Professional Documents
Culture Documents
A STANDARD OF
EXCELLENCE
STEEL
WINDOW
INSTITUTE
2 1 1 2 1
2 2 W-0014
8 6
7
6
5 6
HR-601
HR-601
HR-589
HR-595R INSIDE
HR-598
OUTSIDE
HR-595R
HR-601
HR-601
HR-595R
HR-595R
HR-601
3
5 #6 X 1" PL-FH-SMS 6
410 TEK/2
HR-589
1
OUTSIDE
INSIDE
HR-601
HR-601
#6 X 1" PL-FH-SMS
410 TEK/2
HR-598
HR-598
OUTSIDE
INSIDE
4
HR-589
7
1995
2
CSI SECTION
1
08510 Steel Windows 1 2
2004 CSI SECTION 08 51 23 Steel Windows 1
A.
Heavy custom windows shall be manufactured from
PART 1 - GENERAL solid hot rolled steel shapes
1. DESCRIPTION
2 2 1. Combined weight W-0014of frame and ventilator sections
8 6 be a minimum of 4.20 pounds per lineal foot.
shall
7 A. Work included: Frame section alone shall not weigh less than 1.80
1. Furnish all labor and materials to complete the pounds per lineal foot.
6
5
fabrication of windows as shown on 6 architect's
B. Operable Hardware:
drawings and as specified herein. All windows 1. Awning, Hopper:
3 4 covered by this3specification 3shall be fabricated
3 by 4 a. Fastener: Brass orOptional
Bronze Glazing Bead
cam fastener.
Arcadia Inc. Vernon, California b. Ventilators shall be hung on heavy-duty
B. Related work specified elsewhere: stainless steel four bar hinges with brass
1. Glass, glazing and glazing materials, Section friction shoes.
2 08810. 2. Casement:
2. Perimeter caulking, Section 07915. a. Fastener: Brass or Bronze cam fastener
3. Miscellaneous structural items, Section 05100. b. Pivots: Aluminum-bronze pivot with stainless
2. HR-601 ASSURANCE
QUALITY steel pin.
A. Allowable tolerances: Size dimensions + 1/16 inch.
HR-601
c. Friction and limit device: Stainless steel with
B. Source quality control: sliding brass shoe and screw adjusted friction.
HR-589
1. Air infiltration test C. All screws that are furnished by Arcadia for hardware,
a. Products must be independently lab tested
INSIDE trim, covers, anchoring, weatherbars, water dams,
HR-595R and meet or exceed ASTM E-283.
HR-598
screens, etc. shall be non-ferrous brass or stainless
b. Maximum air infiltration 0.30 CFM/ SQFT with steel. Glazing bead retainer screws are plated steel.
differential pressure across window unit of 2. FABRICATION
1.57 / 6.24 PSFOUTSIDE A. Fabricate steel windows in accordance with approved
2. Water penetration test shop drawings.
a. Products must be independently lab tested B. Prior to fabrication, all hot rolled steel sections shall be
and meet or exceed ASTM E331. cleaned by shot blasting.
b. No water penetration for 15 minutes when
window is subjected to a rate of flow of 5 8
C. Glazing
#6 X 1" PL-FH-SMS MUTINglazing.
1. All windows shall be designed for outside
410 TEK/2 gal./hr/sq.ft with differential pressure across 2. Provide replaceable continuous glazing beads to
window unit of 6.00 PSF suit the glass as specified.
3. Field Testing D. Weatherstrip
a. Field testing criteria (when applicable) shall be 1. All ventilators shall receive continuous EPDM
in accordance with AAMA 502-08. weatherstripping that shall be applied to the interior
4. Structural test and exterior contact surfaces of the frame and
a. Meets or exceeds ASTM E330 ventilator sections.
5. Forced entry test 3. FACTORY FINISHING
a. Meets or exceeds ASTM F588 A. Pretreatment
HR-595R b. Grade 40 @ 300 pounds
HR-601
HR-601
1. Pretreatment process to thoroughly clean and
6. Quality of top coat combination shall meet or
HR-595R
HR-595R
methods.
INSIDE
HR-601
HR-598
5. WARRANTY
OUTSIDE
INSIDE
2 1 1 2 1
INSIDE
OUTSIDE
2 2
8 6 W-0014
7
6
5 6
3 4 3 3 3 4
Optional Glazing Bead
2
HR-601
OUTSIDE
HR-001
HR-601
HR-002
HR-002 INSIDE
HR-002
HR-601
HR-601
HR-002
HR-002
HR-601
5 6
3
HR-001
1
HR-002
HR-601
HR-601
HR-002
4
HR-001
INSIDE
OUTSIDE
1.
Combined weight of frame and ventilator sections
PART 1 - GENERAL shall be a minimum of 4.20 pounds per lineal foot.
2 2 Frame section alone shall not weigh less than 1.80
1. DESCRIPTION pounds W-0014
per lineal foot.
8 6
7 A. Work included: B. Operable Hardware:
1. Furnish all labor and materials to complete the 1. Awning, Hopper:
6 fabrication of windows as shown 6on architect's
5 a. Fastener: Brass or Bronze cam fastener.
drawings and as specified herein. All windows b. Ventilators shall be hung on heavy-duty
3 4 covered by this 3 specification3 shall be fabricated
3 by stainless steel four bar hinges with brass
4
Arcadia Inc. Vernon, California Optional Glazing Bead
friction shoes.
B. Related work specified elsewhere: 2. Casement:
2 1. Glass, glazing and glazing materials, Section a. Fastener: Brass or Bronze cam fastener
08810. b. Pivots: Aluminum-bronze pivot with stainless
HR-601 2. Perimeter caulking, Section 07915. steel pin.
3. Miscellaneous structural items, Section 05100. c. Friction and limit device: Stainless steel with
2. QUALITY ASSURANCE sliding brass shoe and screw adjusted friction.
A. Allowable tolerances: Size dimensions + 1/16 inch. OUTSIDE
C. All screws that are furnished by Arcadia for hardware,
B. Source quality control: trim, covers, anchoring, weatherbars, water dams,
HR-001
HR-601
HR-002
HR-002 and meet or exceed ASTM E-283.
INSIDEscrews are plated steel.
steel. Glazing bead retainer
2. FABRICATION
b. Maximum air infiltration 0.30 CFM/ SQFT with A. Fabricate steel windows in accordance with approved
differential pressure across window unit of shop drawings.
1.57 / 6.24 PSF B. Prior to fabrication, all hot rolled steel sections shall be
2. Water penetration test cleaned by shot blasting.
a. Products must be independently lab tested C. Glazing
and meet or exceed ASTM E331. 1. All windows shall be designed for outside glazing.
b. No water penetration for 15 minutes when 8 2. Provide replaceable continuous glazing beads to
window is subjected to a rate of flow of 5 suit the glass as specified.
gal./hr/sq.ft with differential pressure across D. Weatherstrip
window unit of 6.00 PSF 1. All ventilators shall receive continuous EPDM
3. Field Testing weatherstripping that shall be applied to the interior
a. Field testing criteria (when applicable) shall be and exterior contact surfaces of the frame and
in accordance with AAMA 502-08. ventilator sections.
HR-002 4. Structural test 3. FACTORY FINISHING
a. Meets or exceeds ASTM E330 A. Pretreatment
5. Forced entry test 1. Pretreatment process to thoroughly clean and
a. Meets or exceeds ASTM F588 prepare the substrates for zinc coating.
b. Grade 40 @ 300 pounds B. Paint Finish Top coat
6. Quality of top coat combination shall meet or 1. Following the zinc primer coat(s), all windows and
exceed the following ASTM designations: accessories are given a spray coat of acrylic
HR-601 a. ASTM D4585 Humidity Test
HR-601
HR-002
HR-002
5 HR-601
polyurethane and oven baked at 225°F for615
3 b. ASTM D714 Paint Blistering Test minutes to dry film thickness of 1.5-2.0 mils.
c. ASTM B117–03 Salt Spray (Fog) Test PART 3 - EXECUTION
d. ASTM D1654–05 Painted Products in 1. INSPECTION
Corrosive Environments A. Window openings shall conform to details, dimensions
e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) and tolerances shown on the window manufacturer's
f. ASTM D5894–96 Salt Fog/UV Painted Metal approved shop drawings.
g. ASTM D4541 Pull off Strength of Coating Test 2. INSTALLATION
3. SUBMITTALS
HR-001 A. Install windows in openings in strict accordance with
1 A. Shop drawings approved shop drawings.
1. Submit for approval shop drawings showing 3. CLEANING
window and installation details, including A. Window installer shall leave window surfaces clean after
anchorage, fastening and recommended sealing installation and ready to receive glass and glazing. The
methods. window installer will not be responsible for final cleaning.
2. Dimensioned elevations showing window opening
and window sizes. END OF SECTION
4. PRODUCT, STORAGE AND HANDLING 6.
A. The General Contractor shall be responsible for the
protection and storage of the windows after delivery to
HR-002
HR-601
HR-601
HR-002
the site.
5. WARRANTY
A. Provide Arcadia’s standard 10 year Limited Warranty.
4
PART 2HR-001
- PRODUCT AND FABRICATION
1. MATERIALS
A. Heavy custom windows shall be manufactured from
7
solid hot rolled steel shapes
1
WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13
Venetian Series
Description:STL175HR Hot Rolled Window
Function:Awning, Hopper, Casement, Fixed
Detail:ALL
Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1
2 1 1 2 1
2 2
8 6
7
6
5 6
3 4 3 3 3 4
W8-630
W8-630
WT2-644
WH6-629
W7-640
8
WH5-628
WH6-629
W8-630
W8-630
WH6-629
WH6-629
W8-630
3 5 6
W7-640
1
W8-630 W8-630
4
7
W7-640
WH5-628 WH5-628
2 1 1 2 1
1995 CSI SECTION 08510 Steel Windows
2004 CSI SECTION 08 51 23 Steel Windows
PART 2 - PRODUCT AND FABRICATION
PART 1 - GENERAL 2 2
1. MATERIALS
8 6
1.7 DESCRIPTION A. Heavy custom windows shall be manufactured from
A. Work included: solid hot rolled steel shapes
6
1. Furnish5 all labor and materials to 6complete the 1. Combined weight of frame and ventilator sections
fabrication of windows as shown on architect's shall be a minimum of 4.20 pounds per lineal foot.
3 4 drawings and 3 as specified 3 herein. All windows3 4 Frame section alone shall not weigh less than 1.80
covered by this specification shall be fabricated by pounds per lineal foot.
Arcadia Inc. Vernon, California B. Operable Hardware:
B. Related work specified elsewhere:
2 1. Glass, glazing and glazing materials, Section
1. Awning, Hopper:
a. Fastener: Brass or Bronze cam fastener.
08810. b. Ventilators shall be hung on heavy-duty
W8-630
2. Perimeter caulking, Section 07915. stainless steel four bar hinges with brass
3. Miscellaneous structural items, Section 05100. W8-630 friction shoes.
2. QUALITY ASSURANCE 2. Casement:
A. Allowable tolerances: Size dimensions + 1/16 inch. a. Fastener: Brass or Bronze cam fastener
B. Source quality control: b. Pivots: Aluminum-bronze pivot with stainless
1. Air infiltration test steel pin. WT2-644
WH6-629 a. Products must be independently lab tested c. Friction and limit device: Stainless steel with
and meet or exceed ASTM E-283. sliding brass shoe and screw adjusted friction.
b. Maximum air infiltration 0.30 CFM/ SQFT with C. All screws that are furnished by Arcadia for hardware,
differential pressure across window unit of trim, covers, anchoring, weatherbars, water dams,
1.57 / 6.24 PSF screens, etc. shall be non-ferrous brass or stainless
2. Water penetration test steel. Glazing bead retainer screws are plated steel.
a. Products must be independently lab tested 2. FABRICATION
and meet or exceed ASTM E331. A. Fabricate steel windows in accordance with approved
b. No water penetration for 15W7-640 minutes when shop drawings.
window is subjected to a rate of flow of 5 8 B. Prior to fabrication, all hot rolled steel sections shall be
gal./hr/sq.ft with differential pressure across WH5-628 cleaned by shot blasting.
window unit of 6.00 PSF C. Glazing
3. Field Testing 1. All windows shall be designed for outside glazing.
a. Field testing criteria (when applicable) shall be 2. Provide replaceable continuous glazing beads to
in accordance with AAMA 502-08. suit the glass as specified.
4. Structural test D. Weatherstrip
a. Meets or exceeds ASTM E330 1. All ventilators shall receive continuous EPDM
5. Forced entry test weatherstripping that shall be applied to the interior
a. Meets or exceeds ASTM F588 and exterior contact surfaces of the frame and
WH6-629 b. Grade 40 @ 300 pounds
W8-630
W8-630
ventilator sections.
6. Quality of top coat combination shall meet or 3. FACTORY FINISHING
exceed the following ASTM designations: A. Pretreatment
a. ASTM D4585 Humidity Test
WH6-629
WH6-629
4
7
W7-640
WH5-628 WH5-628
1
WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As of: 05/21/13
Milano Series
Description:STL1375M
Description: STL1375M Hot Hot Rolled
Rolled Window
Window
Function:Awning,
Function: Awning, Hopper,
Hopper, Casement,
Casement, Fixed
Fixed
Detail:ALL
Detail: ALL
Scale:1'-0"
Scale: 1'-0" == 1'-0"
1'-0" (Full)
(Full) SHEET 11 OF
SHEET OF 11
#45
#45 DRIP
DRIP
33 22 11 11 22 11
22 22
77 88 66
66 55 66
113434""
33 44 33 33 33 44
222121""
15
15
OUTSIDE
INSIDE
55 55
16""
16 16""
16
228181""
222121""
113434"" 44
16
16 16
16
WEEP
WEEP
22
55"" 113434"" 113434""
88
222121"" 222121""
118338""
16
16 16
16
118338""
113434"" 113434""
55""
88 WEEP
WEEP 222121"" 222121""
22
WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf As
As of:
of: 05/21/13
05/21/13
Milano Series
Description:STL1375M Hot Rolled Window
Function:Awning, Hopper, Casement, Fixed
Detail:ALL
Scale: 1'-0" = 1'-0" (Full) SHEET 1 OF 1
1 1
2" 2"
1 1
4" 4"
3" 3"
4 4
1 1
2" 2"
1" 141"
3" 1"
4
3"
4
1
2"
Ph 323.269.7300
Fx 323-269-7390
info@arcadiainc.com
Washington Location
7830 S. 196th Street
Kent, Washington 98032
Ph 425-869-7300
Fx 253-395-4234
Arizona Location
2510 West Geneva Drive
Tempe, AZ 85282
Ph 602-437-2514
Fx 602-437-2515
Ph 505-341-4222
Fx 505-341-4225
Nevada Location
1850 East Maule Avenue
Las Vegas, NV 89119
Ph 702-798-7300
Fx 702-798-7305
Connecticut Location
60 Bonner Street
Stamford, CT 06902
Ph 203-316-8000
Fx 203-316-8200
Hawaii Location
94-410 Uke’e Street, Bldg #A
Waipahu, HI 96797
Ph 808-678-9700
Fx 808-676-8663
Ph 510-783-4990
Fx 510-783-1149
Sacramento Location
2324 Del Monte Street
Sacramento, CA 95691
Ph 916-375-1478 arcadiainc.com
Fx 916-375-1523