You are on page 1of 6

Area

Q 1600 m3/hr
Q 0.444444 m3/sec
V 1 m/s

V=Q/A
A 0.444444 m2
0.666667 m

A=0.785d²
d² 0.566171 m
d 0.752444 m

Where:

W =  width, ft
V  =  volume, ft3
 d  =  depth, ft

In the case of our example, the width is calculated as follows:

The length can be calculated using the following formula:

L=2W

Where:

L  =  length, ft
W =  width, ft
So the length of our basin would be:

L = 2 (9.5 ft)

L = 19 ft
With RO Without RO
S.no Description
Duty Duty
1 Intake Pump 2 2
2 Ozone system 1 1
3 Flash Mixer 1 1
4 Flocculator Stage 1 2 2
5 Flocculator Stage 2 2 2
6 Dissolved Air Floatation (DAF) 1 1
7 DAF Recirculation pump 1 1
8 Granular Activated Carbon Filter (GAC) 4 4
9 GAC Back Wash Pump 2 2
10 GAC Back Air Blower 2 2
11 Filter Water Pump 1 2
12 Feed Pumo for HP Pump 2 -
13 Cartridge Filter 2 -
14 HP Pump 2 -
15 RO Train 2 -
16 Product Water Pump 1 1
17 Sludge Transfer Pump 1 1
18 Thickener 2 2
19 Beltpress Feed pump 1 1
20 Beltpress 1 1
21 Outfall Sump Pump 1 1
22 Air Compressor 1 1
23 Gas Chlorination system -Treated water 1 1
24 Gas Chlorination system -Outfall 1 1
Operation Mode Operating time

VSD Continues
- Continues
- Continues
VSD Continues
VSD Continues
- Continues
- Continues
- Continues
VSD Intermittent
VSD Intermittent
VSD Continues
VSD Continues
- Continues
VSD Continues
- Continues
VSD Continues
- Intermittent
- Continues
- Intermittent
- Intermittent
- Continues
- Intermittent
- Intermittent
- Continues
With RO Without RO
S.no Description
Duty Duty
1 Intake Pump 1 1
2 Ozone system 1 1
3 Flash Mixer 1 1
4 Flocculator Stage 1 2 2
5 Flocculator Stage 2 2 2
6 Dissolved Air Floatation (DAF) 1 1
7 DAF Recirculation pump 1 1
8 Granular Activated Carbon Filter (GAC) 1 1
9 GAC Back Wash Pump 2 2
10 GAC Back Air Blower 2 2
11 Filter Water Pump 1 2
12 Feed Pumo for HP Pump 1 -
13 Cartridge Filter 1 -
14 HP Pump 1 -
15 RO Train 1 -
16 Product Water Pump 1 1
17 Sludge Transfer Pump 1 1
18 Thickener 1 1
19 Beltpress Feed pump 1 1
20 Beltpress 1 1
21 Outfall Sump Pump 1 1
22 Air Compressor 1 1
23 Gas Chlorination system -Treated water 1 1
24 Gas Chlorination system -Outfall 1 1
Operation Mode Operating time

VSD Continues
- Continues
- Continues
VSD Continues
VSD Continues
- Continues
- Continues
- Continues
VSD Intermittent
VSD Intermittent
VSD Continues
VSD Continues
- Continues
VSD Continues
- Continues
VSD Continues
- Intermittent
- Continues
- Intermittent
- Intermittent
- Continues
- Intermittent
- Intermittent
- Continues