ASME B31.

4-2019

Table 434.6-1 Minimum Cover for Buried Pipelines


For Normal For Rock Excavation Requiring
Excavation, Blasting or Removal by
Location in. (m) Equivalent Means, in. (m)
Cultivated, agricultural areas where plowing 48 (1.2) [Note (1)] N/A
or subsurface ripping is common
Industrial, commercial, and residential areas 48 (1.2) 30 (0.75)
River and stream crossings 48 (1.2) 18 (0.45)
Drainage ditches at roadways and railroads 48 (1.2) 30 (0.75)
All other areas 36 (0.9) 18 (0.45)

NOTE: (1) Pipelines may require deeper burial to avoid damage from deep plowing; the designer is cautioned to account for this possibility.

diameter in length with acceptable joint designs as illu- (2) If base metals of different tensile strengths are to

strated in Figure 434.8.6-2. be joined, the nominal tensile strength of the weld metal
shall equal or exceed the tensile strength of the weaker of
434.8 Welding the two.
434.8.1 General (3) When filler metals of different strengths are used

in a single weld, the proportions shall be such that the


(a) Scope. Welding herein applies to the arc and gas completed weldment equals the specified minimum
welding of pipe in both wrought and cast steel materials tensile strength of the base metal.
as applied in pipelines and connections to apparatus or (4) For alloy steels, the nominal chemical analysis of
equipment. This includes butt joints in the installation of the weld metal shall be the same as the nominal chemical
pipe, valves, flanges, fittings, and other equipment, and analysis ofthe base metal. Ifbase metals ofdifferent chem-
fillet welded j oints in pipe branches, slip-on flanges, ical analysis are being joined, the weld metal shall be the
etc. It does not apply to the welding of longitudinal or same as either base metal, or of intermediate composition.
helical seam j oints in the manufacture of pipe, fittings, Where austenitic steels are joined to ferritic steels, the
and valves, or to pressure vessels or assemblies manufac- weld metal shall have an austenitic structure.
tured in accordance with the ASME BPVC, Section VIII,
Division 1 or Division 2. 434.8.3 Welder and Welding Procedure Qualifica-
(b) Welding Term s. Definitions pertaining to welding as tions
used in this Code conform to the standard definitions
(a) Welder and welding procedure qualifications for
e s tab li s he d b y the Ame rican We ldi ng S o cie ty and
cross-country pipelines shall be performed in accordance
contained in AWS A3 .0 ; ASME BPVC, Section IX; and
with API 1104. Welder and welding procedure qualifica-
API 1104.
tions for alloy steel and for shop-fabricated piping assem-
(c) Sa fe Pra ctices in Cu ttin g a n d Weldin g . Prior to
blies, and welding at stations and terminals shall be
cutting and welding in areas in which the p os sib le
p e rfo rme d i n acco rdan ce wi th AP I 1 1 0 4 o r AS M E
leakage or presence of vapor or flammable liquid consti-
BPVC, Section IX.
tutes a hazard of fire or explosion, a thorough check shall
(b) Prior to any welding covered by this Code, a welding
be made to determine the presence of a combustible gas
procedure specification shall be established and qualified
mixture or flammable liquid. Cutting and welding shall
by testing to demonstrate that welds having suitable
begin only when safe conditions are indicated.
mechanical properties and soundness can be produced.
ð 19 Þ 434.8.2 Welding Processes and Filler Metal Welding procedure specifications shall be qualified as
required by API 1104 or ASME BPVC, Section IX, which-
(a ) Welding shall be performed by a process or a ever is appropriate for the locations, materials, and type of
co mbination of pro cesses that produces welds that welding to be performed, except as modified by the
meet the procedure qualification requirements of this following:
Code. Welds may be produced by positioning welding, (1 ) Stan dard Welding Procedures. Standard Welding
roll welding, or a combination of position and roll welding. Procedure Specifications (SWPSs) published by the Amer-
(b ) Unles s o the rwis e s p e cifie d b y the o p erating ican Welding Society and listed in Mandatory Appendix E
company, welding electrodes and consumables shall of ASME BPVC, Section IX are permitted for code construc-
comply with the following: tion within the limitations established by ASME BPVC,
(1 ) Filler metal and consumables shall be selected so Section IX, Article V. Either the employer shall demon-
that the strength of the completed weldment will equal or strate his ability to follow SWPSs as required by ASME
exceed the specified minimum tensile strength of the B PVC , S ectio n I X o r he s hall qualify o ne welder o r
materials being joined. welding operator following each SWPS.

45
ASME B31.4-2019

(2) Procedure Qualification by Oth ers. In order to performance qualifications that were made on pipe or
avoid duplication of effort, and subject to the approval tube test coupons. The new employer shall have the
of the owner, WPSs qualified by a technically competent WPS that was followed during qualification or an equiva-
group or agency may be used, provided the following are lent WPS that is within the limits of the essential variables.
met: An employer accepting such qualification tests shall
(-a) The WPSs meet the requirements of ASME obtain a copy of the performance qualification test
BPVC, Section IX or API 1104 and any additional qualifica- record from the previous employer. The record shall
tion requirements of this Code. show the name of the employer by whom the welders
(-b) The employer has qualified at least one welder or welding operator was qualified and the date of that
or welding operator following each WPS. qualification. A record showing use of the process or
(-c) The employer’s business name shall be shown processes from the date of the welder’s qualification
on each WPS and on each qualification record. In addition, shall be available. The new employer’s business name
qualification records shall be signed and dated by the shall be shown on the qualification record, and it shall
employer, thereby accepting responsibility for the quali- be signed and dated by the employer, thereby accepting
fications performed by others. responsibility for the qualifications performed by others.
The welding procedure specification shall be adhered to Welder requalification tests are required if there is
during welding performed under this Code. some specific reason to question a welder’s ability or if
(c) The welding procedure specifications shall at a th e we l d e r i s n o t e n ga ge d i n a gi ve n p r o c e s s o f
minimum include the info rmatio n required b y API welding for a period of 6 months or more.
1 1 0 4 o r AS M E B P VC , S e cti o n I X. Whe n m ate ri al s , (f) The operating company shall be responsible for

welding consumables, mechanical restraint, service qualifications ofprocedures and welders. The preparation
co nditio ns , and/o r weather co nditio ns make mo re of welding procedure specifications and/or performance
details necessary to produce a sound weld, such as of welding qualification tests may be delegated to others;
preheat, interpass temperature, and postweld heat treat- however, each company that performs welding activities
ment, such details shall be provided. When joining mate- is responsible for the welding activities performed by its
rials with notch-toughness requirements, particularly for employees and contractors.
low-temperature service, consideration shall be given to (g ) Qu a lifica tio n Reco rds. The welding procedure

weld metal and heat-affected zone toughness require- followed during the qualifying tests shall be recorded
me nts in the we lding p ro ce dure s p ecificatio n. S ee in detail. Records of the tests that establish the qualifica-
ASME B31T for more information about weld procedure tion of a welding procedure specification shall be retained
qualification requirements for piping that may be subject as long as that procedure is in use. A record of the welders
to brittle failure due to low-temperature service condi- qualified, showing the date and results ofthe tests, shall be
tions. When applicable, the test method, temperature, retained during the construction involved and for 6
specimen, and acceptance criteria shall be specified in months thereafter. These records shall be available to
the welding procedure specification. the owner or the owner’s agent and the inspector at
(d) API 1 1 0 4 and ASM E B PVC, Section I X contain the location where the welding is being done.
sections entitled “Essential Variables” applicable to
welding procedure specifications, procedure qualification
434.8.4 Welding Standards. All the welding done
under this Code shall be performed under a specification
records, and welder qualifications. The classification of
that embodies the minimum requirements of this Code
base materials and weld filler materials into groups
and shall encompass the requirements of API 1 1 0 4
does not imply that other materials within a particular
except as provided in paras. 434.8.3(a) and 434.8.3(b).
group may be indiscriminately substituted for the base
material or weld filler material used for the qualification 434.8.5 Required Inspection and Acceptance Criteria
test. Welding procedure qualification tests shall be
conducted with the highest strength base metal to be (a) Required In spection

(1 ) The quality of welding shall be checked by visual


welded in the essential variable groups identified in
the procedure specification. inspection and supplemental nondestructive methods or
(e) Prior to any welding covered by this Code, each
by removing completed welds as selected and designated
welder or welding operator shall be qualified as required by the inspector for destructive testing.
(2) All welds shall be visually inspected.
by API 1 1 04 or ASME BPVC, Section IX, whichever is
(3) When the pipeline is to be operated at a hoop
appropriate for the locations, materials, and type of
welding to be performed. stress of more than 2 0 % of the specified minimum
In order to avoid duplication of effort and subject to the yield strength of the pipe, the welds shall be inspected.
approval ofthe owner, an employer may accept the perfor- A minimum of 10% of the girth welds and 10% of the
mance qualification of a welder or welding operator made other welds completed each day shall be randomly
by a previous employer. This acceptance is limited to selected by the operating company and nondestructively
inspected. The inspection of girth welds shall be by

46