You are on page 1of 6
$7214181865 Page 1 DAVIS LANGDON FARROW LAING e& NOTES ON MEASUREMENT OF CONCRETE & FORMWORK WIN-03-02-14/00 8 Collections Keep soperste: beams of diferent eros sections beams at edges of slabs (gh of formwork willbe diferent ‘9 Concrete beams attached to slabs 8. Boams (in framed structures) Measure: Concrete in sibs, including beams and inveriee hams a os (a) 4 Peer Formwork to sides and softs of beams () >| # ws >. Wal beams (i load bearing stuctures) Measure: Concrete in slabs. incusing beams and inverted beans {a) Formwork to sides of wall beams (b) Vere the beam extends over an opening then Mesure: Formwork to softs of wal beams over openings Measure: itnatning shown by Engineer then measure «9 ¢ layer i between top of wall and underside Dear «. Inverted beams Moesure. Conctete in slabs, including beams end wvertas beams (a) 7 pe \ im \ Formwork to sides of verted boars (0) & () Fo... \ ’ 10. Lattached to slabs 2 Isolated beams (in framed stuctres) Measure. Concrete in isolated beams (} tN 71+ bioec | Formwork to sides and soflts of isolates beams (b) [ZN FAX vo WeSse\ se conan = oF raxno: HOQ8SA are: ae eee rrow: Nos. : pa counter, — PHONE nor a Pax NO ED conor U4 42:05 W:DAVIS LANGDON DAVIS LANGDON FARROW LAING NOTES ON MEASUREMENT OF CONCRETE & FORMWORK b. Isolated watl beams (in load bearing structures) Measure Where the Measure Measure: Fax:+3721 4181865 WIN-03.02-14/00 Concrete in isolated wall beams (3) Formwork to sides of isolated wall baams (b) beam extends over an opening then, Formwork to Soffits of isolated well beams over openings If nothing shown by Engineer then measure dip. laye batween top of wall and undersi¢e beam, 100mm high above sla Concrete In slabs, including beams. inverlod beams stc(e) Formwork to edges, risers, ete exceeding or exceeding 300mm wide (b) & (c) Concrete in slabs including beams, ete (a} & (b) Formwork to edges, risers, ele not exceeding wide (c) Formwork to sides and soffits of beams (4) Concrete in slabs, including beams, inverted beans ote (a) & (b) Formwork to edges, risers, otc not exceeding 300m wide (c) Formwork to sides and soffils of beams (2) 11 Shallow inverted Beams Shaitow inverted beams ara those which do not exceed 2 ne Measure Measure: Tro au. UL 42:U8 — LD:DAVIS LANGDON Fax:+3721 4181865 PAGE 3 DAVIS LANGDON FARROW LAING NOTES ON MEASUREMENT OF CONCRETE & FORMWORK WIN-03-02-14/00, >200 YOk COMM THE THROUGH An? |B Boge qHeeerace (b) Ss Nor ae AN edqe But by = INVERTED Ben su Measure PND by = BEAM Sine Formwork to edges not exceeding 300mm - m (a) Formwork to edges exceeding 300mm - m* (b) Concrete in slabs, beams, etc. (a) Conerete in stabs, beams, el. (b) Formwork to edge not exceeding 300mm wige (c) Formwork to edge not exceeding 300mm wise (d) Formwork to sides and soffts beams (e) Boxing Qut / Blocking In General Slocking-in should be measured whare a standard price of timber can be used - 09. 12 ¥ 32, 20 x 50, 50x 115 50 x 230 ete Therefore, blocking-in should be cheaper than boxing ou TTT aT Tae Me -voy 49.4U. UL 4ezU6 — LDIDAVIS LANGDON Faxs+o7e1 4181865 Pace 4 DAVIS LANGDON FARROW LAING & NOTES ON MEASUREMENT OF CONCRETE & FORMWORK WIN-03-02-14/00 +. General When measuring, be as descriptive as possible of tha different components to enable the person responsible for pre-editing/editing to combine like components into one Item or leave them as different iterns If this would give @ ‘more accurate reflection of the work involed. 2 Alwaye Mesure slabs over beams / columns (e) Measure columns from top of slab below to underside of slab above (b) Measurs beams between columns below slabs (c) a) ) © ee i (b) ©) 's wider then column then measure columns lo underside of beams. a) «e) () Fice Ne.usu 19.10."0L 12:07 ID:DAVIS LANGDON Fax:+37214181865 PRE 5. DAVIS LANGDON FARROW LAING NOTES ON MEASUREMENT OF CONCRETE & FORMWORK WIN-03-02-14/00 Extra over formwork to sides and soffits of beams for blocking in to form horizontal rebate at bottom of beam size 75 75mm Formwork to sides and soffts of beams ig taken through (a) Extra over formwork to sides and soffits of beams for boxing out to form horizontal projecting nib at top of beam size 150 projecting x 75mm nigh Formwork to sides and soffls of beams is. taker through (2) mew doa. UL 42200 LUEDAVIS LANGDON Fax:+37014181665, Pese 6 DAVIS LANGDON FARROW LAING oe NOTES ON MEASUREMENT OF CONCRETE & FORMWORK WIN-03-02-14/00 Walls flush with external face of building a) Formwork to walls flush with external face of buildingiperimeter b) Formwork to walls ) Slabs When measuring balustrade walls to stairs Measure. Concrete in balustrade walls Formwork to: Outer side of raking balustrade walls flush with the external face of bullding/perimeter (a) Raking soffts (b) nner sides of raking balustrade walls (c) Inner sides of raking balusirade walls over stairs (4) 7 Openings tor pipes atc Ifthe opening has been formed for pipes, etc and has to be closed later after installation of pipes to comply wilh fire regulations, measure the closing as: Concrete of Pyrocrete or other fire resistant material in closing up pipe shafts - m? Formwork to saffits of siabs in closing up pipe shafts, including all necessary cutting (In no) - m? (only it in continad areas Le. enclosed by walls) we — Pant

You might also like