You are on page 1of 1

M-2

WATER LEVEL34.08 0N 29.10.2019 HFL


River Bed
DATUM =30.00
HFL =37.13
37.02

37.01
33.13
32.41

32.26

32.25

32.50

32.65

32.84

33.07

33.35

33.52

33.72

33.84

33.91

34.08

34.36

34.66

35.00

35.50

36.15

36.20

36.28

36.44

36.46

36.52

36.54

36.58

36.66

36.60

36.61

36.70

36.73

36.76

36.70

36.70
RL
(-10.00)

200.00

210.00

220.00

230.00

240.00

250.00

260.00

270.00

280.00

290.00

300.00

310.00

320.00

330.00
100.00

110.00

120.00

130.00

140.00

150.00

160.00

170.00

180.00

190.00
40.00

80.00

90.00
60.00
20.00

30.00

70.00
50.00
10.00
0.00
5.00

Dist.(M)
C/S SHOWING OF RIVER AIE AT BB'
GOVT OF ASSAM
WATER RESOURCES DEPARTMENT.
Name of Scheme:-Training of river Aie-Manas by
prosiltation measures to protect R/B villages Kushbari,
Scale H/V=3/1 Barjana and Madhufal area from its erosion.
Certified that the level and distance shown in the drawing are
RIVER CROSS SECTION
correct to the best of my knowledge. Surveyed by:- Submitted by:-
S. Islam (JE)
L. Kalita (JE) Executive Engineer,
Drawn by:- Dhubri W.R Division,
JE(A) AEE(A) EE(D) A. Roy (JE) Dhubri.

You might also like