function:Awning, Hopper, Casement, Fixed
STL175HR
Detail:ALL
Awning, Hopper, Casement, Fixed
Product Standards and Guide Specifications Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1

2 1 1 2 1
1995 CSI SECTION 08510 Steel Windows
2004 CSI SECTION 08 51 23 Steel Windows
PART 2 - PRODUCT AND FABRICATION
PART 1 - GENERAL 2 2
1. MATERIALS
8 6
1.7 DESCRIPTION A. Heavy custom windows shall be manufactured from
A. Work included: solid hot rolled steel shapes
6
1. Furnish5 all labor and materials to 6complete the 1. Combined weight of frame and ventilator sections
fabrication of windows as shown on architect's shall be a minimum of 4.20 pounds per lineal foot.
3 4 drawings and 3 as specified 3 herein. All windows3 4 Frame section alone shall not weigh less than 1.80
covered by this specification shall be fabricated by pounds per lineal foot.
Arcadia Inc. Vernon, California B. Operable Hardware:
B. Related work specified elsewhere:
2 1. Glass, glazing and glazing materials, Section
1. Awning, Hopper:
a. Fastener: Brass or Bronze cam fastener.
08810. b. Ventilators shall be hung on heavy-duty
W8-630
2. Perimeter caulking, Section 07915. stainless steel four bar hinges with brass
3. Miscellaneous structural items, Section 05100. W8-630 friction shoes.
2. QUALITY ASSURANCE 2. Casement:
A. Allowable tolerances: Size dimensions + 1/16 inch. a. Fastener: Brass or Bronze cam fastener
B. Source quality control: b. Pivots: Aluminum-bronze pivot with stainless
1. Air infiltration test steel pin. WT2-644
WH6-629 a. Products must be independently lab tested c. Friction and limit device: Stainless steel with
and meet or exceed ASTM E-283. sliding brass shoe and screw adjusted friction.
b. Maximum air infiltration 0.30 CFM/ SQFT with C. All screws that are furnished by Arcadia for hardware,
differential pressure across window unit of trim, covers, anchoring, weatherbars, water dams,
1.57 / 6.24 PSF screens, etc. shall be non-ferrous brass or stainless
2. Water penetration test steel. Glazing bead retainer screws are plated steel.
a. Products must be independently lab tested 2. FABRICATION
and meet or exceed ASTM E331. A. Fabricate steel windows in accordance with approved
b. No water penetration for 15W7-640 minutes when shop drawings.
window is subjected to a rate of flow of 5 8 B. Prior to fabrication, all hot rolled steel sections shall be
gal./hr/sq.ft with differential pressure across WH5-628 cleaned by shot blasting.
window unit of 6.00 PSF C. Glazing
3. Field Testing 1. All windows shall be designed for outside glazing.
a. Field testing criteria (when applicable) shall be 2. Provide replaceable continuous glazing beads to
in accordance with AAMA 502-08. suit the glass as specified.
4. Structural test D. Weatherstrip
a. Meets or exceeds ASTM E330 1. All ventilators shall receive continuous EPDM
5. Forced entry test weatherstripping that shall be applied to the interior
a. Meets or exceeds ASTM F588 and exterior contact surfaces of the frame and
WH6-629 b. Grade 40 @ 300 pounds
W8-630

W8-630
ventilator sections.
6. Quality of top coat combination shall meet or 3. FACTORY FINISHING
exceed the following ASTM designations: A. Pretreatment
a. ASTM D4585 Humidity Test
WH6-629

WH6-629

1. Pretreatment process to thoroughly clean and


b. ASTM D714 Paint Blistering Test prepare the substrates for zinc coating.
c. ASTM B117–03 Salt Spray (Fog) Test B. Paint Finish Top coat
W8-630
d. ASTM D1654–05 Painted Products in 1. Following the zinc primer coat(s), all windows and
Corrosive Environments accessories are given a spray coat of acrylic
3 e. ASTM G85 Cyclic Fog/Dry Test (Prohesion)
5 polyurethane and oven baked at 225°F for615
f. ASTM D5894–96 Salt Fog/UV Painted Metal minutes to dry film thickness of 1.5-2.0 mils.
g. ASTM D4541 Pull off Strength of Coating Test PART 3 - EXECUTION
3. W7-640
SUBMITTALS 1. INSPECTION
A. Shop drawings A. Window openings shall conform to details, dimensions
1. Submit for approval shop drawings showing
1 window and installation details, including
and tolerances shown on the window manufacturer's
approved shop drawings.
anchorage, fastening and recommendedW8-630 sealing 2. INSTALLATION W8-630
methods. A. Install windows in openings in strict accordance with
2. Dimensioned elevations showing window opening approved shop drawings.
and window sizes. 3. CLEANING
4. PRODUCT, STORAGE AND HANDLING A. Window installer shall leave window surfaces clean after
A. The General Contractor shall be responsible for the installation and ready to receive glass and glazing. The
protection and storage of the windows after delivery to window installer will not be responsible for final cleaning.
the site.
5. WARRANTY END OF SECTION
A. Provide Arcadia’s standard 10 year Limited Warranty.

4
7
W7-640
WH5-628 WH5-628
1
WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13
Milano Series
Description:STL1375M
Description: STL1375M Hot Hot Rolled
Rolled Window
Window
Function:Awning,
Function: Awning, Hopper,
Hopper, Casement,
Casement, Fixed
Fixed
Detail:ALL
Detail: ALL
Scale:1'-0"
Scale: 1'-0" == 1'-0"
1'-0" (Full)
(Full) SHEET 11 OF
SHEET OF 11
#45
#45 DRIP
DRIP
33 22 11 11 22 11

22 22
77 88 66

66 55 66
113434""
33 44 33 33 33 44
222121""

15
15
OUTSIDE

INSIDE

55 55
16""
16 16""
16

228181""

222121""

113434"" 44
16
16 16
16
WEEP
WEEP

22
55"" 113434"" 113434""
88
222121"" 222121""
118338""

16
16 16
16

118338""
113434"" 113434""
55""
88 WEEP
WEEP 222121"" 222121""
22

WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As
As of:
of: 05/21/13
05/21/13
Milano Series
Description:STL1375M Hot Rolled Window
Function:Awning, Hopper, Casement, Fixed
Detail:ALL
Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1

1 1
2" 2"
1 1
4" 4"

#S515 ALUMINUM SNAP-ON #S516 ALUMINUM SNAP-ON


GLAZING BEAD GLAZING BEAD
1/2" GLASS POCKET 1/2" GLASS POCKET
1/4" THICK GLASS SHOWN 1/4" THICK GLASS SHOWN
(ALSO FOR 1/8" & 3/16") (ALSO FOR 1/8" & 3/16")

3" 3"
4 4

1 1
2" 2"

#S501 ALUMINUM SNAP-ON #S503 ALUMINUM SNAP-ON


GLAZING BEAD GLAZING BEAD
3/4" GLASS POCKET 3/4" GLASS POCKET
1/2" THICK GLASS SHOWN 1/2" THICK GLASS SHOWN
(ALSO FOR 3/8" GLASS) (ALSO FOR 5/8")

1" 141"

3" 1"
4

#S505 ALUMINUM SNAP-ON #S506 ALUMINUM SNAP-ON


GLAZING BEAD GLAZING BEAD
1" GLASS POCKET 1 1/4" GLASS POCKET
3/4" THICK GLASS SHOWN 1" THICK GLASS SHOWN
(ALSO FOR 5/8" GLASS) (ALSO FOR 7/8" & 15/16")

3"
4
1
2"

#S508 ALUMINUM SCREW-ON


GLAZING BEAD
3/4" GLASS POCKET
1/2" THICK GLASS SHOWN
(ALSO FOR 3/8" GLASS)

SCALE: 1/2 FULL SHEET G1

WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13


Milano Series
VICTORIA
Milano Series
Function:
Series
Description:STL1375M Hot Rolled Window
Awning, Hopper, Casement, Fixed
STL212HRV
STL1375MDetail:ALL
Awning, Hopper, Casement, Fixed
Product
Product Standards
Standards andand Guide
Guide Specifications
Specifications
Awning, Hopper, Casement, Fixed
Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1
#45 DRIP
1995 CSI SECTION 08510 Steel 3 Windows 2 1 1 2 1
19952004CSI SECTION
CSI SECTION 0851008Steel
51 23Windows
Steel Windows
2004 CSI SECTION 08 51 23 Steel Windows 1. Combined weight of frame and ventilator sections
PART 1 - GENERAL PART 2 - PRODUCT AND shallFABRICATION
be a minimum of 4.20 pounds per lineal foot.
PART 1 - GENERAL 1. MATERIALS 2 Frame section 2
alone shall not weigh less than 1.80
1. DESCRIPTION 7 A. Heavy custom pounds windows
per lineal foot.shall be manufactured 8 from 6
1. DESCRIPTION A. Work included: solidOperable
hot rolledHardware:
steel shapes
A. Work1.included: B.
Furnish all labor and materials to complete 6 the
5 1. 1.Combined Awning,weight Hopper: of frame and ventilator sections
6
134"
1. Furnish all labor
fabrication of and
windowsmaterials to complete
as shown the
on architect's shalla.be Fastener:
a minimum of 4.20 poundscam perfastener.
lineal foot.
fabrication of windows as shown on architect's Brass or Bronze
drawings and as specified herein. All windows Frameb. section alone
Ventilators shall
shall not
be weigh
hung less
on than 1.80
heavy-duty
drawings andbyas thisspecified herein.
shall All windows by 4
3 fabricated 3 3 foot. 3 hinges with
covered specification be pounds per lineal
stainless steel four bar 4 brass
221"
covered by this
Arcadia Inc. specification
Vernon, California shall be fabricated by B. Operable Hardware:
Arcadia Inc. Vernon, California friction shoes.
B. Related work specified elsewhere: 1. 2.Awning, Hopper:
Casement:
B. Related 1. work
Glass,specified
glazing elsewhere:
and glazing materials, Section a. a.Fastener: Brass or Bronze camcam fastener.
1. Glass, glazing and glazing materials, Section Fastener: Brass or Bronze fastener
08810. b. b.Ventilators shall be hung pivot
Pivots: Aluminum-bronze on heavy-duty
with stainless
08810.
2. Perimeter caulking, Section 07915. stainless steel four bar hinges with brass
2. 3. Perimeter caulking,structural
Section 07915. steel pin.
Miscellaneous items, Section 05100. c.friction shoes.
Friction and limit device: Stainless steel with
2. 3. Miscellaneous
QUALITY ASSURANCE structural items, Section 05100. 2. Casement:
2. QUALITYA.ASSURANCE sliding brass shoe and screw adjusted friction.
Allowable tolerances: Size dimensions + 1/16 inch.
A. B. Allowable
Source tolerances: Size dimensions + 1/16 inch.
quality control: 15C. Alla. screws Fastener:
that areBrass or Bronze
furnished by cam
Arcadiafastener
for hardware,
b. covers,
trim, Pivots: Aluminum-bronze
anchoring, pivot withwater
weatherbars, stainless
dams,
B. Source 1. quality control: test
OUTSIDE

Air infiltration screens, steel pin.shall be non-ferrous brass or stainless


etc.
INSIDE

1. Air infiltration test


a. Products must be independently lab tested c. Friction and limit device: Stainless steel with
a. Products mustor beexceed
independently lab tested steel. Glazing bead retainer screws are plated steel.
and meet ASTM E-283. 2. FABRICATION sliding brass shoe and screw adjusted friction.
and Maximum
b. meet or exceed ASTM E-283.
air infiltration 0.30 CFM/ SQFT with C. A.All screws that are windows
furnishedinbyaccordance
Arcadia forwith hardware,
b. Maximum air infiltration Fabricate steel approved
differential pressure0.30 acrossCFM/ SQFT
window with
unit of trim,shopcovers,
drawings. anchoring, weatherbars, water dams,
differential pressure
1.57 / 6.24 PSF across window unit of
B.screens,
Prior to etc. shall be all
fabrication, non-ferrous brasssections
hot rolled steel or stainless
shall be
1.57 / penetration
2. Water 6.24 PSF test steel. Glazing
5 5
cleaned by bead retainer screws are plated steel.
shot blasting.
16" 16"
2. Water a. penetration
Products test must be independently lab tested 2. FABRICATION
C. Glazing
a. Products and meetmustor beexceed
independently
ASTM E331. lab tested A. Fabricate
1. Allsteel windowswindowsshall bein accordance
designed for with outsideapproved
glazing.
and No
b. meet or exceed
water ASTMforE331.
penetration 15 minutes when shop drawings.
1 2. Provide replaceable continuous glazing beads to
b. No water window penetration
is subjected for to
15aminutes when
rate of flow of 5 28" B. Prior to fabrication, allashot rolled steel sections shall be
suit the glass specified.
window is subjected to a rate of flow
gal./hr/sq.ft with differential pressure across of 5
D.cleaned by shot blasting.
Weatherstrip
gal./hr/sq.ft
windowwith unit differential
of 6.00 PSFpressure across C. Glazing 1. All ventilators shall receive continuous EPDM
window
3. Field unit of 6.00 PSF
Testing 1. All windows shall be that
designed for applied
outside to glazing.
weatherstripping shall be the interior
3. Fielda.Testing Field testing criteria (when applicable) shall be 2. Provide replaceable continuous
and exterior contact surfacesglazing
of thebeadsframe toand
1
22" a. Fieldintesting
accordance criteriawith
(whenAAMA applicable)
502-08. shall be suit ventilator
the glass sections.
as specified.
in accordance
4. Structural test with AAMA 502-08. D. Weatherstrip
3. FACTORY FINISHING
4. Structural
a. Meetstest or exceeds ASTM E330 A.1. Pretreatment
All ventilators shall receive continuous EPDM
134" 5. 4
a. Forced
Meets or
entryexceeds
test ASTM E330 1.weatherstripping
Pretreatment process that shalltobe applied toclean
thoroughly the interior
and
5. Forced a. entry
Meets testor exceeds ASTM F588 16 andprepare
exteriorthecontact
substrates for zincofcoating.
surfaces the frame 16 and
a. b. Meets Grade 40 @ 300
or exceeds ASTMpounds
F588 B. Paint Finishsections.
ventilator Top coat
WEEP
6.
b. Quality
Grade 40 of @top 300coat
pounds combination shall meet or
3. 1. Following the zinc primer coat(s), all windows and
FACTORY FINISHING
6. Quality exceed the following
of top ASTM designations:
coat combination shall meet or accessories are given a spray coat of acrylic
A. Pretreatment
a. the
exceed ASTM D4585
following Humidity
ASTM Test
designations: polyurethane and oven baked at clean
225°Fand for 15
1. Pretreatment process to thoroughly
b. ASTM D714
a. ASTM D4585 Humidity Test Paint Blistering Test minutes
prepare the to dry film thickness
substrates of 1.5-2.0 mils.
for zinc coating.
2 ASTM
b. c.ASTM D714B117–03 Salt Spray
Paint Blistering Test (Fog) Test PART B. 3 - EXECUTION
Paint Finish Top coat
c. d. ASTM ASTM
B117–03 D1654–05
Salt SprayPainted
(Fog) TestProducts in 1. INSPECTION
1. Following the zinc primer coat(s), all windows
5" Corrosive Environments
d. ASTM D1654–05 Painted Products 3
14" in 3"and
1dimensions
A. Window
accessories openings shall aconform
are given spray coat to details,
of acrylic 4
8 e. ASTMEnvironments
Corrosive G85 Cyclic Fog/Dry Test (Prohesion) and tolerancesand shown
ovenon the at window manufacturer's
221" 1" for
polyurethane baked 225°F 15
e. f.ASTM ASTM
G85D5894–96
Cyclic Fog/Dry Salt Fog/UV Painted Metal
Test (Prohesion) approved
minutes to shopdrydrawings.
film thickness of 1.5-2.0 22 mils.
138" f. g. ASTM ASTM
D5894–96D4541 Salt Pull Fog/UV
off Strength of Coating
Painted Metal Test PART 2. 3 - INSTALLATION
EXECUTION
3. SUBMITTALS g. ASTM D4541 Pull off Strength of Coating Test A. Install windows in openings in strict accordance with
1. INSPECTION
3. SUBMITTALS A. Shop drawings approved shop drawings.
1. Submit for approval shop drawings showing A. Window openings shall conform to details, dimensions
A. Shop drawings 3. CLEANING
and tolerances shown on the window manufacturer's
window and installation
1. Submit for approval shop drawings showing details, including A.approved
Window installer shall leave window surfaces clean after
anchorage, shop drawings.
window and fastening
installation and details,
recommended sealing
including 2. INSTALLATION installation and ready to receive glass and glazing. The
methods.fastening and recommended sealing
anchorage, window installer
2. Dimensioned elevations showing window opening A. Install windows in will not be in
openings responsible for final cleaning.
strict accordance with
methods. approved shop drawings.
and window
2. Dimensioned sizes. showing window opening
elevations END OF SECTION
4. PRODUCT, STORAGE AND HANDLING 3. CLEANING
16 16
and window sizes. 6. A. Window installer shall leave window surfaces clean after
4. A. The General
PRODUCT, STORAGE AND HANDLING Contractor shall be responsible for the
installation and ready to receive glass and glazing. The
A. The protection and storageshall
General Contractor of thebewindows
responsible after for
delivery
the to window installer will not be responsible for final cleaning.
the site.
protection and storage of the windows after delivery to
5. WARRANTY
the site.
A. Provide Arcadia’s standard 10 year Limited Warranty. END OF SECTION
5. WARRANTY
3 A. Provide Arcadia’s standard 10 year Limited Warranty.
18"
PART 2 - PRODUCT AND FABRICATION 134" 134"
51." MATERIALS
8 WEEP 221"
A. Heavy custom windows shall be manufactured from 221"
solid hot rolled steel shapes
2
1
1
WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13
Montage Hotel & Resort
Beverly Hills, CA
HKS Hill Glazier Studio
Corporate Location
2301 East Vernon Avenue
Vernon, CA 90058

Ph 323.269.7300
Fx 323-269-7390

info@arcadiainc.com

Washington Location
7830 S. 196th Street
Kent, Washington 98032

Ph 425-869-7300
Fx 253-395-4234

Arizona Location
2510 West Geneva Drive
Tempe, AZ 85282

Ph 602-437-2514
Fx 602-437-2515

New Mexico Location


4705 Mcleod Road N.E.
Albuquerque, NM 87109

Ph 505-341-4222
Fx 505-341-4225

Nevada Location
1850 East Maule Avenue
Las Vegas, NV 89119

Ph 702-798-7300
Fx 702-798-7305

Connecticut Location
60 Bonner Street
Stamford, CT 06902

Ph 203-316-8000
Fx 203-316-8200

Hawaii Location
94-410 Uke’e Street, Bldg #A
Waipahu, HI 96797

Ph 808-678-9700
Fx 808-676-8663

Nor thern California Location


2187 Alpine Way
Hayward, CA 94545

Ph 510-783-4990
Fx 510-783-1149

Sacramento Location
2324 Del Monte Street
Sacramento, CA 95691

Ph 916-375-1478 arcadiainc.com
Fx 916-375-1523

You might also like